NBS Source
I'm a manufacturer

"steel doors"

5,287 results found

Sort by:

Showing 217-252 of 441

Sponsored
The Pathé Building

The Pathé Building

Allgood Ltd

Originally home to Pathé films and situated in the heart of London’s famous Soho district, The Pathé Building at109 Wardour Street is a newly refurbished developmentconsisting of 15 apartments. With exquisite interiors drawingon a classic British palette of textures, the apartments offer2-3 bedrooms with communal area and kitchen. With flatsretailing at the higher end of the market, it was imperativethat Allgood’s specification complemented the luxuryaesthetic of the apartments.Initial discussions revealed that the architect wanted tospecify the same finish throughout the entire building.This presented a challenge for Allgood as there wereseveral different types of doors and door colours:orange, white and grey. Allgood felt stainless steel,while a finish that would suit the décor, would not beappropriate for this type of residential building so abronze finish was agreed upon. The grey apartmentfront doors were supplied with bronze door closers,thumb turns, lever handles, hinges and flushbolts,whilst the bathroom doors were fitted with bronze pullhandles and thumbturns.The building also required signage to direct residentsand guests to various areas of the facility. However,the architect wanted to continue the bronze themeinto this so Allgood manufactured bespoke individualnumerals, letters and various symbols including abicycle in a bronze finish.Like with any central London residential building, spaceis an extremely valuable commodity. In order to maximisespace in the apartments, Allgood supplied bronze pocketdoor locking kits for all the bathrooms.
Sponsored
Security Revolving Doors at Luxe Fitness

Security Revolving Doors at Luxe Fitness

Record U.K. Limited

Installation of 2 security revolving doors at Luxe Fitness, Bristol.
Sponsored
One Bishopsgate Plaza

One Bishopsgate Plaza

Profab Access Ltd

Profab Access proves its worth at One Bishopsgate Plaza Situated in the centre of the City of London, One Bishopsgate Plaza is one of the first high-rise residential and hospitality developments to be built in the capital for a number of years. Once construction has been completed, the flagship 43-storey tower will house London’s first luxury 5* Pan Pacific Hotel, which will comprise of 237 rooms, an indoor swimming pool and a 370 capacity Pacific Ballroom, Square Mile’s first dedicated ballroom. From levels 21 to 41, the development will house 160 luxury one, two and three bed residential apartments, or ‘Sky Residences’, which will boast panoramic views of some of London’s most iconic landmarks. As part of the construction process, over 200 steel riser doors from Profab Access in a range of door leaf configurations and sizes from its INTEGRA 4000 Series, combined with over 300 bespoke ceiling panels from its ECHO 7000 Series, are currently being installed throughout the entire tower by BDL Dry Lining. Specified due to their impressive seamless integration into masonry walls, shaft walls and drywall partitions, the riser doors provide discreet and secure access that won’t impact on the overall interior design scheme of the development, a main consideration for the public and private areas of the hotel.The INTEGRA 4000 Series’ third party CERTIFIRE bi-directional certification from Warrington Fire was also a leading factor for specification, as the riser doors are fire tested from both sides to two hours, providing the highest standard of evidence for fire safety performance.All of the doors were supplied with comprehensive CERTIFIRE accreditation documentation as evidence of Profab Access’ up to date fire testing, providing both the specifiers and contractors responsible for the development with absolute confidence in the performance of the critical fire integrity products.The INTEGRA 4000 Series is independently bi-directionally fire tested and certified by an accredited third party, to ensure legal compliance.A combination of one and two hour fire rated riser doors were chosen to be installed throughout all residential and communal areas of the building to not only achieve compliance with current regulations by eliminating the spread of fire throughout the building for the specified durations, but sufficiently future proof the building for years to come. The bespoke Profab Access ECHO 7000 Series Ceiling Access Panels have also been specified for installation throughout the hotel bedrooms and communal areas to provide concealed and maintenance free access to the ceiling shafts. Due to the significant size of the ceiling access panels, which span up to 1100mm x 1800mm, Profab Access developed a bespoke additional safety system that featured a one side lift out and one side swing/push latch mechanism. The innovative design assisted BDL Dry Lining’s team of engineers in stopping the heavy doors swinging from the ceiling, while also enabling the panel design to work within a reduced space. BDL Dry Lining is one of the largest specialist dry lining contractors in the UK and has been an installer of Profab Access riser doors and access panels on high profile commercial and residential projects for a number of years. Tony Grayson, Project Manager at BDL Dry Lining, said: “This is a standout development to be involved with and we knew from the very beginning that Profab Access would be our go to supplier for this project. “Over the last two years we have worked closely with Profab Access’ team of Specification Managers and Engineering experts to deliver and install the riser doors and ceiling access panels throughout the 41 storeys. The access solutions are extremely easy to install and offer the highest standards in performance, quality and compliance for unfaltering consistency across the entire site.”The riser doors are also 35dB acoustic rated, smoke sealed and airtight to Part L. In the event of a fire, the doors will maintain their frame and integrity for up to two hours, limiting the spread of fire and transmission of radiant heat for this period of time. The doors’ intumescent smoke seals also enables occupants to safely exit the building, whilst subsequently minimising potential damage to other areas of the construction. By specifying the CERTIFIRE bi-directionally fire tested INTEGRA 4000 Series Riser Doors, the development is actively future proofed as the comprehensive testing certification provides a complete and transparent audit trail of due diligence that evidences the products are not only fit for purpose, but meet the duty of care required to ensure legal compliance.  Marcus Parnham, Commercial Director at Profab Access, said: “As One Bishopsgate Plaza is such a unique building, it required a bespoke approach that ensured the access solutions we provided were not only fit for purpose, but superseded expectations. “That’s why every element of the ceiling and wall access products have been individually considered, from the additional safety systems on the ceiling access panels, to the Euro Cylinder locks on the riser doors to prevent unauthorised access. The result is a complementary suite of solutions that provide unobtrusive access, without compromising on aesthetics.”Profab Access’ comprehensive portfolio of access panels and riser doors are manufactured in-house at its headquarters in Atherstone and are supplied with impressive lead times throughout the UK. The products are supported by a wide range of BIM Level 2 and CAD files to aid the specification process and streamline the initial design stages.Manufactured in accordance with ISO 9001, the INTEGRA 4000 Series Riser Doors and ECHO 7000 Series Ceiling Access Panels can be specified and installed in a range of configurations to meet each project’s specific measurements and requirements.For further information on Profab Access and its range of riser doors, access panels, and steel doors, call +44(0)1827 719051 or visit www.profabaccess.com.
Sponsored
Hygienic, fire rated doors for Abbott Nutritional Division

