NBS Source
I'm a manufacturer

"roofing membranes"

4,057 results found

Sort by:

Showing 109-144 of 383

Sponsored
Metro Centre

Metro Centre

Sika Liquid Plastics

The Metro Centre is over 22 years old and the building had been experiencing leaks, a problem which was exacerbated by the numerous changes in plant installations on the roof. The original felt waterproofing had reached the end of its working life and a system was required that would keep the building watertight, help comply with current building regulations, and bring the insulation standards up to Part L. A Cold Bonded Built-Up Roofing System was specified for the project consisting of 40mm Decotherm insulation, a Carrier Membrane, and a seamless Decothane Gamma 20 waterproof ‘cap sheet’.
Sponsored
Industrial stair system - Edinburgh Airport

Industrial stair system - Edinburgh Airport

Safety Fabrications Limited

The Ascent Up and Over step unit / Industrial stair system was specified to create a safe means of access up & over items of mechanical plant & equipment to the roof of the airport terminal building. The Industrial stair unit is supported on rubber spreader feet which provide a non-penetrative support solution on the flat single ply membrane roof. The stair unit is designed in accordance with BS EN ISO 14122-1:2001 + A1:2010 and Building Reg Part K:2013 and manufactured following 1090 factory production control procedures.
Sponsored
Ipe timber tiles offers decking solution for ultra low height threshold

Ipe timber tiles offers decking solution for ultra low height threshold

Wallbarn Ltd

A contractor client was working on a retro-fit balcony and flat roof project in Brighton. The waterproofing membrane had tapered insulation placed on top and the contractor discovered ballasting the insulation was needed, only once on the roof. The door thresholds were too tight for a traditional decking system with joists. Wallbarn advised for paving slabs on 9mm rubber pads; then 30mm thick ipe timber tiles mounted onto Adjustable Pedestals. The buildup was under 100mm and the overall finish of the tropical hardwood was glorious. The architect was relieved that we could produce a solution, the client was delighted.
Sponsored
Orpington - Self Build - Timber and Masonry

Orpington - Self Build - Timber and Masonry

Intelligent Membranes

Renovation stripping out the building completely and rebuilding the walls, Passive Purple® was applied in between the connections of the internal side of the external walls which were a combination of masonry, timber, and steel frame. The ground floor ceiling was removed exposing the warped old timber joists with cracks in the surrounding brickwork and mortar. This was given attention to detail using Passive Purple® Brush to seal above an airtight foam to guarantee the airtightness of this major air leak zone before the final spray coat of Passive Purple® airtight membrane was applied. Passive Purple® was also used to seal window and door linings, ready for the new triple glazed windows to go in. Passive Purple® was sprayed on all the walls and ceiling. This is an ongoing project that still is awaiting an air test, the client is looking to hit 2.5 ach and installing MVHR.
Sponsored
Coláiste an Chláirín

Coláiste an Chláirín

Bauder Ltd

Coláiste an Chláirín Bauder Thermofol single ply waterproofing system with BauderROCK insulationSynopsisThe new Coláiste an Chláirín building in Athenry, Co Galway is a post primary school consisting of classrooms, a special needs unit, sports hall, general-purpose hall, staff amenities and extensive external facilities designed by Smith Kennedy Architects & Healy Partners Architects. The project was managed by JJ Rhatigan and Company and the roofing element appointed to Priority Roofing and Cladding Ltd. The roof of the main building and the gymnasium required flat roof build-ups to meet the specifications as set out in in SDG 02-05-03 (Acoustic Performance in New Primary & Post Primary School Buildings), while meeting the general performance requirements specified within TGD 021-7 2018 (Minimum Performance Standards of Roof Materials and Finishes). The chosen system had to meet an acoustic performance of 35dB indoor ambient noise level (IANL). It was decided that, despite sports halls having a slightly higher IANL threshold, the 35dB performance criteria would be applied across all areas of the school, with control of reverberation being a key consideration in the gym.Bauder Building BoardProject:Coláiste an ChláirínLocation:County GalwayProject type:New BuildRoof size:8550m²Main contractor:JJ Rhatigan & CompanyApproved contractor:Priority Roofing & Cladding LtdThe specification:The Architect specified that the insulation used in the flat roof system should be non-combustible and achieve a U-value of 0.16Wm²k which actually exceeds the thermal requirements as described in the Irish Building Regulations Technical Guidance Document L for flat roofs in schools.BauderROCK was specified to achieve the thermal and acoustic requirements of the design. As a Euroclass A2-s1,d0 non-combustible material, BauderROCK also provided the specified fire performance. This insulation could be used across all roof areas, with some adaptations for the gym which required additional acoustic performance due to the inherent nature of the space. Acoustic infills were used in the troughs of the perforated metal deck, thus combatting the reverberation of the indoor environment.  Products appliedBauder Thermofol PVCAn integrated single ply waterproofing system, featuring a lightweight, cost effective membrane which offers a pleasing aesthetic finish on a flat roof. This system holds fire classification BROOF(t4) for compliance with building regulations under TS 1187 test method 4 for external fire exposure to roofs. BauderROCKHigh density mineral wool insulation.Project challengesOne of the challenges of this project was the ambitious schedule. The use of the self-adhesive air and vapour control layer (AVCL) enabled the trades working within the building to progress quickly without being delayed by weather conditions. BauderROCK is relatively quick to install, as was the lightweight single ply waterproofing.  The resultThe project was finished to time and specification with exceptional workmanship from the fixers at Priority Roofing and Cladding and superb collaboration from all parties throughout. The membrane was finished with standing seams to create a statement look. The roof achieved a U-value of 0.15 W/m2k, exceeding the thermal target, and met or exceeded the 35db IANL requirement across the main building and the sports hall.  The thermal performance, which will hold up for decades to come, will also impart energy efficiency benefits that reduce running costs at the school in the long term. Finally, the non-combustible nature of the mineral wool insulation ensured that the build-up met the fire safety specification. System installed Bauder Thermofol PVC single ply waterproofing system1 Bauder THERMOFOL U15 V FRThis 1.5mm polyester reinforced Poly Vinyl Chloride membrane (PVC) membrane benefits from being highly flexible due to the incorporation of internal plasticizers during the manufacturing process. The combination of materials within this membrane provides high tensile strength, with thermal stability and chemical resistance.2 BauderROCKA mineral fibre non-combustible insulation with high acoustic performance. The dual density mineral wool composition delivers compressive strength, whilst keeping the overall weight to a minimum and providing high noise absorption which enabled the complete system to meet project requirements.3 BauderTEC DBR 06This 0.6mm, self-adhesive, elastomeric air and vapour control layer is light weight and benefits from cleaner, safer, and faster installation than traditional torch applied membranes. Advocacy Niall Hanley, Contracts Manager at JJ Rhatigan, the project’s main contractor, said:"Coláiste an Chláirín Athnery was a great success and in particular the use of the self-adhesive AVCL in advance of the build-up allowed works to commence immediately internally, which was critical from a programme perspective.” Kevin Ryan, Director at Priority Roofing, explained:"We found the system both practical and efficient to install. The combination of the availability of the products and the technical backup received was superior to any other system that we have worked with.”  Eoin O’Grady, Associate Director at Healy Partners Architects commented:"We are delighted with the overall delivery of the roof build-up and the performance achieved. The PE hall solution to deal with reverberation noise as well as rainfall noise was very successfully managed. We look forward to working with Bauder on future projects.” 
Sponsored
Alderley Park, Science and Innovation hub

