NBS Source
I'm a manufacturer

g-fit in UNTIL Marylebone, London

OVERVIEW

At UNTIL Marylebone, London’s first Wellcare facility, Getzner installed g‑fit Shock Absorb Advanced to meet strict acoustic and vibration‑control requirements. Located in a basement next to sensitive medical and office spaces, the gym needed to minimise noise and vibrations from intense training activities and heavy point loads. The g‑fit solution provides effective shock absorption, reduces airborne and structure‑borne noise, and ensures a quiet, comfortable environment for users while protecting neighbouring areas from disturbance.

No featured products in this case study

Contact Getzner Werkstoffe GmbH by clicking the button below to find out which products were used in this case study.

More inspiration from Getzner Werkstoffe GmbH

View inspiration
Pump bearings for a sustainable heat supply with lake water

Pump bearings for a sustainable heat supply with lake water

Compressor bearings for quiet heat pumps

Compressor bearings for quiet heat pumps

Bedding of building services systems at ETH Zurich in Basel

Bedding of building services systems at ETH Zurich in Basel

Floating floors for rolling stock for trains running on the Tren Maya railway (MX)

Floating floors for rolling stock for trains running on the Tren Maya railway (MX)