NBS Source
I'm a manufacturer

"vav equipment terminal units"

11,040 results found

Sort by:

Showing 181-216 of 1047

Sponsored
Castle Hill Hospital Fortified by Yeoman Shield

Castle Hill Hospital Fortified by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Castle Hill Hospital, at Cottingham near Hull, is defending busy areas of the hospital interiors from impact damage with the help of Yeoman Shield protection products.Serving the population of Hull and the East Riding of Yorkshire, the hospital has approximately 370 beds and caters for the majority of the trusts elective activity as well as housing the award- winning Queen’s Centre for Oncology and Haematology.The refurbishment of the Plastic Surgery Outpatients ground floor corridors and First floor I.C.U. corridors saw Yeoman Shield 200mm protection rail installed. The rails are fitted on a 60mm PVC “stand-off” spacers allowing them to be utilised as a handrail for those requiring it.A strengthening solid inner core ensures the rail is capable of taking the heaviest of blows from motorised or wheeled trolleys and equipment saving the wall from structural damage and marking.The vulnerable corners and terminating ends of the rail are equally protected from impact with the addition of Yeoman Shield’s new rubber, hardwearing and durable stop ends and wall return accessories.The busy catering department and corridors were also suffering from impact damage caused by the movement of the catering trolleys, food warmers and equipment. To combat costly damage to the décor Yeoman Shield 200mm protection rail has again been installed this time “flat-back” to the wall.For a hygienic yet protective finish to the walls Yeoman Shield smooth food grade wall panels were installed from floor to ceiling with extra defence in the form of the 200mm protection rail.All Yeoman Shield products were installed by directly employed Yeoman Shield fixing operatives ensuring an efficient and accurate first time fit.“The work carried out to corridors and catering department was undertaken with due consideration of each busy section of the hospital and to suit their working arrangements, including any out of hours working. All went very well and each department commented on how well the work went and how good the improvement is” Alan Parry, Estates Officer (Building).
Sponsored
Bank Underground Station Upgrade

Bank Underground Station Upgrade

Anderson, GEC Ltd

GEC Anderson units were specified as part of the extensive upgrade and improvement works at London’s busy Bank Station.The usual stringent fire regulations applied to the below-ground staff mess area. GEC Anderson are well versed with these special requirements, having supplied well in excess of one hundred London Underground locations over the last few decades. Installation was also handled by the GEC Anderson team.As well as the usual benefits of robust, professional and hygienic equipment that is associated with GEC Anderson’ stainless steel kitchens, special measures were taken to ensure that no combustible or smouldering elements were included in their construction. 
Sponsored
Carrasco airport - Uruguay

Carrasco airport - Uruguay

Barrisol

The Carrasco international Airport is the largest airport in Uruguay serving the capital city Montevideo. Designed by Urugayen architect Rafael Viñoly, the new terminal has the capacity to handle more than 4.5 milion passengers a year. Barrisol® covers 16 000 sqm of ceilings in this international travel and commercial destination.
Sponsored
Heathrow Airport Industrial Doors

Heathrow Airport Industrial Doors

Hart Door Systems Ltd

Heathrow Airport is the UK’s largest and busiest airport connecting the UK to over 80 long haul destinations and flying over 80 million passengers worldwide. Project/doors: Hart has over installed over 280 doors across all terminals including high speed smoke screens, fire conveyor shutters, security shutters, internal and external high speed doors, insulated fast action doors, sectional doors and pedestrian doors.The challenge Terminal 5 baggage handling system serves around 32 million passengers per year and handles around 6000 bags per hour.  Hart were asked to design, manufacture and install a specialist and unique automatic smoke screen system capable of handling over 6000 bags per hour, while providing a seal for 30 minutes in the event of fire. The solution Hart were the only company to provide a solution that fully met all the design requirements. Two years after the initial talks with the client, Hart successfully completed the manufacture and installation of all of the high speed smoke/fire screens within the main check in area, comprising 102 check in desks. Hart also installed a mixed package of roller shutter and fire doors in the lower ground service area and fire shutters on the Tube access tunnels leading directly to Terminal 5. The success Hart was chosen for the quality of engineering and the ability to meet the clients demanding specification and operating requirements. Hart continues to work with contractors and OEM’s such as Vanderlande, Mace and Balfour Beatty on site supplying upgrades and new doors when required
Sponsored
Valencia Airport VLC (Spain)

Valencia Airport VLC (Spain)

