NBS Source
I'm a manufacturer

"toilet"

1,354 results found

Sort by:

Showing 217-229 of 229

Sponsored
Hindu Temple and Community Centre

Hindu Temple and Community Centre

KWC DVS Limited

Hindu Temple & Community Centre, Nottingham, looked for a washroom revamp and specified Franke products for the project. Inspired Washrooms, a Nottingham based fit-out company, executed the project by installing a wide range of Franke products. The three-week programme included the installation of Franke Miranit washbasins and accessories from the Rodan range. The full range of products provided was: ·       2 x ANMW431 Quadro triple washbasins ·       6 x F3SV1001 FS3 self-closing pillar taps·       9 x CHRX669  Jumbo toilet roll holders ·       5 x RODX618 RODAN soap dispensers for wall mounting ·       4 x F1390 AIRBLAST hand dryers (white) The Temple, based in the City of Nottingham, was developed in the early 1970s and has since evolved into an establishment covering a wide range of activities promoting the Hindu ethos. These activities range from Religious, Cultural, Social, Festive, Educational and Charity events to Yoga practice.Miranit washbasins are ideal for busy areas such as community centres. Miranit is a shatter-proof, resin bonded mineral granite material and provided a robust and aesthetically pleasing solution to the project. Miranit is cast in a single mold with no adhesive seams or joints and offers high stability and high durability while keeping a contemporary style.  Chris Kightley, Managing Director of Inspired Washrooms, commented ‘‘We work with Franke regularly and can always trust them to provide us with quality products. Over the years, we have worked on many projects together, and we would consider them one of our most trusted partners. Their range Miranit composite washroom basins are excellent for various projects that we complete, and the Rodan accessories angular side profiles complement the contemporary décor of the washrooms”.
Sponsored
Solving echoing sound issues within Scouts centre, Cheshire

Solving echoing sound issues within Scouts centre, Cheshire

Hush Acoustics

When the 35th South West Cheshire Scouts moved into their brand new £285,000 state of the art Scout Centre, they immediately noticed that a problem with extreme echoes in the main hall.The hall is used by over 120 Beavers, Cubs and Scouts weekly, plus wider community use, so it was imperative that the acoustic issues were resolved as quickly as possible.The building itself was purpose built and is a conventional brick construction lined with Thermalite blocks. The main activity area measures 11 x 11 metres and around this are toilets, a kitchen, large equipment store and a small meeting room. The store area remains with the painted Thermalite blocks, but the remainder of the building has been rendered and skimmed with plasterboard. The decision was made by the Scout leaders that it was inappropriate to use plasterboard in the main activity hall fearing it would not stand up to the rigorous activities of the scouts and would soon get damaged, therefore opting for render and plaster. The ceiling was skimmed plasterboard.After immediate recognition of the acoustic problems within the building, the organisation approached Hush for advice and guidance. Our technical manager carried out tests, calculating the overall existing reverberation time to be 3.9 seconds with a peak at 500 Hz of 5.39 seconds. Subjectively the reverberation time seemed longer, around 6-8 seconds, which was surprising in a hall of these dimensions and construction.After carrying out the tests on the centre, Hush recommended a solution to treat the hall (aiming for a reverberation time of 1.5 seconds over the wider frequency spectrum) using 40x Hush Absorber 50 panels.The transformation was instantaneous, with immediate feedback that they could hear the room recovering. John Bennett, Group Scout Leader, said“The result has exceeded our hopes, it is now possible to have a quiet conversation whilst 20+ six to eight year olds are having fun! Not only that, it looks good as well.
Sponsored
Metal Technology systems used in Oxford’s new groundbreaking SuperLab