Hygienic, fire rated doors for Abbott Nutritional Division

Dortek Ltd

Abbott Nutrition develops and markets a wide range of science-based infant formulae & medical nutritionals. Abbott nutrition required hygienic door solutions, windows and transfer hatches for its new manufacturing facility. The factory it the country’s fifth facility under Nestle and is considered to be among the company’s most advanced worldwide.  Dortek supplied Fire rated single action and sliding doors across the facility. Their smooth and seamless construction means there are no ledges where bacteria can gather. Our encapsulated doors are hygienic, easy to clean and 100% waterproof. Dortek GRP doors are ideally suited to milk processing areas and have been installed in facilities worldwide.
Sponsored
Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

HAG Ltd. - The Door Specialists

2021 sees Rolls Royce unveil Testbed 80, the world’s largest & smartest indoor aerospace testbed, as part of a £90million investment. It has been a hard year for the aerospace industry, with production slowing, and cuts in jobs, however this ground breaking facility shows Rolls Royce’s confidence in the future of aerospace for decades to come.HAG Ltd. have proudly worked alongside Buckingham Group to assist in this ground breaking facility that will not only test propulsion systems of the future, but also secure jobs in Derby, UK for many years to come.HAG Ltd. were tasked with designing & manufacturing a roller shutter for this distinctive & state of the art facility, to enable Rolls Royce to test the largest, smartest and most powerful engines in the world by MDS Aero Support Corporation of Ottawa, Canada.HAG Ltd. designed, manufactured and installed 2 Armourguard F1 insulated roller shutters that were 7.5m by 15m. The F1 model is a high quality insulated security shutters delivering the highest level of security and offering thermal protection. A composite of foam filled sections is encased in a flat double skinned interlocking galvanised steel lath.The project:£90million project3 years of construction7,000 square metres, the same size as a Premier league football groundHouses the world’s largest exhaust pipeContains 3,218 tonnes of steelAnd 27,000 metres3 of concreteEquipped with a 40,000 litre fuel tankCapable of testing engines on Sustainable Aviation FuelThe most capable & complex testbed ever designed & builtWarren East, Chief Executive, Rolls-Royce, said: “Testbed 80 is the largest facility of its type in the world. However, it is not only big, it is also smart and features the most advanced testing technology we have ever used. As the new global hub of our testing capability, it will support the next stage of our UltraFan programme as we begin ground testing the first demonstrator in 2022. This incredible piece of infrastructure is a very visible sign of our commitment to this site and secures the future of Derby as the home of large engine development, continuing a history that began in the late 1960s with the RB211.”HAG Ltd. are proud to be part of this monumental development in the aviation industry.
Sponsored
Stainless Steel Sinktops For Brockholes Nature Reserve

Stainless Steel Sinktops For Brockholes Nature Reserve

Anderson, GEC Ltd

Made-to-measure satin-brushed stainless steel worktops and sinks from GEC Anderson have been used to enhance the light and contemporary spaces they are situated in at Brockholes Nature Reserve near Preston, Lancashire.The nature reserve was formed over 10 years out of a former gravel quarry, with a range of habitats added to existing woodlands and water, carefully crafted to attract different species of birds, animals, fish and plant life. The project is the winner of 2 Civic Trust Awards and has achieved the new and highest rating of sustainability, BREEAM ‘Outstanding’ for interim design stage.Owned by the National Wildlife Trust, Brockholes combines a visitor centre with a 67-hectare nature reserve funded by the North West Regional Development Agency. Brockholes is one of the best sites in the UK for many species of birds and different habitats have been created throughout the area to encourage them and other wildlife to visit the siteThe buildings and open spaces form a village-like cluster, floating on a large pontoon and include various facilities such as a café, gift shop and information area. The kitchenette is situated in the conference centre, which is available for hire by companies and individuals for private functions. The small kitchen space is used for general washing up tasks as well as for the storage of crockery and cutlery, includes two GEC Anderson made-to-measure brushed-satin stainless steel sinktops. Designed to fit the compact space available, the stainless steel worktops combine robust functionality with their professional and attractive appearance.The Education Classroom is situated in the Visitor Village and accommodates up to 60 people. It is used for school and adult education activities during term time and family activities during school holidays. A single piece, 3.5 metre, GEC Anderson made-to-measure brushed-satin stainless steel sinktop is located within this area, that includes a special 2.2 metre trough sink to a 180mm depth. This special trough sink is used for general wet activities and for cleaning of art and craft equipment. Kath Knight, Manager at Brockholes said, “Stainless steel provides clean lines and good looks in a modern classroom environment and compliments the surrounding building materials, which are mainly timber.”For the architect, it was also the obvious choice for this busy educational space, as it is hard wearing, hygienic, maintenance free and retains its original appearance over time. GEC Anderson was also chosen for their ability to provide the sinktop configurations to meet the design requirements.Managing Director of GEC Anderson, Martin Tye, comments: “This is a situation where practical requirements must be satisfied but where design and use of natural, balanced, honest materials are, equally, of importance. Stainless steel worktops tend to blend-in so well precisely because of their neutral appearance.”
Sponsored
Double action fire rated doors for Harrods, London

