Our client wanted a low maintenance but high quality finish for the balconies on a build of high end flats and penthouses.

Castlewood composite decking was chosen as it provides good slip resistance and a very luxurious finish. Our composite decking is very low maintenance due to the unique polymer cap that is applied to the decking boards during production. This particular deck board is supplied with a 25 year limited warranty for domestic applications and a 10 year limited warranty for commercial applications. Terms and conditions apply.

Our aluminium substructure system was chosen as it is quick and easy to install and will never rot like traditional timber joists. The balconies also had very low thresholds in some areas that could not have been overcome with traditional timber joists.

The aluminium substructure was assembled in frames with joists running at 400mm apart to provide adequate support for the composite boards. Additional joists were also installed to support the ends of each decking board where two ends meet.

Each aluminium frame was then laid on our DD adjustable pedestals to make them completely level. Decking boards were then secured to the aluminium with our unique fasteners that work with our boards and aluminium profiles.

If you have a project that may require this system please get in touch with your dimensions and we will happily provide a quotation for everything required.


Products featured in this case study

View all products (45)
Aluminium Decking Substructure - Terrace construction system

Aluminium Decking Substructure - Terrace construction system

ASLON Rubber Support Pads - Rubber Pad

ASLON Rubber Support Pads - Rubber Pad

More case studies from Castle Composites

View all case studies (4)
GYM24

GYM24

Cambridge University - Faculty of History

Cambridge University - Faculty of History

Lanark Golf Club

Lanark Golf Club

More case studies from Decking and paving pedestals

View all case studies (31)
Single Ply Warm Roof Waterproofing on Residential block of flats.

Single Ply Warm Roof Waterproofing on Residential block of flats.

Waterproofing to domes on Historic Building

Waterproofing to domes on Historic Building

Museum of the Home, London. Koster TPO Single Ply Membrane.

Museum of the Home, London. Koster TPO Single Ply Membrane.

Koster TPO Single Ply membrane - Overlay Project.

Koster TPO Single Ply membrane - Overlay Project.

More case studies from Aluminium structural sections

View all case studies (3)
Ensign Court High Rise Decking

Ensign Court High Rise Decking

The Lock, Greenford Quay, West London

The Lock, Greenford Quay, West London

Composite Decking Garden Transformation, Essex

Composite Decking Garden Transformation, Essex