Metal Technology systems used in Oxford’s new groundbreaking SuperLab

Metal Technology Ltd

The extraordinary, purpose built SuperLab in Oxford provides much needed lab space and fantastic facilities for the next generation of science entrepreneurs and innovators. The new state-of-the-art building is located close to the city centre and the university, which spins out around 15 science firms a year. Created and built by Oxford-based Robin Swailes Design and Development, the SuperLab offers almost 7,000 sq ft of accommodation for up to 84 staff and blends contemporary design with the latest efficiency features while meeting the needs of the modern workforce. The building is made of 95 per cent recycled aluminium and features a grey water system using collected rainwater to flush the toilets, thermal efficient panelling, air source heat pumps and solar panels to minimise its carbon footprint and keep running costs as low as possible. Metal Technology Ltd supplied a range of its high-performance glazing products for this unique development via approved fabricator Alternative Windows. Products used were: System 17 Curtain Walling, System 5-35Hi Tilt Turn Windows, System 4-35Hi Fixed Casement Windows and System 10-35 Thermally Broken Commercial Doors. Curved walls, round windows and open ceilings create a sense of space and wellbeing, topped off with advanced acoustics, quality finishing touches and a playful interior. The result is an inspiring and design-focused workplace that encourages collaboration. Outside, a roof top recreation area provides space for al fresco meetings, eating and drinking with views over Oxford’s Dreaming Spires. A fantastic project to have been involved in, which ultimately encourages young and innovative science pioneers to stay and further their career on home soil.
Sponsored
Simon Balle School | Washroom Refurbishment

Simon Balle School | Washroom Refurbishment

Brookhouse

The ChallengeSimon Balle School asked BrookhouseUK to help them create two new Unisex washrooms in their Block 1 and Block 2 Sixth Form areas of the school.The aim was to create open plan washroom spaces but with two sides to them by creating a partial height wall separating the two sides. As the layouts were completely changing and structural work needed to take place, this was a challenging undertaking.Full height IPS cubicles were required with separate vents in each along with new hand washing facilities. Simon Balle School were fully committed to investing in these new modern toilet blocks which future-proofed them for generations to come. They also did not want to wait until the next summer holidays to complete the work.The SolutionBrookhouseUK, having created a strict methodology for term time work, were able to refurbish both washrooms during term-time. We created a design which included demolishing the central dividing wall and installing new half-height partition walls using timber studs and hygiene wall cladding.Two new modern solid surface wash troughs sat on each side of the new walls which included automatic taps and automatic soap dispensers, vastly improving the facilities. Oak effect doors with contrasting dark IPS panels gave the washrooms a fresh, updated look.New automatic dryers were installed to complete the modernisation. Simon Balle School were delighted with the results and have happily recommended BrookhouseUK to other schools. We Provided:Full Height IPSUnisex DesignsContrasting Colour Doors and PanelsAutomatic Taps and Soap DispensersHygienic Hand-DryersModern Solid Surface Trough
Sponsored
Hindu Temple and Community Centre Washroom Revamp

Hindu Temple and Community Centre Washroom Revamp

Dart Valley Systems Ltd

Hindu Temple & Community Centre, Nottingham, looked for a washroom revamp and specified Franke products for the project. Inspired Washrooms, a Nottingham based fit-out company, executed the project by installing a wide range of Franke products. The three-week programme included the installation of Franke Miranit washbasins and accessories from the Rodan range. The full range of products provided was: ·       2 x ANMW431 Quadro triple washbasins ·       6 x F3SV1001 FS3 self-closing pillar taps·       9 x CHRX669  Jumbo toilet roll holders ·       5 x RODX618 RODAN soap dispensers for wall mounting ·       4 x F1390 AIRBLAST hand dryers (white) The Temple, based in the City of Nottingham, was developed in the early 1970s and has since evolved into an establishment covering a wide range of activities promoting the Hindu ethos. These activities range from Religious, Cultural, Social, Festive, Educational and Charity events to Yoga practice.Miranit washbasins are ideal for busy areas such as community centres. Miranit is a shatter-proof, resin bonded mineral granite material and provided a robust and aesthetically pleasing solution to the project. Miranit is cast in a single mold with no adhesive seams or joints and offers high stability and high durability while keeping a contemporary style.  Chris Kightley, Managing Director of Inspired Washrooms, commented ‘‘We work with Franke regularly and can always trust them to provide us with quality products. Over the years, we have worked on many projects together, and we would consider them one of our most trusted partners. Their range Miranit composite washroom basins are excellent for various projects that we complete, and the Rodan accessories angular side profiles complement the contemporary décor of the washrooms”.
Sponsored
Hand Dryer Case Study (Community Centre) - St Werburghs Centre, Bristol