Alderley Park, Science and Innovation hub

Garland UK

Formerly the home of AstraZeneca, Alderley Park is a world-leading life science and innovation campus situated across 93,000 sqm on the outskirts of Manchester city centre. With a mix of new-build waterproofing requirements and existing roof refurbishments, the client appointed Garland UK as a roofing partner across the multi-building site. Alongside the refurbishment and new-build site works, Garland UK was also briefed to provide a tailored design specification for the Glasshouse Project, which would become the largest triple pitched standing seam roof in the UK.Garland UK's 3 system portfolio of high-quality bituminous membranes, cold applied liquid coatings and profiled metal ensured that each roof would get the right system for its unique challenge.
Sponsored
Luxury North London Residence

Luxury North London Residence

Delta Membrane Systems Ltd

Delta Membrane Systems Limited was asked to assistance on a particularly technically complicated project. The project in question was a new build luxury property in North London, providing almost 17,000 sq ft of accommodation, over four floors.  High volumes of hydrostatic water pressure was bearing on the structure, which was causing the property to suffer severe water ingress through construction joints. The property when constructed was built at a low level, it sits lower than the neighbouring properties adding to the hydrostatic water pressure issue.  An additional problem was the property had been built without a waterbar/hydrophilic strip.
Sponsored
GP® Licensed Gas Membrane Installer Scheme

GP® Licensed Gas Membrane Installer Scheme

Juta UK Ltd

A ground-breaking initiative that certifies installers of gas membranes has been launched by JUTA UK and the British Board of Agrément working closely with specialist installer DMI and other industry partners.The new Gas Membrane Approved Installer Scheme is the culmination of three years’ work and is the first of its kind in the UK, delivering supply chain reassurance of high-quality products installed by competent, certified professionals to ensure safe outcomes.It is ‘absolutely right that competent and trained professionals should install these critical barrier applications, which play a key role in the built environment and are designed to last for the lifetime of structures into which they are installed. We talk as an industry about sustainable and resilient solutions for the built environment, and that means using the best possible products, independently certified, installed to the highest possible standards, designed to last for the lifetime of the structure.
Sponsored
ARM (The Global Technology Company) Peterhouse Technology Park. Cambridge.

ARM (The Global Technology Company) Peterhouse Technology Park. Cambridge.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi heavy – Modular Frameworks Services: Air-handling units. Roof build-up: Warm roof design – PIR/PUR insulation with bituminous felt membrane. The air-handling unit support frames were supplied via a wholesaler in Hampshire to the building services engineers working on site. There were four large air-handling units to support in total, all circa 6000kg in weight each. All our frameworks were designed to manage the imposed loads of the AHU sections being supported, to ensure uniform load distribution through the frame feet was achieved.
Sponsored
London Dock Block F, London

London Dock Block F, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley GroupLondon Dock Block F is situated in the heart of Wapping, London, with a magnificent choreographed central water feature and the finest selection of high-quality new homes.The building, which will provide a total of 360 new apartments, is split into blocks at different heights to a maximum of 16 storeys, including communal roof gardens, courtyards and green roofs.The OBEX Class B Interface Sealing System and the Class A1 Breather Membrane System were specified in order to achieve full regulatory compliance and meet the correct performance standards.Quality Apartments: 360
Sponsored
Belvedere Court

Belvedere Court

Bauder Ltd

Belvedere CourtBauder Hot Melt structural waterproofing systemSynopsisThe impressive Belvedere Court 4-storey building, which was converted from a hotel into 16 prestigious residential apartments in 2008, recently underwent further development including extensions for additional accommodation, basement housing, a communal swimming pool, a theatre and an underground car park.As part of the refurbishment of the site, the failing waterproofing of the green roof on the car park roof deck needed to be removed and replaced. Bauder approved contractor, The Complete Roofing Company (TCRC), initially proceeded to remove the existing pathways and landscaping before removing the failed system and providing remedial repairs to the damaged roof.Bauder Building BoardProject:Belvedere Court​Location:Sidmouth, Devon​Roof Area:1,316m²​Specifier:The Complete Roofing Company LtdApproved Contractor:The Complete Roofing Company LtdEnvironmental Focus:Intensive green roofThe specificationWith the car park roof also being used as a recreational green roof for the residents of Belvedere Court, the Bauder Hot Melt Intensive Green Roof System was an obvious choice. The Bauder Hot Melt Bakor 790-11 EV with Polyester reinforcement creates a resistant monolithic waterproofing membrane whilst the Bauder AP2 root barrier provides resistance to the system allowing for a green roof to be installed above. As stated by BBA certificate 06/4350, this system provides a durable waterproofing solution for the service life of the structure that it is incorporated in. The resultOn completion of the waterproofing elements the roof was leak tested to ensure the roof’s integrity. The TCRC then installed the Bauder green roof components; PE foil, FSM600 protection membrane, DSE40 drainage layer, filter fleece and over 300 tonnes of Bauder intensive substrate. Finally, Rowland Gold turf was then installed with a drip line irrigation system installed under the turf. Upon final assessment, this project met the criteria to be issued a 20 year product and workmanship guarantee.System Installed1 BauderPLANT E 42Torch-on root-resistant, green capping sheet. Reinforced with spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Bitterne Park School, Southampton.

Bitterne Park School, Southampton.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Everyday – H Frame Kits and Flexi-Feet, Flexi Light – Base & Extender frames, Flexi heavy – Modular Frameworks & Custom Frame Services: Cable trays, Ducts, A/C Splits & Air-handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. An assortment of products was required to support various services such as cable trays, ductwork, condensers and air-handling units. In addition, due to one of the air-handling units being extremely wider than usual, we also had to manufacture a bespoke custom framework for this item.
Sponsored
Modular in, Modular out’ – M-Trays® transform construction huts in Knightsbridge

Modular in, Modular out’ – M-Trays® transform construction huts in Knightsbridge

Wallbarn Ltd

A three year construction project in Knightsbridge required a temporary green roof on welfare huts. The local residents were concerned about overlooking these steel huts long-term. The solution is M-Tray® – our modular green roof system. The steel huts were wheeled into position on site on skates. They were covered with an EPDM waterproofing membrane. M-Tray® units were installed. They were easily carried up the stairs by hand and installed by hand within minutes. The modular and portable M-Tray® can just be unclicked and lifted away upon completion of the construction process.
Sponsored
BRE Flood Reilient Test Home

BRE Flood Reilient Test Home

Delta Membrane Systems Ltd

Delta Membranes were delighted to be invited by the BRE in adapting a property which could offer Flood Resilience. A housing unit within the BRE (a Victorian Terrace) was refurbished to demonstrate materials, products and innovations that will make it flood resilient. There are an estimated 5.2 million homes considered at risk from surface, river and coastal flooding. Preventative measures play a key role. The specification for resilience, using the same technology Delta have used for many years in Basements or below ground situations with additional consideration as to how we could adapt this to work in flood situations.
Sponsored
Industrial stair system - Wolfson Building, University of Glasgow

Industrial stair system - Wolfson Building, University of Glasgow

Safety Fabrications Limited

The Ascent stair unit - Industrial stair system was specified to create a safe means of access over roof mounted mechanical and electrical plant and equipment. The roof area is tightly packed with Air conditioning plant creating a unique challenge to design a safe means of access across it. The Ascent step over / stair unit is able to accommodate spans up to 4.5m and was able to be utilised to create a safe access route. The step over unit is supported on rubber spreader feet which provide a non-penetrative support solution on the flat single ply membrane roof. The stair unit is designed in accordance with BS EN ISO 14122-1:2001 + A1:2010 and Building Reg Part K:2013 and manufactured following 1090 factory production control procedures.
Sponsored
Canberra House

Canberra House

Bauder Ltd

Canberra HouseBauder Cold Applied LiquiTOP SystemSynopsisCanberra House is an office facility in Swindon. The existing single ply PVC waterproofing system roof was leaking and so Bauder carried out a full site survey. The resultant report gave the client several options to rectify the leaking roof.Bauder Building BoardProject nameCanberra HouseLocationSwindonProject typeRefurbishmentRoof size985m²SpecifierRapleys LLP (Bristol)Approved contractorCentral Roofing & Building Services LimitedThe specificationThe LiquiTOP system was chosen as it can be applied directly to the prepared and primed existing single ply covering. The liquid system allowed us to get into tight spaces and without the need for any hot works.LiquiTOP is excellent on refurbishment projects where the complexity of the roof involves intricate areas to be detailed that are not easily achieved with a sheet membrane, or the actual working space on the roof is constricted.Project challengesLarge areas of plant and machinery were situated just above the roof level making access to the areas below difficult with the plant in-situ. The available budget on this project did not allow for lifting or removing the plant, stripping the existing waterproofing system, and replacing with new. Therefore, the decision was made to overlay the existing single ply membrane with a cold applied liquid waterproofing which can be installed without the need to raise any plant.To overcome drainage challenges, secondary upstands were created under the plant and fabricated channels placed underneath allowing water to flow through to the drainage points.The resultBauder was able to offer a cost-effective solution without the necessity to remove or decommission the roof mounted plant and machinery. Cost reductions were achieved for the client by overlaying the existing roof, negating any need to strip existing materials, and not having to remove or raise the plant.The works were carried out by Central Roofing who manged the project impeccably and also finished ahead of schedule.System installedBauder Cold Applied LiquiTOP System1 LiquiTOP PU cold applied liquidA moisture triggered curing polyurethane waterproofing resin; applied in 2 coats, reinforced with Bauder LiquiTOP Glass Fibre Mat.
Sponsored
Bridges

Bridges

Intelligent Membranes

Passive Purple was used here on a bridge in China. Passive Purple External also comes in multiple colours form Purple to Stone colour. Passive Purple External is an anticarbonisation product that protects concrete from the effects of concrete
Sponsored
Britmet Lightweight Roofing: LiteSlate Residential Roof Renovation

Britmet Lightweight Roofing: LiteSlate Residential Roof Renovation

Britmet Lightweight Roofing

This case study focuses on the successful implementation of Britmet's Structural Conversion System, BritFrame, and composite slate tile, Liteslate, installed by ART Contracts LTD in a residential flat roof renovation project near Llangollen. The existing roof had been plagued by ponding and water ingress, necessitating repeated repairs and replacements over 20 years. This case study explores the benefits, challenges, and outcomes of utilizing the Britframe and Liteslate, providing a long-lasting and aesthetically pleasing solution. Residential flat roofs are susceptible to issues such as ponding water, water ingress and yearly inspections, which can lead to recurrent maintenance and repair requirements. This case study showcases the utilisation of Britmet Lightweight Roofing's Britframe Structural Conversion System and Liteslate to overcome these challenges and deliver a durable, low-maintenance roofing solution. Britframe is a versatile and innovative solution designed to convert flat roofs into pitched roofs, providing improved water runoff and a new more aesthetically pleasing finish, and reduced risk of ponding water and improved thermal performance. This can be covered using a variety of different roofing materials, and Liteslate, a lightweight synthetic slate roofing slate, was specified due to its excellent weather resistance, durability, and aesthetically appealing finish. Llangollen is part of the UNESCO World Heritage Site along eleven miles of canal from Gledrid to the Horseshoe Falls and required a durable yet authentic roofing solution.The project involved the renovation of a residential flat roof that had undergone multiple repairs and replacements over 20 years due to ponding and water ingress, and constant maintenance. ART Contracts LTD was tasked with implementing and installing LiteSlate to resolve recurring issues.The Britframe System converted the existing flat roof into a pitched roof, enabling efficient water runoff and preventing ponding, thereby eliminating the risk of water ingress, and reducing the need for yearly inspections and constant maintenance to site, Britmet’s Liteslate offered excellent weather resistance and durability, reducing the need for frequent repairs and replacements while offering an attractive finish replicating the appearance of natural slate. Overall offering the advantages of lightweight construction and ease of installation.Conducting a thorough structural assessment of the existing flat roof to ensure compatibility and feasibility of the Britframe required careful analysis and engineering expertise. Coordinating the installation of the Britframe and Liteslate with existing roof features, such as skylights or ventilation systems, posed challenges in achieving a seamless integration.The implementation of Britframe has effectively addressed the issue of ponding, providing efficient water runoff and preventing water ingress into the residential property. The utilisation of Liteslate offered exceptional durability, weather resistance, and longevity, significantly reducing the need for future repairs and replacements, and thereby providing long-term cost savings. Liteslate also improved the overall aesthetic appeal of the residential property, replicating the natural beauty of slate roofing while offering the advantages of lightweight construction. The integration of the Britmet Lightweight Britframe System and Liteslate successfully addressed the challenges the building was facing. The project resulted in improved water runoff, enhanced durability, a more aesthetically pleasing roofing solution, along with a new 60+ year life expectancy. This case study emphasizes the importance of selecting innovative and reliable roofing systems to overcome recurring roofing issues and deliver long-lasting and visually appealing outcomes.
Sponsored
Cranstone & Moor End Lodge

Cranstone & Moor End Lodge

Polyroof Products Ltd

The project consisted of two similar flat roof areas totalling 1,100m2 above high-rise residential blocks in a city centre location. The existing roofs were an inverted roof design that had been waterproofed with single-ply that had failed prematurely. Numerous short-term, localised repairs had failed to stop the water ingress and leaks had been a long-term problem.It would have been impractical to remove the tons and tons of ballast and insulation from the top of the high-rise building and it was imperative to the client that removal or replacement works were not involved at all. The specific nature of this project required careful consideration, and so a survey of the roof was arranged.The SolutionA report from an independent consultant commissioned by the client identified a problematic challenge with an overlay option. The existing falls of the roof were assessed to be poor, and so standing water would be an issue for any new waterproof covering. The report concluded that this would reduce the lifespan of an overlay waterproofing system and so was advised against. The client initially thought this to be a stumbling block and that costly and impractical modifications to the roof would need to be made.Having worked with Polyroof on scores of other projects, the client turned to Polyroof Technical Services for a solution that could meet their stringent criteria. Following on from the preliminary discussions, Polyroof’s Technical Services assessed the site, taking core samples and then providing a suitable specification to overlay the roof with the Protec System.The BBA certification of the Protec system specifically covers use for zero falls (completely flat) applications, meaning the client had absolute peace of mind that standing water would not be a detriment to the integrity of the waterproofing system. The client was able to achieve the original objective of an overlay system and benefited from the associated cost and time savings. Furthermore, the BBA certificate states that when used in inverted roof scenarios the lifespan of the Protec system is as long as the design life of the roof.Work was started with J R Flat Roofing, a Polyroof approved contractor with national coverage, moving the ballast and insulation to one-side in four phases of 140m2 at a time, exposing the single-ply membrane to which the Protec system was directly applied.Due to Protec’s rapid cure and walk-on times (30-60 mins dependent on conditions), the system is ideal for larger, phased refurbishment, as specific sections of the roof can be made waterproof with the full Protec system in one day. When carrying out the next section, the new Protec membrane forms a totally seamless and watertight joint to the existing Protec-covered areas.Another objective was to reuse the original inverted insulation and ballast pebbles as this was cost saving and negated the need for the lifting logistics that would have been involved in bringing the ballast to ground level. Additionally, it made the process as environmentally compliant as possible by keeping waste to a minimum. The insulation and pebbles were re-applied in its original format and, due to the weight of the pebbles, was a mammoth task that required three miniveyors to help with the handling. A series of special aluminium breather vents were also fitted down to the concrete slab roof substrate to enable the surface to dry out over a period of 12 months.The whole job was completed in three weeks and the client was delighted with the finished work. With a 20-year insurance back-guarantee and a maintenance-free waterproof membrane that will last as long as the roof stands, the client was once again left with total peace of mind that their buildings could not be better protected.
Sponsored
Waterproofing the Houses of Parliament

Waterproofing the Houses of Parliament

Newton Waterproofing Systems

Waterproofing this historic London landmark – external waterproofing with Newton 403 HydroBond, internal waterproofing with Newton System 500, installed by Newton Specialist Basement Contractor MacLennanUK.Newton Waterproofing were delighted to return for this project at the prestigious Houses of Parliament in London, a landmark that has dominated London’s skyline for over 150 years. Newton Specialist Basement Contractor MacLennan Waterproofing was approached to specify a guaranteed waterproofing solution for the new-build basement.After reviewing the technical drawings, MacLennan decided to bring the job to Newton, whose product range was perfectly suited to the project requirements. Newton and MacLennan are both privileged to be the companies chosen to share in securing the future of the Palace of Westminster.This complex project required the design and installation of an external waterproofing system, an internal cavity drain system, and a polyurea roofing system to ensure a high standard of waterproofing.Externally, Newton’s innovative ‘Type A’ 403 HydroBond membrane was applied extensively to ensure the necessary waterproofing around the basement, whilst internally, Newton 508 and Newton 520 membranes were both applied from floor to ceiling as part of Newton’s complete System 500 cavity drainage solution. With the finished structure in place, the waterproofing was finally completed by the application of both a polyurea coating and further drainage membrane to the roof deck of the basement.With a waterproof basement fully compliant with the requirements of BS 8102:2009, coupled with guaranteed protection against water ingress, this newly completed, large basement area, situated directly next to the River Thames, provides a durable and well-established waterproofing solution, utilising multiple Newton Systems to great effect.
Sponsored
Indigo Hotel, Queens Street. Cardiff.

Indigo Hotel, Queens Street. Cardiff.

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi light – Flexi Base & Extender frames, Flexi heavy – Ahu Frameworks, Flexi everyday – Duct, pipe and electrical containment. Services: VRF Condensers & Air handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. Supplied via a wholesaler in Cardiff, our hot dip galvanised frameworks were supplied in lengths and widths to suit each unit being supported. With all products available from stock, the contractor ordered frameworks in stages, to suit the phased project programme, and eliminated having to find space within an already restricted working environment for everything to be delivered at once.
Sponsored
Battle of Britain Memorial - The Wing

Battle of Britain Memorial - The Wing

Bauder Ltd

Battle of Britain Memorial - The WingBauderThermofol PVC single ply waterproofing systemSynopsisThe client wanted the new visitor centre building to replicate the shape of the iconic spitfire wing and to be waterproofed with a roofing system that would be aesthetically pleasing due to its high visibility. A particularly challenging element of the installation was the amount of intricate detailing requirements due to the elliptical shape and 5⁰ pitch of the wing areas. The waterproofing system needed to incorporate insulation that would achieve a 0.16 U-value and the memorial site had to remain open throughout the works causing logistical challenges.Bauder Building BoardProject:Battle of Britain MemorialLocation:Capel-le-FerneRoof Area:700m²Specifier:Godden Allen LawnApproved Contractor:Byford Roofing ServicesThe specificationBauder’s anthracite coloured Thermofol single ply system was specified because it is high-quality, long lasting and with the addition of welded roof profiles gives the appearance of a standing seam metal roof.The result The system build-up included Bauder’s 160mm PIR Insulation for superior thermal performance and all deliveries were timed as not to conflict with vehicles moving in and out of the facility. Despite the challenges encountered the project was completed in time for its official opening by the Queen in March 2015.System installedBauder Thermofol PVC single ply waterproofing system1 Bauder THERMOFOL U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 BauderTEC KSD FBSA 2.5mm depth, self-adhesive air & vapour control layer with a mica finish.
Sponsored
Paxman Avenue Secondary School

Paxman Avenue Secondary School

Bauder Ltd

Paxman Avenue Secondary SchoolBauderflex bituminous waterproofing system with Euroglaze rooflightsSynopsisPaxman Avenue Secondary School is a new build project situated in Colchester, Essex. The school opened its doors for the first time in September 2019 welcoming 180 year 7 students. It is expected that the school will eventually hold 900 pupils by 2023.Bauder Building BoardProject: Paxman Avenue Secondary SchoolLocation: Colchester, EssexProject type: New buildRoof size: 2500m²Architect: Concertus Design & Property ConsultantsMain contractor: Barnes ConstructionApproved contractor: G.R.M Roofing Company LtdThe specificationThe main contractor, Barnes Construction, was looking for a durable, cost effective roof with longevity, and wanted a waterproofing system which included a comprehensive guarantee with great service and full support from the supplier, and so Bauder’s bituminous system, Bauderflex, was specified. Rooflights were also specified to increase natural light into the building.Bauder’s Rainwater Calculation Software was also used to perform calculations in accordance with BS EN 12056-3:2000 based upon provided data relating to the building’s dimensions, geographical location and the flow rate performance of the selected Bauder rainwater outlet product. This helped to determine the total number of outlets needed for the roof.Products appliedBauderflexA reinforced bituminous membrane system with a choice of self-adhesive and torch-applied membranes that are resistant to high levels of structural and thermal movement. Bauder Euroglaze rooflightsThese rooflights are made to order and the size can therefore be tailor made to fit any roof aperture, with many ventilation and glazing options are available to meet the demands of any type of project.The resultThe client was supported by the Bauder Area Technical Manager, Andy Leggett, from start to finish with help being provided on the design element of the project, and the Bauder approved contractors, G.R.M Roofing Company Ltd, were supported by Bauder site technicians throughout the installation.
Sponsored
Hethel Engineering Centre

Hethel Engineering Centre

Bauder Ltd

Hethel Engineering CentreBauder Thermoplan FPO single ply system with Bauder solar PV systemSynopsisHethel Engineering Centre supports high performance engineering companies located throughout Norfolk. The original building at the centre had been operating at maximum capacity and they urgently required a new building to satisfy increasing levels of demand. The client wanted the new facility to meet a high level of sustainability, achieving a BREEAM excellent rating and using key renewable technologies, such as photovoltaics (PV) to minimise its environmental impact.Bauder Building BoardProject:Hethel Engineering CentreLocation:Hethel, NorfolkProject type:New buildRoof size:2,500m²Specifier:NPS GroupApproved contractor:Voland AsphalteThe specificationBauder’s Thermoplan single ply membrane was specified for the new building’s 2,500m2 roof due to its longevity. Roof areas totalling 500m² were fitted with 160 PV Modules, enabling the centre to generate at least 44.23 mWh of solar power each year and annual CO² savings of 23.40 tonnes. The PV system was installed without any penetration of the waterproofing or roof deck, ensuring the integrity of the roof is completely upheld. The simplicity of the installation also meant that approved contractor, Voland Asphalte, could install the entire PV array in just one day.Products appliedBauder solar PV system160 solar photovoltaic modules were installed with an expected energy generation of 44.23 megawatt-hours and a kilowatt peak of 47.20 along with Bauder's Thermoplan single ply membrane.  Project challengesThe centre remained operational throughout the works, which caused logistical challenges, however all deliveries were timed as not to conflict with vehicles moving in and out of the facility. The work at HEC was completed on time and to budget, providing the client with an innovative roof that boasts extraordinary environmental credentials.System installedThermoplan Single Ply System 1 Bauder Thermoplan FPO FPO membrane with laminated fleece for adhered installations; pre-coated cross weave polyester reinforcement for high levels of tear resistance.2 BauderPIR M 60An efficient PIR flatboard insulation with aluminium foil facing on both sides and rebated edges to remove a thermal bridge.3 BauderTEC KSDA technically advanced self-adhesive elastomeric bitumen air and vapour control layer with an aluminium foil facing for vapour impermeability.AdvocacyKarl Manning at NPS Group: “Hethel Engineering Centre is a perfect example of a project where outstanding workmanship and top quality products can harmoniously come together to deliver an exceptional, sustainable roofing solution. The Voland team in collaboration with Bauder provided the highest degree of technical support throughout the project, helping us overcome any issues we encountered promptly and efficiently.”
Sponsored
Castlebar Government Offices

Castlebar Government Offices

Bauder Ltd

Castlebar Government OfficesBauder Total Roof System (BTRS) and BauderThermofol PVC single ply waterproofing systemSynopsisThe roof area of this government office building was complex due to expansion joints, air conditioning units and intricate detailing requirements. Work hours had to be agreed with the client to keep disruption to other ongoing work at the site to a minimum and insulation upgrades were necessary to satisfy building regulations. The office also had to remain open throughout the works, causing some logistical challenges. All deliveries were timed so not to cause any disruption to visitors coming in and out of the facility.Bauder Building BoardProject:Castlebar Government OfficesLocation:Castlebar, Ireland​Roof Area:2,500m²Specifier:Office of Public Works​Approved Contractor:Deane Roofing & Cladding​The specificationBauder’s bituminous system, BTRS, was specified because it is durable, robust and can withstand permanently sited loads of up to 2000Kg/m². The system build-up included Bauder’s 100 mm Thermotech Glass insulation for superior thermal performance, ensuring the roof achieved the required 0.17 U-Value. Small linking roof areas were waterproofed using Bauder Thermofol PVC single ply system, which is long lasting, possessing high tensile strength of over 1100N, and allows for no physical penetrations of the roof.Products appliedBauder Total Roof SystemIntegrated bituminous waterproofing system with a life expectancy in excess of 40 years.Bauder Thermofol PVC1.5 mm single ply membrane can be guaranteed for up to 20 years depending on system type.System installedBauder Total Roof System (BTRS)1 Bauder K5KA heavy duty, torch-applied SBS elastomeric bitumen capping sheet, featuring a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture. The mineral finish provides protection against UV degradation.2 Bauder ThermotechPIR insulation board with a coated glass tissue facing on both sides.3 BauderPIR FA-TEAn efficient PIR insulation board with aluminium foil facing on both sides. The top facing features a printed grid pattern to aid site cutting. It is lightweight and has zero ozone depletion potential.4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.Bauder Thermofol PVC single ply waterproofing system1 Bauder Thermofol U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 BauderTEC KSD FBSA technically advanced self-adhesive elastomeric bitumen air and vapour control layer with an aluminium foil facing for vapour impermeability.AdvocacyProject specifier, Tony Collins, Office of Public Works:“Bauder delivered a comprehensive roofing solution that utilised their top quality products and unrivalled technical support. Despite the design and logistical challenges encountered, the new roof system was delivered on time and to budget much to the delight of the client” 
Sponsored
The Lanesborough Hotel - London

The Lanesborough Hotel - London

Fixfast Ltd

The Lanesborough 5-star hotel on Hyde Park Corner, Knightsbridge in central London; is operated by the Oetker Collection, and is reputedly the most expensive hotel in the city.All the rainwater outlets on the roof were in need of replacement, and Holborn Asphalt needed a simple, effective solution that would be compatible with the waterproofing membrane that they were installing.An extensive number of our FarBo rainwater outlets were selected for this project - these outlets are perfect for this type of work as they fit neatly into any existing drains and downpipes.
Sponsored
Asbestos Roof Coating & Roof Refurbishment

Asbestos Roof Coating & Roof Refurbishment

Liquasil Ltd

This is an asbestos cement roof coating and refurbishment project completed by Liquasil Approved Installers, Nadco Ltd. The roof was first cleaned and all cracks, small holes and fixings sealed with Liquasil Non-Sag Sealer, providing a permanent seal. The entire roof surface was then coated with the BBA Approved Asbestsoeal 20 asbestos roof coating system.
Sponsored
Rooftop Apartments, Gisburn Rd, Tottenham, Passive Purple

Rooftop Apartments, Gisburn Rd, Tottenham, Passive Purple

Intelligent Membranes

We all know warm roofs and joist zones are huge areas for air leakage and extremely hard to solve this problem. This warm roof structure for luxury apartments retrofit fit onto an already existing block of apartments in Tottenham was typically the icing on the cake for detail and performance. With the hand cut roof providing the client with multiple skylights, dormers and 360-degree turrets, this was going to be no easy task of getting the airtightness and vapour control secure and correct in a traditional method. Step forward Passive Purple! Rather than just covering the issues, once the hand cut roof was finished, the 220mm roof rafters were filled with a layer of spray insulation supplied by Lapolla UK. The dormers, skylights and turrets were then given some attention to detail with Passive Purple BRUSH before the final application of Passive Purple (spray applied) This gives this roof a complete airtight vapour control with performance like no other and getting around all of them circular details and angle’s galore this was just another simpler, easier way to get the job done right and guaranteed! Passive Purple liquid application saves the client and user so much time and so much less strenuous labour.
Sponsored
low Energy Home, Threlkeld, Passive Purple

low Energy Home, Threlkeld, Passive Purple

Intelligent Membranes

low energy home in Threlkeld, Lake district, this huge open plan warm roof home went full Passive Purple to achieve maximum results of airtightness.
Sponsored
Fulham Jetty

Fulham Jetty

Bauder Ltd

Fulham JettyBauder Bakor 790-11 hot melt structural system with Bauderflex waterproofing system and BauderGREEN sedum systemSynopsisFulham Wharf is a landmark regeneration scheme that began in 2013 and included the ecological enhancement of an abandoned jetty on the River Thames. This redevelopment was designed to provide the local community with an ecological education centre and bio-diverse wildlife reserve.Bauder Building BoardProject:Fulham JettyLocation:LondonRoof Area:1,000m²Specifier:FabrikApproved Contractor:Accurate RoofingProject challenges One of the major challenges for this roof was installing the central sloped section, which required exceptional levels of technical input and workmanship. This roofing area was waterproofed with the same bituminous green roof system as the upper roof; however a special timber design for retaining the substrate and sedum blanket was also needed. Since its official opening in October 2013, the lower wildflower roof has become a haven for a variety of different birds and insects.The resultThe building’s new roof swoops down to become a continuum with the jetty deck and is covered with a green habitat providing three distinct environments for wildlife; one on the flat roof, one on the slope and the third on the jetty deck. The education centre roof was waterproofed with Bauder’s root resistant bitumen membrane before then having a sedum blanket fitted. On the lower roof, 650m² of Bauder’s hot melt structural waterproofing was installed along with a wildflower blanket, providing an instant carpet of vegetation. Systems installedBauderflex bituminous waterproofing system1 BauderPLANT E 42A torch applied, SBS elastomeric bitumen capping sheet. The product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL. The membrane is reinforced with 250g/m² spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 BauderTEC SPRINT DUOSelf-adhesive bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. The product features a glass fleece reinforcement for strength and stability. The product benefits from cleaner, safer, and faster installation than traditional torch-applied membranes.3 BauderPIR FA-TELightweight, PIR flatboard insulation board with aluminium foil facing on both sides. This product has zero ozone depletion potential.4 BauderTEC KSD FBSSelf-adhesive air and vapour control layer with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder Insulation AdhesiveBauder Bakor 790-11 hot melt waterproofing system1 BauderPLANT E 42Torch-on root-resistant, green capping sheet. Reinforced with spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 790-11 with reinforcement layerHot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.Bauder XF 301 Sedum system1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green
Sponsored
Shetland Islands Museum

Shetland Islands Museum

Carlisle Construction Materials Limited

The Shetland Museum and Archive Centre at Hays Dock in Lerwick was built at a cost of £11.6 million which was part financed by the Heritage Lottery fund. The walls of the Museum were constructed in the shape of a fishing boat sail and the building won a prestigious design award from the Glasgow Institute of Architects. The harbour is regularly battered with wind speeds in excess of 100mph and Hertalan membranes were specified to waterproof the roofs and fa çades of the building due to their durability, BBA, ISO14001 and WINTEC certification and the products 20 yr manufacturer warranty.
Sponsored
All wrapped up...

All wrapped up...

RENOLIT Cramlington Ltd

Private house, Jersey CHALLENGE Glulam beams – or glued laminated timber – are an ideal light weight alternative for steel or reinforced concrete that allow for much longer spans, heavier loads and complex shapes. Over the years timber rot may occur to such a degree that renovation becomes imminent and irreversible. That’s exactly what has happened to the property of a Jersey customer of RENOLIT’s approved contractor Advanced Roofing. A solution was sought to “save” the existing Glulam beam structure without too many structural changes. SOLUTION The RENOLIT ALKORPLAN roofing contractor solved the problem as follows: For the first stage they removed the failed, rotten areas and treated the remaining areas for insect infestation. Then they covered the glulam beams at each change of direction with RENOLIT ALKORPLAN metal sheet. Over the metal the beams were completely wrapped in reinforced RENOLIT ALKORPLAN membrane. Nicely packed… and completely waterproof. It worked really well and actually quite an ingenious idea! The glulam beams can start a second life resistant to all weather conditions. Once the glulam beams were encased there was still the issue of the solar shading to be re-fitted. Preferably without having to penetrate the newly applied membrane! The brilliant idea of using RENOLIT ALKORSOLAR profiles welded to the top edges of the glulam beams as a safe and solid support for the solar shading evolved. This project is again an excellent proof of the versatility of our RENOLIT ALKORSOLAR mounting system.
Sponsored
The Castings

The Castings

illbruck – a brand of Tremco CPG UK Ltd

Project: The Castings, Piccadilly EastLocation: Heyrod Street, ManchesterVCL membrane system supplier: ADA FastfixSystem used: illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer, illbruck TF448 High Performance Bonding Tape, ME322 Internal Tape 100illbruck, a part of CPG UK, have celebrated the successful installation of their new A2 fire classified vapour control layer within an exciting new residential development in the heart of Manchester.The projectThe Castings, Piccadilly East is on a 0.7-acre site in the Manchester Piccadilly regeneration area and includes four stepped building elements rising to 25-storeys high. The development will consist of 352 build-to-rent (BTR) apartments, including a mix of studio, 1, 2, and 3 bed units, alongside roof terrace gardens, retail and amenity space, and a public square. The project was designed with a focus on sustainability, to deliver low energy consumption with highly efficient building fabric.ADA Fastfix, a leading supplier into the construction industry, were approached to find an airtight vapour control membrane which would ensure high levels of thermal performance and energy efficiency in the building. As a ‘relevant building’ according to Building Regulations Approved Document B, the installed membrane needed to be a fire classified solution; an A2 fire classified solution was requested to provide enhanced fire safety for the building and its occupants.The solutionADA Fastfix selected illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer due to its enhanced reaction to fire classification of A2-s1, d0 to EN 13501-1, excellent product performance, and the accompanying technical support from the illbruck team. illbruck ME060 A2-Membrane uses advanced technology to combine reinforced glass fibre with an aluminium and laminated coating, providing long lasting strength and durability. The special coating also improves thermal performance by reflecting up to 95% of heat.  Its airtight and vapour-tight properties, which can be used to comply with Passivhaus, helps improve energy efficiency whilst protecting the building fabric from moisture vapour and condensation.The applicationOver 6,000m2 of illbruck ME060 A2-Membrane Pro Air and Vapour Control Layer was attached to the Steel Frame Structure using TF448 50mm high performance tape. The lap joints and window details were then sealed with ME322 70mm tape. This system can be used on the internal structure of a timber frame or lightweight steel structure to manage air and moisture flow, as well as enhance the building’s thermal performance, energy efficiency, and fire safety. Alongside providing high performance products, the illbruck team also helped the client with detailed drawings, technical service and application guidance, and on-site support – to ensure a smooth installation process and great finished result.Project overviewScott Hurry, Area Sales Manager at CPG UK, said, “illbruck ME060 A2-Membrane was the ideal choice for this fabric first build due to its enhanced reaction to fire classification as well as helping to improve thermal performance in the building. This is the first major installation of our new ME060 A2 fire classified membrane - we’re delighted to work with ADA Fastfix to see our products installed in this development, where our membrane will be helping to protect the building and its residents for years to come.”
Sponsored
Case Study - Proteus Pro-Felt® - High Street, Polegate

Case Study - Proteus Pro-Felt® - High Street, Polegate

Proteus Waterproofing

Comprising of nine shops and several residential flats, properties 29-47 High Street Polegate required a full roof refurbishment after complaints of water ingress into the residential buildings. Proteus Waterproofing conducted a thorough survey which revealed that the existing roof build up, made up of a timber deck and 2-layer felt, had been previously repaired but was now at the end of its serviceable life.Being a residential building with a combustible deck, protecting individual properties from internal fire spread was a key consideration. Compartment walls were identified allowing Proteus Waterproofing to provide a solution that would meet regulatory guidance relating to the junction of compartment walls and roofs in Approved Document B whilst meeting the needs of the client.Proteus Waterproofing specified their robust reinforced bitumen membrane range of Proteus Pro-Felt®, including a bespoke hybrid insulation approach, where instead of a full replacement consisting of entirely non-combustible insulation, a scheme was designed to meet the requirements above and either side of the compartment walls, offering the client the most cost-effective solution possible that would also mitigate any unnecessary increase of weight loading elsewhere on the roof.High Performance WaterproofingThe waterproofing and existing deck were stripped back and re- decked with 18mm plywood. When removing the existing waterproofing, our approved contractor, carefully recorded the exact location of the party walls as no drawings of the upper story flats were available.Proteus Pro-Felt® SA AVCL was used as a vapour control layer to allow for the application of the hybrid combination of 150mm Proteus Pro-Therm PIR insulation and 150mm Proteus Pro-Therm Mineral Wool insulation. A thermal calculation was undertaken to ensure that the final result met the requirements of Part L of the National Building Regulations. These were both adhered with Proteus Pro-Bond Foaming Adhesive. Proteus Pro-Felt® SA Underlay Plain was laid and finished with Proteus Pro-Felt® Ultima Plus Fireguard Mineral Capsheet, providing the client with a fully waterproofed Part B and Part L compliant roof, guaranteed for 20 years.Proteus Waterproofing worked closely with the Proteus Approved Contractor, to ensure the project was delivered to a high standard.Health & SafetyWhen working on occupied buildings, safety is always of utmost importance, as well as keeping disruptions to a minimum. The Proteus Pro-Felt® range have been tested to the highest European Classification of BROOF(t4), making it the ideal system to use on all buildings, as the risks to residents, property and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines. Proteus also have a range of cold liquid applied membranes which are also BROOF(t4) certified.Long Term PerformanceProteus Pro-Felt® offers high-performance bituminous membrane systems, tested to perform in extreme temperatures and weather conditions, while offering clients a robust and cost-effective waterproofing solution. Proteus Pro-Felt® Ultima Plus range retains its high polymer performance. Its class leading, high quality modified bitumen content allows this flexible membrane to move with the building and ensure long term durability and performance with third party BBA accreditation and guarantees available up to 30 years.
Sponsored
Old War Office, London

Old War Office, London

EFFISUS

The 760,000 sq ft development will bring the Old War Office back into use, creating a world class 5-star hotel and 85 apartments. Works will include developing a six storey basement and constructing a three storey roof extension. The venue has been designed by UK-based EPR Architects, with the hotel interiors designed by New York-based designer Thierry Despont, and the residences by 1508 London. A1 Fire Rated Breather and Vapour FR Membranes were used to protect the insulation and building interior, maximizing its energy efficiency and value.
Sponsored
St Margarets Head Railway Tunnel

St Margarets Head Railway Tunnel

Cordek Ltd

The now disused St Margaret’s Head Tunnel was a structure originally formed as part of the Dunfermline to North Queensferry railway line, providing a link to the ferry service until the opening of the Forth Bridge in 1890 and remaining in limited use for freight until 1954. The vaulted roof and brick lined tunnel is located 15 metres below the A900 trunk road and the B981, adjacent to the northern approach to the Forth Road Bridge. Cordek were asked to supply a structural fill solution, encapsulated within a protective membrane to fill the entire cavity of the tunnel.

Showing 109-144 of 383

Feedback