NBS Source
I'm a manufacturer

"underground pipes and fittings"

3,243 results found

Sort by:

Showing 181-216 of 886

Sponsored
West Cliff Hotel, Bournemouth

West Cliff Hotel, Bournemouth

Cellecta Ltd

West Cliff Hotel is a two six story Premier Inn which hosts 105 guest rooms and a third block with 88 residential units. The project included the demolition of a previous building then the construction of the hotel, with underground car parking. The hotel is only a 15-minute walk away (0.5 miles) from Bournemouth Pier and the Oceanarium.Cellecta ScreedBoard 28 was specified by HGP Architects in this luxury refurbishment to improve upon its existing acoustic properties. It's high density, and unique resilient layer provides unrivalled acoustic performance, typically 5dB better than legislative requirements.Inland Homes was awarded this 3,000m² contract to construct this development in Bournemouth.
Sponsored
Girvan Community Hospital, South Ayrshire, Scotland

Girvan Community Hospital, South Ayrshire, Scotland

nVent Thermal Management

RSP Consulting Engineers designed 1.8km of RAYCHEM HWAT-R self-regulating heating cable in a single-pipe hot water system throughout this new hospital. Capable of maintaining water temperatures at a standard 55°C, the system also provides the capability to boost temperatures to 65°C periodically during legionella prevention cycles. The system is controlled via 19 RAYCHEM HWAT-ECO controllers which communicate seamlessly with the central BMS. As the system uses half the pipework of a conventional re-circulation system the installation time was cut dramatically and much needed space savings were made in walls and ceiling voids.
Sponsored
Wey Hill, Surrey

Wey Hill, Surrey

Cellecta Ltd

Wey Hill is a three-story building accommodating eight apartments located in Haslemere in the borough of Waverley in Surrey. Demolition of the existing warehouse was authorised to build this 570m² development, consisting of two one bedroom and six two bedroom apartments, located 12 miles from Guildford.Cellecta’s Mojave S2-10 was specified by Landmark Estates for its high-performance underfloor heating system that offers a dry and robust floor build-up from one source.XFLO FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.Vero Developments were awarded the contract to erect this development.
Sponsored
Indigo Hotel, Queens Street. Cardiff.

Indigo Hotel, Queens Street. Cardiff.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi light – Flexi Base & Extender frames, Flexi heavy – Ahu Frameworks, Flexi everyday – Duct, pipe and electrical containment. Services: VRF Condensers & Air handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. Supplied via a wholesaler in Cardiff, our hot dip galvanised frameworks were supplied in lengths and widths to suit each unit being supported. With all products available from stock, the contractor ordered frameworks in stages, to suit the phased project programme, and eliminated having to find space within an already restricted working environment for everything to be delivered at once.
Sponsored
Charters Ascot -Luxury Private Residences

Charters Ascot -Luxury Private Residences

nVent Thermal Management

To provide high quality instantaneous hot water, the developers were persuaded to move away from a conventional recirculation system to the higher efficiency single-pipe solution, using nVent RAYCHEM HWAT-M self regulating cable and the unique nVent RAYCHEM RayClic connection system. In addition, nVent RAYCHEM T2Red and T2Reflecta underfloor heating was used in the main living areas. The self-regulating cable could provide very responsive heating without overheating, thus avoiding damage to the high quality wooden flooring. Underfloor heating was also used in the bathrooms, using nVent RAYCHEM T2Quicknet. All fully integrated with the BMS to avoid individual controllers.
Sponsored
Green Park Tube Station

Green Park Tube Station

Albion Stone plc

This £48M project provided a new copper and Portland Stone cladding canopy fronting Piccadilly provides shelter for the lift entrance and a new staircase that runs from Piccadilly.The planning approval process involved collaboration with artist John Maine RA whose work is featured in relief on the Portland Stone cladding and granite paving to the Piccadilly area of the project. The work focuses on the geology of the Portland Stone cladding and setting of the station in the natural environment of Green Park.Art on the Underground commissioned artist John Maine RA to create a new artwork which forms part of the station structure for passengers to enjoy.Albion Stone provided stones from the full range of Portland Stone beds available creating a stunning contrast between the stones
Sponsored
Solar Shading & Privacy Screens at Solihull Retirement Village

Solar Shading & Privacy Screens at Solihull Retirement Village

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Solihull Project Type: Residential Development Cost: £47m Product: Balcony Cladding, Window Cladding, Rainwater Pipes Finish: Syntha Pulvin RAL 7016 Anthracite Grey Satin Fire Rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018) Product: Shadex 150 Solar Shading and Privacy Screens Finish: Powdertech’s PWF1 Timber-effect polyester powder coating Fire Rating: A2-s1, d0 (EN BS 13501-1) Client: The Solihull Retirement Village in partnership with the ExtraCare Charitable Trust Architect: DLA Architecture Main Contractor: The Vistry Group Sub Contractor: MQM Fabrications
Sponsored
Impressive Basement Extension, Berkshire

Impressive Basement Extension, Berkshire

Newton Waterproofing Systems

An impressive basement extension, housing a swimming pool and sauna, required a robust waterproofing solution at this large country home.Newton Specialist Contractor Stonehouse were brought onto this large residential project to waterproof an underground extension including a swimming pool and sauna. Set in a small village in Berkshire, the impressive countryside home was designed by architects Spratley and Partners.For the new below-ground structure, Stonehouse were required to install a failsafe and maintainable waterproofing system that would completely protect the luxurious basement from unwanted water ingress.Ensuring that the project was fully compliant with BS 8102:2009, Stonehouse recommended a combined waterproofing solution using a Type B reinforced and water-resistant concrete structure designed to BS EN 1992, combined with a full Type C internal cavity drain membrane system.As the most reliable and completely maintainable Type C waterproofing solution, the Newton CDM System was the ideal choice for this structure. Firstly, Newton 508 membrane was securely fixed to the internal walls of the basement using Newton's specialist MultiPlug fixings.Any water that is captured by the membrane is then drained away with Newton Basedrain channels, and pumped out of the property using a Titan-Pro sump chamber fitted with two NP400 pumps and supported by a failsafe battery back-up system.As an extremely experienced waterproofing contractor, Stonehouse were able to confidently recommend, design and install a comprehensive and truly failsafe waterproofing system that will protect the property from unwanted water ingress for many years to come. Stonehouse also provided complete peace of mind by offering a 10-year guarantee on the installation.
Sponsored
Whitechapel Station - The Elizabeth Line - The Full Story

Whitechapel Station - The Elizabeth Line - The Full Story

Teckentrup UK Ltd

Doors in underground stations not only have to meet fire protection, security and safety requirements, but in particular they have to be able to handle pressure. This was also one of the key requirements for the doors of the new Crossrail stations in London. Here, security doors were required that had to be fire, sound and pressure resistant. Teckentrup was able to offer appropriate door solutions with corresponding conformity, which also complied with the revised, stricter version of LPS 1175 for proof of product certification. In addition, all required values for soft impact tests, structural strength data, „U“ values, cycle tests and life cycles could be met. This tipped the scales in favour of the German manufacturer when the project was awarded and, with the stations Whitechapel and Liverpool Street marked the start of a successful collaboration.
Sponsored
BBC W1

BBC W1

CDM Stravitec

The enormous redevelopment of the site around Broadcasting House is situated between the Bakerloo and Victoria underground lines and the tube trains are clearly audible in all the buildings. Therefore, CDM Stravitec was asked to install floating floors using the Stravifloor Deck system.To protect the BBC W1 technical boxes from structure-borne noise each one was built off a concrete floating floor.The construction of the floating floors depended on the location within the building: in the basement the floors were 125 mm concrete on 100 mm void supported by bearings with a natural frequency of <8Hz.On the ground floor the floors were 90 mm concrete on 100 mm void; the 2nd floor was 90 mm concrete on 75 mm void and the 3rd and 4th floors 90 mm concrete on 50 mm void.
Sponsored
Bibliotheca, Alexandria

Bibliotheca, Alexandria

dormakaba UK & Ireland Ltd

Does the new library bring the Bilbao effect to Alexandrina?The cultural centre Bibliotheca Alexandrina opened in April 2002 was built under the auspices of UNESCO, and aims to build on the glorious past of the ancient library.dormakaba's contribution to the projectOnly 30 metres separate the library from the Mediterranean. Its deepest sections lie 18 m underground and 12 m below sea level, calling for sophisticated structural measures. Library stocks had to be wellprotected against both water and fire.To guarantee this protection and user comfort, the architects turned to dormakaba. The fire protection and smoke check concept includes TS 93 cam-action door closers and ITS 96 integrated door closers, some with electromechanical hold-open, plus BTS 80 and BTS 80F floor springs.
Sponsored
Vertical Sola Shading at Dash, Hoxton

Vertical Sola Shading at Dash, Hoxton

Dales Fabrications Ltd - Aluminium Eaves Products

Location: New Road, Hoxton, London N1 6JAProject Type: Private, Shared Ownership & Social Rent Housing Development Cost: £40mProducts: Aluminium Vertical Solar Shading, SFX Fascia & Soffit Cladding to Terraces & Balconies, Weatherstruck Wall Copings, Curved Weatherstruck Wall Copings, Square Rainwater Pipes, Bespoke Rainwater HoppersFinish: Syntha Pulvin RAL 8080 Matt Metallic BronzeFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018). Client: LB of Hackney & Countryside Properties Plc Architect: Child Graddon Lewis Ltd Main Contractor: Countryside Properties Plc Sub Contractor: Roweaver Developments Ltd
Sponsored
Solar Shading and Delta 150 Gutter at Lymington Shore

Solar Shading and Delta 150 Gutter at Lymington Shore

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Lymington, HampshoreProject Type: HousingDevelopment Cost: £80mProduct: Shadex 150 Raking: First Fix Brackets (Thru Render)Shadex 190 Drop-in Cassettes (Structural Steel Supports)Aluminium Plain FasciaDelta 100 GutterDelta 150 Gutter100mm Round Contemporary Rainwater PipeMeridian Wall CopingFinish: Syntha Pulvin RAL 7000 Matt Squirrel Grey: Marine SpecificationFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Redrow Homes LtdArchitect: AAP Architecture LtdMain Contractor: Redrow Homes LtdSub Contractor: Stafford Rainwater Systems Ltd
Sponsored
Green facade covers like an envelope

Green facade covers like an envelope

RENOLIT Cramlington Ltd

Roof and facade cover... CHALLENGE For the design of a youth centre a Belgian architect wanted to have a fully homogeneous and waterproof cover for the roof and the facade. This envelope technique needed to be combined with a more ecological and aesthetically pleasing green wall design. SOLUTION For the waterproofing of the roof surface a standard RENOLIT ALKORPLAN roofing membrane was used. For the facades the architects opted for a RENOLIT ALKORSOLAR fixing system as the base to attach the final greenwall system. As the roof and the wall covering (waterproofing) are the same material there were no jointing issues. The whole building has been covered with RENOLIT ALKORPLAN roofing membrane. The facade details were similarly accomplished as standard roof details and RENOLIT ALKORSOLAR profiles were used to fix the rain water pipes from the roof.
Sponsored
LPG for hotels, restaurants & pubs

LPG for hotels, restaurants & pubs

Calor Gas Ltd

If your hospitality establishment is off grid, here at Calor you can benefit from our versatile LPG heating solutions which translate into both fuel and CO2 savings when compared with oil, keeping your customers happy with hot water and piping hot food. Follow the link to read through the case study with one of our clients, Nash Manor House. ''The oil tank has rusted and started leaking and I was concerned about the impact that this might have on the environment. I also didn’t like the fact that oil was a target for thieves – so I wanted a fuel that could not be easily stolen. On paper LPG appeared to be more expensive than oil, but in practice that has not been the case.''
Sponsored
Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear

Newfoundland Tower, Canary Wharf - Alumasc Harmer SML & Wade Gullies & Linear

Alumasc Water Management Solutions

Two renowned Alumasc brands, Harmer and Wade, were recently specified and installed for a new striking residential development in London.Newfoundland Tower, also known as “The Diamond Tower”, due to its unique diamond shape and diagonal structure, is a build-to-rent development in Canary Wharf, London. Harmer SML Cast Iron above ground, and Wade gulliesand linear drainagewere installed to provide an effective water management solution.The Harmer SML lightweight cast iron pipework system is dry-jointed, BBA & Kitemark certified, and has a proven track record in above-ground drainage. With its comprehensive range of fittings and accessories, Harmer SML is the ideal soil and waste system for above and below-ground drainage, including rainwater installations, and is fully compatible with other Harmer and Wade drainage products.“Harmer was chosen primarily for its longevity,” said Gary Zumeris - Area Sales Manager – Harmer SML, South. “It’s also easy to install and has excellent acoustic qualities. It’s a very quiet system, which is especially good in apartments or other high-density housing as you can’t hear fluids flowing down the pipes.“The Harmer system was also chosen for its fire-resistant properties, which is an important aspect, due to current legislation. Cast iron is highly specified in London currently, where most buildings incorporate cast iron for increased fire safety.”Harmer SML has the highest product reaction to fire classification possible, which is A1 for BS EN 13501-1, as well as a system fire classification of A2 for BS EN 13823 Single Burning Item A2, s1-d0.
Sponsored
Cement based floor screed solution for underfloor heating

Cement based floor screed solution for underfloor heating

Tarmac

A new flooring solution was required as part of a large, high-specification selfbuild housing project on the stunning Archerfield estate in North Berwick. Underfloor heating had been specified for the ground floor of the house and it was important that the chosen floor solution would help to optimise heating efficiency. Given the scale of the project it was also important that the chosen screed solution could be installed quickly over a large area to fit within the build programme. Following initial discussions and a successful pump trial the customer decided to use Tarmac’s TOPFLOW Screed C cement based liquid screed.TOPFLOW Screed C is a free-flowing, cement based liquid screed that can be trafficked after just 24-48 hours and dries within 21-28 days. It can be pumped into place and allows large areas to be covered quickly with up to 120m2 laid in as little as 45 minutes. Fast drying times mean it can be laid later in the programme when the building is fully water-tight and still hit deadlines for installation of flooring. It is ideal for use with underfloor heating systems. As a self-compacting screed, it fully encapsulates heating pipes without leaving any voids and is also a more conductive medium than traditional sand and cement screeds, improving the thermal performance of the system. It is also compatible with most cement based adhesives meaning it can be used with a wide range of flooring types.The fast-drying times and early trafficking characteristics of TOPFLOW Screed C enabled other trades to follow on quickly, helping to provide continuity and efficiency within the client’s build programme. The contractor was delighted with the outcome, commenting on how good the material was to work with and on the excellent finish achieved.
Sponsored
Access Covers - Liffey Service Tunnel Project, Dublin, Ireland.

Access Covers - Liffey Service Tunnel Project, Dublin, Ireland.

Surespan

Project:Surespan designed and manufactured several floor access covers for the £6.5m Liffey Service Tunnel Project in Dublin Ireland.The service tunnel is one of the crucial links for the rejuvenation of the docklands, it will carry water mains to the docklands and transfer wastewater to the treatment plant at Ringsend. The 260m tunnel will also carry district heating pipes, gas mains, and electrical and telecommunication cables.Products:Surespan designed and manufactured several floor access covers including SAC Flush floor access covers and HIAC Recessed floor covers.All the access covers were supplied with either a gas spring-assisted opening, hydraulic or electric with a retractable safety grid and pedestrian (FACTA Class ‘A’) Loading. A hydraulic HIAC was also supplied with a FACTA Class ‘D’ Loading which is the equivalent of an 11-tonne wheel load.
Sponsored
Haydons Road, Wimbledon

Haydons Road, Wimbledon

Cellecta Ltd

Haydn Avenue is a block of 8 purpose-built flats consisting of seven one beds, and one two beds arranged in two interlinked blocks. The front block includes six flats over three floors with two further flats to the rear block over two. This development is located within walking distance of Haydons Road station and offers regular links into central London.Cellecta’s Mojave S2-8 was specified by Papa Architects as it offers a dry and robust floor build up from one source. Mojave S2-8 is a high-performance underfloor heating system which performs at a low flow temperature. XFLO FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.Caldera Construction was awarded this 100m² contract for this development in Wimbledon.
Sponsored
Cotton Tails - Domiz Standard

Cotton Tails - Domiz Standard

Spanish Slate Quarries UK Ltd

Built in the market town of Sandy, Bedfordshire, Cotton Tails is a prestigious £2.5 million private residential property, the finalist for the RCI Pitched Roofing Awards. The property extends for around 4.8 acres and it includes formal gardens, fenced paddocks, stables, and outbuildings. The incredibly modern five-bedroom mansion offers 6000sq ft of living space characterized by a wealth of attractive features, including an impressive full height reception hall with a floating staircase and enviable underground wine cellar.The Cotton Trails project was managed by Mark Lenn, the landowner, and built by Bartram Timber Frame Buildings Ltd. For the installation of the roof, the landowner selected D Stockwell Roofing Contractor, based upon recommendations, experience, and quality of workmanship. Roofers were instructed to only use high-quality materials to complement the luxurious mansion and interiors of the prestigious property.
Sponsored
Movement Joint Resin Injection, London.

Movement Joint Resin Injection, London.

Newton Waterproofing Systems

At this new-build shopping centre in Shepherd's Bush, West London, the new underground car park was experiencing high levels of water ingress through two movement joints that had failed. Newton Specialist Contractor ASF Waterproofing, who are specialists in injection resins and structural repair work, was therefore called in order to provide a quick solution and fix the leaking joints.Following an initial investigation, the technical team from ASF decided to use the 5-part acrylic rubber sealing resin Newton 324-SR to seal the joint, as it reacts to form a very durable and flexible seal that exhibits exceptional adhesion, making it ideal for movement joints.ASF began by drilling holes at angle into the concrete, and at regular intervals for the 10mm injection packers above the joints. The injection packers were then fitted to each hole, and foam backing rod was used to temporarily block the joint and prevent uncured resin from escaping as it is injected.The five components of the PC 509 Rubber Acryl are mixed to make two solutions, whilst the curing time of the resin can also be adjusted by changing the quantity of initiator used. The resin was then injected through the packers and into the joint using a three-component stainless steel pump.Finally, once the resin was cured and the joints were effectively sealed, ASF ground back the surface of the concrete to either side of the joints and applied Newton 106 FlexProof, a flexible liquid waterproofing material, to provide a final protective seal and finish the job.With two leaking movement joints in a finished structure, the client required a swift resolution to get the area back into use quickly. With the benefit of Newton’s advanced resin and waterproofing products, ASF got to site and delivered the sealed joints within the client’s tight timeframe.
Sponsored
Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Case Study - Proteus Hot Melt® and Proteus Cold Melt® - Nashmills

Proteus Waterproofing

On the Grand Union Canal in Hemel Hempstead, the Nash Mills Wharf housing development features a range of stylish new build 1-4 bedroom houses and luxury apartments offering high quality waterside living in this Hertfordshire town.With a waterproofing system required to protect the concrete podium above the ground floor car park, a selection of hot and cold applied products were provided by Proteus Waterproofing that met the requirements of the client Linden Homes. The licensed roofing contractor worked with Proteus Waterproofing on a dual system specification which included the fast and economical Proteus Hot-Melt waterproofing system, and for the intricate detailing around upstands and to avoid hot works around the plastic soil and vent pipes, the Cold Melt® waterproofing system was the ideal solution.Fast, hassle-free applicationWith the podium deck covering 3000m2, the Proteus Hot Melt® system was the optimum waterproofing solution for a robust, cost effective, seamless and fast application. This solution worked exceptionally well for the Licensed Contractor and is compatible with the fast applied Cold Melt® solution which was used for high detail items including plastic soil and vent pipes and upstands. There was also the added challenge of wet brickwork and an exacting building program to keep to. To overcome this problem, Proteus isolated the wet substrate with Pro-DPM Primer (Damp Proof Primer) which can be applied to green concrete 3 days old and then followed immediately by the Proteus waterproofing system. This enabled the Cold Melt® to be installed on to the vertical elevations will no loss of time.Quality controlProteus Waterproofing worked in close partnership with its Licensed Contractor to successfully deliver the project to a very high standard within the required timeframe.Long term performanceIncorporating recycled rubber-crumb and other organically grown products, Cold Melt® creates an elastomeric, seamless, cold applied membrane and can outlast the lifetime of the substrate on which it is installed.
Sponsored
Hemisphere

