You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
This project combines SuDS bound permeable paving with the most up to date methods of construction in BS 7533-101 and a variety of build-ups over varying substrates including structural concrete, permeable concrete, made up ground and attenuation crates.
The Steintec tuffflow system of permeable bedding and jointing mortars was used to construct a SuDS permeable, bound/rigid pavement. The system allows the designer to capitlize on the low maintenance, high durability of a BS structurally compliant bound/rigid public realm pavement, while avoiding the disadvantages of loose bedding and jointing aggregates used in conventional SuDS pavement construction.
Tuffflow Fully Permeable SuDS Jointing Mortar - Permeable jointing mortar
Leicester Square.
Luton Town Centre.
One Tower Bridge
Hull City of Culture 2017
Hackney - Daubeney Road, Residential Bound Permeable Pavement
UltraScape flowpoint used at beautiful and historic Citadelle of Namur
UltraScape paves the 'Greenest City' in Europe
UltraScape is a hard act to follow at iconic Australian theatre