Record U.K. Limited

Valencia Airport is located in Manises, 8 km west of Valencia, in Spain. In time for the America's Cup in 2007, this international airport was modernized and expanded, and received, among other new features, a new terminal building.Again, the tried-and-tested record FlipFlow TWIN models are installed here, smoothly controlling the flow of passengers and preventing unauthorized access to the restricted zones.
Sponsored
Case Study: Liverpool John Lennon

Case Study: Liverpool John Lennon

Twinfix Limited

Handling over five million passengers a year, Liverpool John Lennon Airport is one of the UK’s busiest airports. Last year Twinfix worked with Principal Contractor Technical Construction Group Limited on a £750,000 project to design, manufacture and install a new covered walkway at the airport from the terminal building past stands 51 to 53 on the airside apron.
Sponsored
Manchester Airport, Manchester

Manchester Airport, Manchester

Rapid Ramp Limited

PROJECT BACKGROUND: Work had begun on the airport’s 10-year, £1 billion transformation programme. The airport hoped ’the programme would “transform passenger experiences and help attract yet more of the world’s leading airlines” (The Manchester Airports Group: 2017).REQUIREMENT: Our assignment involved the installation of semi-permanent wheelchair ramps in the temporary lounge. These ramps were designed to offer temporary wheelchair accessibility for both visitors and staff.The lounge plays a pivotal role in the larger transformation initiative, facilitating the redevelopment of the current Terminal 2.END RESULT:Our skilled installers effectively constructed ramps on the airport runway's eastern and southern sides, meeting the scheduled timeline and budget requirements.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and to help users distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections. Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED: Fully Compliant Step Unit – an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.
Sponsored
Barcelona Airport BCN (Spain)

Barcelona Airport BCN (Spain)

Record U.K. Limited

With almost 40 million passengers per year, El Prat Airport in Barcelona is Spain's second largest airport (only Madrid-Barajas is larger), and the tenth largest in Europe. The terminals use several record FlipFlow TWIN models, creating one-way secure access points between the restricted areas and public areas, enabling passenger flows to be automatically and smoothly controlled.
Sponsored
Education: Understanding BB103 and BB104 Guidelines for School Buildings

Education: Understanding BB103 and BB104 Guidelines for School Buildings

Astor Bannerman

In the world of education, the physical environment plays a crucial role in shaping the learning experiences of students. To ensure that every child has equal access to education, the Department for Education (DfE) in the United Kingdom has laid down comprehensive guidelines for the design and construction of school buildings. Two key documents, BB103 and BB104, stand at the forefront of this initiative, setting standards to promote inclusivity and accessibility within educational settings.BB103 | Designing Accessible School BuildingsFor mainstream schools, BB103 mandates the inclusion of accessible facilities to accommodate pupils, students, staff, and visitors with disabilities. Crucially, this includes the provision of a specialist hygiene room equipped with either a fixed or mobile hoist, alongside ample space for assistants to facilitate the changing process.In primary schools, the hygiene room must span a minimum of 9m² and feature essentials such as a changing bed and accessible WC.Secondary schools, on the other hand, are required to allocate a minimum of 12m² for their hygiene rooms, which should additionally incorporate an accessible shower, sluice toilet, and changing trolley. These specifications are designed to ensure that hygiene rooms meet the unique needs of students across different age groups and educational settings.According to recent statistics from the DfE, approximately 14.1% of children in the UK have special educational needs, highlighting the critical importance of ensuring that school environments are inclusive and supportive.BB104 | Catering to Special Educational Needs and Disabilities (SEND)BB104 further refines the standards for hygiene rooms in special schools and alternative provisions (APs). For non-ambulant special schools or units, the guideline stipulates the provision of one hygiene room for every 12 non-ambulant pupil places. These rooms must be equipped with a fixed hoist, a changing bed, a wash hand basin, an accessible WC, and an accessible shower, underscoring the comprehensive support required for students with profound disabilities.In ambulant special schools and APs, one hygiene room per setting is mandated, featuring either a fixed or mobile hoist, a changing bed, a wash hand basin, and an accessible WC.Additionally, all hygiene rooms are required to have facilities for waste disposal, such as a sluice or equivalent, to maintain hygiene standards and ensure the efficient management of waste.Conclusion | Building for a Brighter FutureAs educators and stakeholders in the education sector, it is our collective responsibility to champion inclusivity and accessibility in every aspect of school design and construction. By understanding and implementing the guidelines outlined in BB103 and BB104, we pave the way for a brighter, more inclusive future where every child has the opportunity to thrive and succeed.How can we help? Our skilled team have many years’ experience of planning and installing equipment within public environments such as schools and universities. Please do get in touch if you need help or advice with your project or further support on the Government requirements for equipment that needs to be installed to support SEND students.
Sponsored
London Luton Airport

