Oxford Biochemistry – Phase Two

OVERVIEW

With an acclaimed biochemistry building constructed in 2008, the University of Oxford appointed main contractor, Laing O’Rourke, to build the £73m phase two expansion of the facility.


The institution required extra space for the faculty and the new building would house very specialised equipment.


With respect to a partnership agreement with the University of Oxford spanning 20 years, it was important for Laing O’Rourke to select the right partner for the project.

Products featured in this case study

View all products (275)
Sika® Watertight Concrete Powder - Water Resisting Concrete Admixture

Sika® Watertight Concrete Powder - Water Resisting Concrete Admixture

Sika® Drain-850 Geo

Sika® Drain-850 Geo

Sika® CD Cavity Drain

Sika® CD Cavity Drain

More case studies from Sika Limited

View all case studies (24)
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford

More case studies from Water-retaining concrete admixtures

View all case studies (12)
243 Ealing Road, London

243 Ealing Road, London

399 Edgware Road, London

399 Edgware Road, London

Adelphi Wharf, Salford

Adelphi Wharf, Salford

Arsenal Waste Transfer, London

Arsenal Waste Transfer, London