Double action fire rated doors for Harrods, London

Dortek Ltd

Arguably the most famous department store in the world, Harrods of Knightsbridge is a huge retail concern with over 5000 staff members working in over 70,000 square meters of retail space split into 300 plus departments over seven floors.When Harrods decided to redesign their staff food court they required double action doors that were aesthetically pleasing, had a high hygienic rating and were easy to use and they also needed a double action door with a 120 minute Fire Rating.SolutionDortek Installed Polyethylene doors that could be used as personnel doors. They also allow easy movement of trolleys and kitchen equipment between the three distinctive kitchen areas. Dortek also installed double-action 2-hour fire rated GRP doors into a 2530mm wide structural opening to enable staff to bring in large pieces of kitchen equipment when necessary.
Sponsored
Panama Hatty's

Panama Hatty's

Bushboard Washroom Systems Ltd

Panama Hatty’s is located near Spurstow, current owner Lee Brennan has made a great success of the restaurant. Knowing how important quality washrooms are was one of the main reasons for the refurbishment of the washrooms.Lee chose Bushboard’s Definition range as he wanted the ‘top of the range cubicle’. With full height flush fronted doors and stainless steel contemporary fixings; Definition was the perfect choice for the washrooms.Read the whole case study on our website.
Sponsored
Potato Wharf, Manchester - Residential

Potato Wharf, Manchester - Residential

Aspex UK Limited

Potato Wharf scheme comprises 191 apartments in Manchester. The canal-side development scheme led by Lendlease is set amongst surrounding waterways and a vibrant modern community within a historic setting.  Location: ManchesterContractor: LendleaseArchitect: David Vanderson of Weedon Architects, helped by mechanical and electrical engineers, Hulley & KirkwoodAspex supplied: Integra Living doorsets, Novista Steel Riser Doors, all complete with a full Ironmongery package.
Sponsored
Guernsey Airport Fire Station

Guernsey Airport Fire Station

HAG Ltd. - The Door Specialists

Guernsey Airport Fire Station are a service specialising in the prevention of plane fires, located within proximity to the airfield to allow quick action in the event of an emergency. The work was implemented for G4S Secure Solutions (Guernsey) LTD on behalf of the state of Guernsey fire service at Guernsey Airport. HAG Ltd was enlisted to help the installation of 4 electrically operated Q Doors. Originally using sectional overhead doors, they instead switched to a product which had thermal properties and ease of operation.
Sponsored
Ideal concealed door hardware for a chic entrance area

Ideal concealed door hardware for a chic entrance area

Sugatsune Kogyo UK Ltd

The MFU1200 door hardware was used for a walk-in closet door in the entrance area of a private residence. The goal of the product was to create a hidden door.In this article, the benefits and objectives of this product will be explored. Specifically, the purpose of this project which was to fulfil the client’s request to “have the closet door look like a wall when it is closed.”PROBLEMKey IssuesThe design goal was to create a closet door that could blend in and look like a wall when it was closed.SOLUTIONThe SolutionThe push-to-open door functionality eliminates the need for a handle to be installed on the front of the door.*The door's handle-less design enables it to flawlessly integrate into the wall and give the impression of being practically invisible.Seamless blending into walls*The MFU1200 is a push-to-open type door hardware that does not require a handle to be installed into or on the front of the door. The handle-less design allows for the door to seamlessly blend into the wall and appear to be almost invisible.*Requires handle on back side of door.Click here to see how it works. This “secret” door is only noticeable when you push it, making it a fun and functional design choice.Maximising space in closetsThe benefits of this product are not limited to its appearance.With conventional swing doors, you have to make room in the opening direction of the door to accommodate its opening radius. However, the MFU1200 allows the door to slide open laterally, maximising the space available in the closet.Maximum 70kg for heavy doorsThe door used in this project has a door height of 2700 mm, a door width of 1200 mm, a load capacity of up to 70 kg and has passed 100,000 open-close tests*, making it suitable for marble doors such as those used in this mansion.In addition, the sliding mechanism is equipped with dual dampers. As a result, the door opens and closes softly and gently, the door an upscale feel.The client commented that the heavy marble doors used with the MFU1200 “closed flat against the wall and moved smoothly.”*Internal testing.This product can be used to create wall-like doors, save space and is compatible with heavy doors making it a versatile product for a variety of home interiors.Click here for product videoClick here for installation video
Sponsored
Street furniture rusting steel planters

Street furniture rusting steel planters

Powdertech (Corby) Ltd

A major urban regeneration programme to revive a neglected area within the town centre, creating a vibrant community of shops, workplaces, and open spaces.Striking a balance between modern facilities and historic features was at the heart of the design brief, particularly referencing the industrial heritage. In former times this town played a major role in establishing the UK shoe industry Street furniture is throughout the re-development for which the architect decided to use premium powder-coated galvanized steel, delivering both visual appeal and high levels of resistance required within a heavy footfall outdoor environment. Rust-effect powder coat finish, ‘Sahara’ evokes the town’s manufacturing heritage that captures the look of weathered steel without the concern of staining the surrounding paving. Providing excellent weather resistance, colour stability and durability, Sahara was applied to metal planters, seating, bollards, railings and art installations. This achieves visual appeal and a fresh and bold aesthetic. The use of proven powder coating combined with galvanizing technology established in the architectural industry ensures that the street furniture will remain structurally sound and smart for many years to come. The project has achieved a key objective in attracting increased footfall in the commercial ‘sole’ of this once down-at-heel area.
Sponsored
Carpet, Matting & Stair Edgings - Steel City House

