OVERVIEW
Newton System 500 fulfils all Listed Building requirements in this Georgian Manor House. Newton Pumping Systems installed to manage waste water, including two Newton Titan pumps and battery backup systems.
The Project
This Georgian property is situated in one of most sought after locations of Royal Tunbridge Wells in Kent. The client converted this extensive 15 room basement into a luxury stand alone property; converting the space from a damp storage area into a Grade III habitable apartment.
The main contractors Brambilla Ltd were awarded the contract and contacted Newton Specialist Basement Contractor, Advanced Preservation to carry out the design and installation of the Newton System 500 cavity drain system.
The Solution
Newton System 500 was installed onto all external and internal areas of the property. The Newton 508 membrane was curtain hung to the walls with Newton Multiplug. In the confined spaces of the basement Newton 503 was installed.
Once the new concrete slab has been installed and levelled, Newton Basedrain was placed on top of the slab level around the retaining walls. 50mm of closed cell insulation was installed abutting the drainage channel. From here, the Newton 508 membrane was placed on top of the insulation and sealed to the up stand of the Basedrain. Within this project, head height was a concern to the client, so a specialised pumped polymerbased screed was introduced. This product was pumped on top of the under floor heating system which was installed over the floor membrane. The client was then able to introduce a 40mm screed instead of the standard 65mm sand and cement screed finish.
Two Newton Titan pumping systems are in use alongside the Basedrain with battery back-up support.
The Result
Minimal surface preparation was required and the client has a clean, effective solution that allows the contractor to fulfil Listed Buildings requirements as well as sound and insulation regulations.
Benefits:
This stunning property has a serviceable and effective water management solution. Extendible access ports were installed into the perimeter channel to give the installer the ability to service the system at a later date. The engineered screed applied saved 25mm in over head height and construction could continue 24 hours after the screed was poured.
BaseDrain & FloorDrain - Drainage System - Newton CDM - Drainage System
Basement Waterproofing Membrane for Waterproofing of Existing and New Build Basements - Newton CDM 508 - 8 mm Cavity Drain Membrane for Basements
Basement Waterproofing Membrane for Waterproofing of Existing and New Build Basements - Newton CDM 503 - 3 mm Cavity Drain Membrane for Basements
Waterproofing a Luxury London Hotel
Warwick Court Redevelopment, London
Flooded Shop Basement Refurbishment, Chelsea
Saving a Notting Hill Failed Double Basement
Structural Waterproofing Mixed Commercial Development
Remedial Basement Waterproofing
Future Proofing Waterproofing Multi Level Commercial New Build Structure
The Schwarzman Centre
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
375 Kensington High Street
Four Seasons Hotel, Park Lane