Hemisphere

Guttermaster Ltd

Project Overview:The Hemisphere Project marked a unique architectural venture where Guttermaster Limited played an integral role in shaping the project from its inception. Collaborating closely with Ruddle Wilkinson Architects and Stoneguard (Midlands) Ltd, Guttermaster was tasked with designing and manufacturing 960 meters of bespoke aluminium copings, alongside providing 90 meters of TrimFix fascia, aluminium rainwater pipes, and cast aluminium hoppers. This case study unveils the meticulous planning and execution that resulted in a stunning architectural statement with bold symmetrical lines surrounding the entire building.Project DetailsScope of Works:960 meters of bespoke SnapLok cappings90 meters of TrimFix fasciaAluminium rainwater pipesCast aluminium hoppersClient's Requirements:The client, driven by a vision for a distinctive and iconic architectural statement, outlined their objectives for the project:Architectural Finesse: The project aimed to create an architectural masterpiece with bespoke aluminium copings, challenging Guttermaster to deliver on design, quality, and execution.Symmetrical Roof Edge: The roof edge required bold and symmetrical lines to accentuate the building's aesthetics.Collaborative Design: Guttermaster was involved from the project's conception stage and had to work in close collaboration with Ruddle Wilkinson Architects and Stoneguard (Midlands) Ltd to bring the design to life.Guttermaster's Approach:Guttermaster's role in this ambitious project was characterised by a blend of precision and collaborative innovation:Custom Design and Engineering: The Guttermaster design team embarked on creating complex bespoke aluminium copings that adhered to the architect's vision. This involved advanced engineering to ensure structural integrity and aesthetic excellence.Symmetrical Lines: Guttermaster devised a slim edge perimeter feature aluminium coping with secondary support, ensuring that the roof edge featured bold and symmetrical lines that embraced the entire building.Collaborative Development: From the very start, Guttermaster worked hand in hand with the architectural and construction teams, ensuring seamless integration of their solutions into the project's design and construction plans.ResultsThe collaborative effort between Guttermaster Limited, Ruddle Wilkinson Architects, and Stoneguard (Midlands) Ltd yielded remarkable results:Architectural Masterpiece: The bespoke aluminium copings, SnapLok cappings, TrimFix fascia, aluminium rainwater pipes, and cast aluminium hoppers combined to create an architectural masterpiece that surpassed the client's expectations.Bold Symmetrical Lines: The roof edge, with the slim edge perimeter feature aluminium coping, displayed bold and symmetrical lines, enhancing the building's visual appeal.Seamless Integration: Guttermaster's proactive involvement from the project's conception ensured that their solutions were seamlessly integrated into the architectural and construction plans, contributing to the project's overall success.ConclusionThe Hemisphere Project stands as a testament to the power of precision, collaborative design, and innovative engineering in creating a distinctive architectural masterpiece. Guttermaster's role in the project showcased their commitment to delivering bespoke solutions that enhance architectural vision and bold symmetrical lines. This project serves as a striking example of how expert collaboration can transform a vision into reality, producing an iconic and visually appealing building that captivates all who encounter it.
Sponsored
Redland Court, Bristol

Redland Court, Bristol

Cellecta Ltd

Redland Court is an exceptional landmark development of the former Redland High School, which was transformed into a collection of architecturally unique buildings to create 44 new 1, 2 and 3 bedroom apartments located in Bristol. Also, an exquisite duplex and townhouse over two floors with an open plan living area, additional mezzanine living space and roof terrace. Many of the original period features will be meticulously retained and restored, with the original Old School Hall and Library.Cellecta Mojave S2-8 was specified by KWL Architects for its high-performance underfloor heating system, it offers a dry and robust floor build-up from one source. XFLO-FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.Juniper Homes were awarded this 600m² contract to develop this collection of architecturally unique buildings.
Sponsored
Solid wood floors guaranteed with underfloor heating

Solid wood floors guaranteed with underfloor heating

Junckers Ltd

Hatfield Place, a luxury country house wedding venue, chose Junckers solid wood flooring fitted with Leveldek underfloor heating system for its newly developed building. The new foyer, ceremony hall and wedding breakfast room overlook the original walled garden, with views of the beautiful parkland to the rear. The redeveloped building is bright and airy with large feature windows and high ceilings. In the foyer, a spacious room with seating for up to 300 guests, Junckers 22mm Oak Variation flooring provides a warm and lively backdrop, adding character with its subtle colour variations and natural grain patterns. In contrast, the ceremony hall and wedding breakfast room were fitted with Junckers’ Oak Harmony plank flooring, a wide board floorboard which gives a more uniform impression required for the formal spaces. Both floor types were pre-finished in Junckers’ popular Ultramatt lacquer, a strong and durable finish with no surface sheen. Delivered pre-finished, the floors are ready to walk on as soon as they have been installed and will withstand years of dancing and dining with the correct maintenance. The floors in all three rooms were installed over Leveldek, Junckers’ fully integrated underfloor heating and levelling system. Working in partnership with Jupiter Heating Systems, the Leveldek system was developed to simplify the specification process to offer a versatile levelling system, underfloor heating and solid hardwood floor from a single point of supply. Underfloor heating is the most efficient way of heating a large, open area. Specifying Leveldek offered Hatfield Place an all-in-one solution whereas traditionally, installation of the heating system, levelling system and the floor itself would have to be separately sourced. The system is efficient and cost effective to run, ideal for use in a large space. For energy efficiency and fast acting warm-up time, the heating pipes are installed directly beneath the floorboards and the panels are insulated and reinforced for outstanding heat output. The system can be used on an uneven substrate as varying heights can be achieved with the stacking cradles. For more than 30 years, Junckers’ wooden floors have been recognised as the only type of solid hardwood flooring on the market stable enough to be guaranteed for use over underfloor heating. Junckers offers a full guarantee for the system, which is recommended for residential and commercial buildings as well as sports and dance. The flooring contractor was PICA Floorings. 
Sponsored
Pembroke House, Camberley

Pembroke House, Camberley

Cellecta Ltd

Pembroke House is an assisted living home located in Camberley. The home had a conversion of the second and third floors and construction of a 2 story roof extension to provide 116 affordable apartments, as well as 20 in a dedicated dementia suite. Facilities include a private dining room, lounge areas, restaurant, cinema, library, café, spa bathroom, bistro, library, beauty salon and activities room. Located in the city centre, the building has underground parking, garden terraces on the 4th Floor, and a porte cochere providing outdoor space for residents to enjoy.Cellecta’s DECKfon Batten 70 was specified by PRP Architects as they have been rigorously tested and are robust detail complaint for steel, concrete and timber separating floor applications. The battens consist of a layer of recycled, low resonance, open cell, flexible polyurethane foam bonded to an FSC/PEFC certified timber batten.Wates Construction was awarded this 2,880m² contract to construct this development in Surrey.
Sponsored
Historic Restoration - Concourse Village Plaza, New York City

Historic Restoration - Concourse Village Plaza, New York City

C-Probe Systems

Challenge: Concourse Village Plaza houses apartment blocks, retail shops, a multiplex cinema and underground parking. Chloride ingress and weathering has taken its toll on the structure with cracking and spalling of the concrete cover from reinforcement corrosion.Strategy: Significant concrete repair in conjunction with an ICCP system was needed for the structure. LoCem® +chase®, will be used specifically for reinforced concrete structures, where the ICCP anode mortar operates within slots cut and holes drilled strategically into the reinforced concrete structural elements. LoCem® is a low carbon cement alternative that can also act as a cathodic protection anode.Outcome: With the design of the ICCP for the Central podium completed, construction will begin in 2023 before moving to the West and East podiums. The project and is expected to go on for the next 2.5 years. The result of the project will be an ESG compliant strategy that will create a more resilient structure, utilising low carbon build materials that can control the impact of corrosion.
Sponsored
Crowne Plaza/Holiday Inn Express Dual Brand Hotel, Heathrow Terminal 4

Crowne Plaza/Holiday Inn Express Dual Brand Hotel, Heathrow Terminal 4

Smart Balustrades

Client: Grove Developments/Arora HotelsContract value: £362kProducts used:  0.74kN loading stainless steel with glass balustrade to stairs1.5kN loading structural glass balustrade to link bridgesThe dual-brand Crowne Plaza and Holiday Inn Express, which operates under Arora Hotels, is located at Heathrow Terminal 4 and opened in 2018. It consists of 300 rooms as well as business and meeting facilities. The building is directly connected to Heathrow’s Terminal 4 via an air bridge and also offers convenient access to the London Underground, Heathrow Express train service and nearby major motorway routes. We were instructed to supply and install more than 600 metres of balustrades, as well as over 300 metres of wall fixed handrails during the hotel’s construction phase. The balustrades used for the project were 1.5kn structural glass balustrades to bridges and 0.74kN loading stainless steel with glass balustrade to stairs. We provided approximately 300 metres of structural glass balustrades to the hotel’s link bridges. At the design stage of the project, we were advised that the bridges could deflect by 25mm, so our balustrade design had to accommodate this. The solution was simple but very effective – we left a 5mm gap in between each five-metre length of track, which was not noticeable when walking along the bridges but allowed for adequate movement in the structure with no damage to the balustrades or the finishes, and no compromise to the overall look. In addition, we adapted our handrail system to provide protection to the walls where guests wheel trollies and luggage into the hotel. By fixing handrails along the flooring close to the walls, it provided a functional yet attractive solution to avoid any marks or scratches that luggage might create.The overall result was a mix of balustrades to the hotel’s stairs and link bridges, plus handrail finishes to the high-traffic areas of the premises that all fit in with the building’s modern and clean design. 
Sponsored
IKEA Store, Sheffield