Hand Dryer Case Study (Community Centre) - St Werburghs Centre, Bristol

Dryflow

The challengeThe building housed old conventional hand dryers which hardly dried the hands and were very energy hungry. The requirement was that new units dried the hands quickly enough, but also were energy efficient. “They make the place more hygienic and people are less inclined to use toilet roll.” Jonathan Newey - Centre Director, St Werburghs Community AssociationAbout St Werburghs CentreBased in St Werburghs in East-Central Bristol, they serve the local communities and communities of interest across the city. Managed by the St Werburghs Community Association, it aims to provide accessible and affordable meeting rooms and facilities for individuals, community groups and voluntary organisations. Rooms are offered within its characterful Victorian building or contemporary and eco-friendly Annexe.The solutionThe Ecoforce hand dryer can run at just 500W and still provide a dry time that satisfies all user expectations. A low noise hand dryer suitable for all demographicsModel: Dryflow EcoforceDry time range: 20 – 25 secondsRated power: 500W – 1250W (On/Off heater switch)Guarantee length: 3 yearsThe resultsEstimated annual cost to use old hand dryers: £180 (based on 12p per kW/h) Estimated annual cost to use new hand dryers: £18.90 - £47.25 (based on 12p per kW/h)Annual cost savings: £132.75 - £161.10Estimated annual old hand dryer carbon production: 810 Kg/CO2 (based on 1kW = 0.54 kg/CO2) Estimated annual new hand dryer carbon production: 85 – 212.63 Kg/CO2 (based on 1kW = 0.54 kg/CO2)Annual carbon savings: 597.37 – 725 Kg/CO2Estimated return on investment period:Payback period: approx. 3.9 – 4.7 years
Sponsored
Hand Dryer Case Study (Large office complex) - One Station Square, Cambridge

Hand Dryer Case Study (Large office complex) - One Station Square, Cambridge

Dryflow

The challengePaper towels were the original hand drying method of choice. The tenants decided that hand dryers would be more cost effective and more eco- friendly. This would also match the eco credentials of the building. “The service provided by Intelligent Facility Solutions Ltd, especially Andrew Cameron was excellent, I can't recommend them highly enough. The hand dryers themselves are exactly what we required and have received excellent feedback.” Caroline Hodgson - Receptionist, One Station SquareWho are One Station Square?One Station Square is part of the regeneration of the centre of Cambridge. It is home to some major brands including Amazon, Deloitte, Thales and Carter Jonas. It is the largest building in the city centre, servicing around 800 people a day. It was built using sustainable materials and exceeding energy efficiency standardsThe solutionAfter initial energy and cost calculations were made, as well as discussions regarding suitability, Jet Force hand dryers were installed throughout the building.Model: Dryflow Jet Force ProDry time range: 15 – 20 secondsRated power: 700W – 1650W (intelligent heating system)Guarantee length: 5 yearsThe resultsAnnual paper towel cost: £16,848 (based on 0.6p per paper towel) Annual cost to use new equipment: £349.44 - £823.68 (based on 12p per kW/h)Annual cost savings: £16,024 - £16,498Annual paper towel carbon production: 21,060 Kg/CO2 (based on 22.5g/CO2 per toilet visit) Annual hand dryer carbon production: 1,572.48 – 3,706.56 Kg/CO2 (based on 1kW = 0.54 kg/CO2)Annual carbon savings: 17,353.44 – 19,487.52 Kg/CO2Estimated return on investment period:Payback period: approx. 0.48 – 0.5 years
Sponsored
St Anns P22 Project

St Anns P22 Project

Dart Valley Systems Ltd

St. Anns, London, new mental health inpatient building Blossom Court is undergoing it’s second phase and specified DVS and Franke products for the project. The unit is due to be completed in Autumn 2002 and aims to replace its old mental health wards with modern, state of the art facilities for patients requiring inpatient care. The full range of products provided was: • 2 x VR01-072 V2 High security WC pan less abled with grey top • 3 x VR01-010 High security ligature resistant toilet • 5 x VR01-030 High security V2 basin with integrated backplate (not including sensors) • 5 x VR07-004 Washroom control system kit – for DVS high security backplate & WC • 5 x WC02-014 Concealed plastic cistern kit – vertical – 2” unit • 4 x F0354P Single bowl • 4 x F0359P Single bowl • 6 x F0360P Single bowl • 1 x G22025L DUH hospital disposal unit • 1 x G20605N Stainless steel cistern • 3 x G20055N Centinel janitorial unit – HTM64The plans for the redevelopment of St Ann’s Hospital were developed with patients, staff and local stakeholders and involve a series of improvements. Following completion of the new inpatient unit in summer 2020, Phase 2 includes the refurbishment of other buildings, a new restaurant for visitors and staff and improvements to the site power and water supplies, roadways, car parking and landscaping. Designing sanitaryware for mental health and high-security environments can be a challenge, however, the DVS branded safe ensuite range is manufactured using advanced technologies, provides the perfect solution. These high-security and ligature resistant products are virtually unbreakable and create a safe solution within all mental health facilities.
Sponsored
Redecorated Hotel Arcadeon in Hagen impresses with style-conscious blend of modernity and comfort

