NBS Source
I'm a manufacturer

"roofing membranes"

4,107 results found

Sort by:

Showing 217-252 of 512

Sponsored
Case Study - Proteus Pro-Felt® - City Tower

Case Study - Proteus Pro-Felt® - City Tower

Proteus Waterproofing

City Tower, a private apartment tower block located in Canary Wharf required a new high performance waterproofing system as the existing single ply roof had been damaged beyond repair due to a fire. To provide a cost effective, long term waterproofing solution, Proteus Waterproofing specified a Hybrid Tapered Insulation Scheme with a Proteus Pro-Felt® finish, meeting the client’s specific requirements.High Performance WaterproofingAs the existing roof was beyond repair, it needed be completely stripped. Pro-Prime® SA and Proteus Pro-Felt® Self Adhesive Underlay were used as a vapor control layer. Proteus Pro-Therm EPS and Proteus Pro-Therm PIR were used for the Hybrid Tapered Insulation Scheme and bonded using Pro-Bond Foaming Adhesive. Proteus Pro-Felt® 3mm Plain Underlay was then fully adhered to the insulation, followed by a final installation of Proteus Pro-Felt® Ultima Plus Fireguard. Proteus Waterproofing worked closely with the Proteus Approved Contractor to ensure the project was delivered to a high standard.Health & SafetyWhen working on residential buildings, safety is always of utmost importance. Proteus Pro-Felt® Ultima Plus Fireguard has the highest European Fire Rating, BROOF(t4), making it the ideal felt to use on residential properties as the risks to operatives, building occupants and members of the public are greatly reduced. All Proteus Waterproofing specifications promote fire safe installation methods conforming to the industry lead Safe2Torch guidelines.Long Term PerformanceProteus Pro-Felt® Ultima Plus Fireguard is a high-performance multi-layer bituminous membrane system, tested to perform in extreme temperatures and weather conditions. It has class leading modified bitumen content which allows the flexible membrane to move with the building and ensure long term durability and performance. It is certified by the BBA to be in excess of 30 years, and had the highest European Fire Rating – BROOF(t4).
Sponsored
Metal Roof Coating - Merlin Grey

Metal Roof Coating - Merlin Grey

Liquasil Ltd

This metal roof in Warwick was suffering from cut-edge corrosion, delamination of the factory finish, and spot corrosion.The specification called for a full liquid roof coating in Merlin Grey, which Liquasil was able to supply for installation by Nadco Roofing Services. Liquasil's Metalseal can be made in any RAL or British Standard colour to suit the client's needs.After the corroded surfaces had been prepared back to bare metal and the substrate had been jet-washed and dried, a single coat of Metalseal was applied to the entire roof at a wet film thickness of 350 microns.Despite the steep pitch of the roof, runoff was not an issue; the product stuck to the roof and did not drip, leaving a consistent, glossy finish that left the whole roof looking like new.Metalseal can be made in more than just the standard goosewing grey - if you have an industrial roof that needs coating, Liquasil can meet your needs - no matter the colour.Give us a call on 0121 709 5352, or email us at info@liquasil.com.
Sponsored
177 Bothwell Street, Glasgow