IKEA Store, Sheffield

Tobermore

Hadfield Carkwell Davidson specified Tobermore for the 376,737sq ft job at the IKEA retail store in Sheffield.The large-scale scheme, which has created nearly 500 jobs, involved construction and fit-out of the two-storey superstore, providing a sales floor, warehouse, staff facilities, café, and children’s play area, as well as underground and external car parking. The project has received a BREEAM excellence accreditation due to its application of sustainable technologies like solar panels, rainwater harvesting, and electric vehicle charging points on-site.The ChallengeBlock paving was required to meet both SuDs requirements and aesthetic aspiration.The IKEA store was constructed adjacent to the famous Tinsley Viaduct on the outskirts of Sheffield, bringing the popular retail destination to the area near the Meadowhill Shopping Centre.A crucial part of the £60M project was that the hard landscaping design would satisfy SUDs requirements but maintain a high-end aesthetic appeal that would reflect the IKEA brand.The SolutionTobermore Hydropave products provided suitable drainage for the project.The hard landscaping solution created an outdoor area that effectively promoted the IKEA brand. By utilising high-end block paving product Fusion in the cool tones of silver, mid grey, and graphite, the elevated finish was beautifully realised. Permeable paving was employed in certain areas to support drainage that would meet SuDs requirements for the site, exemplifying the project’s green credentials. This in turn made it one of IKEA’s most sustainable stores.Tobermore’s Granite Step Units with Contrasting Nosing allow for the uneven terrain to be navigated elegantly with appealing steps that augment the customer experience at the IKEA store. Hazard Warning flags also ensure that the site fully meets modern accessibility standards for people with impaired vision.Laying patterns and delineation enhanced the area to meet customer expectations, creating spacious parking bays and attractive pedestrianised walkways. Hydropave Pedesta and Fusion paving combined to realise a project that radiates a unique, high-quality feel.
Sponsored
Foxley Lane, Purley

Foxley Lane, Purley

Cellecta Ltd

Foxley Lane is a redevelopment of a former residential care home on a prominent corner plot west of Purley town centre in a prime position on one of West Purley’s premier roads. This development comprises of a five-storey building with fifty-seven exquisite one, two and three bed apartments located within a mile of Purley mainline station. All with parking and a private balcony or patio, it also features white rendered façades and prominent gabled elevations, significantly enhancing the Foxley Lane street scene.Cellecta’s Mojave S2-8 was specified by OB Architecture as it offers a dry and robust floor build up from one source. Mojave S2-8 is a high-performance underfloor heating system which performs at a low flow temperature. XFLO-FF boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.HQ Homes were awarded this 530m² contract to construct this redevelopment.
Sponsored
Moneyfields, Portsmouth

Moneyfields, Portsmouth

Cellecta Ltd

Moneyfields is football club in Portsmouth which includes a new social club and sports facility Building with housing development of 26 residential units in the form of 14 one and two bedroom apartments and 12 four-bedroom houses. Redevelopment of this part single and two storey building was completed to accommodate the sports and social club with bars, function hall, kitchen, cellar, offices, changing rooms, boxing ring, gym, spectator stand, classrooms, ticket office, tea hut, car park, and a pitch with floodlights and fencing.Cellecta’s Mojave S1-8 was specified by PLC Architects due to it being a high-performance underfloor heating system, offering a dry and robust floor build up from one source.XFLO boards are manufactured to suit the pipe diameter and spacing required to achieve the desired thermal output.Chichester Building and Carpentry Ltd was awarded this 900m² contract to construct this redevelopment in Portsmouth.
Sponsored
Cambridge Road

Cambridge Road

The Safety Letterbox Company

THE PROJECTThe Building a Safer Future Charter has been created to promote an urgent and positive culture and behaviour change in the safety of the built environment. It is about putting people’s safety first in how we plan for, design, build, maintain, and look after the safety of the buildings we live, work or play in and protect those that use them.THE PRODUCTSLB’s 2 hour Fire-rated mailboxes were used on this project at Cambridge Road, London for a large Housing Association and arranged on a radius, providing an interesting yet highly functional arrangement of 2-hour integrity only fully tested mailboxes. The Fire-rated range from SLB is tested at Exova Warrington and exceeds 2 hours in temperatures beyond that of molten lava without distortion, flame or deterioration. This system was polyester powder coated in a burnt orange RAL colour, powder used conforms to London Underground specifications.This arrangement is also comprised of manual parcelboxes positioned underneath with a manual locking option.
Sponsored
Fresh Wharf, Barking

