NBS Source
I'm a manufacturer

"separating membranes geotextiles"

1,998 results found

Sort by:

Showing 325-360 of 395

Sponsored
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

The 2014 Commonwealth Games’ swimming competition was played out at Tollcross International Swimming Centre. In anticipation of the games, the centre’s facilities underwent a complete refurbishment. Some of the screed below the tiles on the main competition pool floor had separated from the concrete pool tank. The entire floor needed to be re-laid. Glasgow City Council Scott hired, Tilecraft, a specialist tiling works company that delivers high quality tiles, to lay the tiles and specified products from ARDEX UK. A fast track solution which would produce high quality results was needed, and ARDEX UK seemed the logical choice.
Sponsored
Alleyne's Academy, Stone - F. Ball products help with A* refurbishment at Staffordshire school

Alleyne's Academy, Stone - F. Ball products help with A* refurbishment at Staffordshire school

Ball, F and Co Ltd

Fast-track products from F. Ball have enabled a school hall to be refurbished after damage caused by floods. To begin with, contractors removed existing wooden blocks from the floor and used a mechanical scabbler to remove old adhesive residues. Stopgap F77 one-part waterproof surface membrane was applied due to high moisture levels in the subfloor, followed by a subsequent application of Stopgap 1200 Pro to provide a smooth surface for the receipt of new wooden floorcoverings. Once cured, contractors used Styccobond B95 high performance wood flooring adhesive to install new oak blocks over the entire floor area.
Sponsored
28 Well Hung Restaurant, London - F. Ball provides natural look for new organic meat restaurant

28 Well Hung Restaurant, London - F. Ball provides natural look for new organic meat restaurant

Ball, F and Co Ltd

Stopgap 800 wearcoat has been used to create a visually striking floor finish at a new organic meat restaurant in South London. First, contractors lifted the old wood floorcoverings to ensure it was suitably sound, smooth, and dry. To guard against excess subfloor moisture, contractors applied Stopgap F77 waterproof surface membrane to isolate excess subfloor moisture. Stopgap 800 Wearcoat was then applied over the entire subfloor. Stopgap 800 was selected due to its capabilities when it comes to upgrading and renovating new and existing internal floors, where floorcoverings are not required to be installed, making it perfect for this project.
Sponsored
New Elgin Primary School, Elgin

New Elgin Primary School, Elgin

Sika Sarnafil

With previous roof re-coverings proving problematic, two key requirements were highlighted, building the thermal performance to help save energy, and improving robustness, to mitigate damage caused by vandalism. The architect worked closely with Sarnafil to ensure the chosen roofing products provided the required detail, specification and performance. A Sarnafil HD bonded system was specified guaranteeing a high quality and durable roof. By combining the thickest single ply membrane available – 2mm – and the robust insulation board – SarnaTherm HD – the Sarnafil HD system offered a long-term, resilient and well-insulated roofing system with very low thermal conductivity.
Sponsored
48 Leicester Square

48 Leicester Square

Premcrete

This historic landmark required revitalising to enhance its appearance whilst maximising floor space within the existing retained Grade 2 listed facade. This project required a flexible yet robust structural waterproofing design supported by the appropriate warranties. FIS were able to provide a strategy within the budget constraints exceeding the clients requirements whilst ensuring practicability of installation. The waterproof layer beneath the basement slab incorporated a combination of a bentonite membrane and a cementitous coating to the top of the piles caps providing full protection. This deep basement construction required a maintainable cavity drain system applied to the secant piled walls.
Sponsored
National Trust Visitor Centre

National Trust Visitor Centre

Carlisle Construction Materials Limited

The National Trust visitor centre at Tarn Hows in the Lake District is set in a protected Site of Special Scientific Interest (SSSI). EPDM was specified for the roof because of its environmentally friendly credentials which have the backing of Greenpeace. Hertalan roofing products were chosen because of ISO9001/14001 and BBA certification. The membranes were a combination of factory vulcanised sheets and easy weld rolls which were installed in accordance with strict FLL/GRO guidelines. The specification for the green roof insisted on local species of sedum and had over 2000 plug plants installed into 150mm deep recycled growing substrate.
Sponsored
Bitterne Park School, Southampton.

