NBS Source
I'm a manufacturer

Cambridge Road

OVERVIEW

THE PROJECT

The Building a Safer Future Charter has been created to promote an urgent and positive culture and behaviour change in the safety of the built environment. It is about putting people’s safety first in how we plan for, design, build, maintain, and look after the safety of the buildings we live, work or play in and protect those that use them.



THE PRODUCT

SLB’s 2 hour Fire-rated mailboxes were used on this project at Cambridge Road, London for a large Housing Association and arranged on a radius, providing an interesting yet highly functional arrangement of 2-hour integrity only fully tested mailboxes. The Fire-rated range from SLB is tested at Exova Warrington and exceeds 2 hours in temperatures beyond that of molten lava without distortion, flame or deterioration. This system was polyester powder coated in a burnt orange RAL colour, powder used conforms to London Underground specifications.

This arrangement is also comprised of manual parcelboxes positioned underneath with a manual locking option.

Products featured in this case study

View all products (38)
FR2 - 120 Fire Rated Mailbox

FR2 - 120 Fire Rated Mailbox

More case studies from The Safety Letterbox Company

View all case studies (77)
AXO Students - Intelligent myRENZbox Parcel Boxes

AXO Students - Intelligent myRENZbox Parcel Boxes

Camden Road - Manual Parcel Delivery Boxes

Camden Road - Manual Parcel Delivery Boxes

Covent Garden - Floral Court

Covent Garden - Floral Court

Fulham High Street -

Fulham High Street -

More case studies from Letter boxes

View all case studies (10)
Fire-rated MySmartBox and mailboxes unit - Bronze finish

Fire-rated MySmartBox and mailboxes unit - Bronze finish

Fire-rated mailboxes and MySmartBox

Fire-rated mailboxes and MySmartBox

Fire Rated MySmartBox and Mailboxes

Fire Rated MySmartBox and Mailboxes

DAD 009 - RAM QUARTER

DAD 009 - RAM QUARTER