177 Bothwell Street, Glasgow

Alumasc Roofing

Scotland’s Largest Single Office Building with Rooftop Running Track and 360 Panorama.A Sustainable and Futureproof Roof, Harnessing the Power of the OutdoorsBothwell Street in Glasgow is now home to an exceptionally progressive office space – making way fora new chapter in the rich history of the area. If there are any doubts about what Grade A office spacereally means, then think touchless entry, bike storerooms, lux changing facilities, an 8,000 sq. ft roofterrace, a 150-metre rooftop running track, 4 activity zones/terrace spaces and panoramic views.The project complements the sustainable regeneration programme along the Clyde Waterfront also,home to the new financial Northern European hub, firmly cementing the business district at the heart ofmodern Glasgow.GOALSThe architects at Sheppard Robson have made sure sustainability and lifecycle credentials remaincentral to the design specification. Occupants’ wellbeing has been carefully considered with a stunningpanoramic rooftop and 150m running track and general outdoor employee wellness facilities.A roofing solution was required to support the lifecycle of the building along with an excellentproduct reputation for this distinguished office space. Given the quality, longevity and environmentalconsiderations required from the roofing design, the insulation properties and warranty performancewere extremely important from the outset.CHALLENGESOur Technical department assisted the architectural and construction teams to resolve numerouscomplex design elements across the varied roof zones including running track, ballast walkways, greenzones, and pedestal zones, to determine the best roofing solution.Installation of the Davit Arm System for a building of this scale was especially important so personnel canbe safely suspended whilst working at height. This presented us with a unique challenge in providing aworkable solution that aligned with the sequence of works, whilst facilitating future routine inspection ofits base plates, and maintaining waterproof integrity without compression.Careful planning and detailing were required around roof penetrations to minimise aesthetical impact,and roof equipment was safely installed above the roof assembly.SOLUTIONThe construction comprises a composite concrete slab receiving our Hot Melt Hydrotech Waterproofing System. Offering a true lifecycle – Hydrotech high performance waterproofing, through its’ unique characteristics and installation process, now forms part of the building fabric. The result offers complete watertightness for the lifetime of the building.The building is also insulated to a high u-value target offering exceptional thermal performance and achieving a high kPa rating. This was essential to receive loadings from all components including overlying finishes, roof equipment and the end use for the building occupants.Key fire performance standards were achieved throughout including the lift overrun and lower roof terrace areas where the preferred solution was switched to our Derbigum sustainable warm roof system to maintain project performance targets.LIFECYCLE MANAGEMENTDesigned with BREEAM credentials and an EPC rating coming in at below 10 the careful focus on lifecycleconsiderations and the choice of materials throughout the building envelope is exemplary.Hydrotech hot melt is a high-performance solution containing 30% recycled content and zero productfailures in over 50 years, offering lifetime peace of mind, designed for the service life of the roof.PROJECT DATACompletion: Autumn 2022Building Type: Commercial OfficeProduct Application: Hydrotech & Derbigum waterproofing systemsCertification: BBA Approved, European Technical Approval & FM Global Class 1Architect: Sheppard RobsonMain Contractor: HFD Group
Sponsored
Centenary Quay

Centenary Quay

Axter Ltd

This project was part of the vibrant regeneration of Southampton’s waterfront, including 102 apartments with high rise penthouse flats, retail and commercial space. Phase three of the project incorporated a bio-diverse living roof as well as amenity space built above a Morrisons supermarket.ChallengesWith fully accessible amenity gardens including a flowing water feature, it was vital a robust specification was delivered. Due to this space being built above a Morrisons supermarket, careful design consideration was essential to ensure that Axter’s driving philosophy of the right system in the right place was successfully employed.SolutionsFor the main roof area, a robust system was required. The Wilotekt-Plus was specified for system on the podium, main roof and terraces (5000m2). This system is the original and industry renowned second generation hot melt structural waterproofing system. Its pure polymer modified bitumen compound formulation, combined with reinforcement mesh and high strength protection membrane, resulted in a tough, seamless, flexible, self-healing monolithic waterproofing system, with incredibly fast installation speeds, that will last the lifetime of the building.Ecoflex PVC single ply waterproofing (450m2) installed on the canopies, idea due to the system being incredibly lightweight, typically 2-3kg per m2. Ecoflex systems are strong and flexible, are fully reinforced and available for mechanically fixed and adhered applications.Working alongside horticulture specialists and substrate and seed providers, we ensured all elements of the roof complied with the Biodiversity Design Report for the development. This included specially selected grass and flower species, chosen for their ability to withstand windy coastal conditions. When established, these plants will provide shelter and forage to a range of invertebrates and birds.Systems in useWilotekt®-PlusEcoflex®Biodiverse Living Roof
Sponsored
Asbestos Roof & Cladding Refurbishment Coating

Asbestos Roof & Cladding Refurbishment Coating

Liquasil Ltd

The finish to the asbestos roof and asbestos cladding on this property was faded and the roof leaked in several places, along with the gutter. Liquasil's silicone roof coating, Asbestoseal, was chosen to seal the roof and dramatically improve the aesthetic appearance using specially made RAL colours to the match the original finishes. The asbestos cement gutter was also lined with the Liquasil liquid gutter liner to form a permanent, bonded solution.
Sponsored
Metal roof coating project in Leicestershire

Metal roof coating project in Leicestershire

Liquasil Ltd

Failing factory finishes and cut edge corrosion were present across the entire roof and Liquasil's Metalseal metal roof coating system was specified as the most appropriate solution. The roof was cleaned and all failing finishes and rust was removed as far as reasonably practicable. The roof was then coated. In this case, two colours were employed. Liquasil is the only company able to produce silicone coatings in any RAL colour.
Sponsored
Asbestos roof coating project in Haverhill

Asbestos roof coating project in Haverhill

Liquasil Ltd

This was the first asbestos roof coating project undertaken with Liquasil products, back in 2013. The roof was heavily soiled and was cleaned using a DOFF steam cleaning machine, delivering 150°c steam to completely kill moss and lichen spores. The metal fixings were treated with Liquasil's corrosion primer and sealed with Non-Sag Sealer before the whole roof was coated with Asbestoseal, the only BBA Approved asbestos roof coating.
Sponsored
Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Safety Fabrications Limited

