The idea behind the project was to explore a new usage for the main exhibition hall and replace the administrative wing and develop it from a residential point of view. The project sits at the southern end of Holland Park and occupies an area of 30.000 m2.
Effisus weatherproofing solutions and Consulting Services have been integrated throughout the project, aiming to maximize the building’s energy efficiency and air quality. Some of the Effisus solutions installed were: Effisus Ecofacade Membrane, Effisus Breather+ Membrane, Effisus VAP Vapor Control Barrier, Effisus Bonding KF Adhesive and Effisus 2Bond GO Tape.
No featured products in this case study
Contact EFFISUS by clicking the button below to find out which
products were used in this case study.