Bitterne Park School, Southampton.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Everyday – H Frame Kits and Flexi-Feet, Flexi Light – Base & Extender frames, Flexi heavy – Modular Frameworks & Custom Frame Services: Cable trays, Ducts, A/C Splits & Air-handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. An assortment of products was required to support various services such as cable trays, ductwork, condensers and air-handling units. In addition, due to one of the air-handling units being extremely wider than usual, we also had to manufacture a bespoke custom framework for this item.
Sponsored
Modular in, Modular out’ – M-Trays® transform construction huts in Knightsbridge

Modular in, Modular out’ – M-Trays® transform construction huts in Knightsbridge

Wallbarn Ltd

A three year construction project in Knightsbridge required a temporary green roof on welfare huts. The local residents were concerned about overlooking these steel huts long-term. The solution is M-Tray® – our modular green roof system. The steel huts were wheeled into position on site on skates. They were covered with an EPDM waterproofing membrane. M-Tray® units were installed. They were easily carried up the stairs by hand and installed by hand within minutes. The modular and portable M-Tray® can just be unclicked and lifted away upon completion of the construction process.
Sponsored
Ferrari & Maserati, Swindon

Ferrari & Maserati, Swindon

Planet

Planet Partitioning used p20 single glazed demounatble partitioning with a smoked laminate glass finish on optiwhite glass, then combined this carefully with low-iron glass to give the client the exact colour wanted. The requirement covered two floors and some of the partitioning formed a balustrade for the edge between them. Eclipse sliding doors ensured a highly premium, clean-like look and feel. Several doors were patch-hinged to address key deflection head requirements. As part of the package we also created a membrane ceiling across a recess area within the showroom, enhancing key illumination areas by softening the light.
Sponsored
SMARTPLY AIRTIGHT provides energy efficient solution to environmental engineer’s Passivhaus project

SMARTPLY AIRTIGHT provides energy efficient solution to environmental engineer’s Passivhaus project

MEDITE SMARTPLY

Nestled in the fashionable, switched-onNestled in the fashionable, switched-on London borough of Camden, high-performance London Max Fordham House has been completed  to the highest energy saving standards with to the highest energy saving standards with SMARTPLY AIRTIGHT.An ultra-low energy, all-electric, contemporary three-bedroom ‘Passivhaus’, Max Fordham House is specifically designed by bere: architects to feature a thermal envelope geared towards reducing heat loss. The less heat lost from a building, the more overall environmentally efficient it can be. One way to do achieve as little heat loss as possible is making the building airtight, which is the aim of the Passivhaus system.SMARTPLY AIRTIGHT, a structural OSB panel with integrated vapour control developed by MEDITE SMARTPLY especially for use in Passivhaus construction, is the vital ingredient in this project. Specified by the award-winning Bow Tie Construction company, SMARTPLY AIRTIGHT provides a state-of-the-art, engineered vapour barrier with consistently high vapour resistance over the entire surface.“The house uses a fabric-first Passivhaus approach, requiring only a fraction of the energy needed by a similarly sized home built to the minimum requirements of UK Building Regulations, for all uses including “The house uses a fabric-first Passivhaus approach, requiring only a fraction of the energy needed by a similarly sized home built to the minimum requirements of UK Building Regulations, for all uses including heating,” Hagop Heath-Matossian, Business Development Manager at Bow Tie Construction, says.“We chose to specify SMARTPLY AIRTIGHT because it is efficient, reliable and it was important to us that all timber products used were sustainably manufactured and sourced; AIRTIGHT offered us a guaranteed sustainable timber solution. Vitally, the client was delighted with the end result.”Max Fordham House, which was completed in the Spring of 2019 and achieves an Energy Performance Certificate of B 83, is the third project that Bow Tie Construction has specified PROPASSIV for, favouring it for its rigidity and quality assurance compared to a traditional membrane-based system.Hagop explains: “AIRTIGHT was specifically used to insulate the roof of the Max Fordham House, but has been used within the entire interior space in other Passivhaus projects previously, to great success.”In most Passivhaus projects in the UK, a membrane is used as an airtight barrier for the properties’ insulation, however, such solutions can be easily damaged during the construction process. SMARTPLY AIRTIGHT offers a solution to this as it will not come apart during a negative pressure test like a membrane would.
Sponsored
Coláiste an Chláirín

