M4 Junction 3-12 Motorway Upgrade

OVERVIEW

The M4 Junction 3-12 motorway upgrade project, which started construction in July 2018, is designed to increase capacity, and reduce congestion between Junction 3 (Hayes) and Junction 12 (Theale). In the sections where there is no pre-existing hard shoulder for conversion into an additional running lane, a total of 11 overbridges needed to be demolished and replaced with longer decks to enable continuity of the widened carriageway.


The £848m project is due for completion in Spring 2022, by which time it is expected that approximately 680,000t of material will have been excavated, 1.8M.m² of new surface laid, 130km of cabling installed and 63km of concrete barrier positioned.


Cordek were approached by the Principal Contractor Balfour Beatty VINCI joint venture to provide a lightweight structural fill solution to be used for the embankment construction adjoining the Datchet Road Overbridge, between Junction 5 and Junction 6.

Products featured in this case study

View all products (31)
Filcor EPS

Filcor EPS

More inspiration from Cordek Ltd

View inspiration
Dream

Dream

Spencer Dock Bridge

Spencer Dock Bridge

London 2012 Olympic Diving Platforms

London 2012 Olympic Diving Platforms

Moorgate Shaft

Moorgate Shaft

More inspiration from Expanded polystyrene (EPS) boards

View inspiration
baseTherm® 200 Floor Insulation Project | Kill Co Kildare

baseTherm® 200 Floor Insulation Project | Kill Co Kildare

Case Study - Proteus Pro-Felt® - City Tower

Case Study - Proteus Pro-Felt® - City Tower

EnerPHit Dublin Residence Features Partel’s Structural Insulation

EnerPHit Dublin Residence Features Partel’s Structural Insulation