OVERVIEW
The Sizewell C Nuclear Power Plant in Suffolk represents one of the UK’s largest energy infrastructure projects, designed to provide reliable low-carbon electricity for decades to come. With a vast construction footprint located close to the sea, the site required a secure perimeter solution that could withstand not only the operational demands of a large-scale infrastructure build but also the harsh marine environment.
The contractor needed
The challenge was not just about security, but about providing a solution that could offer long-term durability in one of the most demanding environments.
The Solution
Alexandra Security was appointed to provide the fencing and gate package for the Sizewell C site. We supplied and supported the installation of:
Every product underwent rigorous quality checks prior to dispatch to guarantee defect-free delivery.
To ensure smooth progress on this critical project, our team coordinated just-in-time staggered deliveries direct to site, with offload support so the subcontractor could install efficiently. Throughout the process, we maintained constant communication with the contractor, ensuring that every deadline was met. With the contractor’s reputation tied to programme success, reliability and timeliness were paramount—and we delivered.
The Benefits
By working with Alexandra Security, the contractor gained:
The Sizewell C project demonstrates Alexandra Security’s ability to supply large, complex, and environmentally challenging infrastructure projects with robust, British Standard-compliant perimeter solutions.
With in-house UK manufacturing, rigorous quality control, and proven delivery reliability, we are trusted by contractors on some of the most important infrastructure projects in the UK and beyond.
For more information or to discuss your upcoming project, contact our team today and discover how Alexandra Security can deliver secure, durable perimeter solutions at any scale.
Contact Alexandra Security Ltd by clicking the button below to find out which products were used in this case study.
Confidential Government Project
New Build Gas Power Plant, England
Securing Potash Farm – Perimeter Fencing for a 5MW Solar Farm
Securing the Instavolt Superhub – Winchester