NBS Source
I'm a manufacturer

London Bridge Station

OVERVIEW

London’s oldest station receives a significant upgrade to meet its increasing demands including optimum performance floor insulation

Products featured in this case study

View all products (45)
Kingspan OPTIM-R

Kingspan OPTIM-R

More case studies from Kingspan Insulation

View all case studies (47)
Kingspan Insulation rises to the challenge of water tower renovation

Kingspan Insulation rises to the challenge of water tower renovation

Kingspan TEK travels through time at Seaton Jurassic

Kingspan TEK travels through time at Seaton Jurassic

Royal Military Academy given luxury finish with Kingspan OPTIM-R

Royal Military Academy given luxury finish with Kingspan OPTIM-R

Kingspan insulates beachfront Grand Design

Kingspan insulates beachfront Grand Design

More case studies from Vacuum insulated panels

View all case studies (1)
Clarges Mayfair

Clarges Mayfair