Fresh Wharf, Barking

Cellecta Ltd

Fresh Wharf is a multi-phase brownfield project which transforms the wharf on the river Roding. The project includes a demolition of the old industrial estate and construction of 911 one and two bedroom apartments in a range of tenures, flexible commercial spaces, generous landscaping, a new riverside walk and new infrastructure, along with parking concealed below podium gardens. Buildings ranging from 3 to 14 storeys are surrounded by cafes, shops, and restaurants, it is 15 minutes from Barking station, with access to the underground, overground and rail connections into central London. Cellecta’s YELOfon HD10+ was specified by Frank Reynolds Architects due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.Countryside Properties UK was awarded this 40,000m² contract for this development in Barking.
Sponsored
Bermondsey Spa, Southwark

Bermondsey Spa, Southwark

Cellecta Ltd

Bermondsey Spa is a transformation of a neglected corner of south London into one with well designed homes, streets, spaces, and places for the local community. Located in Southwark, close to Tower Bridge and Bermondsey Underground station. 2,000 new homes, 40% of which are affordable housing, have been created. 16 GP surgeries in two new health centres, a NHS dental practice, pharmacy, youth, and play facilities, 2.5 hectares of re-landscaped open space, bicycle parks, council offices and a One Stop Shop, shops, including a food retail store, and offices for the Southwark Primary Care Trust have been constructed.Cellecta’s YELOfon HD10+ was specified by Levitt Bernstein for this development for its acclaimed resilient layer which isolates floating screed from the structural concrete floor. YELOfon HD10+ has superior impact sound deadening properties, is light weight and is easy to handle and install.Hyde Group was awarded this 25,000m² contract to construct this development in one of the most vibrant places to live in London.
Sponsored
Poolside Steam Room and Sauna

Poolside Steam Room and Sauna

Sauna360 Ltd

Following the current trend for basement installations our client had an interesting twist; a large underground area was to be created under the rear garden. Designed to house the client’s beautiful motor cars, there was still plenty of room to include an opulent, huge swimming pool and generously sized sauna and steam room with shower between. Both rooms were designed with a U shaped, emphasising the great social occasion of heat bathing with clear glass fascias providing a wide view of the pool and client’s stunning décor including a feature faux-living wall.Sauna: Warm Alder panelling was chosen for the sauna with a hidden heater to have clean lines and ensure absolute safety for young ones.Steam Room: The matching steam room was lined in beautiful pearl green mosaics to echo the pool finish.Yet another angle on how to introduce a wellness feature at home, all beautifully presented and a project in which Sauna360 were proud to play our part!
Sponsored
MEGAPRESS IMPRESSES AT STYLISH DEANSGATE DEVELOPMENT

MEGAPRESS IMPRESSES AT STYLISH DEANSGATE DEVELOPMENT

VIEGA LTD

Viega’s Megapress press connection technology has been installed across 11 floors of a new £85 million development, 125 Deansgate in Manchester. Selected for its speed of installation and its reputation as a trusted method for connecting thick walled steel tube without hot works, the Megapress connections have been used throughout the heating system.With 12 floors in total, 125 Deansgate echoes the industrial Victorian architecture of the Deansgate area and comprises 117,000 square foot of offices above 12,000 square foot of retail space at ground floor level. The development is expected to achieve a BREEAM Excellence rating on completion.Briggs & Forrester Engineering Services Ltd. were awarded the M&E contract by main contactor Marcus Worthington & Co. Ltd. and began on site in May last year. Briggs & Forrester had not previously worked with Viega’s Megapress system in its northern region so this was the team’s first experience of the product.On the decision to use it in this development, Richie Jones, Site Manager for the company commented: “The project specification suggested using a crimp system for the pipe connections, but Briggs & Forrester Engineering Services do not use lightweight carbon steel crimp systems, so we were looking for an alternative.“Our sister company, Briggs & Forrester Living highlighted that they had used a Viega press connection system on one of their projects and had also been on a Viega factory tour where they had been impressed with the Megapress system. After researching Megapress and the installation process ourselves, we decided to use the product for 125 Deansgate.”In total, approximately 7,000 Megapress connection joints were installed, with somewhere between 500 and 650 joints being used per floor across the 11 floors of office space.Richie highlighted that while Briggs & Forrester were working to a tight programme, Viega’s Megapress helped the company to meet its installation targets though its simple installation process.Using Megapress press connections can provide a 60% to 80% time saving compared with alternatives such as welding, grooving or threading tube. Viega’s proven SC-Contur technology is also designed to deliver a 100% positive leak if a fitting is left unpressed which is clearly discernible during leakage testing or when the system is filled for the first time. This prevents costly remedial work that might be required later on and can again save contractors a significant amount of time on site.Richie continued: “The installation of the Megapress connections was simple and we did not have any issues with the products. There is a good selection of connections to choose from to suit any installation requirement and the system is also simple to clean which reduces the flushing time and overall cost.“We will definitely use Megapress again - using Viega is like going back to using traditional heavy grade steel pipe systems but with a modern twist.”Paul McCormick, Senior Project Manager at Marcus Worthington & Co. Ltd commented, “As yet, Briggs and Forrester have not started to test the system; however, from a safety stand point the Megapress system is much better than traditional brazed pipework as it cuts down on the number of live hot works permits required at any one time and is also less prone to workmanship errors. I look forward to seeing the system prove its reliability during testing.”

Showing 181-216 of 886

Feedback