Redecorated Hotel Arcadeon in Hagen impresses with style-conscious blend of modernity and comfort

KEUCO

The meticulous selection of products and materials can be sensed in every corner of the Arcadeon. Special combinations and unique, premium creations adorn each guest room, seminar room and bathroom, and add an entirely personal touch. The rooms were intended to contain an element of surprise, while still radiating authenticity; to be trendy and in sync with the times, but still full of comfort and appeal. That is why for Jörg Bachmann, who placed high value on local products and services in the renovations, there was only one logical choice when it came to selecting the fittings and accessories for the premium bathrooms: "Only KEUCO products harmonised with the modern and luxurious design." In the showers of the 80 rooms and two suites, guests have the pleasure of using KEUCO's innovative IXMO fittings. The special thing about IXMO is that the minimalist design of the fittings combines multiple functions in the smallest of spaces. As such, guests are met with a clear and uncluttered picture in Arcadeon's showers. Particularly popular among hotel guests is IXMO SOLO, the clever combination of single-lever mixer and shower hose in only one module. "Finally, a fitting that can be understood by every guest right away," acknowledges the hotelier.Crowning the washbasins are EDITION 400 fittings, which stand out luxuriously with their slender and organic design. The filigree elegance is underscored by brilliant chrome surfaces, whose high value is immediately apparent, adding a touch of style and aesthetics. This holistic approach is continued with the accessories in the bathrooms' toilets. Discreetly elegant, with a luxurious presence, KEUCO's EDITION 400 accessories set special accents with their superb design and high quality finishes. Hotel Arcadeon calls itself a "house of science and further training" and is known in the business community in the region for its generous and exceptionally designed seminar rooms. With its rich offering, the hotel doesn't just attract overnight guests or seminar participants to its dining facilities. In actual fact, for guests from towns in the vicinity the hotel has established itself as "Hagen's living room".
Sponsored
Durlum Ticell and Star Ceilings at medi GmbH

Durlum Ticell and Star Ceilings at medi GmbH

LSA Projects Ltd

PROJECTmedi, Bayreuth [DE]COMPLETIONMarch 2023ARCHITECTSeiler Architektur GmbH / kadawittfeldarchitekturPRODUCTSTICELL in outdoor and indoor areas:White strip-painted aluminium; cell dimension: 54.55 x 54.55 mm; height: 40 mm, format 1200 x 600 mm; [1630 m²]STAR 3:White strip-painted aluminium; width of blade: 3 mm; height of blade: 20 mm; pitch: 20 mm [1700 m²]TANGENTA-H special version:Surface-mounted luminaire; light distribution: 2 x 35°; wide-angle; light colour: 3500 K; DALI dimmable [320 units]PUNTEO-Q50:Wide-angle downlight; light distribution: 2 x 55°; light colour: 3500 K; CRI >80; DALI-dimmable [40 units]PUNTEO-J85:Cardanic recessed downlight; light distribution: 2 x 30°; wide-angle; light colour: 3500 K; CRI >80; DALI-dimmable [6 units]With its new head office building in Bayreuth, medi GmbH & Co. KG , a manufacturer of medical aids, has created an open architecture concept that aims to promote dialogue between its employees. However, it is still possible to work centrally with additional break-out areas such as quiet workplaces.The ceiling and lighting solutions provided by durlum underline this architectural concept. The ’woven’ TICELL open-cell ceiling is used outdoors as well as indoors. In combination with the special version of the TANGENTA luminaire, this ceiling-lighting integration creates a unique look that gives the workspaces a modern, soothing lightness.In the washroom and toilet areas, the linear STAR 3 open-cell ceiling with its clearly defined edges sets architectural accents and creates a unique appearance.With this investment in its new building, medi has created a modern world of work, an impressive contribution towards the status of Bayreuth-East as a location for industry.
Sponsored
Conquest Hospital, St Leonards-on-Sea

