OVERVIEW
On this office refurbishment the original windows were non-thermally broken aluminium and for that reason not suitable for a residential tenancy.
With the windows being on the 12th floor it would have been extremely difficult and expensive to replace them - due to scaffolding etc. Therefore, after a recommendation, the client decided to source Incarnation secondary glazing.
As an office refurbishment in a busy built-up area, noise reduction was a key consideration. Using a hidden coupling bar between two units was a key feature, allowing the secondary glazing to match the sightlines of the original windows perfectly.
By installing the secondary glazing with an air gap of 150mm between it and the existing window resulted in an impressive decibel reduction.
Secondary Glazing Horizontal Slider C12 Five Panel
Secondary Glazing Horizontal Slider C9 Three Panel
Heritage Rose - Millwater Cottage
Heritage Rose - California Hotel
Charisma Rose - Surrey Style
Ultimate Rose - Carlton Cottage
Castle Park View, Bristol
MT to supply its Passive House products for one of the world’s largest Passivhaus buildings
Kestrel Aluminium. Case Study: Coton House Estate
Kestrel Aluminium. Case Study: Mod Pods