The 2,500m2 basement extends beyond the property where a blue-green roof will be created over a suspended podium deck to form part of the garden. The Triton team worked closely with waterproofing and blue-green roof design specialists, EPG, to create a waterproofing strategy and utilised a comprehensive Construction Quality Assurance protocol agreed between Triton and EPG. The Triton team had been called in by main contractor, Era Build Ltd, to replace a previous supplier who had been unable to provide a warranty. After detailing was complete; Triton Approved Contractor, Cast Contracting Ltd (CCL), installed the systems.