Coláiste an Chláirín

Bauder Ltd

Coláiste an Chláirín Bauder Thermofol single ply waterproofing system with BauderROCK insulationSynopsisThe new Coláiste an Chláirín building in Athenry, Co Galway is a post primary school consisting of classrooms, a special needs unit, sports hall, general-purpose hall, staff amenities and extensive external facilities designed by Smith Kennedy Architects & Healy Partners Architects. The project was managed by JJ Rhatigan and Company and the roofing element appointed to Priority Roofing and Cladding Ltd. The roof of the main building and the gymnasium required flat roof build-ups to meet the specifications as set out in in SDG 02-05-03 (Acoustic Performance in New Primary & Post Primary School Buildings), while meeting the general performance requirements specified within TGD 021-7 2018 (Minimum Performance Standards of Roof Materials and Finishes). The chosen system had to meet an acoustic performance of 35dB indoor ambient noise level (IANL). It was decided that, despite sports halls having a slightly higher IANL threshold, the 35dB performance criteria would be applied across all areas of the school, with control of reverberation being a key consideration in the gym.Bauder Building BoardProject:Coláiste an ChláirínLocation:County GalwayProject type:New BuildRoof size:8550m²Main contractor:JJ Rhatigan & CompanyApproved contractor:Priority Roofing & Cladding LtdThe specification:The Architect specified that the insulation used in the flat roof system should be non-combustible and achieve a U-value of 0.16Wm²k which actually exceeds the thermal requirements as described in the Irish Building Regulations Technical Guidance Document L for flat roofs in schools.BauderROCK was specified to achieve the thermal and acoustic requirements of the design. As a Euroclass A2-s1,d0 non-combustible material, BauderROCK also provided the specified fire performance. This insulation could be used across all roof areas, with some adaptations for the gym which required additional acoustic performance due to the inherent nature of the space. Acoustic infills were used in the troughs of the perforated metal deck, thus combatting the reverberation of the indoor environment.  Products appliedBauder Thermofol PVCAn integrated single ply waterproofing system, featuring a lightweight, cost effective membrane which offers a pleasing aesthetic finish on a flat roof. This system holds fire classification BROOF(t4) for compliance with building regulations under TS 1187 test method 4 for external fire exposure to roofs. BauderROCKHigh density mineral wool insulation.Project challengesOne of the challenges of this project was the ambitious schedule. The use of the self-adhesive air and vapour control layer (AVCL) enabled the trades working within the building to progress quickly without being delayed by weather conditions. BauderROCK is relatively quick to install, as was the lightweight single ply waterproofing.  The resultThe project was finished to time and specification with exceptional workmanship from the fixers at Priority Roofing and Cladding and superb collaboration from all parties throughout. The membrane was finished with standing seams to create a statement look. The roof achieved a U-value of 0.15 W/m2k, exceeding the thermal target, and met or exceeded the 35db IANL requirement across the main building and the sports hall.  The thermal performance, which will hold up for decades to come, will also impart energy efficiency benefits that reduce running costs at the school in the long term. Finally, the non-combustible nature of the mineral wool insulation ensured that the build-up met the fire safety specification. System installed Bauder Thermofol PVC single ply waterproofing system1 Bauder THERMOFOL U15 V FRThis 1.5mm polyester reinforced Poly Vinyl Chloride membrane (PVC) membrane benefits from being highly flexible due to the incorporation of internal plasticizers during the manufacturing process. The combination of materials within this membrane provides high tensile strength, with thermal stability and chemical resistance.2 BauderROCKA mineral fibre non-combustible insulation with high acoustic performance. The dual density mineral wool composition delivers compressive strength, whilst keeping the overall weight to a minimum and providing high noise absorption which enabled the complete system to meet project requirements.3 BauderTEC DBR 06This 0.6mm, self-adhesive, elastomeric air and vapour control layer is light weight and benefits from cleaner, safer, and faster installation than traditional torch applied membranes. Advocacy Niall Hanley, Contracts Manager at JJ Rhatigan, the project’s main contractor, said:"Coláiste an Chláirín Athnery was a great success and in particular the use of the self-adhesive AVCL in advance of the build-up allowed works to commence immediately internally, which was critical from a programme perspective.” Kevin Ryan, Director at Priority Roofing, explained:"We found the system both practical and efficient to install. The combination of the availability of the products and the technical backup received was superior to any other system that we have worked with.”  Eoin O’Grady, Associate Director at Healy Partners Architects commented:"We are delighted with the overall delivery of the roof build-up and the performance achieved. The PE hall solution to deal with reverberation noise as well as rainfall noise was very successfully managed. We look forward to working with Bauder on future projects.” 
Sponsored
Stansted Airport, London

Stansted Airport, London

Howe Green

The multi-million pound transformation of London Stansted Airport required a floor access solution that could accommodate very specific site conditions and meet the required loading. In two separate phases of work Howe Green supplied over 250 bespoke floor access panels and frames for the Satellite One and Departure Hall refurbishment. Howe Green adapted the 2500 Series and 5000 Series Stainless Steel Floor Access Covers to custom depths and incorporated an additional base plate reinforcement to meet the clients exact requirements. Single floor access covers and multi-part covers were supplied to provide safe and easy access to service utilities.
Sponsored
Bishop Luffa School chooses Bow Top and Mesh to secure the perimeter of newly remodelled site

Bishop Luffa School chooses Bow Top and Mesh to secure the perimeter of newly remodelled site

Jacksons Fencing

Around the perimeter of the school, Jacksons installed approximately 140 metres of 1.8m high Bow Top fencing, 3 metres of 1m high Bow Top fencing. To provide separate access control for pedestrians and vehicles, 4 manual single leaf Bow Top gates and 3 double leaf Bow Top gates were installed, one of which was automated to control access to the site. In addition to this, we supplied 26.6 metres of 1.8m high EuroGuard® Flatform Medium mesh, and 38 metres of 2.4m high EuroGuard®Flatform Medium , along with 1 single leaf 2m wide EuroGuard Flatform Heavy Gate.
Sponsored
Type G200 - Project Smoove

Type G200 - Project Smoove

London Wall Design Ltd

Having outgrown their previous offices, Smoove – a company operating in the property sector (formerly ULS) – took the decision to take on three floors at Masters Court; a fully refurbished office building in the quaint town of Thame, Oxfordshire. They swiftly appointed HNB and Leap Architects to deliver an overhaul of the dated interior that would better suit the Smoove team.We were approached to deliver a glass moving wall capable of separating the ground floor kitchen and main open plan space when required. Our Type G200 system was chosen, which provides transfer of natural light when the partition is closed while simultaneously stopping the transfer of sound.
Sponsored
Dorma Varitrans HSW single glazed moveable Writable Dividing Walls for Global Bank’s UK Offices

Dorma Varitrans HSW single glazed moveable Writable Dividing Walls for Global Bank’s UK Offices

Style - Moveable Partition Specialists

Aiming to maximise space at Bank of America's UK offices, Style was contracted to work with TP Bennett and contractor Amspec, to design a partitioning solution that would allow the meeting rooms to be used more flexibly, and encourage collaborative working practices. Two Dorma Hüppe Variflex, semi-automatic, white laminate operable walls divide the main meeting room into two separate areas. Boasting an impressive 59dB acoustic integrity, the walls allow concurrent meetings to run entirely undisturbed. Inspiring lively sharing of ideas, Style also installed six vibrantly coloured, moveable glass ‘squiggle’ panels, providing magnetic, writable surfaces for use in dynamic discussions.
Sponsored
Dorma Variflex Glass Semi automatic Acoustic moveable wall installed by Style at Wellington Place

Dorma Variflex Glass Semi automatic Acoustic moveable wall installed by Style at Wellington Place

Style - Moveable Partition Specialists

Working with architect, Sheppard Robson, and contractor, Overbury, Style was specified to install two Dorma Hüppe semi-automatic Variflex glass moveable walls in Wellington Place, a group of prestigious, mixed-use developments in Leeds city centre. Separating the catering facility from meeting areas in a key office building, the glass operable walls deliver an impressive 52dB Rw acoustic integrity, providing outstanding privacy for meetings and gatherings whilst maximising the use of natural light. Addressing the ongoing need for social distancing, moveable wall systems can be effectively utilised to create discrete employee ‘bubbles’ by dividing office space into smaller areas.
Sponsored
Dorma Variflex Manual Acoustic moveable wall installed as 
Global Consulting Group Contracts Style Again

Dorma Variflex Manual Acoustic moveable wall installed as Global Consulting Group Contracts Style Again

Style - Moveable Partition Specialists

Delivering flexible space that can be quickly adapted to encourage collaborative working practices, moveable wall systems are fast becoming the norm for modern UK offices. Having enjoyed the benefits of a moveable wall that Style installed a few years ago, a major global consulting group recently invited them back to their London offices to install two further partitioning solutions, effectively sub-dividing a key meeting area. The Dorma Hüppe Variflex ML100 moveable walls allow the open-plan space to be closed off, creating three separate rooms. An incredible 59dB Rw acoustic integrity allows meetings to run concurrently, entirely undisturbed.
Sponsored
Dover Fuelling Solutions Factory

Dover Fuelling Solutions Factory

Brett Martin Daylight Systems

A comprehensive set of rooflight solutions has been provided, including Energysaver factory assembled GRP rooflights, to a newly expanded production facility in Dundee. Brett Martin was selected for this project due to meeting for 3 separate specifications. This involved supplying daylighting solutions to an existing building, new building and link corridor. These rooflight play a significant part in ensuring this facility meets its energy targets, whilst enhancing the working environment. Specifications: Factory Assembled Rooflights: 230m2 of Trilite 3.0 Energysaver FAIRs Vaults: 2 x 8m and 10 m Triple skin GRP Multivaults Skylights: 2 pyramid glass Ritchlights, 2.5m x 2.5m
Sponsored
Great Western Railway - F. Ball products keep contractors on track at Great Western Railway train depot

Great Western Railway - F. Ball products keep contractors on track at Great Western Railway train depot

Ball, F and Co Ltd

F. Ball products have been used to install vinyl safety flooring at the Great Western Railway train depot in Penzance. Flooring contractors installed 400m2 of flooring in the depot. Firstly, to combat the excess subfloor moisture, which can cause extensive damage to floorcoverings and lead to costly remedial work, contractors used a combination of Stopgap F77 and Stopgap F78 Waterproof Surface Membranes. The fast-setting, minimal preparation Stopgap 1200 Pro smoothing underlayment was then applied over the area. A short time later new Polyflor Polysafe Standard PUR flooring was installed using Styccobond F46, a solvent-free pressure sensitive acrylic adhesive.
Sponsored
Glasgow University Library - F. Ball Products Used to Install First Class Floor

Glasgow University Library - F. Ball Products Used to Install First Class Floor

Ball, F and Co Ltd

A floor preparation system from F. Ball has been used to install 2,700m2 of floorcoverings at Glasgow University Library. First, old linoleum floorcoverings were removed. Over this area, Stopgap F77 waterproof surface membrane was applied due to excessive relative humidity levels. Stopgap 1200 Pro smoothing underlayment was applied on concrete sections of the subfloor. An F. Ball primer was applied to a ramp constructed from plywood before Stopgap 700 smoothing underlayment was used to receive floorcoverings. In the entranceway, Styccobond F46 adhesive was selected to install vinyl sheets, with Styccobond F41 carpet tile tackifier used to install carpet tiles.
Sponsored
Waterproofing Crossrail Deep Underground with Preprufe®

Waterproofing Crossrail Deep Underground with Preprufe®

GCP Applied Technologies

Reaching depths of more than 30 metres beneath the streets of London, Crossrail Stations required unique solutions to ensure water tightness. GCP Applied Technologies, a leading supplier on some of the major stations including Canary Wharf, Whitechapel, Liverpool Street, Moorgate, Farringdon, Tottenham Court Road and Bond Street, reached into an extensive portfolio of high performing and easy to install Preprufe® waterproofing products to solve challenges presented by each station. Composed of durable HDPE, the Preprufe® waterproofing membrane adheres directly to concrete with Advanced Bond Technology™ to form an impermeable seal. Find out more from gcpat.com.
Sponsored
Adidas Warehouse, Stockport, England

Adidas Warehouse, Stockport, England

R-Tek Manufacturing Ltd

 Adidas chose the R-Tile Dovetail Textured Light Grey for their refurbishment project in Stockport.The R-Tile not only met all their strict accreditation needs, but it also provided the solution to their functional constraints.   The project requirements were:Surface area to cover 3,000m2Must be able to handle manual and electric pallet trucksFire retardant - Bfl S1Fast installationImpact resistantNo adhesive or damp-proof membrane requiredHardwearingReduce dust and noiseEasy to clean and maintainCE accredited R-Tile Textured Dovetail by R-Tek Manufacturing was the clear choice, we supplied and fitted a durable, hardwearing flooring suitable for their needs and requirements.
Sponsored
Indigo Hotel, Queens Street. Cardiff.

Indigo Hotel, Queens Street. Cardiff.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi light – Flexi Base & Extender frames, Flexi heavy – Ahu Frameworks, Flexi everyday – Duct, pipe and electrical containment. Services: VRF Condensers & Air handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. Supplied via a wholesaler in Cardiff, our hot dip galvanised frameworks were supplied in lengths and widths to suit each unit being supported. With all products available from stock, the contractor ordered frameworks in stages, to suit the phased project programme, and eliminated having to find space within an already restricted working environment for everything to be delivered at once.
Sponsored
Retail Store - Staines Upon Thames

Retail Store - Staines Upon Thames

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi access. Services: Bespoke access ramp solution. Roof build-up: Warm roof design / TPO/PVC membrane. Pump House recently supplied an external rooftop access ramp solution for a proposed route out of a building down onto the flat roof. The solution was fully adjustable against typical flat roof falls, and did not penetrate the waterproofing below. Steelwork was hot dip galvanised whilst landings were a non-slip 8mm thick GRP sheet to provide great slip resistance. Supplied with full handrail and kick plates to all exposed sides, to ensure safe passage of pedestrians and cargo.
Sponsored
Stunning Mill House Extension, Cornwall

Stunning Mill House Extension, Cornwall

Newton Waterproofing Systems

This old Mill House in Cornwall has undergone a huge conversion and extension to become a luxurious five-bedroom home, protected by the failsafe Newton CDM System. Simon Williams purchased the 18th Century Water Mill in 2015 with a view to renovating, developing and extending the beautiful property, located in Blowinghouse just South of Perranporth, into his private residence.Once planning permission was gained for the required conversion and extension to transform the mill into a luxurious 5-bedroom family home, Simon liaised with CAD Architects on the design, which incorporated a waterproofing design specified by Newton.An additional large garage with charming two-bedroom ancillary accommodation was also added to the grounds of the property, which required specialist steel and concrete foundations, given the close proximity of the water.In order to restore the old mill and achieve a Grade 3 habitable environment, BS 8102:2009 recommends that a Type C internal cavity drain membrane system is one of the primary forms of waterproofing, as it is the most failsafe system that is least prone to defects and issues.The Newton CDM System is also completely maintainable, and was therefore ideal for the 18th Century structure, considering that Williams Creative Homes did not want to compromise the external appearance of the thick stone walls.The proximity of the river also meant that there was a high risk of water ingress, however, Newton's robust cavity drain waterproofing is designed to capture water using Newton 508 membrane on the walls, then drain it away via gravity using Newton Basedrain.Finished to an incredibly high standard by Williams Creative Homes, Simon has been living in the property ever since, whilst the Newton waterproofing system successfully ensures that his home is completely dry and protected.
Sponsored
Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Alumasc Water Management Solutions

Alumasc Rooflights provided an ideal solution to allowing natural daylight into the building from above. The unique kerb design incorporates both security and waterproofing to create a reliable, safe and secure rooflight, allowing horizontal termination of the waterproof membrane. This makes water penetration virtually impossible. The domed glazing is moulded from Marlon FSX Longlife, premium quality solid polycarbonate, which has an impact resistance up to 200 times that of glass.Technically sophisticated, Harmer AV high-performance aluminium roof outlets are chosen for this project as they guarantee a trouble-free performance and are especially suited to flat roofing applications featuring continuous membranes.Harmer AV roof outlets combine innovative product design with full industry compliance to meet the needs of rainwater drainage in any construction project, with the ability to drain up to 40% more roof area than conventional gravity outlets. Further to this, their lightweight, durable, non-corrodible design means that they will do so for up to 40 years.GX Pressed Aluminium Gutters are robust box section gutters designed for traditional wet jointing on site. They’re especially suited to applications where maximum capacity gutters are required. For the very large drainage area of the campus roof, they were perfect.Designed to fully accommodate thermal movement at every joint, they are lightweight, durable and noncorrodible, and, upholding the environmental prerequisites of this project, they are 100% recyclable.Finally, Heritage Circular Pipes are available in 4 pipe diameters and 3 pipe lengths, together with a complete range of fittings. Can be factory finished to replicate cast iron or with BBA certificated powder coatings in a range of colours.
Sponsored
Waterproofing Historic Leaking Vaults

Waterproofing Historic Leaking Vaults

Newton Waterproofing Systems

As part of their ongoing relationship with Imperial College London, Newton Specialist Contractor A.P. Gooch assessed and waterproofed 11 Victorian brick vaults beneath the streets of Kensington, London, after the existing competitor ‘waterproof render’ failed.Imperial College London is a world top ten university, and it's top-class educational facilities in Central London are constantly used by multidisciplinary students, including doctors, and nurses, for their studies. It was therefore crucial for AP. Gooch to perform the work whilst also creating minimum disruption to the college students.Following a full assessment of the vaults, A.P. Gooch decided that the best option was to install the tried and tested ‘failsafe’ Newton System 500 cavity drainage membrane solution in order to depressurise, capture and safely manage ingressing water away from the building. A.P. Gooch also committed to carrying out the entire installation at night in order to cause as little disruption as possible to the College’s students.By installing Newton 508 membrane with strategically placed Newton MultiPlug fixings, the system remained sympathetic to the historic structure beneath. Newton Basedrain was also installed in order to channel captured water to one of four Newton Titan-2 sump chambers, the compact size of which made them ideal for use in a structure with such tight size restrictions. Each chamber also contained primary and backup Newton CP400 pumps to ensure that there will always be a safe means of removing captured water from the building.Now fully protected by a maintainable system, compliant with waterproofing code of practice BS 8102:2009, all 11 vaults are now completely dry, providing safe and healthy individual study rooms for the medical students at Imperial College.
Sponsored
Listed Vault Waterproofing in Central London

Listed Vault Waterproofing in Central London

Newton Waterproofing Systems

Beneath the streets of Central London lies a network of Grade 2 Listed underground vaults. As Newton Specialist Contractors, Stonehouse were called in to waterproof four of these impressive structures and turn them into a completely dry commercial space. The four vaults were situated just North of the River Thames in Central London, a short walk from such famous landmarks as Smithfield Market and St Paul's Cathedral.The Grade II Listed structures are each over 4 metres in height, and form part of an impressive below-ground infrastructure network. Newton Specialist Contractor Stonehouse were asked to waterproof four of these impressive vaults for the multinational service provider KPMG, in order to turn them into useful commercial spaces.When waterproofing historic vaults such as these, the Newton CDM System provides the ideal solution as it is maintainable, requires minimal fixings and therefore avoids damaging the structure, and crucially is deemed as reversible should the structure need to be returned to its original condition in future.As an experienced contractor, Stonehouse proceeded with an expert installation of a full CDM System to the tricky vaults, including:508 Mesh membrane to the walls, for a direct plaster finish508 membrane and Fibran XPS 500-C insulation boards to the floor.Basedrain channels to direct any captured water towards two Titan-Pro sump chambers, each containing two NP400 pumps.Victron Inverter and a NorthStar battery for reliable backup power.Stonehouse completed an extremely complex and detailed cavity drain installation with precision, resulting in an exceptionally neat waterproofing system, and proving the benefits of using a specialist waterproofing contractor.
Sponsored
Bath Riverside

Bath Riverside

Axter Ltd

Bath Western Riverside development is a multi-award-winning project for client Crest Nicholson Regeneration. The project has won multiple awards including the coveted NHBC ‘Pride in the Job’ award for H&S and the seal of excellence for quality.Systems in useExcel®ChallengesThe ‘curved’ bulk-heads, walls and interior finishes presented a special challenge to our on-site team, one that would be present over multiple floors and apartments.The system needed to be both robust and aesthetically pleasing, as the roofs are overlooked by residents and used as amenity spaces, and the colour had to be in keeping with the traditional Bath stone.In addition to this, the project featured many unique and complex terraces in terms of shape, threshold height, u-value requirements and access.SolutionsTo achieve both a level threshold and a good thermal performance, we designed a unique tapered insulation scheme for the terraces, utilising our Excel system, reinforced bitumen waterproofing membrane, in combination with our high performance and cost effective Hytherm VIP (Vacuum Packed Insulation) insulation scheme.To meet the aesthetics guidelines dictated by the local planning authority, the capsheet membrane was specified with a white granular finish, which provided the unique look the authorities were looking for.To ensure the terraces were installed correctly and in accordance with Axter requirements, we worked in close partnership with the development construction team. In conjunction with Avonside, a ‘traffic light’ system was introduced to ensure that each individual terrace had been checked by our Quality Assurance team, that it had been independently integrity tested and that it was installed in accordance with the architect’s details, upon which the guarantees were issued and the finishes thereafter installed.
Sponsored
Early Learning Unit (ELU)

Early Learning Unit (ELU)

Axter Ltd

The Early Learning Unit (ELU) in Hamilton was relocating to the former Hamilton Grammar School site, which had been demolished the previous year. Axter were brought on board to determine the best type of roof that would provide the greatest benefit to the school and its pupils.ChallengesThis project was originally specified to be a single ply system but, with the school catering for children with special requirements, it was decided that a living roof system would be beneficial to both the staff and pupils, and that single ply would not be suitable.This is when Axter and Procladd became involved in this project and worked together to design a robust waterproofing system that could work with a living roof, and still provide value for money for the Council, whilst delivering the project on time and on budget.SolutionsFollowing discussions, Axter’s Cityflor Reinforced Bitumen Membrane system was specified over a plywood substrate, with an extensive green roof. This project presented some unique challenges, specifically in the need for the use of Flame Free Technology to combustible upstands. Axter and Procladd were both committed to NFRC Safe2Torch standards, with Axter’s Flame Free Neo-Bitumen Technology specified on upstands to remove any risk of fire. The Force 4000 Flame Free system to these areas consisted of a self-adhesive binder, combined with hot air welding technology to seal and bond all laps, to ensure a robust detail without any risk of a naked flame near combustible materials.When asked to comment on using the Neo-Bitumen Flame Free technology, Procladd Operatives Billy and John commented: “The membrane was very easy to work with and a pleasure to install. The self-adhesive membrane adhered incredibly well to the upstand without the need to heat the underside, like a standard torch applied system, which made the installation a quick process. Once completed we heated the side and head laps using a hot air gun, normally associated with Single Ply membrane, to ensure a full bond complete with a 2mm bitumen bead. The system is one of the most straightforward and workable systems that we have used.”Procladd Managing Director Keith Burrell said, “We have worked with Axter on a number of projects and knew, through their commitment to achieving robust waterproofing systems, and their experience within the education sector, that it meant we could work together to complete this project in harmony to give the best service possible to South Lanarkshire Council.The introduction of their Flame Free Neo-Bitumen system to the areas of combustible upstand meant that works could progress quickly on site, whilst maintaining safety and reducing any risk of naked flame near to timber or combustible materials.From start to finish Axter were informative and helpful with initial NBS specifications, detailed drawings and thermal calculations, right through to on site technical guidance and Quality Assessment of the ongoing works and through to completion and Guarantee.”AcknowledgmentsWe have worked with Axter on a number of projects and knew, through their commitment to achieving robust waterproofing systems, and their experience within the education sector, that it meant we could work together to complete this project in harmony to give the best service possible to South Lanarkshire Council.The introduction of their Flame Free Neo-Bitumen system to the areas of combustible upstand meant that works could progress quickly on site, whilst maintaining safety and reducing any risk of naked flame near to timber or combustible materials.From start to finish Axter were informative and helpful with initial NBS specifications, detailed drawings and thermal calculations, right through to on site technical guidance and Quality Assessment of the ongoing works and through to completion and Guarantee.Keith Burrell - Managing Director, Procladd
Sponsored
ProEdge Install

ProEdge Install

EverEdge

EverEdge ProEdge was used to create borders, pathways and to provide an edge between lawn and driveway at this property in Chailey, Sussex. The 100mm deep ProEdge border addition, with perfectly straight edges and perfect right angles, frames the house and will keep neat lines for years to come. Lengthy pathways installed from drive to patio and then patio through to established gardens keeping gravel and grass separate.ProEdge was chosen because of its thickness (2.5mm steel) and length (2.5m) as this was a large install on varying ground. Install was carried out by J Sutton Landscapes who said they were “very impressed with the product and plan to use it in several upcoming projects”Pleasing to hear and pleasing to see pictures of a great install.
Sponsored
Style Enhances Staff Wellbeing with Flexible Space

Style Enhances Staff Wellbeing with Flexible Space

Style - Moveable Partition Specialists

Global engineering consultancy, WSP, recently relocated 850 Manchester-based staff to new offices situated in the prestigious, No8 First Street building. The refurbished office space focuses on the wellbeing of employees, creating relaxing spaces where they can unwind and spend time with colleagues. Contributing to this positive lifestyle environment, Style installed two DORMA Varitrans glass moveable walls, effectively separating breakout areas and creating either two smaller rooms or one large open plan space. A further eight DORMA Variflex, fully automatic moveable walls were installed across two other floors, allowing WSP to create three larger meeting rooms or seven smaller ones.
Sponsored
Sage

Sage

Komfort Partitioning Ltd

To make the space work for the acoustic and aesthetic requirements, Ryder specified Komfort’s frameless partitioning systems.Komfort’s single and double glazed partitioning systems with 25mm deflection were specified by Ryder in all the meeting rooms on multiple floors. Komfort’s manufacturing team MIG welded together each of the 90-degree corners to create a unique and bespoke design for this project. This helped install speed and resulted in a seamless and high-end appearance by ensuring no separation once glazed.In an aluminium frame, our partitioning creates the appearance of frameless glass with our patented bubble joint. Our systems are designed to balance aesthetics, elegance and durability in any working environment and offer market-leading performance.
Sponsored
Meeting Room - MG100 Top Hung Double Point Suspension

Meeting Room - MG100 Top Hung Double Point Suspension

ModernGlide Ltd

The ModernGlide MG100 Top Hung Double Point Movable Acoustic Wall provides seamless room dividing options and is ideal for separating meeting room space.Movable Walls Key Facts & Specifications:Acoustic reduction from 37dB to 58dBTop-hung with no floor trackFixing to beam on concrete soffitPanel widths of 650mm to 1250mmHeight up to 12000mmFull height or inset pass door optionsSemi-electric top and bottom seal optionsVersatile stacking via double point suspensionFinishes include melamine, laminate, veneer and magnetic wipe boardIntegral glazing options30 minute and 1 hour fire rating options
Sponsored
Fast, passive and beautiful

Fast, passive and beautiful

RENOLIT Cramlington Ltd

Family houses renovated... CHALLENGE 134 single family houses needed to be renovated to liveable conditions. The main problem for the architect and building contractors was the fact these houses had to remain occupied during the works. SOLUTION For the roof two prefabricated timber roof elements covered with the RENOLIT ALKORDESIGN roofing system were installed to replace the existing roof structure. The roofing elements consisted of a layer of OSB, a layer of 350 mm cellulose fibre insulation, another OSB plate and a 2 mm thick RENOLIT ALKORPLAN roofing membrane. The prefabricated roof element has a U-Value of 0.11 W/m². On top of the prefab roof elements hot water panels were installed. 
Sponsored
The Moorings, Wales

The Moorings, Wales

PARTEL

The Moorings is a high-end, self-build project in an area of outstanding natural beauty in Anglesey, Wales.This collaborative project, between MBC Timber Frame and WM Design and Architecture, consists of a three-bedroom, 250m2 detached private residence that has been designed and constructed to achieve the airtightness and thermal performance targets required to meet Passive House standards. The timber frame home has been built incorporating a range of low carbon building solutions from Partel including high performing breather membranes ECHOFOIL EXO and EXOPERM MONO 150 and also the phA Class Passive House Certified components IZOPERM PLUS vapour control layer and CONEXO MULTISEAL airtight tape.

Showing 325-360 of 395

Feedback