London Luton Airport

Broxap Ltd

Travel to London Luton Airport (LLA) is being made easier, faster and greener with the development of the DART people mover.And the final journey between shuttle stop and airport terminal is via a covered walkway designed, manufactured and installed by Broxap.The walkway complements a series of canopies we created for the airport in 2019 as part of a bus and coach station upgrade.Together the DART (Direct-Air-Rail-Transit) system and bus services are designed to encourage more people to leave their cars behind when flying from LLA as well as offer sustainable travel options to employees.The 150-metre bespoke walkway guiding passengers to the terminal from the DART station is based on Broxap’s flagship ‘Newcastle’ design.The freestanding walkway features clear multi-wall polycarbonate cladding and is an essential element in the passenger journey, forming the final connection between ground transportation and the boarding of aircraft.A bespoke Hartcliffe Cantilever Shelter has also been made for the DART building to form a covered entrance area.Testing of the shuttle system is now underway with an announcement on its opening due in early 2023.
Sponsored
A STYLISH KEUCO BATHROOM IN A TEMPORARY HOME

A STYLISH KEUCO BATHROOM IN A TEMPORARY HOME

KEUCO

Private Clinic Blomenburg stands for holism when it comes to the therapy and design concept.A haven in the middle of a beautiful environment in the north of Germany: The 19th Century Blomenburg („Burg“ for castle), is surrounded by a huge park. Away from the everyday hustle and bustle, offering 69 furnished in premium quality, spacious single rooms and suites. The modern bathrooms are equipped with KEUCO furnishings and complement the syntonic interior design. Here the guests can dedicate their soul to regeneration in a quiet and peaceful stylish ambience.The elaborate restoration of the building was carried out taking the historic importance and special use of the Blomenburg into consideration. The new building with its generous glass facade was constructed under the castle rock and now accommodates the guest rooms. Between the old and the new building, there is an approximately 800m² big spa and pool area engrafted in the topography of the castle rock. The historic buildings surrounding the castle yard are used for social purposes, medical fitness, healthy living and mindfulness training of the body, soul and mind. The exclusive design of the indoor rooms is not to be compared with the magnificence of the outside of the buildings.Noble materials and luxurious items of furniture in the guest rooms create an ideal setting for convalescence and relaxation. This temporary home equipped with KEUCO furnishings and accessories in the bathroom offer the guests plenty of storage space for personal care products. Not only do the PLAN vanity unit and tall unit in unobtrusive truffle offer generous storage space, but the light mirror with a frame offers additional storage space. The perfect light lets the windowless bathrooms appear brighter and friendlier. The integrated mirror heating makes it possible to look in the mirror after a hot and relaxing shower.IXMO fittings in a strong design offer intuitive use to reach the right temperature. Matching accessories nicely round-off the bathroom interior in a coherent way and perfectly match the high-class concept of the clinic.
Sponsored
Yeoman Shield Proves to be the Right Treatment for Halton Hospital

Yeoman Shield Proves to be the Right Treatment for Halton Hospital

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Yeoman Shield have recently supplied and installed wall and door protection in the new Urgent Care Unit at Halton Hospital Runcorn.The unit will be busy catering for people in the Runcorn area and is hailed as a one stop shop offering an alternative to A&E for a range of minor injuries and urgent medical care.“The new Urgent Care Unit has been adapted from the old Minor Injuries Unit which has under gone alteration and redecoration with new and refurbished doors fitted. We were keen to protect the new finishes from the damage which can be caused by the everyday use of a busy hospital department.” Said Lee Bushell, Building Surveyor at Warrington & Halton NHS Trust.Yeoman Shield products were installed by their directly employed fixing team to the corridors and cubicle areas in the unit.Guardian Handrail was fitted to protect the walls along the corridors and waiting areas in Aqua Blue with an attractive contrasting insert strip in Mid Grey. An Ultra 60 Protection Rail, also in Aqua Blue, was included at low level to protect the skirting and wall from damage which can be caused at this height from wheelchairs and trolleys.Some of the doors in the unit required replacement and Yeoman Shield fire rated door protection panels and door edge protectors were fitted to all doors to protect from costly damage reoccurring. The addition of Yeoman Shield door protection helped to add uniformity of colour and style to the mixture of the new and old doors.Aqua Blue FalmouthEx wall protection panels were installed along the cubicle area corridors and in the cubicles themselves protecting from damage which is caused by the movement of equipment and trolleys.A Yeoman Shield Clapping Lath was applied to the double swing doors of the X-ray room. The lead lined clapping lath was fitted to the inside of the room doors to prevent any leaking of X-rays through the gap between the meeting edges of the door set.“I am very pleased with the way that the Yeoman Shield products look and from past experience know that these products will help to keep the new unit looking smart for some time to come.” Concluded Mr Bushell.
Sponsored
Alicante Port - Gatic UltraSlot

