OVERVIEW

Client

VR Captial

Architect

n/a - Design and Build with Contractor

Contractor

ODB Group

Location

Kensington

Service Delivered

13 SMI blinds powered by S3 Automated Blind System

Waverley was appointed to deliver a high-spec blind control solution for a premium office fit-out at The Kensington Building in London.

Working with ODB Group and their client, VR Capital, the project demanded an elegant, integrated system that complemented the sleek interior design and exposed ceiling aesthetic. Our S3 system, combined with custom KNX integration, provided the ideal solution, blending performance with discretion and simplicity.

The Requirements

As part of a high-end office fit-out for ODB Group, on behalf of VR Capital, the brief was clear: deliver a premium finish with seamless integration between lighting and blind controls. The client had selected bespoke switches to match their lighting controls, which were not part of the standard KNX range. With exposed ceilings and a clean aesthetic being central to the design, Waverley’s S3 system was the ideal choice to reduce visible cabling and floorplate equipment.

The Challenges

This project marked Waverley’s first time building and commissioning a full control panel entirely in-house, following our recent KNX integration training. The unique switches required a custom approach — we needed to integrate binary input KNX devices to convert the client’s switching signals into KNX-compatible commands. Added to this, there was no high-level containment for wiring and the ceilings remained exposed, requiring careful coordination with the site team.

Our Solution

We pre-programmed each motor with individual IDs and fully built and commissioned the panel off-site. This preparation allowed for a swift and simple installation once on site. Close collaboration with the electrical contractor ensured the panel was safely powered, and we worked with the project manager to agree on cabling routes in areas without traditional containment. Despite an initial mix-up regarding first-fix dates, open communication meant we resolved everything on the day.

The Outcome

The install and commissioning of the S3 system were completed efficiently and without issue — a smooth and successful execution thanks to thorough off-site preparation. While the final installation felt almost anticlimactic due to how quickly it was completed, it reflected the strength of our in-house capabilities and the benefit of continued technical training. A clean, coordinated result for a discerning client.

Products featured in this case study

View all products (5)
ShadeTech® RBL Roller Blind (Chain, Electric and Geared Operated) - Roller Blind System

ShadeTech® RBL Roller Blind (Chain, Electric and Geared Operated) - Roller Blind System

More inspiration from Waverley

View inspiration
RHS Wisley Gardens - Hilltop Building

RHS Wisley Gardens - Hilltop Building

150 Holborn

150 Holborn

More inspiration from Roller blinds

View inspiration
BSO Outdoor Venetian Blinds in Guido Home

BSO Outdoor Venetian Blinds in Guido Home

B-Box and Premium Plus roller blinds in Juan Carlos I Hospital

B-Box and Premium Plus roller blinds in Juan Carlos I Hospital

O-Box roller blinds in Picci House

O-Box roller blinds in Picci House

B-Box roller blinds in Quirón Marbella Hospital

B-Box roller blinds in Quirón Marbella Hospital