Conquest Hospital, St Leonards-on-Sea

Rapid Ramp Limited

PROJECT BACKGROUND:As pressure continues to build on the UK’s health service, Conquest Hospital's Emergency Department urgently needed to transform their current staff welfare area with additional space, achievable with a modular extension.The design included a canteen space, toilets, shower rooms, storage areas and lockers for NHS staff.REQUIREMENT:External developments included an accompanying ramp to overcome the exterior door threshold. The works needed to be achieved within a quick turnaround time and with minimal disruption to the daily running of the department.SITE SURVEY & DRAWINGS:We responded rapidly with a site survey soon after the initial enquiry.This project benefitted from the Lidar scanning technology used by our site surveyors.The machine scanned and plotted the heights and widths of the objects in view, including different floor levels.Our in-house designer then created a 3D visual of the ramp on top of the lidar model, ensuring to draw around any obstructions.The final 3D & 2D drawings were after given to the client with their quotation.END RESULT:Once the extension was near completion, the ramp was fitted in an L shape configuration within a day, minimizing disruption.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder Coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURES INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.
Sponsored
GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

GEC Anderson Offers Pristine Performance For UCS Sports Pavilion

Anderson, GEC Ltd

GEC ANDERSON OFFERS PRISTINE PERFORMANCE FOR UCS SPORTS PAVILIONThe fit out of a major new academic sports facility in North London has included the selection of custom built sinks, work-surfaces, shelving and other stainless steel units, manufactured and installed by sector specialist, GEC Anderson.The University College School Sports Pavilion in Hampstead has been designed by Marcus Beale Architects (MBA) with LIFE Build Solutions of High Wycombe filling the role of main contractor. The area was farmland until the 20th century. The use as playing fields dates from the 1920s.The 18th month project encompassed upgrades to the schools playing fields themselves and the erection of a two-storey structure with extensive changing room facilities, showers and toilets on the first floor. The comprehensive catering facilities include kitchens large enough to serve a dining area which can seat 200. Amongst the stainless steel fabrications designed and fashioned by GEC Andersons highly experienced workforce are a number of base units which combine with single section work-surfaces, sinks and splashbacks to create an easily cleaned, hygienic and ergonomic working environment.As well as the actual kitchen, GEC Anderson also supplied adjustable wall shelving and an L-shaped, three level base unit for a food storage and preparation area. In several places GEC Andersons site survey and subsequent liaison with the project team, which also included The Litmus Partnership Ltd. Catering Consultants, led to units being tailored to fit around structural columns and to accommodate different sized pieces of catering equipment.The stainless steel back bar, with associated fabrications and appliances were also supplied and installed by GEC Anderson.A spokesperson for MBA commented: In 2015 MBA won an invited competition to design a new sports pavilion on the site. Thorough analysis of the topography and the wider views led to a radical design for a pavilion in two parts, linked by a bridge angled westwards to align precisely with the Wembley Arch.
Sponsored
Three types of mineral ceiling tiles for Scottish health charity

Three types of mineral ceiling tiles for Scottish health charity

Zentia

The challengeThree types of mineral ceiling tiles feature at the Jenny’s Well care home for older people with sight loss. It is operated by the Royal Blind charity, which shares sister charity Scottish War Blinded’s new Hawkhead Centre for visually impaired veterans.The Jenny’s Well care home designed by the Unum Partnership features Zentia’s tiles in the main entrance, reception and manager’s offices, all the corridors, back of house staff areas, kitchens and toilets.The solutionThese include 1,000 m² of Zentia’s Perla Tegular and 250m² of Prestige dB tiles, as well as 350 m² of Aruba Max, all mineral with Tegular edges installed on a Zentia Prelude 24mm XL2 grid system.In addition, it features ISO clean room rated Hygiene tiles to the main kitchen and humidity-resistant Hydrabloc tiles to laundry areas and WC, both square-edged 600 x 600 mm in a Prelude 24mm Corrosive Resistant grid. The use of a 200 mm high Axiom profile also provided a solution for ceiling level changes with a pre-finished bespoke upstand.The Zentia systems were supplied by CCF in Glasgow and installed for main contractor CCG (Scotland) Ltd by specialist sub-contractor Brian Hendry Interiors, a member of Zentia’s Pinnacle Partner network of sustainably-certified installers, whose squad of specialist fixers completed over a six-month programme.Unum found the site for the client, The Royal Blind, to not only accommodate proposals for the bespoke care home but also a drop-in centre for the Scottish War Blinded. The care home is designed to provide an exceptional caring environment designed to the exacting requirements of the visually impaired. The design has been developed to create domestic-scale pavilions centred around a sensory courtyard, creating a community hub, with the aim of providing a secure environment that promotes care and social interaction and encourages self-confidence and independence among its residents.

Showing 217-229 of 229

Feedback