Alicante Port - Gatic UltraSlot

Alumasc Water Management Solutions

Alicante Port, the well renowned commercial and cruise ship terminal has been upgraded to benefit from a Gatic Slotdrain high-capacity surface water drainage system.Slotdrain UltraSlot was specified during the re-conditioning of Dock 19 to increase capacity from 300,000 twenty-foot equivalent units (TEU) to 463,000 TEU.“UltraSlot was chosen by specifier SETI, SA, who are well established within the ports sector and who have worked with Gatic products for many years,” said International Sales Manager – Luis Triguero “The engineer in charge was familiar with the mechanical and hydraulic advantages of UltraSlot and requested a competitive price for the project. As Gatic is so well established in the Spanish market, we could exceed their expectations.”UltraSlot is used in external concrete areas which are subject to constant traffic, such as airports and ports. This high-capacity system is designed to ensure sufficient depth of concrete cover over the main body of the channel to withstand ultra-heavy-duty loads of up to F900 - 90 tonnes.“The biggest challenge we faced was ensuring the system could withstand the consistent, heavy traffic that will always be moving throughout the port,” continues Luis. “However, thanks to its capacity to bear heavy loads, UltraSlot proved to be one of the best drainage options on the market.”
Sponsored
Istanbul Airport

Istanbul Airport

Inpro

Located in Istanbul, Turkey, the Istanbul International Airport was inaugurated on 29 October 2018 and has continued expanding. Once all phases of airport construction are complete, the airport is estimated to serve 200 million passengers per year.Our Sanparrel™ Rigid Sheet has been installed throughout the terminals and some of the airport hotels as well. Using our Elements patterns, the installation looks sleek and modern and is protected for years to come.
Sponsored
Heathrow Airport

Heathrow Airport

Ronacrete Ltd

During the regeneration of the new Terminal 2 at Heathrow Airport, Vetter UK, the specialist contracting arm of Laing O’Rourke needed to specify a fast-drying 135mm deep screed so that the project could continue with minimum disruption, saving time and costs. RonaScreed FastDry Prompt was specified for its fast-drying properties and the fact that it could be mixed at ground level and then pumped up the three storeys to the point of application, saving on time and cost.
Sponsored
London Bridge Rail Station

London Bridge Rail Station

Sika Limited

The proven, durable properties of Sika’s high-quality waterproofing system were required to ensure the successful upgrade of one of the UK’s busiest rail terminals.The multi-million pound refurbishment of London Bridge station – which brings an estimated 56 million passengers into the city each year represents a huge undertaking by Network Rail to create new connections and increase peak hour services by 30%. The project is part of the government-sponsored Thameslink Programme.
Sponsored
Changi Airport, Singapore (144,000m2 Duralay Durafit 500.)

Changi Airport, Singapore (144,000m2 Duralay Durafit 500.)

Interfloor Ltd

Changi Airport, is one of the world’s busiest and most renowned international airports. It is located in Changi, Singapore, and serves as a major transportation hub for both domestic and international flights with over 68 million visitors each year, making it one of the most advanced and well connected airports globally.This airport consists of 4 huge passenger terminals and the jewel, a multi-story indoor garden and entertainment complex with attractions like the Rain Vortex, bright greenery, restaurants, shops, and a hotel. Changi Airport is not just a place for travelers to pass through; it’s an attraction in itself, offering a unique and world-class experience for visitors and passengers alike. Its commitment to innovation and passenger comfort has made it a model for airports around the world.Interfloor was proud to be chosen to supply 144,000 sqm of our Durafit 500 underlay for the departure lounges and air bridges in Terminals 1, 2, 3 & 4 at the world famous Singapore Changi Airport. With that kind of foot traffic our Durafit range of crumb rubber underlays was the perfect solution, as crumb rubber is without doubt the most durable underlay available. With an End Use Classification (BS 5808: 1991 : HC/U) of heavy contract use, Durafit 500 has 93% recovery from compression as well as containing over 65% recycled materials.
Sponsored
Hoists in Changing Places Toilets: Top 4 Considerations

