NBS Source
I'm a manufacturer

Heated Lockers at the Innovation Hub, Production Park

OVERVIEW


Heated Lockers were the focus of Helmsman’s most recent project. We travelled up to South Kirby in Pontefract, Yorkshire to work alongside Triton Construction at the brand-new Innovation Hub at Production Park. Production Park is a unique support environment for the live events industry, uniting technology, creative spaces and education. Their newest venture is the brand-new Innovation Hub, with a large research studio with connected offices and teaching spaces. The new innovation hub features specialist equipment designed to support the live events industry as well as a business support programme focusing on assisting SMEs.


In an area off the main entrance lobby, Helmsman installed a set of Wet Specification Heated Lockers. With a mix of 1, 2 and 4 compartments, these lockers are designed with a single or twin tube heater at the bottom of the locker, hidden within the locker stand, and perforations throughout to allow warm and/or damp air to circulate and escape the locker.


Triton Construction requested a modern, heavy duty laminate finish for these heated lockers. The body of the lockers was manufactured from aluminium and powder coated in colour Ice, whilst we used Biocarbon’s Solid Grade Laminate in colour Elegant Grey for the locker doors, end panels and cladding. This laminate is a great choice as it is carbon neutral as well as being moisture resistant and easy to clean, perfect for a semi-public area such as this project. Our heated lockers can either come with a standard 3 pin power plug or can be available with a spur to wire into a fused switch. Triton construction requested a plug which was positioned on the end panel of the bank of lockers.


We paired stainless steel numbers recessed into the doors with Lowe and Fletcher camlocks for a seamless finish to the lockers.  This option of lock is simple and cost effective, whilst also safe and secure.


It was great to work with Triton Construction on this project and we look forward to hearing about the success of the Innovation Hub at Production Park in the future. If you have a similar project, or want to know more about our Heated Lockers, contact us today on 01284 530427.

Products featured in this case study

View all products (26)
Laminate Lockers - Wet Area

Laminate Lockers - Wet Area

Heated Lockers

Heated Lockers

More inspiration from Helmsman

View inspiration
Isenhurst Health Club

Isenhurst Health Club

Reach Printing Services

Reach Printing Services

Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes

Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes

Eos Interiors Ltd Office Lockers Project

Eos Interiors Ltd Office Lockers Project

More inspiration from Lockers

View inspiration
Investment bank project, Lockers

Investment bank project, Lockers

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Ipswich Town Football Club Project

Ipswich Town Football Club Project

1 Poultry, London

1 Poultry, London