NBS Source

Dan Court Wembley, London

by EFFISUS

The purpose of this development is making the re-cladding of an existing building removing Aluminium Composite Material insulation and cement particle board and replacement with new 3mm aluminium cladding and associated works. The new building will include a mixed tenure unit of 138 one, two and three bed apartments. It’s design was developed by the PRP Architects. Its design was developed by the PRP Architects. In order to protect the façade building from moisture, driving rain and wind the solution Effisus A2 Fire Rated Breather FR System was applied, using an A1 Fire Rated Breather FR Membrane.

Products featured in this case study

View all products (9)
Effisus Breather FR Membrane -  Class A1

Effisus Breather FR Membrane - Class A1

More case studies from EFFISUS

View all case studies(46)
Birmingham New Street Station

Birmingham New Street Station

Redmond Building (University of Liverpool)

Redmond Building (University of Liverpool)

Royal Wharf

Royal Wharf

SSE Hydro Arena

SSE Hydro Arena