Hoists in Changing Places Toilets: Top 4 Considerations

Astor Bannerman

Hoists are one of the key components of a Changing Places Toilet and there are a few essential things to consider before installing them. See below for our top 4 things to think about at the planning, design and installation stages.Installing hoists into Changing Places Toilets requires knowledge of the equipment, the relevant regulations and requirements specific to these fully accessible toilets, plus the experience to install the specialist equipment safely.Astor Bannerman have a Changing Places team who have extensive experience with the planning and installation of hoists and other specialist equipment.
Sponsored
Fire Doors Protected by Yeoman Shield

Fire Doors Protected by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

After carrying out a fire door survey, Warwick Hospital undertook measures to protect and refurbish the fire doors throughout their sterilisation unit with Yeoman Shield door protection products.Catering for the sterilisation requirements for all wards and departments within South Warwickshire NHS Foundation Trust as well as GP surgeries and clinics, the department is a hub of activity. The movement of heavily laden trolleys and equipment around the unit had caused impact damage to the department’s doors around door edges, glazing beads and the door fronts. Damage to these particular parts of a fire door can render it unfit for purpose.In this instance Yeoman Shield fired rated door protection products were used to refurbish and then protect from further impact damage. Door edge protectors were fitted to the leading and meeting edges of the doors with door protection panels installed to a height that would shield the most vulnerable areas.For additional protection, particularly to ward off blows to the glazing bead section of the doors, Yeoman Shield’s rub rail was fitted to the face of the door just below the vision panels. Colours of Blue and Red were chosen to distinguish between the contaminated and sterile areas within the unit.Yeoman Shield door protection products come with current and relevant fire certificates and do not affect the integrity of a fire door when installed but will continue to protect from detrimental impact damage for many years to come.Malcolm Bloxham Reactive Supervisor commented “We have used Yeoman Shield for many years and find their door protection products perfect for maintaining our fire doors in good working condition, helping to reduce our door maintenance costs by minimising repair and replacement requirements.”
Sponsored
GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

Anderson, GEC Ltd

GEC ANDERSON OFFERS PRISTINE PERFORMANCE FOR UCS SPORTS PAVILIONThe fit out of a major new academic sports facility in North London has included the selection of custom built sinks, work-surfaces, shelving and other stainless steel units, manufactured and installed by sector specialist, GEC Anderson.The University College School Sports Pavilion in Hampstead has been designed by Marcus Beale Architects (MBA) with LIFE Build Solutions of High Wycombe filling the role of main contractor. The area was farmland until the 20th century. The use as playing fields dates from the 1920s.The 18th month project encompassed upgrades to the schools playing fields themselves and the erection of a two-storey structure with extensive changing room facilities, showers and toilets on the first floor. The comprehensive catering facilities include kitchens large enough to serve a dining area which can seat 200. Amongst the stainless steel fabrications designed and fashioned by GEC Andersons highly experienced workforce are a number of base units which combine with single section work-surfaces, sinks and splashbacks to create an easily cleaned, hygienic and ergonomic working environment.As well as the actual kitchen, GEC Anderson also supplied adjustable wall shelving and an L-shaped, three level base unit for a food storage and preparation area. In several places GEC Andersons site survey and subsequent liaison with the project team, which also included The Litmus Partnership Ltd. Catering Consultants, led to units being tailored to fit around structural columns and to accommodate different sized pieces of catering equipment.The stainless steel back bar, with associated fabrications and appliances were also supplied and installed by GEC Anderson.A spokesperson for MBA commented: In 2015 MBA won an invited competition to design a new sports pavilion on the site. Thorough analysis of the topography and the wider views led to a radical design for a pavilion in two parts, linked by a bridge angled westwards to align precisely with the Wembley Arch.
Sponsored
Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes

Staybridge Suite (Heathrow Airport) Lockers for Luggage & Bikes

Helmsman

Staybridge Suite is located close to the main entrances to Terminals 1,2&3 of Heathrow Airport and now home to Helmsman Lockers. Our client chose bespoke Helmsman Heavy Duty Two Door Lockers with combination locks and engraved numbers and rovere fumo laminate doors and side panels. The hotel lockers can accommodate luggage and other bulky items such as foldable bikes. At Helmsman, we are here to accommodate your needs for foldable bike storage with the Staybridge Suites a perfect example of maximising the use of the bespoke lockers.
Sponsored
EuroPipe at Manchester Airport - Case Study

EuroPipe at Manchester Airport - Case Study

BLÜCHER UK Ltd

BLÜCHER recently supplied our BLÜCHER EuroPipe system to the new Terminal 2 car park at Manchester Airport. The new multi-story car park has space for 3,800 vehicles and is part of the £1 billion transformation programme at the airport. The installation was overseen by G Beverley & Son on behalf of the M&E Contractor, Crown House. Our stainless steel drainage systems are the ideal choice due to our lightweight push-fit pipes and fittings are easy to handle and install, and provide rapid discharge of rainwater and waste water.
Sponsored
Gatwick Airport MSCP

Gatwick Airport MSCP

Shield Membranes Ltd

As part of a framework agreement between Gatwick Airport and Galliford Try, Bourne Parking were appointed to design and build an above ground scope of works for the over decking of Gatwick South terminal’s long stay parking Zones F and G. The single suspended deck car park provides an additional 1,224 car parking spaces and was built to assist with achieving Gatwick’s objective of passenger growth. The project is Shield’s largest and fastest single deck car asphalting project to date, with 26,000m² completed in nine weeks.
Sponsored
Liverpool Street Station

Liverpool Street Station

AATi (Antislip Antiwear Treads International)

Liverpool Street station first opened in 1874 and by 1895 it had the largest number of platforms than any other terminal railway station in London. Liverpool Street is one of the busiest railway stations in London, serving as the terminus of the West Anglia Main Line to Cambridge, Great Eastern Main Line to Norwich, Stansted Express service to Stansted Airport and other trains serving East London and destinations in the East of England. Not forgetting the integration of London Underground lines; Central, Circle, Hammersmith & City and Metropolitan lines.
Sponsored
North Coast Veterinary Specialist, Sunshine Coast

North Coast Veterinary Specialist, Sunshine Coast

Dortek Ltd

North Coast Veterinary Specialist provide surgical services for small animals in Sunshine Coast in Queensland Australia. They have a large fully equipped sterile theatre suite with excellent facilities and have access to all the equipment required to investigate, diagnose and manage and treat complex medical and surgical problems.
Sponsored
Care for Veterans

Care for Veterans

Pressalit Limited

Adjustable bathroom equipments for ex-Servicemen and women. Care for Veterans, providers of long term nursing care, rehabilitation, respite and award-winning end of life care to disabled ex-Servicemen and women, have opted for adjustable bathroom equipment from specialists Pressalit in a suite of new bathrooms in their Worthing rehabilitation facility.
Sponsored
Braefoot Jetty - Fife, Scotland

Braefoot Jetty - Fife, Scotland

Saint-Gobain Weber

Located between St. David's and Aberdour, the tanker terminal at Braefoot Bay is a base for the export of liquefied petroleum gas. The terminal consists of two jetties located on the north shore of Incholm Island. The gas is piped to the Mossmoran Plant in Fife direct from the North Sea, broken down to form ethane and then converted into ethylene, the basic hydrocarbon 'building block' of the petrochemical industry. The products are then piped the final three mile journey to the Braefoot Marine Terminal where they are fed into tankers and gas carriers for markets in Europe and the USA. The terminal is operated jointly by Shell Expro and Exxon.The jetty was suffering from increasing levels of deterioration of the reinforced concrete structure due to the relentless corrosive action of the marine salt environment on the reinforcing steel. A remedial plan was developed to carry out repairs and to introduce a cathodic protection (CP) system to greatly enhance the protection level and therefore extend the life of the structure. The plan was prepared by structural engineers from Shell, led by Hans Verheyde, and Balfour Beatty Construction Services UK (BBCS) was awarded the contract.Two major factors had to be accommodated within the repair programme. Firstly, the tidal flow that submerged the lower part of the jetty twice every 24 hours and secondly, the jetty is a fully live and very active transport hub and shipping schedules had to take precedence at all times. Round-the-clock flexible working maintained delivery of the twelve-month project.Saint-Gobain Weber's specialised repair concrete products were specified for the remedial actions on the Braefoot Bay jetty and technical application advice was provided for the active phase of the project. A suspended scaffold was designed and installed which allowed fast access when the tide ebbed so that productivity could be maintained. Traditional techniques were used to breakout the spalled and cracked concrete and to wash out the surface chlorides and clean the existing reinforcement steels.webercem five star repair concrete CP is a shrinkage-compensated, high strength, low resistivity, flowing repair concrete designed for use in conjunction with CP systems. This pre-blended cementitious concrete fully complies with the Highways Agency Specification Class 29F for high-strength flowing concrete for major structural repairs. It contains non-reactive aggregates with a low soluble-alkali cement content which is particularly important where CP is to be used. The rapid strength development and dimensional stability of webercem five star repair concrete CP – which reaches 27N/mm² in 24 hours – was especially valuable in the tidal conditions in Fife. Tight shuttering was used on the wide beam sections of the jetty to take the poured concrete which reached an integral bond with the original concrete. This process reformed the structural integrity using products with proven durability.An innovative CP system using Duogard® hybrid anodes from CPT was installed to protect the steel reinforcement with the anodes fixed into the soffits with a special CPT mortar. Where the CP installation required chases to carry the cabling, webercem HB40 high-build structural repair mortar was used to fill and seal the chases. webercem bondcoat, a polymer-modified, cementitious bonding aid and steel reinforcement primer, was first applied into the chases to ensure enhanced bonding. webercem HB40 is an acrylic-polymer modified, single component mortar and is lightweight with high build qualities. It can be applied in layers up to 75mm thick vertically, and 50mm on overhead soffits, and can be used without formwork. It was then applied onto the tacky webercem bondcoat primer and finished flush to the concrete surface.The Braefoot Bay terminal project has been completed successfully and Dewi Miller, contracts manager, BBCS, is confident that the jetty protection will extend the working life of the structure. "The products we have used are excellent and the application methods have enabled us to deliver a high degree of protection and reinstatement to the concrete structure. Working on a live site in a tidal zone has required a flexible work schedule but the whole project has worked exactly to plan and the client is very pleased with the result. The Weber materials have been the key to achieving this success."
Sponsored
Gatwick Airport

Gatwick Airport

Genesis Global Systems Limited

When the Gatwick consortium began renovation on the South terminal of Gatwick Airport they needed to ensure that the new floors were protected against movement of the daily traffic that they endure. Genesis provided a solution; working with the architects and installation contractors a cost effective Stainless Steel Movement Joint was selected from the Genesis range. Renovations been part of an £850million investment to see the replacement of floors and ceilings and enhance the experience travellers receive; Genesis movement Joint meets and exceeds all standards of Movement Joints and will save the floors from cracking long into the future.
Sponsored
SAS Royal Hotel

SAS Royal Hotel

dline

In July 1960 the SAS Royal Hotel opened in Copenhagen as the world’s first design hotel. Now known as the Radisson Blu Royal Hotel, it was the embodiment of Arne Jacobsen’s whole-picture approach to architecture and design.Jacobsen received the brief in 1955 from Scandinavian Airlines System (SAS) to build the first hotel of its kind and set Copenhagen up as the Nordic gateway for the new tourists travelling from America. The hotel was to act as a terminal in the city centre, with guests whisked direct from its cocktail lounge to Kastrup Airport in a mere 20 minutes.
Sponsored
STEREO-KINETIC dynamic wall cladding system made from freely-moving stainless steel sheets

STEREO-KINETIC dynamic wall cladding system made from freely-moving stainless steel sheets

Lang+Fulton

The frontage of the Ocean Terminal shopping centre in Edinburgh has received a radical makeover as part of a major investment to increase footfall by enhancing the visitor experience. The extension has been covered with STEREO-KINETIC cladding; hundreds of freely-moving stainless steel sheets suspended from grating panels. Gusts of wind, traffic, even people walking by cause the metal rectangles to ripple in an ever-changing display. The kinetic artwork has been designed in such a way as to allow the passage of natural daylight through the underlying window openings on the second floor level.
Sponsored
Yeoman Shield Anti-Ligature Guardian Handrails Installed at Mental Health Accommodation

Yeoman Shield Anti-Ligature Guardian Handrails Installed at Mental Health Accommodation

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Yeoman Shield recently supplied and installed a handrail system in an NHS Trust’s seven mental health accommodation units.With a requirement for a handrail that was also sensitive to the nature of service users, an Anti-Ligature Guardian Handrail was chosen from the Yeoman Shield range to be fitted to corridor and passage way walls, offering both support as a handrail for those who may require it as well as a form of protection from impact damage to walls from footfall and wheeled equipment.Using a continuous fixing bracket running the full length of the handrail installation eliminates points where ligatures can be attached. Close fitting wall return ends ensures complete enclosure of all mechanical parts of the rail.Supplied in Red, the contrasting colour not only adds to the interior décor but can assist in wayfinding. Manufactured from a rigid PVCu material Yeoman Shield’s Guardian Handrail products do not promote the growth of mould or viruses and are easy to clean, being impervious to commercial cleaners.
Sponsored
Tooting Medical Centre

Tooting Medical Centre

Anderson, GEC Ltd

A new purpose-made stainless steel worktop by GEC Anderson was included within the clinical area of this busy London medical centre. Responsibility for medical centres to carry out minor clinical procedures is increasing. To deal with the need for a safe and professional clinical area, refurbishment works included the provision of a new sink and worktop.Carefully specified by Edwards Rogers Associates, the 1800x625mm worktop includes 450mm high, integral, upstands at back and sides for total hygiene and cleanliness. Two sinks were seamlessly integrated within the continuous worktop. One circular and one rectangular in shape, denoting their differing purposes. The circular bowl is for hand washing and the rectangular bowl for the washing of instruments and equipment. The front edge profile is curved, complying with the precise detailing prescribed by HTM 63 (Healthcare Technical Memorandum).The unit was produced in EN 1.4301 grade brushed satin stainless steel. Stainless steel is well know for its robustness and the brushed finish provides not only a highly resilient and practical surface but also an attractive aesthetic.
Sponsored
Emirates Air Line, London

Emirates Air Line, London

Howe Green

Howe Green’s 5000 Series and 7500 Series access covers were specified for the Emirates Air Line, the first urban cable car in the UK. The cable car crosses the Thames from Greenwich Peninsula to the Royal Docks and links two former Olympic sites. The access covers were required to provide easy and reliable access to essential services within the North and South Terminal buildings. A bespoke aluminium bar was also designed and made for the project. The bar comprises a decorative trim featuring a semi-circular section with a 10-metre radius and a 6mm visible edge.
Sponsored
DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU Fires

DRU has installed 89 gas fires into Ebury Square, a development of luxury 1-4 bedroom apartments and 5 bedroom penthouses by Berkeley Homes in Belgravia, London. The fires were selected for their contemporary design, easy installation and high energy efficiency. They consist of single-sided and double-sided tunnel models. Berkeley Homes selected DRU because of their unique PowerVent® flue system. Due to the configuration of the apartments, the flues had to be extended up to 64 metres throughout the service ducts in the complex, with most of the fires having external PowerVent® terminals on the roof.
Sponsored
Gatwick Airport

Gatwick Airport

SAS International Ltd

For one of the world’s largest self-service bag drop zone in Gatwick North Terminal SAS designed a bespoke, hand-formed 45° angle bulkhead to surround the SAS200 islands. Presenting a clean finish, the 'knife-edge' feature provides a precision-engineered and dramatic aesthetic. This architectural metalwork solution frames the ceiling islands and stands out against the dark grey ceiling. SAS600 rafts were specified over walkways to guide visitors from the entrance to the main check-in area. This design aesthetic and the ease of integration with signs fulfilled the client brief to improve airport ‘wayfinding’.
Sponsored
Bournville Village

Bournville Village

TRC Windows

TRC Windows have been appointed by Bournville Village Trust for the first phase of a six year planned works program to supply and install bespoke sash and casement windows to 46 properties in the Bournville Village estate.The rented dwellings in Bournville Village consist of bungalows, maisonettes, flats and family accommodation.The estate also features a variety of special needs housing particularly for the elderly and people with learning disabilities.Two areas of the estate have been declared conservation areas and there are a number of buildings of architectural interest and historical importance.Window profile & thermal performanceTo meet conservation requirements, window profiles will match the style, configuration and visual appearance of the existing windows (including glazing bars, horn detail, beading, etc).For each building, they will be be supplied and manufactured in preservative-treated softwood.The thermal performance of all windows and doors will meet the requirements of the Building Regulation Part L1B and have a minimum Window Energy rating of 1.4u-value.Measurement and surveyThe process will involve the removal of existing windows and doors where necessary and installation of the new timber frames and glazing.All equipment, scaffolding and materials employed to fix and seal the windows and doors inside and outside the dwelling will be in accordance with the BS 8213-4 specification for surveying and installation.In instances where the structural box frame is to remain, allowances will be made for minor repairs and redecoration.Narrow cavity glazing (A rated)Narrow cavity insulated glazing units (IGU) will be installed so as not to compromise energy-efficiency and authenticity.These units will meet the requirements of BS EN 1279 and be manufactured by a Kitemark or similar accredited manufacturer.

Showing 181-216 of 1047

Feedback