Carpet, Matting & Stair Edgings - Steel City House

Gradus

John Scotting, Managing Director of main developer Scott’s Developments Ltd, commented: “The restoration of Steel City House has created a thriving business hub in the heart of Sheffield. Gradus were able to provide a choice of colour and design options that allowed us to achieve a modern flooring scheme, whilst still complementing the heritage of this period building. “The Gradus products selected provide the perfect balance between practicality and aesthetics and we’re really pleased with the finished outcome.”
Sponsored
Private Hospital London

Private Hospital London

Specialist Door Solutions

Based in Central London, this private hospital boasts a clean, sharp design.The entire hospital is fitted with bespoke products to accentuate the premium setting. This Private Healthcare branch has been refurbished to equip SDS DFendoor doorsets in Woodgrain effect combining stunning looks, durability and hygiene.This great looking project boasts many bespoke features including 3 metre high woodgrain encapsulated SDS DFendoor’s, including doors with a different finish and colour on each side and colour matched cladding. SDS is proud to have added to the overall design and execution quality.
Sponsored
David Austin Roses - Alumasc Rainwater Infinity Steel

David Austin Roses - Alumasc Rainwater Infinity Steel

Alumasc Water Management Solutions

David Austin Roses, award winning rose growers and home of the National Rose Collection, has recently installed Alumasc Rainwater steel gutters and downpipes at its nursery tea rooms in Shrewsbury. Following a recent extension they wanted to give the property a new lease of life as the existing plastic rainwater was becoming unsightly and tired. Rainwater specialists Roweaver Developments Ltd recommended the perfect solution for David Austin Roses with Alumasc’s contemporary steel range. The replacement steel guttering complements the timber cladding of the building and fits in with the overall look of its well-kept gardens.
Sponsored
The Neighbourhood, Cardiff.

The Neighbourhood, Cardiff.

The Safety Letterbox Company

THE PROJECTThe Neighbourhood student accommodation is located in Cardiff – one of the UK’s most popular urban destinations that “combines an eclectic mix of history, culture, and fresh and exciting innovations”.The Neighbourhood student accommodation project is situated on the corner of City Road and The Parade in the heart of Cardiff city centre, within a short walking distance to the university, railway station and town centre.The project features cost-effective MODA stainless steel mailboxes configured into a large bank of freestanding mailboxes that are fitted to the floor using bespoke steel plinth supports. Integrated into the bank of boxes are mailboxes finished in a Pure White (RAL 9010) colour that spell out the word “HEY”.The mailboxes are located in the reception lobby area close to the property entrance doors, welcoming visitors and residences to the student accommodation each time they enter the building.
Sponsored
Performance Door Blanks for Christ Church at Spitalfields

Performance Door Blanks for Christ Church at Spitalfields

James Latham

James Latham have supplied 40 door blanks from their Moralt Laminesse FireSmoke range to the grade 1 listed Christ Church at Spitalfields in the East End of London. The brief was to convert the crypt of Nicholas Hawksmoor’s church into a multi-purpose space for events, board meetings and a fully operating café. The door blanks with a European Oak veneer were specified due to their superior acoustic values which was of the upmost importance for keeping the outside noise out and not disturbing any events or services that will take place simultaneously.
Sponsored
Slimdrive SL NT automatic sliding door system

Slimdrive SL NT automatic sliding door system

GEZE UK Limited

Product name Slimdrive SL NTType Door openers / closersDoor type suitability Sliding doorsOperation ElectromechanicalInstallation Door surround mountedGrade CommercialMax. size of door leaf 120kgOperator dimensions (mm) 70mm highPart of the Slimdrive range, the SL NT is an electronic automatic sliding door system that offers flexibility, reliability, functionality, efficiency and safety.The extremely slim design of the SL NT makes it possible for the operator to be concealed in any facade, giving architects the freedom to design stylish entrances. Extremely versatile and suitable for a wide range of applications, the Slimdrive SL NT can be used for single- or double-leafed internal or external doors. GEZE Slimdrive SL NT also benefits from quick and easy assembly and installation.The Slimdrive SL NT is an intelligent automatic door system that is perfect for busy entrances to buildings such as shopping centres, hospitals and stores - anywhere where there is a high volume of traffic and where manually operated doors are not appropriate.The Slimdrive SL NT is suitable for a variety of applications, from the simple installations to grand all-glass facades. Two or more SL NTs can be combined to provide a draught-proof lobby.Key featuresOne of the most compact sliding door operators availableOperator height only 7cmEasily integrated into almost any facadeEnvironmentally friendly due to economical use of materials and energyDimensionsOpening widths: 700 to 3000mmWeight: up to 125kg per leaf
Sponsored
Vibrant Green decors chosen for doors throughout school

Vibrant Green decors chosen for doors throughout school

Formica Group

Four Formica® Laminates were specified for fire doors in Octavia House School, an independent specialist therapeutic school based in Essex, UK. Doors were designed for high traffic areas including classrooms, offices, toilets and communal spaces such as corridors and halls.
Sponsored
Specialist Speed Doors for a well-know British baker.

Specialist Speed Doors for a well-know British baker.

Tekta UK

This well known producer of bakery products was experiencing repeated damage and rising repair costs on their loading bay roller shutter doors. Beings a BRCGS accredited site, they could not afford to have their external doors damaged (or left open) for any period of time, as this creates an ingress point for rodents. Tekta were pleased to work with this site to create an effective solution. The Rapidor Impact high speed door was specified due to it's self-repairing feature and it's anti-rodent functionality. Click the "View More" button above to view the full case study.
Sponsored
The devil is in the detail...

The devil is in the detail...

GEZE UK Limited

Richard Richardson-Derry of GEZE UK looks at how a properly fitted fire door with the appropriate components can give occupants vital time to escape in the event of a fire.Despite what most people believe, toxic smoke is the cause of the most deaths in fires, as opposed to the fire itself. So what constitutes a fire door?The BWF Fire Door Alliance states the term usually refers to a fire door leaf which is the main component installed into a fire-rated frame, along with ‘essential ironmongery’ to make the door perform correctly in the event of a fire.However therein is the challenge – when not required to be a fire door it must still perform everyday functions of providing safety, security, privacy, separating different areas and reducing noise in a building.When an architect specifies door products, it is imperative that as well as achieving the everyday design requirements, factors relating to fire resistance are also a key consideration in order to achieve regulatory compliance.Under the spotlightApart from the frame and door leaf, a fire door includes a door closer, smoke seals, hinges, push pads or handles, signage, and maybe a vision panel. Each and every component must be fit for purpose; should any component fail then the whole fire door assembly could fail. And any item that is badly fitted or wrongly specified could contribute to the spread of fire.For each part of the fire door there are standards that must be adhered to.The door and frame should be installed securely and plumb and true with a maximum gap of 3 mm to all sides for a fire door with smoke protection (for a general fire door the gap can be up to 10 mm).The door closer is an important part of the fire door assembly and it is critical to specify a suitable unit and ensure minimum size EN 3 is used.All doors must be fitted with intumescent seals – they play a major role in fire safety as they will expand to around 10 times their volume when significant heat is applied.Hinges are a critical part of a door, carrying its weight and allowing free movement of the door leaf but also helping to keep the door straight during a fire episode. There should be three hinges in a fire door up to 2,100 mm high. For doors over 2,100 mm high, exceeding 150 kg, or over 100 mm wide there should be four. All hinges for fire doors should be made of steel or stainless steel and have a melting point of no less than 800°C.All relevant push pads, handles and kick plates must have the required test data and standards and should have a melting point of at least 800°C. Locks need to comply with BS EN 12209 and lever handles with BS EN 1906.Signage on a fire door is required, such as ‘Fire Door Keep Shut’ or ‘Fire Door Keep Locked’. They need to conform to BS 5499: ISO 7010.Vision panels can be introduced to a door specification for reasons of safety, aesthetics, or to allow transfer of light, however the relevant seals must still be used so as not to compromise the integrity of the fire door and only suitable fire tested glass should be used.Specifying a closer for a fire doorThere are four main types of closer – surface mounted with link arm, surface mounted with guide rail, concealed, and floor mounted closer. All should be tested, approved and certificated to harmonised standard EN 1154, BS EN 1634-1 and have Certifire or similarly approved testing. In addition, a closer should be CE marked or hold the new UKCA (UK Conformity Assessed) certificate (effective fromJanuary 2023).There is also the application to consider: which closer is best suited to the door type, size, location and intended use of the door? Another consideration is the best fitting arrangement, and again this is dependent on door type, size, location and use.There are several different configurations for a variety of applications that also need to be taken into account including fitting configurations, using brackets, mounting plates or spindle extensions to overcome specific site details. All should be specified in accordance with test evidence.Another consideration is being able to adjust the closer. The correct adjustment of the closing force is needed to ensure it meets the requirements for access under Part M and BS 8300 with Part B of the Building Regulations for fire as well. Correct adjustment refers to electro hold open, back check, closing speed, and latch action to ensure the door opens and closes safely and securely.All door closers complying with EN 1154 will have a six figure classification which should be marked on the door closer.The power of door closers according to the EN 1154 standard are rated from one to nine, for example a size three door closer has a closing force of 18 Nm (Newton Metres), where Nm is the closing force exerted by the door one metre from the hinge point. It should be noted that the minimum size allowed for any door closer on a fire door is size three.In summary, while all the component parts of a fire door must be thoroughly tested and conform to all relevant standards, the most important aspect is that they must work together as a doorset.Richard Richardson-Derry is national specification manager for GEZE UK
Sponsored
Kings Cross Square: high quality stainless steel grating

Kings Cross Square: high quality stainless steel grating

Lang+Fulton

The final phase of the £500m redevelopment of Kings Cross has been completed with the creation of a 75,000 sq ft square in front of the station.The square has granite benches with inset panels of high quality stainless steel grating supplied by Lang+Fulton, stunning lighting, trees and an area dedicated to art.The 11×66/25×2 heel-proof grating panels for the six separate seating areas were shaped to accommodate the up-lighters, the planting and adjacent watering points and were supplied in stainless steel grade AISI-316L with a satin finish.
Sponsored
London Stadium

London Stadium

Hart Door Systems Ltd

London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.Project/doors:21 Fire and Security shutters (2010)50+ Fire and Security shutters (2015)The challengeHart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.The solution2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena. The successHart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.The review:“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Sponsored
Cornbrook Apartments - Residential

Cornbrook Apartments - Residential

Aspex UK Limited

The Cornbrook Apartments is one of the two major build-to-rent projects in the region of Manchester. The project will consist of two towers of 16 and 19 storeys, featuring 363 one-and two-bedroom units along with duplex and townhouse apartments.  Contractor: ISGArchitect: Tim GroomProducts supplied: Bespoke Ironmongery in 3 finishes (PVD Satin Brass, PVD Bronze & PVD Matt Black), as well as Integra Living Doorsets & External Steel Entrance Doors 
Sponsored
New Clement steel windows for leading independent school

New Clement steel windows for leading independent school

Clement Windows Group

St Mary’s School in Calne, Wiltshire, is a leading UK independent boarding and day school for girls aged 11-18. It was founded in 1873 by local vicar, The Reverend John Duncan, who believed that the daughters of the town’s Anglican families at the time lacked access to a wide-ranging education. The school moved to the current site in 1907 and over the years as the school grew, nearby properties were bought and new buildings were established.Clement Windows Group was chosen to manufacture and install almost 40 new steel windows to replace the original steel windows on the front and gable ends of the Plumer Wing which comprises classrooms for music, computing, Religious Education and art. Windows from the EB20 steel window range were chosen and these were polyester powder coat painted RAL 7016 (Anthracite Grey) instead of white like the original windows.This was the second phase of work for Clement who had previously manufactured the steel windows for the rear elevations of the building. The school acted as the main contractor and CDM lead for the job and Clement was the sole contractor on site. The project was completed to programme and budget during a break from the school term with minimum disruption to the school overall.Bob Lunn, Director of Estates at St Mary’s said “The installation of 83 high quality Clement windows, which were installed in two phases during 2021 and 2022, have significantly enhanced the aesthetics and environmental efficiency of this building. Installation was very efficiently completed by Clement operatives within the specified installation timeframes.”
Sponsored
1800s Dutch Barn incorporates ECLISSE Pocket Door Systems

1800s Dutch Barn incorporates ECLISSE Pocket Door Systems

Eclisse UK

Derek Coffey, a college lecturer, renovated a traditional 1800s-built Dutch barn in Llansilin, near Oswestry, Shropshire. The exterior of the barn is clad in burnt larch which looks fantastic and the interior of the home is equally impressive. When the renovation work reached an end in autumn 2023 the finished result was nothing short of stunning. The converted barn will now be a family home for Derek, his wife and their ten year old daughter.Coffey installed ECLISSE pocket door systems throughout the home in order to provide more usable space and better options for interior layouts. A total of ten pocket doors were installed, which were especially beneficial on both of the upstairs bedrooms leading onto ensuite bathrooms. “Installing pocket doors throughout the barn allowed us to save space and to use the space that we do have to better effect,” says Coffey. “We have another ensuite bedroom downstairs with a pocket door and the pocket doors on the downstairs toilet and utility room are especially beneficial as these doors would otherwise have clashed with one another when open – this problem is eliminated with sliding doors.”
Sponsored
Colour coated pull handles help Boots open doors to their customers

Colour coated pull handles help Boots open doors to their customers

ASH Door Furniture & Entrance Specialists Ltd

With over 160 years of business, Boots is one of the oldest and most trusted brands on the British high street. Its roots have been firmly based in Nottingham, which is also the home of Ash Door Furniture. Boots began as a local herbalist store and rapidly grew into the country’s largest chemists’ chain.Boots has pioneered the creation of affordable, reliable products, designed to make people look and feel good. Its emphasis on customer care has helped to make it one of the most trusted brands on the high street.These ASH103 handles are perfect for the high footfall that Boots stores receive because of their strong and robust design. They chose to powder coat the handles to align with their brand identity. Powder coating can also be used to create contrast within the look of the entrance. Because powder coating does not have a liquid carrier, it can produce thicker coatings than conventional liquid coatings without running or sagging, and powder coating produces minimal appearance differences between horizontally coated surfaces and vertically coated surfaces.Here at ASH we strive to produce high quality British made products suitable for commercial applications on many different door types.From high footfall retail units to Boutique hotels - we have it covered when it comes to creating an entrance that is welcoming and functional.Did you know Boots was also founded in Nottingham? We are proud to provide the handles for a brand not so far from home!
Sponsored
122 Leadenhall Street

122 Leadenhall Street

Allgood Ltd

Towering over London’s skyline at 225 metres, the Leadenhallbuilding is now the fourth tallest building in the UK. Theskyscraper joins a growing cluster of buildings in the City ofLondon’s financial district including: the Gherkin, 20 Fenchurchstreet (the walkie talkie) and the Lloyds building.The construction of the Leadenhall building was a pioneeringfeat. Rather than using a traditional concrete core, Laing O’rourke,used an external steel frame, more commonly used on bridgesand offshore oil rigs. The frame, which is incorporated into thebuilding’s exterior design, is the tallest in the world.The distinctive slanted design of the building was born throughthe City of London Corporation’s request that the view of St.Pauls Cathedral from Fleet Street must not be obscured by a newbuilding. The resulting wedge shape of the project lead it to beingdubbed the ‘Cheesegrater’.As the Leadenhall building is largely built for the commercialarena with a high level of usage, the ironmongery package thatAllgood supplied had to meet the highest performance standardsthat would stand the test of time. Allgood created the specificationthat met the most stringent of European performance standards inaddition to providing long warranties, including hinges that carry a25 year warranty.Like many modern buildings, there was a strong desire for thebuilding to be built as environmentally sustainable as possible.Not only are all Modric stainless steel door fittings made from 62%recycled material, but 95% of the material can be recycled at theend of the products life.By supplying the Modric range, which is made in our UK factory,Allgood ensured that carbon emissions from transportation werereduced to a minimum providing the most environmentally friendlyoption. 122 Leadenhall street is a unique building that providesan excellent addition to London’s rapidly evolving skyline andAllgood were able to offer an ironmongery specification thatmatched it’s high standards.
Sponsored
GEZE doors installed to memorial at St Paul's Cathedral

GEZE doors installed to memorial at St Paul's Cathedral

GEZE UK Limited

The Remember Me memorial portico at St Paul’s Cathedral is a physical memorial to all those that died as a result of the Covid-19 pandemic. Entered via the cathedral’s North Transept entrance it is home to the online book of remembrance. Designed by Caroe Architecture with Connolly Wellingham, the portico is a beautiful, elliptical structure crafted in the UK and featuring several GEZE doors.As a visitor enters the cathedral from the North Transept they pass through a pair of swing doors powered by GEZE Powerturn automatic swing door operators. These doors take the visitor into the memorial and were chosen as they can open large or heavy doors and offer the flexibility of allowing the doors to be used both manually and automatically due to GEZE’s Smart swing function.Above the doors, etched in to the structure in gold are the words ‘ Remembering all who died as a result of the coronavirus pandemic’. Once inside the portico, visitors can view the online Remember Me memorial, search for and view the tribute to their loved one, light a candle and take a moment to pause and reflect in this tranquil space. The online book is open to all people, whatever their faith or none. From the memorial portico the main entrance into the cathedral is through GEZE’s TSA 325 NT, a manual revolving door with 4 leaves. The revolving door was chosen as it minimises air flow into the cathedral as only one quadrant is open at a time. To ensure access for all a GEZE Slimdrive SCR curved automatic sliding doors was installed opposite the revolving door enabling those who are less able, or people with children in buggies, can still visit the memorial and access the cathedral. The Slimdrive SCR is controlled by wave sensors to ensure the doors only open when requested. This is part of the portico’s design to minimise air flow.Across all the glass in the doors are beautiful phrases such as ‘we will always remember’ and ‘never forget’. The Remember Me memorial portico is a poignant tribute to those who died as a result of the Covid-19 pandemic and is the most significant change to St Paul’s Cathedral in 300 years. Following the public response to the online memorial, and in partnership with the Daily Mail, over £2million was raised to give the Remember Me memorial a physical home within the Cathedral. Said GEZE’s National Specification Manager, Richard Richardson-Derry: ‘We were honoured to play a part in the construction of the Remember Me memorial. The combined challenges of minimising air flow, ensuring equal access and creating a beautiful structure to recognise those lives lost has been successfully achieved’.
Sponsored
Folding Doors and Radar Ensures Draught-Free Waiting Room

Folding Doors and Radar Ensures Draught-Free Waiting Room

Record U.K. Limited

The waiting room at Houton Pier on The Mainland of the Orkney Islands was cold and draughty due to a weather-damaged door opening directly into the waiting area. An extension was built to create a weather break and fitted with record FTA 20 automatic folding doors which minimise the time the door is open to the elements but still provides good access. The doors are activated by a radar presence sensor for two way traffic. The old door was also replaced with a THERMCORD sliding door with energy efficient core panels to further reduce the ingress of cold air.
Sponsored
Hybrid operating theatre doors for The London Clinic, Harley Street

Hybrid operating theatre doors for The London Clinic, Harley Street

Dortek Ltd

The London clinic is one of the UK’s largest private hospitals. Located in the heart of London’s world famous medical district it is the first hospital to have hybrid theatres. Hybrid operating theatres combine the surgical capacity of traditional operating rooms with the imaging capabilities of a catheterisation lab.BriefThe trust required specialist hybrid operating theatre doors for its new hybrid operating suite. The hybrid theatre provides the surgical technology to enable surgeons to switch between open vascular surgery and endovascular surgery as necessary, with real time imaging support.SolutionDortek’s hygienic hybrid operating theatre doors were installed in theatre areas. Dortek’s hybrid operating theatre doors can combine a number of key properties all in one hygienic door. Whether its x-ray rated, automated, fire rated, waterproof or hermetically sealing sliding, these doors were a versatile solution for these new breed of hybrid operating theatres. Doors were also automated to allow staff to open and close them without touching any surface to reduce the risk of infection.
Sponsored
The Beacon Shopping Centre - Creating a welcoming, safe and efficient entrance in Eastbourne’s popular shopping Centre.

The Beacon Shopping Centre - Creating a welcoming, safe and efficient entrance in Eastbourne’s popular shopping Centre.

FAAC Entrance Solutions UK

The Beacon Shopping Centre is well known for great places to shop, eat and play. The busy centre required a sturdy door with a strong profile to take on the variable weather conditions. We were happy to advise and provide a solution that allowed savings in energy costs and a pleasant experience for shoppers.Project Year: 2020Product: (Terminus Road Main Entrance): SL500 Framed Sliding Door with break out and SL500 150mm operator.Product: (Sainsbury’s entrance): SL500 Framed sliding door system with break out and SL500 150mm operator.Project Background: The Beacon shopping centre is one of Eastbourne’s most popular shopping destinations. We were contacted in conjunction with Hawes Construction Group to put in two new sets of automatic sliding doors across the mall in two locations; the centre’s main entrance and the entrance to Sainsbury’s within the centre. Hawes Construction laid the foundations and installed new steel columns which were part of the doors support system, getting the site ready for the door installation.Solution: We installed the SL500 Framed sliding door with a 4 leaf panel, side screens and SL500 bi-parting operator, providing extra sturdiness and protection from the strong winds that regularly hit Eastbourne. We used Clear Insulated laminated 22mm glass which look streamlined whilst creating an improved environment for customers and staff at The Beacon.Our exclusive presence detection sensors and sidelight presence detection sensors were a large factor in enabling the doors to provide a more energy efficient outcome for the shopping centre. The FAAC sensor technology allowed partial opening of the doors, which saved ample energy as doors do not open unless somebody intends to walk through them. Presence detection sensors and sidelight presence detection sensors to comply with EN16005.The final outcome was a great success, creating optimal accessibility for all users, streamlining entry and saving energy.
Sponsored
Four Seasons, Dubai

