OVERVIEW
Project: Leeds College of Building
Date: 2018
Background:
· APL were involved from an early stage with the architects, providing design and costing advice throughout the tendering process, along with significant design support as the project progressed
· APL’s technical expertise and close relationships with its supply chain ensured that solutions were provided to some very complex colour requirements
Systems:
· 1,400m² of half-round profile AP50HR in aluminium with an anodised-look PPC finish
· 850m² of sinusoidal profile AP18HR in aluminium with an anodised-look PPC finish
· APL Tritherm™ GALV support system onto SFS
· LB4 live louvre system
· All fixings and accessories
Building Location:
· Leeds
Louvre System - Live Louvres - APL LB3 & LB4 - Live Louvre System
Louvre Profile Wall Cladding System - AP70 LCP - Louvre Profile Cladding System
Half-Round Profile Wall System - AP50HR - Half-round Profile Cladding System
Corrugated / Sinusoidal (19mm Deep) Profile Wall System - AP18HR - Sinusoidal Profile Cladding System
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - BMW Swindon Press Shop
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - BMW Swindon Press Shop
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow