NBS Source
I'm a manufacturer

"special purpose lighting"

6,470 results found

Sort by:

Showing 145-180 of 1339

Sponsored
Dublin Landings, Ireland - Pyroguard Protect

Dublin Landings, Ireland - Pyroguard Protect

Pyroguard UK Ltd

The ChallengeAs part of this strategy, the decision was taken to replace a fully-glazed non-fire-rated internal atrium with a new, high-performance fire-rated solution to ensure the highest levels of fire protection.Spanning five storeys, the atrium would create a functional yet architecturally stunning light-filled centrepiece within the modern office space.Forming part of the broader regeneration of Dublin Landings, bringing this aspect of the project in on time would be critical.As a result, Walls to Workstations were tasked with removing and replacing the five-floor atrium in just six weeks to see the project through to completion.The SolutionWorking closely with W2W, Pyroguard supplied more than 500 square metres of toughened EI30 fire safety glass to the project. Equipping fabricators with the flexibility to deliver on ambitious architectural projects which require large expanses of glazing, Pyroguard toughened glass provides protection against flames, smoke and radiant heat and delivers impact classification of 1B1 to EN12600.Complementing modern architectural ambitions, the inclusion of large areas of toughened glazing within projects helps to safely incorporate natural light into buildings, something which is critical in renovation projects where buildings are being transformed from their original purpose.In practice, this sees spaces flooded with natural light, elevating levels of light transmission throughout a building and having a positive impact on occupants’ wellbeing – crucial in delivering functional and inspiring workspaces.
Sponsored
Bellway Homes HQ

Bellway Homes HQ

Tobermore

After almost 30 years, Bellway Homes has relocated to a new purpose-built headquarter office building. Based in Newcastle Upon Tyne, the company have settled into the newly formed energy- efficient Airview Park adjacent to Newcastle Airport.  The company were previously based in a small, listed property with cellular offices that were no longer fit for purpose. With light and spacious open-plan office space, the move was the perfect opportunity to support the company’s growth.  The facility houses 100 staff members and include high-spec welfare facilities including a gym, breakout room and a roof terrace. The state-of-the-art office space also features a new training hub providing educational facilities for Bellway Academy. Benefitting from a rich landscape setting, the overall design concept was to create a ‘Pavilion in a Park’. With this in mind, the external design was equally as important as the building itself. Various Tobermore block paving and permeable paving products were used. The hard landscaping featured Tobermore’s award winning paving product Braemar. The premium product fulfilled both aesthetic and design aspirations. 
Sponsored
LEGACY PROJECT BOASTS FENCING FIRST

LEGACY PROJECT BOASTS FENCING FIRST

Zaun Limited

London 2012 organisers always planned, as part of their Olympic legacy, to transform the Athletes’ Village into a purpose-built education and leisure campus with a specialism in performing arts comprising a nursery, primary and secondary school, sixth form and adult learning.While the main base for organising and managing teams from the record 206 nations that took part would readily convert to their new educational purpose, they needed a fencing solution to reduce the impact of noise from the Tube line that runs alongside.The SolutionContractor Osborne, Academy architects Allford Hall Monaghan Morris, and Lend Lease Group, responsible for the design, development and construction of East Village, chose Zaun’s DBS acoustic fencing for the job.Zaun used mixed recycled waste plastics to develop the DBS panels that can deflect noise, soak up flying fragments, and be incorporated onto Zaun’s extensive range of fencing post and panel systems to tailor specifiers solutions to their precise needs.The panels are easy to erect and suffer shallow repair needs, significantly reducing the whole life cost of the fencing system. In addition, the panels’ impressive acoustic-loss properties have been rated B3 with a 36dB loss under BS EN 1793-2.The Chobham Academy, which incorporates the Beth Tweddle Academy for gymnasts, has been dubbed ‘the school with an Olympic playground’, with swimming lessons in the aquatics centre and sports days in the Olympic Stadium.It sits on the edge of the new East Village neighbourhood with 2,818 new homes, community health facilities and over 10 hectares of public leisure space.
Sponsored
Bicester Village

Bicester Village

Umbra

Blinds for Skylights and Velux WindowsBicester Village is an expansive shopping village located in Oxfordshire. As hub of shopping activity, it is a prominent part of any London tourist’s itinerary.Bicester Village can also boast a selection of KuroLok RL and KuroLok Twin RL blinds, specially designed to provide a blind solution for ceiling light, giving much more flexibility and an added layer of utility when it comes to overhead lighting.The KuroLok RL blind is a specialised roof blind, fitted with a constant tension spring mechanism that ensures that there is no unwanted sagging of fabric despite the challenging angle.The KuroLok Twin RL blinds are much the same, but with the added feature of having two blinds that meet in the middle of the framework. This means that the blind itself can cover more space than the single KuroLok RL, also making it infinitely easier to work around obstructions such as chandeliers or other ceiling décor that may get in the way of a traditional roof blind.
Sponsored
Murchison House Has All Angles Covered With HERADESIGN®

Murchison House Has All Angles Covered With HERADESIGN®

Knauf Ceiling Solutions Limited

Murchison House, received a significant refurbishment, giving the University of Edinburgh a new purpose-designed venue.Reconfigured to provide light-filled, comfortable spaces for students and staff, architects Reiach & Hall specified Knauf Ceiling Solutions' HERADESIGN® for a first-class acoustic solution aligning with the university’s contemporary design brief.A suspended raft system in the café and breakout area was created using HERADESIGN®.Cut to create triangular canopies, the floating ceiling solution offered the illusion of height and provides excellent acoustic performance. In the study areas, 100sqm of HERADESIGN® wall absorbers were installed throughout the study zones continuing the geometric theme.
Sponsored
Cambridge Central Mosque, Mill Road

Cambridge Central Mosque, Mill Road

Cellecta Ltd

Cambridge Central Mosque is Europe's first eco-friendly mosque and the first purpose-built mosque within the city of Cambridge. The mosque is well insulated and naturally ventilated, using efficient heat lights in the roof and solar panels on the top to help generate renewable energy.Cellecta XFLO Micro was specified by Marks Barfield Architects as its underfloor heating insulation boards were used to help create an efficient and environmentally friendly heating system. Cellecta ScreedBoard 20 was also specified for the overlay floorboard. It is suitable for all types of steel, concrete and timber floors.Warmafloor were awarded this 250m² contract to develop this eco-friendly structure.
Sponsored
World-class concert acoustics

