OVERVIEW

PROJECT BACKGROUND: A mobile trailer was adapted into a Covid PCR Testing Laboratory.


The staff test 6-7 thousand saliva pots every three weeks.


REQUIREMENT: Temporary modular steps to replace the existing ones to the trailer. 


The current steps were too steep and narrow, with no handrails and platform.


END RESULT: We installed fully compliant temporary steps, which included infill handrails and a platform for turning space.

We matched the hire period for the mobile laboratory. Once no longer needed, the steps will be removed by our installation team. Removal is a service included in our rental package. 

The steps are fully compliant with documents M & K of the building regulations.


FEATURES INCLUDED:

  •  Infill Handrail - this product prevents users from climbing or falling through gaps.
  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.
  • Trombone Ends - these are added to the ends to prevent clothes catching.
  • Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.
  • Continuous Handrail - this handrail system ensures users always have support to hold onto.


Products featured in this case study

View all products (7)
Fully Compliant Step System

Fully Compliant Step System

Modular Walkway Platform

Modular Walkway Platform

More case studies from Rapid Ramp Limited

View all case studies (20)
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Euston Station, London

Euston Station, London

More case studies from Working platform and walkway systems

View all case studies (7)
Retail Store - Staines Upon Thames

Retail Store - Staines Upon Thames

Retail Store, Sheffield.

Retail Store, Sheffield.

New Facebook Data Centre. Ireland

New Facebook Data Centre. Ireland

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe

More case studies from Heavy steel stair systems

View all case studies (2)
Lincoln Cathedral, Lincoln

Lincoln Cathedral, Lincoln

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe