NBS Source
I'm a manufacturer

"roofing membranes"

4,059 results found

Sort by:

Showing 181-216 of 374

Sponsored
Bilco Roof Access Hatch Provides Safe Roof-top Access at Blair Castle

Bilco Roof Access Hatch Provides Safe Roof-top Access at Blair Castle

Bilco UK

Bilco UK's CS-50TB Roof Access Hatch provides the perfect solution for roof-top access at Blair Castle, Scotland. The Category A listed building is said to have been constructed in 1269 and has been extensively added to over the years. Maintaining such a historic monument is a massive task. The Atholl Estate employ an army of staff to ensure this iconic property is preserved for future generations. One of the many problems in looking after such a building is the fact that it was not designed with ease of access to the roof in mind.
Sponsored
easyHotel, Cardiff

easyHotel, Cardiff

Alumasc Roofing

Derbigum + BluRoof = Sustainable Drainage Solutions Mitigate your risks with Alumasc BluRoofs Think Stormwater Management - Derbigum BluRoof SolutionsA 5-minute hop from Cardiff Queen Street and you’ll find the first blue roof in Wales. Upon what was formerly 1960’s office accommodation the Cromwell House site has been transformed into an 8 storey, 120-bedroom easyHotel with a rooftop stormwater management system. OUR DESIGN PROCESSOur clients at Carter Lauren Construction were interested in learning about the benefits of a blue roof to meet planning conditions. ” Working in a compact city centre environment where ground attenuation was not possible, it made sense to install a blue roof. The Alumasc team demonstrated how their BluRoof System attenuates stormwater via controlled discharge over a 24-hour period at roof level.” Kevin Jenkins, Surveying Director, Carter Lauren Construction. CLIENT BRIEF AND DESIGNWorking closely with the appointed consulting engineer and architect, our team of technical experts designed a solution for stormwater attenuation to comply with planning and meet all other project objectives. Alumasc’s Matt Davies, Area Technical Manager - Mid, West & South Wales commented, “Given the urban location, the Alumasc BluRoof system was the perfect fit in providing a fully warranted single-source waterproofing and sustainable drainage solution.”The Alumasc technical team provided a full specification service and specialist drainage design using key data from the project brief. By incorporating our BBA Accredited Derbigum APP polymer modified bituminous waterproofing system the longevity of the total solution is assured with a proven track record since 1967. Other key components comprise of a BluRoof geotextile filter fabric, BluRoof interlocking void former, flow control outlets, and overflow system.ENVIRONMENTALLY FOCUSSED SOLUTIONExtreme weather events are now the new normal, says the World Meteorological Organisation. Our rainfall patterns are becoming increasingly unpredictable, and we must plan accordingly to adapt the built environment to help alleviate flood risk. PARTNERSHIPWorking with the contractor to construct the first blue roof in Wales. Kevin Jenkins, Surveying Director, Carter Lauren Construction, “Matt and the Alumasc team were available throughout the design and installation process. We knew that installing the BluRoof by Alumasc was the right decision for the future of the easyHotel and the benefit to reduce pressure off the drains.” SAFETY PERFORMANCEThe easyHotel has a 35-year warranty for the works and life expectancy of up to 50 years.ABOUTEasy Hotel Cromwell House, Cardiff - Wales’s first blue roof. Completion: Spring 2021 Main Contractor: Carter Lauren Construction Architect: Axiom Architects 
Sponsored
an M-Tray®  Green Roof reaching the parts other green roofs cannot reach

an M-Tray® Green Roof reaching the parts other green roofs cannot reach

Wallbarn Ltd

This project had incredibly restricted access, where the client wanted a green roof on an existing bitumen rooftop overlooked by hotel rooms. The M-Trays® had to be transported on a trolley through the hotel kitchens. They were winched onto the roof itself using a genie lift and slotted into position in a matter of hours. Trying to construct a roll-out green roof was impossible, given the restricted access. Installation was fast and effective, taking only a day and giving an instant green roof. M-Tray® dramatically improved the view from the rooms and improved the guests’ experience.
Sponsored
Museum of London - Visionary Roof

Museum of London - Visionary Roof

Bauder Ltd

Museum of London - Visionary RoofSynopsisThe Museum of London opened in 1976 on the historic London Wall and is a few minutes’ walk from St Paul’s Cathedral. A visionary approach to roofing had been adopted on a building that, will not only green as much of the exposed roofs as possible, but also provide a strong research aspect for future green roof projects. As with many buildings, the original roofs needed to be upgraded or replaced, at the same time as being brought up to date using environmental and sustainable solutions.Through the recommendation of waterproofing and green roof manufacturer Bauder Ltd, the Museum invited Dusty Gedge, one of the UK’s leading independent green roof consultants, to work directly with them to design 3500m² of varying habitats that encompassed the museum’s sustainable vision. and help in the provision of environments that would attract a range of wildlife, as well as being able to help the city adapt to climate change.Bauder Building BoardProject:Visionary roof, Muesum of LondonLocation:LondonProject type:RefurbishmentRoof size:9512m²Specifier:Museum of LondonRoofing contractor:Russell Trew LtdThe specificationAn independent consultant had previously carried out an energy model on the Museum of London buildings. When the museum inputted the green roof specification, it showed a potential energy saving of 10% per year, as well as a reduction on the future replacement costs of the heating and cooling plant. Some of the green roofs were funded through Drain London, a partnership project led by the Greater London Authority and funded by Defra. The project aims to better understand surface water flood risk across London, with a view to promote interventions (such as green roofs) to reduce surface water flooding. The museum has used the Bauder green roof system and worked closely with Dan Costen of Bauder and the roofing contractor Russell Trew Ltd, to deliver the various green roof spaces.These include:The refurbishment of the lower garden in the central courtyard with hard landscapingThe installation of Bauder’s new wildflower blanket to the upper garden in the central courtyard (funded through Drain London)Plug planting the roofs of the recently completed garden and terrace rooms that provide high quality corporate hire (matching the colour scheme chosen for the rotunda garden refurbishment and integrated with the new rainwater harvesting system funded by Renaissance London)An integrated sustainable urban drainage system (SuDS)Plug planting in other individual small roof areas including outside the boardroom and committee roomsTwo different planting schemes on an area of the main museum roof where the Drain London Project aims to carry out water attenuation researchThe resultRetrofitting green roofs will help to realise the Mayor of London’s ambition, to increase green cover in central London by 5% by 2030. The Museum of London is one of the largest retrofit green roof projects in the City and is certainly to be commended for allowing its roofs to be used for research purposes. Not only will it provide a benchmark for best practice, but it also demonstrates that retrofitting green roofs onto existing buildings is both environmentally and economically viable and is the way forward in helping London adapt to climate change.System installedBauderflex Green 1 BauderPLANT E 42A torch applied SBS elastomeric bitumen capping sheet. This product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL2 BauderTEC Sprint DUOA self-adhesive elastomeric bitumen underlayer with DUO lap technology. This product has a glass fleece reinforcement feature for stability and strength.3 BauderPIR FA-TEFlatboard insulation boards containing rigid polyisocyanurate (PIR).4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.XF 301 Sedum System1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green.AdvocacyGavin McCourt MRICS, Project Manager for The Museum of London said:“In producing the business case for installing green roofs, reference was made to the extensive published documents on the benefits of green roofs. In this case as the museum building had already been energy modelled by outside consultants, it was decided to input the green roof specification into the model. The results showed a potential energy saving of 10% per year, as well as a reduction in future replacement costs for heating and cooling plant. These factors, combined with the longer life cycle replacement of green roofs compared with normal felt roofing systems, enabled me to produce a robust business case for green roofs. With increasing energy prices the economic benefits of installing green roofs can only become more viable”Dusty Gedge added:“One of the major issues that London faces is flash floods during the summer, when sudden rainfall levels overwhelm the current drainage network. With the support of Drain London we will be researching the rainwater run-off for different green roofs. This will help us validate the kind of roofs and depth of substrates that will negate the costly effects that the sudden rainfall has on the infrastructure of the City.”
Sponsored
Social Housing – Oxfordshire

Social Housing – Oxfordshire

Russell Roof Tiles

Russell Roof Tiles worked closely with the roofing contractor to supply tiles for a rural exemption scheme.
Sponsored
Social Housing – Ashfield

Social Housing – Ashfield

Russell Roof Tiles

Russell Roof Tiles su.pplied 200,000 Highland roof tiles in Cottage Red for a reroof project
Sponsored
Degaflex Flat Roofing Repair

Degaflex Flat Roofing Repair

Degafloor Ltd

London GRP Roofing Ltd, specialists in fibreglass flat roofs and terraces, recently completed a Degaflex roofing installation using our high-performance system and gave their professional opinion.Stephen Knuckey, the Director of London GRP Roofing Ltd. posted on LinkedIn photos of their project along with a comment of ‘our "Degaflex overlay. Safe to say I am extremely pleased with the finish on this. Being a felt overlay and turning out this smooth, I’ll be looking forward to applying it directly to an OSB deck.’
Sponsored
Britmet Lightweight Roofing: The Ultimate Solution to the RAAC Concrete Crisis Case Study

Britmet Lightweight Roofing: The Ultimate Solution to the RAAC Concrete Crisis Case Study

Britmet Lightweight Roofing

The Royal Blackburn Hospital, located in Lancashire, England, was dubbed a “ticking time bomb” that could “collapse without warning” due to the failure of its existing reinforced autoclaved aerated concrete (RAAC) roof. This issue was part of a larger nationwide crisis, with 34 NHS buildings, including Blackpool Hospital, and thousands more schools, offices and more at risk of collapse due to the deterioration of RAAC structures. The estimated cost of repairs for these buildings loomed at over £1 billion. In the face of this urgent and challenging situation, The Royal Blackburn Hospital sought a solution to ensure the safety and integrity of its infrastructure.The Royal Blackburn Hospital's existing RAAC roof had reached a critical state of disrepair. The risk of a catastrophic collapse was real and imminent, posing a serious threat to patients, staff, and the hospital's ability to provide essential medical services. The financial burden of repairing or replacing such a roof was substantial, and the hospital needed an innovative, cost-effective, and expedient solution.The hospital administration and engineering team explored various alternatives to address the RAAC roof crisis. After careful evaluation, they opted for Britmet's Tactray 90 Structural Liner System as the best solution to mitigate the risk of a roof collapse. Tactray 90 offered the necessary structural reinforcement while ensuring long-term durability and stability. The installation could be completed with minimal disruption to hospital operations, a critical consideration given the hospital's 24/7 operation.Project Outcomes:Implementing Britmet's Tactray 90 Structural Liner System at The Royal Blackburn Hospital resulted in several significant benefits. The hospital's roof regained its structural integrity, mitigating the risk of collapse. The hospital saved a substantial amount by opting for the Tactray 90 system as it provided a weatherproof roof covering to minimise the impact of construction so that the hospital could resume full medical services quickly, ensuring continuity of patient care. Conclusion: The Royal Blackburn Hospital's adoption of Britmet's Tactray 90 Structural Liner System offered an innovative solution to a critical structural problem caused by the failure of the existing RAAC roof. This case study demonstrates that even in challenging situations involving aged infrastructure, cost-effective and efficient alternatives exist to safeguard structural integrity, ensure safety, and enable the continued provision of vital healthcare services. The success of this project serves as a model for other NHS facilities grappling with similar RAAC-related challenges, providing hope for the resolution of the wider national crisis.
Sponsored
Case Study - Proteus Pro-Felt® - City Tower

Case Study - Proteus Pro-Felt® - City Tower

Proteus Waterproofing

City Tower, a private apartment tower block located in Canary Wharf required a new high performance waterproofing system as the existing single ply roof had been damaged beyond repair due to a fire. To provide a cost effective, long term waterproofing solution, Proteus Waterproofing specified a Hybrid Tapered Insulation Scheme with a Proteus Pro-Felt® finish, meeting the client’s specific requirements.High Performance WaterproofingAs the existing roof was beyond repair, it needed be completely stripped. Pro-Prime® SA and Proteus Pro-Felt® Self Adhesive Underlay were used as a vapor control layer. Proteus Pro-Therm EPS and Proteus Pro-Therm PIR were used for the Hybrid Tapered Insulation Scheme and bonded using Pro-Bond Foaming Adhesive. Proteus Pro-Felt® 3mm Plain Underlay was then fully adhered to the insulation, followed by a final installation of Proteus Pro-Felt® Ultima Plus Fireguard. Proteus Waterproofing worked closely with the Proteus Approved Contractor to ensure the project was delivered to a high standard.Health & SafetyWhen working on residential buildings, safety is always of utmost importance. Proteus Pro-Felt® Ultima Plus Fireguard has the highest European Fire Rating, BROOF(t4), making it the ideal felt to use on residential properties as the risks to operatives, building occupants and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines.Long Term PerformanceProteus Pro-Felt® Ultima Plus Fireguard is a high-performance multi-layer bituminous membrane system, tested to perform in extreme temperatures and weather conditions. It has class leading modified bitumen content which allows the flexible membrane to move with the building and ensure long term durability and performance. It is certified by the BBA to be in excess of 30 years, and had the highest European Fire Rating – BROOF(t4).
Sponsored
Basement Extension

Basement Extension

Delta Membrane Systems Ltd

The project was split into 2 phases. Phase 1, waterproofing the exiting basement and Phase 2, retrofit extension to the existing basement to create a luxurious multiuse living area. Due to the partially retaining nature of the structure, the project required a combination of Type B and C waterproofing systems to ensure a Grade 3 habitable environment.
Sponsored
Basement Renovation

Basement Renovation

Delta Membrane Systems Ltd

Shooters Sports bar is a modern sports bar located in Neath Town Centre, a principal area of Port Talbot, Wales.  A popular venue, well known for its 6 screens showing live sports, licensed bar and pool, American pool and snooker tables.Delta Registered Installers, Tywi Damp Proofing were first approached to offer remedial assistance with a section of wall which was experiencing severe water ingress.The structure being of reinforced concrete and old wall construction was allowing water ingress via cracks in the structure.Most faults in older structures which allow water ingress are either damaged or deteriorating mortars.Any cracks in the brickwork or substrates will also allow water to enter a structure and would need addressing in creating a Grade 3, habitable space under BS8102:2009 “Code of practice for protection of below ground structures against water from the ground”.Prior to proposing remedial works, ground water assessment, drainage and associated risk assessments were all undertaken.
Sponsored
Basement Waterproofing

Basement Waterproofing

Delta Membrane Systems Ltd

This luxurious residential project incorporated a double level basement with the lower level extending out underneath the garden. In regards to the below ground structure Knowles & Associates Ltd undertook the following works: Excavation and formation of a basement to footprint and under 7 metres below garden level. Two/three stage underpinning. Internal steel staircase frame. Piling. Mass excavation of spoil. Construction of rear extension. Below slab drainage. Cavity drain Waterproofing. Insulation and screed. Swimming pool shell within lower level basement.
Sponsored
Gatwick Airport MSCP

Gatwick Airport MSCP

Shield Membranes Ltd

As part of a framework agreement between Gatwick Airport and Galliford Try, Bourne Parking were appointed to design and build an above ground scope of works for the over decking of Gatwick South terminal’s long stay parking Zones F and G. The single suspended deck car park provides an additional 1,224 car parking spaces and was built to assist with achieving Gatwick’s objective of passenger growth. The project is Shield’s largest and fastest single deck car asphalting project to date, with 26,000m² completed in nine weeks.
Sponsored
Railroad low energy home

Railroad low energy home

Intelligent Membranes

Magly MGO board spray applied with Passive Purple for a MAGLPLY advert on Whitehaus bespoke timber frame build in london
Sponsored
Railroad low energy home

Railroad low energy home

Intelligent Membranes

Magly MGO board spray applied with Passive Purple for a MAGLPLY advert on Whitehaus bespoke timber frame build in london
Sponsored
Citu, Leeds, passive Purple

Citu, Leeds, passive Purple

Intelligent Membranes

Citu, Leeds - SIPS panels made 0.03ach on the fabric/joints/connections using PASSIVE PURPLE.
Sponsored
Passivhaus CPD Training Facility

Passivhaus CPD Training Facility

Intelligent Membranes

We built the world first Passivhaus CPD training facility / pub, this is the worlds most airtight pub at 0.07ach at 50 pa. This is a twin wall timber frame, it’s 450mm wide insulation Huntsman which is made of thousands of recycled plastic bottles. Huntsman also recycled 1 billion plastic bottles from the sea last year. We have a 7.2 KW system solar panels system that powers the building, it’s got MVHR Nilan. On the external façade we applied Passive Purple External which is airtight up to 0.03ach.
Sponsored
Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Asbestos roof coating project by Nadco Roofing Services, using the BBA Approved Asbestoseal system

Liquasil Ltd

Another example of the BBA Approved asbestos roof coating system, Asbestsoeal from Liquasil Ltd. The asbestos cement roof was first cleaned using a closed box pressure washer. All waste was filtered and disposed of by a licensed asbestos disposal contractor. Metal fixings were treated with Liquasil SWT Corrosion Primer and then sealed, along with small cracks and holes, with Non-Sag Sealer before the roof was coated with Asbestoseal 20. The project included GRP rooflight replacement and new ridge detail and flashings.
Sponsored
Asbestos Roof Coating - Norwich

Asbestos Roof Coating - Norwich

Liquasil Ltd

This asbestos cement roof in Norwich was soiled with moss and lichen covering the surface and had leaks in several places. Liquasil's BBA Approved Asbestoseal 20 asbestos roof coating was specified to extend the life of the roof and provide an aesthetically pleasing finish. The Contractor, ID Asbestos Ltd, carried out the works safely and efficiently.After being steam cleaned, the metal fixings were treated with our SWT Corrosion Primer and all fixings and cracks were sealer with Non-Sag Sealer. The whole roof was then coated with Asbestoseal 20 to provide a sleek new finish to the old asbestos sheets.Liquasil's Latent Defects Insurance Guarantee was provided upon completion.
Sponsored
The Roof Gardens, Manchester

The Roof Gardens, Manchester

Zeroflame

- Location: The Roof Gardens, Apartments, Manchester - Developer: DeTrafford Estates Group - Challenge: The previous intumescent varnish on external timber panelling on walls and decking broke down after just 12 months. - Solution: Remove existing coating, apply Zeroflame Treatment - Result: Original beauty of the decking and timber paneling on the walls is resorted, the timber is compliant with building regs and the property owner is happy.
Sponsored
Walsall - Metal Roof Coating

Walsall - Metal Roof Coating

Liquasil Ltd

This 6,500m² metal roof at Axcess 10 Business Park, Walsall was soiled, delaminating and affected by spot corrosion in numerous areas, which would have eventually spread and perforated the sheets if a treatment was not applied.Bosworth Cladding Services Ltd ensured that the roof was cleaned and the peeling factory finish was removed with a 4000 psi pressure washer. The laps were ground back and primed as necessary.The whole roof area was then coated with Liquasil's single-coat BBA Certified Metalseal 20 system to provide a 20 year product guarantee upon completion.The completed installation left a metal roof on its way to failure looking brand new, with a protective silicone coating that will last 20 years.For more information, or to make an enquiry, contact Liquasil on 0121 709 5352.
Sponsored
Metal Roof Coating - Merlin Grey

Metal Roof Coating - Merlin Grey

Liquasil Ltd

This metal roof in Warwick was suffering from cut-edge corrosion, delamination of the factory finish, and spot corrosion.The specification called for a full liquid roof coating in Merlin Grey, which Liquasil was able to supply for installation by Nadco Roofing Services. Liquasil's Metalseal can be made in any RAL or British Standard colour to suit the client's needs.After the corroded surfaces had been prepared back to bare metal and the substrate had been jet-washed and dried, a single coat of Metalseal was applied to the entire roof at a wet film thickness of 350 microns.Despite the steep pitch of the roof, runoff was not an issue; the product stuck to the roof and did not drip, leaving a consistent, glossy finish that left the whole roof looking like new.Metalseal can be made in more than just the standard goosewing grey - if you have an industrial roof that needs coating, Liquasil can meet your needs - no matter the colour.Give us a call on 0121 709 5352, or email us at info@liquasil.com.
Sponsored
Asbestos Roof & Cladding Refurbishment Coating

Asbestos Roof & Cladding Refurbishment Coating

Liquasil Ltd

The finish to the asbestos roof and asbestos cladding on this property was faded and the roof leaked in several places, along with the gutter. Liquasil's silicone roof coating, Asbestoseal, was chosen to seal the roof and dramatically improve the aesthetic appearance using specially made RAL colours to the match the original finishes. The asbestos cement gutter was also lined with the Liquasil liquid gutter liner to form a permanent, bonded solution.
Sponsored
177 Bothwell Street, Glasgow

177 Bothwell Street, Glasgow

Alumasc Roofing

Scotland’s Largest Single Office Building with Rooftop Running Track and 360 Panorama.A Sustainable and Futureproof Roof, Harnessing the Power of the OutdoorsBothwell Street in Glasgow is now home to an exceptionally progressive office space – making way fora new chapter in the rich history of the area. If there are any doubts about what Grade A office spacereally means, then think touchless entry, bike storerooms, lux changing facilities, an 8,000 sq. ft roofterrace, a 150-metre rooftop running track, 4 activity zones/terrace spaces and panoramic views.The project complements the sustainable regeneration programme along the Clyde Waterfront also,home to the new financial Northern European hub, firmly cementing the business district at the heart ofmodern Glasgow.GOALSThe architects at Sheppard Robson have made sure sustainability and lifecycle credentials remaincentral to the design specification. Occupants’ wellbeing has been carefully considered with a stunningpanoramic rooftop and 150m running track and general outdoor employee wellness facilities.A roofing solution was required to support the lifecycle of the building along with an excellentproduct reputation for this distinguished office space. Given the quality, longevity and environmentalconsiderations required from the roofing design, the insulation properties and warranty performancewere extremely important from the outset.CHALLENGESOur Technical department assisted the architectural and construction teams to resolve numerouscomplex design elements across the varied roof zones including running track, ballast walkways, greenzones, and pedestal zones, to determine the best roofing solution.Installation of the Davit Arm System for a building of this scale was especially important so personnel canbe safely suspended whilst working at height. This presented us with a unique challenge in providing aworkable solution that aligned with the sequence of works, whilst facilitating future routine inspection ofits base plates, and maintaining waterproof integrity without compression.Careful planning and detailing were required around roof penetrations to minimise aesthetical impact,and roof equipment was safely installed above the roof assembly.SOLUTIONThe construction comprises a composite concrete slab receiving our Hot Melt Hydrotech Waterproofing System. Offering a true lifecycle – Hydrotech high performance waterproofing, through its’ unique characteristics and installation process, now forms part of the building fabric. The result offers complete watertightness for the lifetime of the building.The building is also insulated to a high u-value target offering exceptional thermal performance and achieving a high kPa rating. This was essential to receive loadings from all components including overlying finishes, roof equipment and the end use for the building occupants.Key fire performance standards were achieved throughout including the lift overrun and lower roof terrace areas where the preferred solution was switched to our Derbigum sustainable warm roof system to maintain project performance targets.LIFECYCLE MANAGEMENTDesigned with BREEAM credentials and an EPC rating coming in at below 10 the careful focus on lifecycleconsiderations and the choice of materials throughout the building envelope is exemplary.Hydrotech hot melt is a high-performance solution containing 30% recycled content and zero productfailures in over 50 years, offering lifetime peace of mind, designed for the service life of the roof.PROJECT DATACompletion: Autumn 2022Building Type: Commercial OfficeProduct Application: Hydrotech & Derbigum waterproofing systemsCertification: BBA Approved, European Technical Approval & FM Global Class 1Architect: Sheppard RobsonMain Contractor: HFD Group
Sponsored
Metal roof coating project in Leicestershire

Metal roof coating project in Leicestershire

Liquasil Ltd

Failing factory finishes and cut edge corrosion were present across the entire roof and Liquasil's Metalseal metal roof coating system was specified as the most appropriate solution. The roof was cleaned and all failing finishes and rust was removed as far as reasonably practicable. The roof was then coated. In this case, two colours were employed. Liquasil is the only company able to produce silicone coatings in any RAL colour.
Sponsored
Asbestos roof coating project in Haverhill

Asbestos roof coating project in Haverhill

Liquasil Ltd

This was the first asbestos roof coating project undertaken with Liquasil products, back in 2013. The roof was heavily soiled and was cleaned using a DOFF steam cleaning machine, delivering 150°c steam to completely kill moss and lichen spores. The metal fixings were treated with Liquasil's corrosion primer and sealed with Non-Sag Sealer before the whole roof was coated with Asbestoseal, the only BBA Approved asbestos roof coating.
Sponsored
Metalseal Metal Roof Coating - Lichfield

Metalseal Metal Roof Coating - Lichfield

Liquasil Ltd

This 4,000 square metre roof in Lichfield, completed by Projects UK Ltd, was in need of refurbishment and Liquasil's BBA Approved Metalseal 20 was specified for its 20 year guarantee against manufacturing defects. The roof was cleaned and the cut-edges were treated with our unique SWT corrosion primer before a single coat of Metalseal 20 was spray-applied to the roof to provide a protective and decorative finish leaving the roof sheets looking like new.To get in touch, call our team of Building Surveyors on 0121 709 5352.
Sponsored
Asbestos roof refurbishment coating in Preston

Asbestos roof refurbishment coating in Preston

Liquasil Ltd

This complicated asbestos roof structure was heavily soiled and leaking in numerous places. Asbestoseal was specified because it is the only BBA Approved asbestos roof coating on the market. The roof was cleaned using 150°c steam, which kills all moss and lichen spores on contact, leaving a perfectly clean substrate for coating. The success of any coating comes from its preparation and Liquasil teaches all of it approved installers various cleaning methods. The roof was coated and is now leak free with a much extended life expectancy.
Sponsored
Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Safety Fabrications Limited

The Ascent Aluminium Roof Access Steps were specified to meet the clients requirement to create a safe access route up & over the “saw-tooth” roof for maintenance personnel. In this instance the Ascent steps were specified for use with an adjacent MSA Latchways climb-latch fall protection system. If collective protection is required handrails can be supplied to one or both sides of the steps. The Ascent Aluminium steps were specified for this project by Eurosafe Solutions Ltd a specialist fall protection company who also installed steps. The Ascent Aluminium walkway steps are tested for use on the aluminium standing seam roof and are secured back to the roof sheet using a proprietary support clamp. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardrail, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.The walkway steps can be configured with a handrail to withstand a loading of either 0.36 kN (general duty) or 0.74 kN (heavy duty) and can be supplied with an optional toe-board if required. The system can achieve these loadings without the need for additional bracing, allowing the walkway to be placed against the area to be accessed. UKCA / CE marked. Designed & Tested in accordance with BS EN 516:2006 Class 1 Type C. Designed & Tested in accordance with BS EN ISO 14122-3:2016 where a handrail is fitted. Designed & Tested in accordance with BS 4592-0:2006+A1:2012 for loadbearing and BS 7976-2:2002+A1:2013 for anti-slip. With or without handrail.Standardized modular system roof walkway system. Can be supplied with a range of fixing kits to suit different roof profiles.
Sponsored
Metal roof coating, Watford

Metal roof coating, Watford

Liquasil Ltd

A roof at teh Jaguar Land Rover premises in Watford was in poor condition and suffering from cut edge corrosion. All of the loose and flaking factory finish was removed using 4000psi pressure washers and the rusted end and mid-laps were ground back to remove the rust. The cut edge corrosion was treated with Liquasil's corrosion primer and the entire roof was coated using the BBA Approved Metalseal.
Sponsored
A flat roof in the Austrian Alps - INVATHERM

A flat roof in the Austrian Alps - INVATHERM

FOAMGLAS®

A flat roof in the state of Tyrol was used to rigorously test a new non-combustible inverted roof insulation solution for the UK market.
Sponsored
Commercial Project – Surrey

Commercial Project – Surrey

Russell Roof Tiles

A stable conversion project needed an authentic clay roof finish.
Sponsored
Metal Roof Coating in Suffolk

Metal Roof Coating in Suffolk

Liquasil Ltd

The original factory finish to the metal roof of this property was failing, with the coating delaminating badly due to UV damage. The gutterless eaves construction meant that both the roofs and cladding had to be coated. Metalseal was specified because it is available in any RAL colour., In this case, Juniper Green was required. The original finish was removed with 4000psi pressure washers , before corrosion was treated with Liquasil's corrosion primer before Metalseal 20 was applied.
Sponsored
Metal Roof Coating Project in Middlesex

Metal Roof Coating Project in Middlesex

Liquasil Ltd

After first cleaning the roof and attending to rusted areas with Liquasil’s corrosion primer, it was the coated with Metalseal 20 from Liquasil, using airless spray equipment. The specification for this roof was for a special RAL colour. Only Liquasil can make silicone coatings in any RAL colour, so Metalseal 20 was specified for the project. This roof was completed in Forest Green.
Sponsored
Extra Care, Bedfordshire

Extra Care, Bedfordshire

Russell Roof Tiles

A large retirement village at Parkland Place in Bedfordshire required slate appearance roofs.
Sponsored
Social Housing – Derby

Social Housing – Derby

Russell Roof Tiles

Russell Roof Tiles supplied tiles to 3 social housing sites in Derby.

Showing 181-216 of 374

Feedback