Four Seasons, Dubai

Allgood Ltd

Completed in November 2014, the Four Seasons Dubaisits beside Jumeirah Beach, just ten minutes fromDubai’s famous commercial district.California based architect WATG worked alongsideinterior designer BAMO to create a resort heavilyinfluenced by mediterranean architecture and the hotel’sseaside location. For example, the lobby sits underneathan octagonal dome finished with gold leaf that enhancesthe natural light coming through the windows.Each of the 237 guestrooms come with a balcony,offering panoramic views of the sea or the city’sextravagant skyline, punctuated by the world’s tallestbuilding, the Burj Khalifa.The luxury hotel required a tailored package toensure it’s aesthetic flair was complemented bythe door furniture.The intricate detail on the Royal Suite doors wasmatched by custom made lattice pull handles in a pewterfinish (far right image), whilst the rest of the suite andpublic areas were supplied with pull and knob handles ina co-ordinated bronze finish.In contrast, the hotel opted for a polished finish in thepresidential suite, with nickel and stainless steel thepreferred materials. A full spectrum of door furniture wasapplied including lever handles, lock cases and doorclosers, all supplied in the desired polished finish.
Sponsored
Door closer air pressure and excessive smoke seal issues - how to solve?

Door closer air pressure and excessive smoke seal issues - how to solve?

Rutland

Since the Grenfell tragedy in 2016, there has been an increased focus on fire-safety compliance in all communal buildings. This focus sharpened even more when, early in 2018, the media unearthed evidence of some non-compliant products having been installed there, including internal fire doors that had been fitted without smoke seals. As a result, there has been heightened attention on every aspect of safety, not least on fire doors. Fire officers and building management personnel understandably want to ensure they have covered every possible safety angle.To this end, they are now often insisting on going beyond the specifications required by regulations.However, in trying to ensure doors provide the maximum protection against fire and smoke, another potential problem can arise that, if not addressed, can undermine those good intentions.The problem:One of our customers, a door manufacturer and installer, had recently supplied doors but then been informed by their customer that they were not successfully self-closing as they were meant to. The assumption was that the door closer was not performing correctly, so the ‘fault’ was relayed to Rutland with a request for a resolution. We agreed to visit the site swiftly to assess the situation. Our inspection found that the door closer was correctly specified for the width and weight of the door, but that the smallest possible door gaps had been specified. These, coupled with substantial smoke seals around the doors, were causing significant resistance to the doors closing. Although the resistance was due in part to the physical aspects of the small gaps and the seals, the main problem was actually the build-up of differential air pressures on either side of the doors.Given the increased focus on maximum fire defence at doorways on all new-builds and building refurbishments, this problem is arising ever more frequently. Tighter door seals have the effect of creating separate, near air-tight pockets within a building, each holding air at slightly different pressures. The bigger the building, the more such pockets and the greater the pressure differentials that can potentially build up.These pressure differentials can have a significant additional effect on the amount of force needed to close each door and must be taken into account when choosing and setting closers.The Rutland response:Rutland’s technical team attended the site as required to support the customer in achieving a solution, first to identify the issues with air pressures and then recommend and implement a solution to the problem.Initially, we made hinge and latch adjustments to the door sets to overcome some of the resistance. This proved to be insufficient to ensure all the doors correctly closed first time, so we advised upgrading to stronger door closers. This recommendation was supported by supplying the door manufacturer with relevant data from previous tests on an equivalent door set to verify the product’s suitability.The new closers were delivered to the site and our technical team remained on hand to provide extensive assistance with the installation. Rutland created a bespoke jig to aid the door manufacturer’s installers in fitting the replacement door closers, significantly cutting down the time it took to rectify the problem.Outcome and key learning points:The project was successfully brought back on track, to the full satisfaction of the property owner and the door set manufacturer. All doors now function as they should and are delivering the intended fire safety for all building occupants.This case highlights that, due to heightened protective sealing around doors, there is an increasing likelihood of air locks forming in buildings, which means that specifying of door closers cannot be based simply on weight and width of doors, as has traditionally been the case. The pressure differentials that result vary building by building, based on each one’s layout, so it necessitates careful assessment to ensure that appropriate closers are specified.
Sponsored
North Hampshire Endoscopy

North Hampshire Endoscopy

Specialist Door Solutions

The North Hampshire Hospitals, part of the Hampshire Hospitals NHS Foundation Trust, includes services that provide specialist services for rare or complex illnesses for patients across the UK.With links to University Hospital Southampton NHS Foundation Trust, Frimley Park Hospital NHS Foundation Trust, Royal Surrey County Hospital NHS Foundation Trust and Royal Brompton and Harefield NHS Foundation Trust for some specialised services.In 1999 it became the first hospital in Europe to perform surgery using equipment operated by voice commands.The Dfendoor doorsets consisted of an Aqua door frame and leaf with a textured finish, giving the hospital a unique yet minimalistic design that helped deliver a durable finish and a desirable aesthetic and clearly demonstrates that sometimes, less is more.
Sponsored
Installation Video - Riser doors with adjustable frame

Installation Video - Riser doors with adjustable frame

Profab Access Ltd

Installation of Profab Access' Riser doors with Adjustable Frame at 8 Bishopsgate

Showing 217-252 of 441

Feedback