World-class concert acoustics

GKD - GEBR. KUFFERATH AG

The Koningin Elisabethzaal in the northern Belgian seaport of Antwerp is unusual in every respect. Located at the heart of an architecturally charming city, structurally merged with a world-famous zoo, and boasting an immensely varied history as a concert hall, it transformed from an acoustic ugly duckling into a gleaming swan of aural experience. At the core of this metamorphosis is the design by the renowned American acoustician Larry Kirkegaard, who completely remodeled the hall acoustically. Golden metal fabric by GKD – GEBR. KUFFERATH AG (GKD) plays a key role in his concept. The woven texture really underlines the one-of-a-kind spatial experience in its use as large-scale cladding for ceiling, walls, and balustrades.One of 65 participants in an international competition to redesign and remodel the Koningin Elisabethzaal, the consortium comprised of SimpsonHaugh Architects (London) and Kirkegaard Associates (Chicago) produced the winning design. Kirkegaard’s ambitious concept, which employed structural and technical agility to aim for nothing less than a world-class standard for the new concert hall, played no small part in this success. The original hall was opened in 1897, served as a hospital ward during the First World War, morphed into a venue for boxing and wrestling matches during the Olympic Games a few years later, and was reopened in 1960 following major destruction in the Second World War. The fan-shaped design of this building, which was not intended to be used purely as a concert hall, contributed greatly to its poor acoustics, which achieved only six out of ten points on the rating scale. Plus, although it provided a stage, there were no rehearsal rooms for the orchestra and soloists. One aim of the new building was therefore to finally offer a home to the Antwerp Symphony Orchestra. The new Koningin Elisabethzaal is the centerpiece of the Elisabeth Center, which was also newly built as an ultramodern 25,000-square-meter conference center. When redesigning the concert hall, the planners decided to reduce its size in order to optimize the acoustics. This resulted in an enormous light-flooded foyer with atrium in the Elisabeth Center. Architect Ian Simpson embedded the new building into the historical complex in such a way that the art nouveau façades that had previously been hidden by the building were revealed once more and the old halls remained largely untouched. One of these halls, the Loos Hall, connects the new 2,000-square-meter concert hall with the historical part and also serves as the foyer of the Elisabeth Center. With its high stuccoed ceilings and rich marble decor, it provides a representative space for exhibitions and receptions. The new four-story building comprises various conference and meeting rooms for up to 1,900 participants, the concert hall with a capacity of 2,000 guests, extensive logistics facilities, VIP and catering areas, administrative offices, and soundproofed rehearsal rooms.An acoustic embrace in a shoe boxThe designers selected a shoe box shape for the concert hall, which classical music lovers deem to be a guarantee of optimum acoustics. This is aided by a perfectly balanced distance between the stage and the wall and an unusual seating arrangement in the parterre and the two galleries. Doing without a permanent apron also prevents a loss of sound. A curved wall means that the largest distance between the stage and audience seats is 30 meters, so that every guest feels part of what is happening on stage and can see and hear equally well from all seats. Movable reflectors clad in metal fabric and suspended from the ceiling as well as frames covered in the same fabric ensure that the sound is able to unfold throughout the entire hall. At the same time, the semitransparent membranes conceal the bare ceiling and the technical installations above. In designing the walls, Kirkegaard Associates chose a wave-shaped oak wainscoting. The cavities were filled with lava sand to prevent vibrations. With this construction, the acousticians drew on the sound experience of earlier concert halls, which employed arm-thick stone walls to reflect low-frequency sound back into the hall. As such, the walls and the rear wall of the stage in the Koningin Elisabethzaal form an acoustic embrace which ensures that the echo is not absorbed but is fully reflected to the stage.Metal fabric for good soundThe same fabric that was used for the ceiling elements also covers the movable reflectors on the back wall of the stage: gold-colored powder-coated Alu 6010. For the ceiling and stage wall, GKD fitted a total of 204 frames, some of them wave-shaped, with 1,600 square meters of this fabric type. Four-meter-long and 2.50-meter-wide panels were fastened to the frames provided by the customer with thin stainless steel wires at intervals of ten centimeters. GKD also incorporated the cutouts for the lights exactly according to the specifications. A first for the weave specialists was that the entire construction consisting of frames and fabric was then coated in the desired shade of gold. This required special pretreatment in order to ensure homogeneous coloring of the components made from different materials – steel and aluminum. Prior to selecting the material, Kirkegaard Associates had carried out extensive tests on the GKD fabrics in order to achieve the best possible sound and space experience. As such, GKD was involved in the planning process with architects and acousticians from a very early stage. The decisive factor in opting for metal fabric was the acoustic neutrality. In addition, the exclusive look, flexibility, and robustness of the GKD fabrics corresponded to the ambitious design concept. That is why the fabric from GKD – Omega 1520 with gold-colored coated weft – was also chosen for the balustrades of the galleries. It fits flexibly to the bidirectionally curved corners of the balustrade and is also resistant to impact thanks to tensioning in the direction of the cable. When fitting the front and rear of the balustrade elements with 400 square meters of this fabric type, the curve needed to be followed exactly. GKD selected a slightly conical panel cut for this purpose in order to realize the radius by tracing a polygon.The clever interaction between the design of the hall shape, ceiling, wall, and balustrade is what gives the new Koningin Elisabethzaal its excellent acoustics: with 9.3 out of 10 points on the rating scale, it is considered almost perfect. At the opening concert, Belgium’s Queen Mathilde personally handed over the hall, which offers a world-class space and sound experience, to the public.
Sponsored
Lidl Youghal Co Cork | SMET Bauprotec Render System | NRS Construction

Lidl Youghal Co Cork | SMET Bauprotec Render System | NRS Construction

SMET Building Products Ltd

DescriptionLocal Smet Supported Partner, master builders NRS Group Construction, machine-applied the LIDL External Render System onto Poroton blocks externally using as Base Coat: Bauprotec 850 M – Lightweight Lime Cement Render, and as Key Coat: Change of substrate concrete/steel pillar/Poroton block or mass concrete and insulated plinths: Bauprotec RHS Multi-Purpose Render.The internal Render System specification onto Poroton blockwork consists of a base of Coat: Bauprotec 850 M, Lightweight Lime Cement Render, sponge floated in warehouse areas, and skim finished in sales areas. Key Coat: Change of substrate concrete/steel pillar/Poroton block: Bauprotec RHS is used.The Irish LIDL render spec, available from SMET consists of:Bauprotec 850 M is a factory-produced Lightweight Lime Cement Render, specially designed for machine or hand application produced to EN 998-1: 2010 and is CE Marked.Bauprotec RHS is a CE Marked, factory-produced highly polymer-modified render specially designed for hand and machine application produced to EN 998-1: 2010.The special render properties; lightweight, low thermal conductivity, high yield, and the Smet Supported Partner’s superior technical backup, are key factors in choosing SMET. SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET.All LIDL spec SMET Render System products are available directly from Smet Building Products Ltd, who ensures the contractor has a superior level of technical backup in the machine application of the LIDL specification.SMET is committed to delivering consistently superior quality, German-made Render Systems to Lidl Plastering and rendering/plastering contractors across the UK and ROI.  If you’d like to speak to us about your Lidl job – contact SMET.
Sponsored
Cadena House

Cadena House

Forbo Flooring Systems

FORBO FLOORING SYSTEMS’ ALLURA DECIBEL AIDS IN CREATION OF DESTINATION OFFICE After over a decade of operation, 299 Lighting decided it was time to invest in a new office space, creating a destination office for its team of lighting engineers. Tasked with revamping a 90-year-old building for this purpose, interior designers Fable and Form looked to Forbo Flooring Systems’ Allura Decibel and Furniture Linoleum ranges to reduce impact noise, as well as providing a warm and friendly finish throughout the office. A former industrial unit that was converted into a bakery in 1946, Cadena House got its name from the Cadena Cafes brand, and has been used for a variety of purposes over the years. 299 Lighting spotted the potential the old building had and purchased it in December 2020, with the view to renovate it completely, reimagining the space into a new team orientated office.  Sara Barnett, Co-founder and Director at Fable and Form, commented on the design brief she received, saying: “299 Lighting wanted to strip back the building to its shell, with the view to maximise the sustainable solutions that could be added to it. With this in mind, they asked for our help to uncover the full potential of the space, as they realised engaging in the design process early would mean their imaginations could be successfully realised.  “When looking at the aesthetic requirements of the design, we took inspiration from 299 Lighting’s branding; balancing the bold and fresh company brand, with the nurturing and supportive attributes of the co-founders. This helped to create an environment which is truly unique and innovative – just like them!” The wellbeing of staff was also paramount to 299 Lighting. With this in mind, Fable and Form’s design team looked for materials that would fit the stripped back feel of the space, whilst also contributing to the biophilic design. Stevie Cleverly, Co-Founder and Director at Fable and Form explained further: “With the aim to create a sustainable and healthy space for 299 Lighting’s employees, it was important that we carefully selected the materials we used in this project. It was for this reason that we specified Forbo’s Allura Decibel Luxury Vinyl Tiles.” A unique proposition in the market, Forbo’s updated Allura Decibel collection meets the demand for stylish, luxury acoustic floor coverings no matter what the application area. Offering 19 dB impact sound reduction, the collection is available in 49 contemporary colourways, which are split between the following ranges: woods, and stones and materials. Stevie continued: “We specified Allura Decibel in a contemporary concrete colourway across the entire first floor for continuity. This decor was in keeping with the building’s original materials and matched the concrete ceilings, which were shot blasted to its original look. Not only this, but with a 19 dB impact sound reduction, unnecessary noise could be reduced in the office, helping to create a better space to work in. “In keeping with our sustainable design principles, we also included Forbo’s Furniture Linoleum into the meeting tables and breakout furniture, providing a warmer and more tactile finish to touch points.”  Forbo’s Furniture Linoleum is a natural surfacing material and has recently been confirmed to be climate positive (cradle to gate) without offsetting. In addition to this, it is antistatic – stopping the build-up of dust and fingerprints on surface tops.  Work on the building began in early 2021 and was finished in seven months, with 299 Lighting saying: “What we have achieved is even more than we envisaged would be possible.” Find out more about Forbo’s solutions for offices, here: www.forbo-flooring.co.uk/offices.
Sponsored
Wolverton Hall: The only Folly is to call it a Folly

Wolverton Hall: The only Folly is to call it a Folly

Michelmersh Brick Holdings PLC

A folly; an ornamental building with no practical purpose built in a large garden. Whilst aspects of this definition can be applied to describe Wolverton Hall Folly, it certainly contradicts the ‘practical purpose’ element with the most appealing of purposes. Wolverton Hall Folly is a retreat for contemplation, an office away from home, a place to entertain and somewhere to enjoy the views, sun and a good book. Can we therefore call this beautiful building a folly?
Sponsored
Multipurpose Centre

Multipurpose Centre

Rock Unique

Many years ago, on a site in Misterbianco, Catania, where the ancient, very active during the first two decades of the twentieth century, Monaco furnace used to stand, there now stands a modern multi-purpose centre created to bring a moment in time back to local residents.Designed by the Mimesi 62 studio of Florence, the new building offers large spaces lit up by light that passes through large glass windows and enhanced by the use of porcelain stoneware surfaces that are all different but that all match and perfectly harmonise with the destination of use: the 5,000 m² of the outdoor areas have been clad with the Plan collection, with a natural effect, in Black 30x60, while the discreet elegance of Format Black 45x45 has been used indoors.Photographs by Alfio Scigliano.
Sponsored
Durlum Rhombus Ceiling in Dubendorf High School

Durlum Rhombus Ceiling in Dubendorf High School

LSA Projects Ltd

PROJECTSecondary school in Grüze 5, Dübendorf [CH]COMPLETIONOctober 2023ARCHITECTStutz Bolt Partner Architekten AGPRODUCTSTANGENTA Y100 luminaireLight distribution: 2 x 60°; light colour: 4000 K; DALI dimmable; CRI > 80; LED: 3 x 34.5 W; dimensions [L x W x H]: 1,550 x 100 x 100 mm [72 units].S7 RHOMBOS TAIFUN expanded metal ceiling system1.5 mm thickness of black sheet; mesh size: 44 x 12 x 3 x 1.5 mm; dimensions: 980 x 790 mm and 1,650 x 680 mm; powder-coated in RAL 9016 matt [576 units] The new extension to the school building at Dübendorf-Schwerzenbach blends seamlessly into the existing complex and, with a lightness of design touch and its versatile range of usage options, it takes a big step towards modern school infrastructure. This building has been designed to enable it to be adapted to suit changing requirements in future. The school building is constructed on a double gym facility, two thirds of which are recessed below ground level, receiving natural daylight through a strip of windows at the top of its walls. When needed, the TANGENTA-Y100 luminaires supplied by durlum can be switched on. These deliver high lighting intensity combined with superlative lighting efficiency. These luminaires are discretely integrated in the S7 RHOMBOS TAIFUN expanded metal ceiling system with tested ball impact resistance to fulfil the special requirements of sports hall. Combined with its small mesh size, the white, powder-coated ceiling imbues an aesthetic appeal to this hall, which is also used by the general public. All entirely in sympathy with the architectural vision.
Sponsored
Royal Birmingham Conservatoire of Music

Royal Birmingham Conservatoire of Music

Michelmersh Brick Holdings PLC

Envisioned as the first purpose-built music college in the UK since 1987, the Royal Birmingham Conservatoire of Music hosts 5 performance venues that have been created to service an increasingly digital environment.Its public concert hall contains seating for 500 and a full orchestra and is flanked by an organ studio, the Eastside Jazz Club, a 150-seat recital hall and “The Lab” – an experimental music space. It is additionally serviced by 70 practice rooms, a cafe, and a large three-level entrance foyer.Constructed in Birmingham’s Education sector, the project acts as a cultural hub by offering visual and performing arts to the city as well as its students. Special attention was given to creating a building that made access feel as easy as possible.Using our Floren Polaris bricks, and beautifully designed by Feilden Clegg Bradley Studios, the exterior of the project has been described as an ‘Urban Castle’, with the acoustic benefits of brick being employed to reduce external noise as well as enable the Conservatoire to carry itself visually amongst the surrounding campus.The Royal Birmingham Conservatoire has won the RIBA West Midlands Project of the Year, RICS West Midlands Project of the Year and the RICS West Midlands Design for Innovation Award.
Sponsored
Malvern Theatre

Malvern Theatre

Saint-Gobain Building Glass

The BuildingThe Malvern Theatre in Worcestershire is a longstanding asset to the community, having undergone extensive renovation works, the construction of the new entrance, now uses Saint-Gobain Glass COOL-LITE SKN 175, further enhancing its appeal.In addition to serving as the theatre's new main entrance, the extension facilitates a significant increase in workshop capacity, from approximately 2,500 to 14,500 places annually. This expansion enables the hosting of further drama, music, movement, dance, and art classes. Furthermore, the enhanced facilities enable the Malvern Theatres to extend its collaborations with Acorns Children’s Hospice and other specialized care providers.The GlassThe COOL-LITE SKN 175 glass is an ideal solution for façades and glazing in commercial buildings. This high-performance product excels in solar control, providing a neutral aesthetic whilst prioritising energy efficiency. The result is the creation of beautiful, functional buildings that perform well, considering aspects of comfort, visual appeal, and the sustainability of building glass over the complete building life cycle.COOL-LITE SKN 175 balances the advantages of a high-performance neutral solar control product with:·      High light transmission 70%·      Low g-value of 0.35·      Excellent U-value of 1.0W/m2K·      High degree of neutralityBy using COOL-LITE SKN 175, interiors can be made more comfortable, reducing overheating and the reliance on costly air conditioning. Simultaneously, it noticeably decreases excessive heat loss. The high light transmittance also diminishes the need for interior lighting during daylight hours, contributing to a further reduction in energy costs.
Sponsored
St Bronaghs Primary School, Rostrevor

St Bronaghs Primary School, Rostrevor

Colinwell Masonry

Robust and Functional Acoustic Solution delivered by Colinwell for a Multi-Purpose Hall.The pupils of St Bronagh’s have a long tradition ofchampioning environmental improvement projects. So it was no surprise when d-on architects ltd chose Colinwell's EchoCheck Acoustic Block, which is manufactured from 65% recycled agregates, for the interior of the schools Multi-Purpose Hall.
Sponsored
On the (B)RIGHT track...

On the (B)RIGHT track...

RENOLIT Cramlington Ltd

Gent Sint-Pieters railway stationCHALLENGE Gent Sint-Pieters, the main railway station in Ghent, is undergoing a spectacular metamorphosis today. The listed main building, constructed for the 1913 World Exhibition, has to remain untouched. Behind the old building however the platforms, waiting rooms and the central passengers corridor are being entirely refurbished. Architect Voncke’s objective was to create a pleasant atmospheric site with a 35,000 sqm open and attractive central hall, broadened and completely covered platforms and renovated rails. Functional, well-designed and above all spacious! As the 12 rail tracks had to stay on ground level, the passengers alley was excavated to a lower level under the railroad tracks. This necessitated permitting considerable daylight to enter the underlying levels.SOLUTION Transparent canopies, featuring large glass sections and translucent floors were all designed with this purpose in mind. To gain even more light the architect chose RENOLIT ALKORBRIGHT for waterproofing the platform canopies. The six long rectangular platform blocks, differing in height, are interconnected and make one large roof. The white highly reflective RENOLIT ALKORBRIGHT membrane on top of the construction reflects the daylight through the high side windows. A clever way to add extra day-light to the underlying areas. 
Sponsored
Engineering Building, Lancaster

Engineering Building, Lancaster

Technal

The award-winning and BREEAM Outstanding Engineering Building at the internationally renowned Lancaster University features a complete range of architectural aluminium glazing systems from Technal. Located on the Lancaster University campus in the North West of England, the new engineering facility was awarded Winner of the RIBA National Award for 2015 and was highly commended by the Royal Institution of Chartered Surveyors in the Design through Innovation category at the 2016 RICS North West Awards. Purpose-built to a world-class standard, the scheme comprises of 4,701 sqm of workshop, laboratory and office space in two concrete framed blocks either side of a dramatic four-storey atrium. Using passive techniques to achieve the environmental performance measure of BREEAM 'outstanding' in the design assessment, which is in-line with Lancaster University's sustainability and carbon reduction targets. With this in mind, aluminium doors and curtain walling were chosen for this project. The Facade is featured throughout the building, and was specified for its contemporary aesthetics. The system also includes concealed vents to allow natural ventilation without compromising the architectural integrity of the facade. With natural light being a key part of the specification, Technal aluminium curtain walling allowed larger and heavier glazing units to be installed thanks to its superior load distribution, permitting more natural light to flow through the building's rooms.
Sponsored
Coláiste an Chláirín

Coláiste an Chláirín

Bauder Ltd

Coláiste an Chláirín Bauder Thermofol single ply waterproofing system with BauderROCK insulationSynopsisThe new Coláiste an Chláirín building in Athenry, Co Galway is a post primary school consisting of classrooms, a special needs unit, sports hall, general-purpose hall, staff amenities and extensive external facilities designed by Smith Kennedy Architects & Healy Partners Architects. The project was managed by JJ Rhatigan and Company and the roofing element appointed to Priority Roofing and Cladding Ltd. The roof of the main building and the gymnasium required flat roof build-ups to meet the specifications as set out in in SDG 02-05-03 (Acoustic Performance in New Primary & Post Primary School Buildings), while meeting the general performance requirements specified within TGD 021-7 2018 (Minimum Performance Standards of Roof Materials and Finishes). The chosen system had to meet an acoustic performance of 35dB indoor ambient noise level (IANL). It was decided that, despite sports halls having a slightly higher IANL threshold, the 35dB performance criteria would be applied across all areas of the school, with control of reverberation being a key consideration in the gym.Bauder Building BoardProject:Coláiste an ChláirínLocation:County GalwayProject type:New BuildRoof size:8550m²Main contractor:JJ Rhatigan & CompanyApproved contractor:Priority Roofing & Cladding LtdThe specification:The Architect specified that the insulation used in the flat roof system should be non-combustible and achieve a U-value of 0.16Wm²k which actually exceeds the thermal requirements as described in the Irish Building Regulations Technical Guidance Document L for flat roofs in schools.BauderROCK was specified to achieve the thermal and acoustic requirements of the design. As a Euroclass A2-s1,d0 non-combustible material, BauderROCK also provided the specified fire performance. This insulation could be used across all roof areas, with some adaptations for the gym which required additional acoustic performance due to the inherent nature of the space. Acoustic infills were used in the troughs of the perforated metal deck, thus combatting the reverberation of the indoor environment.  Products appliedBauder Thermofol PVCAn integrated single ply waterproofing system, featuring a lightweight, cost effective membrane which offers a pleasing aesthetic finish on a flat roof. This system holds fire classification BROOF(t4) for compliance with building regulations under TS 1187 test method 4 for external fire exposure to roofs. BauderROCKHigh density mineral wool insulation.Project challengesOne of the challenges of this project was the ambitious schedule. The use of the self-adhesive air and vapour control layer (AVCL) enabled the trades working within the building to progress quickly without being delayed by weather conditions. BauderROCK is relatively quick to install, as was the lightweight single ply waterproofing.  The resultThe project was finished to time and specification with exceptional workmanship from the fixers at Priority Roofing and Cladding and superb collaboration from all parties throughout. The membrane was finished with standing seams to create a statement look. The roof achieved a U-value of 0.15 W/m2k, exceeding the thermal target, and met or exceeded the 35db IANL requirement across the main building and the sports hall.  The thermal performance, which will hold up for decades to come, will also impart energy efficiency benefits that reduce running costs at the school in the long term. Finally, the non-combustible nature of the mineral wool insulation ensured that the build-up met the fire safety specification. System installed Bauder Thermofol PVC single ply waterproofing system1 Bauder THERMOFOL U15 V FRThis 1.5mm polyester reinforced Poly Vinyl Chloride membrane (PVC) membrane benefits from being highly flexible due to the incorporation of internal plasticizers during the manufacturing process. The combination of materials within this membrane provides high tensile strength, with thermal stability and chemical resistance.2 BauderROCKA mineral fibre non-combustible insulation with high acoustic performance. The dual density mineral wool composition delivers compressive strength, whilst keeping the overall weight to a minimum and providing high noise absorption which enabled the complete system to meet project requirements.3 BauderTEC DBR 06This 0.6mm, self-adhesive, elastomeric air and vapour control layer is light weight and benefits from cleaner, safer, and faster installation than traditional torch applied membranes. Advocacy Niall Hanley, Contracts Manager at JJ Rhatigan, the project’s main contractor, said:"Coláiste an Chláirín Athnery was a great success and in particular the use of the self-adhesive AVCL in advance of the build-up allowed works to commence immediately internally, which was critical from a programme perspective.” Kevin Ryan, Director at Priority Roofing, explained:"We found the system both practical and efficient to install. The combination of the availability of the products and the technical backup received was superior to any other system that we have worked with.”  Eoin O’Grady, Associate Director at Healy Partners Architects commented:"We are delighted with the overall delivery of the roof build-up and the performance achieved. The PE hall solution to deal with reverberation noise as well as rainfall noise was very successfully managed. We look forward to working with Bauder on future projects.” 
Sponsored
Wall Protection - Bitterne Park School

Wall Protection - Bitterne Park School

Gradus

Gradus has supplied and fitted a range of wall protection solutions as part of the £16m newly built Bitterne Park School in Southampton. The new school includes 80 new teaching classrooms, a purpose-built assembly hall/theatre, a new dining space with a fully fitted kitchen and purpose built fully fitted classrooms to house the students as part of their Food and Nutrition studies.
Sponsored
Hornsey Town Hall Redevelopment

Hornsey Town Hall Redevelopment

Sheridan Lifts

9 New Lifts on a Multi-Purpose Conversion Site
Sponsored
Stratosphere

Stratosphere

Michelmersh Brick Holdings PLC

The Stratosphere building in London, designed by Allies and Morrison, is a sleek and contemporary addition to the capital’s skyline. Its location in the Stratford area of London makes it a part of the vibrant cultural and business hub of East London.The building’s striking design is characterized by its distinctive saw-tooth facade, which is made up of a series of alternating angled and flat planes. The facade was inspired by the industrial heritage of the surrounding area, which was once home to factories and warehouses. The saw-tooth design also serves a practical purpose, allowing for maximum natural light to enter the building while minimizing solar gain and glare. The building’s interior spaces are designed to be flexible and adaptable, making them suitable for a range of uses from office spaces to residential apartments.The Stratosphere building uses Floren.be’s Sirius clay bricks. The deep browns help set it apart from its contemporary counterpart and also speak to the industrial heritage of the area.
Sponsored
Bespoke Rundum Meir door chosen for period property renovation

Bespoke Rundum Meir door chosen for period property renovation

Rundum Meir (UK) Ltd

A bespoke side sliding sectional garage door by Rundum Meir provides a blend of aesthetics and modern functionality in a Victorian house renovation project. The 19 ft x 12 ft garage has been transformed into a quality working space equipped and finished exquisitely, allowing for use as a utility area or office as well as a vehicular. A clear 2900mm span is provided by a sliding sectional garage door. Hand crafted using knot-free Spruce, this bespoke timber door in RAL 6021 Pale Green is fully automated with insulation between the five solid double skinned timber panels.With one third obscure glazing, the door allows for plenty of natural light to enter the garage. The design of the garage door panels and the cross styles in the window were the customer’s wish to satisfy the local conservation area requirements. It is the perfect example of the role a Rundum Meir garage door can play in transforming a garage to give it new purpose and flexibility.
Sponsored
Hobhouse Court: Realising Ambitious Brick Façades

Hobhouse Court: Realising Ambitious Brick Façades

Michelmersh Brick Holdings PLC

Michelmersh’s Charnwood factory speciality is producing handmade bricks in bespoke blends with matching special shapes, all made by expert craftsmen. As the project developed and evolved it concluded with 20 bays, with varying angles on plain and face folds requiring 1400 different mould types to form the wide array of bespoke special bricks, all of which were to be intricately made from plan. Brick distributor EHSmith felt that Charnwood was the only manufacturer capable of achieving excellent results due to its production team’s knowledge, understanding, experience, dedication and flexibility.
Sponsored
A SOUND CHOICE FOR CHILDREN

A SOUND CHOICE FOR CHILDREN

Troldtekt A/S

Patalab architects were commissioned to convert an intriguing building off Acton High Street in the London Borough of Ealing into a new certified school for children with Special Education Needs and one with a special focus on pupils with severe autism. Snowflake School is an Ofsted-outstanding teaching environment in a building which was originally a purpose-built hall for the Salvation Army before being turned into an animation studio. Inserted steelwork mezzanines over a herringbone-floored hall contributed to a mishmash of conversions. Given the nature of the school and the links between autism and noise sensitivity, Troldtekt’s acoustic wood wool panelling was specified to minimise sound reverberation and to promote a healthy sound environment and calmness.Project Architect Sophie Fuller explains “The double-height central space works really well as the school’s main hall. In order to minimise sound reverberation, we chose to clad the upper half in acoustic panelling made from wood wool. The texture and neutral colour of the panelling also help to make this tall space feel friendlier and warmer.” Following design guidelines, as well as meeting fire protection and safety requirements, meant many aspects of the building’s history had to be covered although glimpses remain. For example, the original parquet floor used in the assembly hall, original metal handrails protruding from new plywood balustrades and relocated doors as internal windows. At the same time, ramps and a platform stair lift have been added to create accessibility. Founded on the Cradle-to-Cradle design concept, Troldtekt’s natural and inherently sustainable panels are available in a variety of different surfaces and colours and contribute positively to a building’s BREEAM, DGNB and LEED ratings. In addition to their high sound absorption and tactile surface, they offer high durability and low cost lifecycle performance. Available in various sizes and in four grades from extreme fine to coarse, the panels can be left untreated or painted in virtually any RAL colour.
Sponsored
Anti Trap Bow Top fencing secures school perimeter

Anti Trap Bow Top fencing secures school perimeter

Jacksons Fencing

Jacksons Fencing has supplied and installed perimeter security fencing at Bickley Park School, an independent school in South East London. The school site consists of a mix of listed buildings and newer contemporary facilities, all set in attractive grounds. The modern structures include a purpose-built nursery, with strong environmental credentials, and a new multi-purpose astro pitch, to complement the existing sports facilities.
Sponsored
Air Rotation Warehouse Heating - Derbyshire

Air Rotation Warehouse Heating - Derbyshire

Powrmatic Ltd

OverviewIn partnership with Tidyco, Powrmatic was selected to supply an energy-efficient air rotation heating system for a 5,100m2 warehouse storage facility in Derbyshire using a Powrmatic TEx41 Air Rotation Heater measuring over 20ft tall.Project BackgroundTidyco was approached by a customer who is involved with manufacturing, transport and additional services in the aerospace industry amongst others. After recent success, their customer needed to expand their footprint and managed this by moving into a newly built warehouse situated in Derbyshire.SolutionAs this was a brand-new commercial building, there was no heating provision and just the original lighting installed by the builder, which was not fit for purpose. Tidyco was tasked with installing an efficient and effective means of heating solution for the 5,100m2 (55,000 sq ft) vast space along with a modern lighting system. In order to heat and illuminate this space, which occupied a space of more than seven and a half football pitches, some heavy-duty kit was required.ResultFor the heating aspect, Tidyco engineers installed an internal Powrmatic TEx 41 air rotation heater, manufactured in the UK. With an output of 350 kW, the unit measured in at over six metres (20 ft) tall. This particular TEx model was gas-powered and has the superior capacity to provide complete climate control for a 55,000 sq ft with a single TEx Air Rotation Heater.
Sponsored
KEUCO BATHROOM FURNISHINGS AS INTEGRAL PART OF AN INSPIRING HOTEL EXPERIENCE

KEUCO BATHROOM FURNISHINGS AS INTEGRAL PART OF AN INSPIRING HOTEL EXPERIENCE

KEUCO

The hotel is full of rooms flooded with light and exceptional design ideas from the interior architects of JOI-Design.The hotel has its own beach on the Baltic Sea and 124 rooms with a view of nature. It is the blend of wonderful design, cosy comfort and leisurely simplicity in particular which makes the furnishings so special. Strong colours and maritime details in the rooms are contrasted with soft tones in the bathrooms. At ARBOREA they believe in sustainability and quality – just as KEUCO does with bathroom furnishings. KEUCO fittings, accessories, and cosmetic mirrors accentuate the high quality bathroom design. Here, the focus is on guest comfort: KEUCO’s IXMO_solo fittings in the shower combine single-lever mixer with hose connection in only one element on the wall, so they are easy and self-explanatory to use. And for all your care and well-being needs, the iLook_move cosmetic mirror from KEUCO leaves nothing to be desired. The iLook_move is known for its solid design and versatile use, because its arm is very flexible. With a simple motion of the hand the height, distance, and vertical and horizontal angle can be set to the ideal position.In places such as hotel bathrooms, its special hinge technology makes it the perfect furnishing for frequent and heavy use.KEUCO’s COLLECTION MOLL series of accessories features softly rounded lines and corners, combined with rectilinear shapes. These design attributes can be found throughout the entire series. The organic and the formal fuse into one.On the single-lever mixers of the IXMO_solo fittings in the shower and the PLAN fittings at the washbasin KEUCO added an individual touch: They are decorated with an engraved ARBOREA logo.
Sponsored
Bastion House stands out thanks to Lima bricks from Vandersanden

Bastion House stands out thanks to Lima bricks from Vandersanden

Vandersanden Brick

An imposing boutique scheme of nine luxury apartments in Hackney, London, Bastion House is a modern take on a castle-like structure with its multi-faceted walls, tiered form and variously sized openings. The choice of Vandersandan’s Lima facing brick enhances this robust look while the brick’s light colour contrasts with the black mortar joints and recessed jet-black window frames and balcony soffits. Bastion House is built on the site of a two-storey, post-war house on Farleigh Road in a predominantly residential area that includes a variety of architectural styles and a range of building heights. The new building is five storeys in total but its scale and massing are carefully considered, stepping back at both third and fourth floor levels in response to the surrounding built form, while also ensuring that the crown of a street tree, immediately to the west of the site, remains unaffected. Creative brickworkGoldrose Sharpe, the developers of Bastion House, embraced the challenge of carefully detailing the brickwork which, along with the building’s unconventional form, helps it stand out. Specially cut bricks were employed to achieve the different angled corners - most corners of the building are not at a right angle. Brick soffit panels were designed to surround the balcony openings along with brick-faced lintels to create depth to the set-back windows. Relief panels employing a different brickwork pattern were also introduced at various points across the facades. When selecting the bricks for the project, the team at Goldrose Sharpe ordered samples from various brick suppliers. “We were exploring our options with light coloured bricks,” explains Maria Patton, project lead at Goldrose Sharpe. “The Lima bricks have this artisanal, handmade texture which is quite unique; they stood out compared to other brick samples.” The Lima is a stock brick consisting of a mix of different clays with a white base colour, grey accents and a sanded-coated and grained structure.Goldrose Sharpe purchased the bricks directly from Vandersanden.“Vandersanden was always very helpful with its customer service and the team there was good at explaining the technicalities of the brick,” says Maria Patton. “We had to send the bricks to be specially cut and made for the special angles and brick-faced soffits and lintels. They worked well to these variations.”An impactful facadeThe Lima bricks and the impressive detailing ensure Bastion House makes a bold statement. “We often notice people who walk past the building touch the walls out of curiosity,” notes Maria Patton. “We’re very happy with the final result and the overall look of the brickwork. The use of the Lima bricks made a real difference to the building’s appearance.”To find out more about the bricks used in this project or to see the wide range of high-quality bricks available from Vandersanden, click on the 'View more' link
Sponsored
Trafalgar Place

Trafalgar Place

Michelmersh Brick Holdings PLC

Trafalgar Place, London designed by De Rijke Marsh Morgan Architects (dRMM) is a Stirling-award shortlisted mixed-use project designed as part of the Elephant and Castle regeneration. It offers 235 homes set within a reinvigorated area, designed to replace 1960’s era mega blocks. Each new home comes with its own garden, balcony or roof terrace and has been designed to maximise light and space.A rich combination of MBH PLC’s Freshfield Lane clamp-fired Danehill Yellow, Anthracite, Selected Lights, Selected Darks and First Quality Multi bricks were used to create a stunning vertical gradient that helps to both blend in with the established vernacular while creating a modern identity befitting such an expansive redesign of the area. FabSpeed blended all the brick special products which had to be meticulously coordinated and blended to achieve the gradient colour change on the main facade.Additional care was given to the landscape, with pre-existing trees integrated into the project and a variety of open spaces created to allow residents to find solace amongst natural environments despite the site’s proximity to the wider city.Trafalgar Place won the ‘Best New Place to Live’ and the ‘Mayor’s Award for Planning Excellence’ at London Planning Awards, in 2016 and Best Housing Design Award at the 2015 Brick Awards.
Sponsored
St Albans CCOS

St Albans CCOS

Logic Manufactured Bespoke

CCOS South is a new multi-purpose development located in the heart of St Albans city centre.
Sponsored
Holborn House Community Centre, London

Holborn House Community Centre, London

Junckers Ltd

A community space in the heart of central London has been completely transformed and by 6a architects. The new building, incorporating an old basement gymnasium, is home to Holborn Community Association, has a 100-year history which has been sensitively referenced in artwork created by artist Caragh Thuring on the façade of the building. What was solely an old basement gymnasium has been rebuilt as a light-filled, naturally ventilated, low energy space, extending upwards with two new public-facing floors. 6a architects specified Junckers solid Oak Harmony Driftwood Grey two-strip flooring, a pale shade of grey. Suitable for multi-purpose use, the sprung floor fitted in the gym as well as in the club rooms, will enable the community centre to maximise earnings through hires, being able to offer a safe space for everything from various sports to arts and social events. Said Stephanie Macdonald of 6a architects: “The floor looks fantastic and really unusual, a beautiful warmth of timber and colour for the gym and the clubrooms which is going to allow them to be used equally well for hires and events - a really beautiful set of spaces for community use”. Throughout the building, an emphasis on pale, light-reflecting colours and materials minimises reliance on artificial lighting. The light-coloured Junckers Driftwood Grey Oak provides the centre with a durable floor which helps maximise natural light levels. It can be sanded and refinished up to ten times without loss of performance and will serve the centre well for 60 years plus. Junckers floors carry the Danish Indoor Climate Label, which is recognised by BREEAM. Having undergone extensive degassing and odour testing to ensure there are no harmful chemicals, a Junckers floor will help maintain a healthy indoor climate. Stirling Prize nominated 6a architects worked closely with Thuring whose artwork features throughout the architecture. For the etched glass façade which runs the width and height of the building Thuring drew on stories from the community and local area which are inscribed onto the glass alongside irregular mortar lines of the original brickwork. For the gymnasium, Thuring created a bespoke woven fabric, echoing the brickwork motif of the façade, which lines the acoustics panels on the upper walls. The flooring contractor was Junckers Approved Contractor Hutchison Flooring. 
Sponsored
Woodside Fountain Health Centre

Woodside Fountain Health Centre

Kingspan Insulation

GP practice staff in Aberdeen are enjoying a new and improved environment at their purpose-built facility, with the help of the OPTIM-R Roofing System
Sponsored
HOSPITAL AND HOTEL IN ONE

HOSPITAL AND HOTEL IN ONE

KEUCO

High-quality and durable KEUCO bathroom fittings in the Waldkliniken Eisenberg in Thuringia.A hospital with a quality of stay at a five star level - the Waldkliniken Eisenberg in Thuringia is changing the German hospital landscape with their new concept. And that quite visibly: "Future was built" with the spectacular new building. The round floor plan of the new building offers each patient a view into the nature from their bed - a central aspect of the design. Every patient from all health insurance categories is welcome. Of the 246 patient beds, only 13 are for private patients.In addition to a new care concept and an outstanding special design, the patients and guests in Eisenberg also receive first-class furnished rooms: The soft, natural colours used for the interior decoration radiates tranquillity and cosiness.Regarding the furnishing of the bathrooms, value was set on durable quality and the decision was made to use complete KEUCO bathroom furnishings. So everything matches perfectly. Fittings, accessories, light and cosmetic mirrors, washbasins and washbasin boards from KEUCO convince with their strong design and easy handling. The IXMO fittings in the shower and on the washbasin are custom-made: As a special highlight, they feature an oak leaf, the Eisenberg logo.The new building was designed by the world-famous Milanese architect Matteo Thun. "Only who dares to do something new and crosses borders, can experience new knowledge". This is Matteo Thun's driving force. Together with the managing director of the Waldkliniken Eisenberg, David-Ruben Thies, Matteo Thun developed this exceptional architecture for his first hospital building, which is completely focused on the patient or guest.Matteo Thun worked closely with the architectural office HDR for the combination of form and function, design and the requirements of a modern clinic. The new building of the Waldkliniken Eisenberg offers patients and guests a harmonious environment for their treatment and recovery phase in the midst of the most beautiful Thuringian landscape.The bathrooms are all completely equipped with KEUCO products and offer the patient or guest a pleasant stay rounded-off with small special features. The movable arm of the iLook_move cosmetic mirror is very flexible. Height, distance from the face, tilt and lateral angle can be optimally adjusted at a single grip. Offers storage space and is easy to clean: the KEUCO washbasin with a washbasin board.
Sponsored
Whitethorn Village Apartments

Whitethorn Village Apartments

PARTEL

Whitethorn Village is an attractive residential scheme positioned adjacent to the centre of Naas. The contemporary development led by Cairn Homes PLC includes a mix of spacious family homes and two apartment buildings. These comfortable, sustainable residences offer the very best in terms of quality and energy efficiency.Developer Cairn Homes collaborated with Horizon Offsite to deliver the impressive 5-storey residential blocks in Whitethorn Village, benefiting from off-site fabrication, accuracy, and rapid completion within a tightly controlled cost plan.The apartments were constructed using an offsite fabricated light gauge steel (LGS) structural system. The external LGS wall panels and floor decking used in this system incorporated a number of Partel’s low carbon building envelope solutions. This included the advanced fire rated components EXOPERM MONO DURO 200 breather membrane and ECHOSEAL ALU FR airtight and windtight tape, the multi-purpose adhesive VERBOND, and also the phA Class Passive House Certified components IZOPERM PLUS vapour control layer and VARA SEAL smart airtight tape.
Sponsored
Ahead of the curve garage design

Ahead of the curve garage design

Rundum Meir (UK) Ltd

A stunning ‘roundhouse’ curved garage door, built as part of a project to renovate and extend a Grade II listed property, provides a new perspective on the design, purpose and visual appeal of an exceptional British garage. The project at the large family home in Surrey encompassed internal alterations, restoration of a five metre high bay window to the main house and the creation of a four bay garage. The garage’s purpose, usage and desired appearance meant fusing traditional design with contemporary solutions, with Rundum Meir tailor-made garage doors being key to delivering on the architects’ vision.
Sponsored
West Grove, Jersey

West Grove, Jersey

Sika Limited

The small housing development scheme incorporated waterproofing a new block of garages to ensure they were fit-for-purpose for the four new-build apartments.

Showing 145-180 of 1339

Feedback