The Ascent Aluminium Roof Access Steps were specified to meet the clients requirement to create a safe access route up & over the “saw-tooth” roof for maintenance personnel. In this instance the Ascent steps were specified for use with an adjacent MSA Latchways climb-latch fall protection system. If collective protection is required handrails can be supplied to one or both sides of the steps. The Ascent Aluminium steps were specified for this project by Eurosafe Solutions Ltd a specialist fall protection company who also installed steps. The Ascent Aluminium walkway steps are tested for use on the aluminium standing seam roof and are secured back to the roof sheet using a proprietary support clamp. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardrail, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.The walkway steps can be configured with a handrail to withstand a loading of either 0.36 kN (general duty) or 0.74 kN (heavy duty) and can be supplied with an optional toe-board if required. The system can achieve these loadings without the need for additional bracing, allowing the walkway to be placed against the area to be accessed. UKCA / CE marked. Designed & Tested in accordance with BS EN 516:2006 Class 1 Type C. Designed & Tested in accordance with BS EN ISO 14122-3:2016 where a handrail is fitted. Designed & Tested in accordance with BS 4592-0:2006+A1:2012 for loadbearing and BS 7976-2:2002+A1:2013 for anti-slip. With or without handrail.Standardized modular system roof walkway system. Can be supplied with a range of fixing kits to suit different roof profiles.
Sponsored
Asbestos roof refurbishment coating in Preston

Asbestos roof refurbishment coating in Preston

Liquasil Ltd

This complicated asbestos roof structure was heavily soiled and leaking in numerous places. Asbestoseal was specified because it is the only BBA Approved asbestos roof coating on the market. The roof was cleaned using 150°c steam, which kills all moss and lichen spores on contact, leaving a perfectly clean substrate for coating. The success of any coating comes from its preparation and Liquasil teaches all of it approved installers various cleaning methods. The roof was coated and is now leak free with a much extended life expectancy.
Sponsored
Metalseal Metal Roof Coating - Lichfield

Metalseal Metal Roof Coating - Lichfield

Liquasil Ltd

This 4,000 square metre roof in Lichfield, completed by Projects UK Ltd, was in need of refurbishment and Liquasil's BBA Approved Metalseal 20 was specified for its 20 year guarantee against manufacturing defects. The roof was cleaned and the cut-edges were treated with our unique SWT corrosion primer before a single coat of Metalseal 20 was spray-applied to the roof to provide a protective and decorative finish leaving the roof sheets looking like new.To get in touch, call our team of Building Surveyors on 0121 709 5352.
Sponsored
Metal roof coating, Watford

Metal roof coating, Watford

Liquasil Ltd

A roof at teh Jaguar Land Rover premises in Watford was in poor condition and suffering from cut edge corrosion. All of the loose and flaking factory finish was removed using 4000psi pressure washers and the rusted end and mid-laps were ground back to remove the rust. The cut edge corrosion was treated with Liquasil's corrosion primer and the entire roof was coated using the BBA Approved Metalseal.
Sponsored
Commercial Project – Surrey

Commercial Project – Surrey

Russell Roof Tiles

A stable conversion project needed an authentic clay roof finish.
Sponsored
A flat roof in the Austrian Alps - INVATHERM

A flat roof in the Austrian Alps - INVATHERM

FOAMGLAS®

A flat roof in the state of Tyrol was used to rigorously test a new non-combustible inverted roof insulation solution for the UK market.
Sponsored
Metal Roof Coating in Suffolk

Metal Roof Coating in Suffolk

Liquasil Ltd

The original factory finish to the metal roof of this property was failing, with the coating delaminating badly due to UV damage. The gutterless eaves construction meant that both the roofs and cladding had to be coated. Metalseal was specified because it is available in any RAL colour., In this case, Juniper Green was required. The original finish was removed with 4000psi pressure washers , before corrosion was treated with Liquasil's corrosion primer before Metalseal 20 was applied.
Sponsored
Bexley Park Sports & Social Club

Bexley Park Sports & Social Club

Axter Ltd

Bexley Park Sports and Social Club is home to a wide range of sporting facilities and teams, including bowling, squash, football and rugby. They also have a large function room that is available for hire. Read on to learn how Axter was able to help them with a complete roof refurbishment.Project overviewThe original roof had been on the building for over 40 years. It was coming to the end of its serviceable life and was starting to show signs of aging, such as leaks around the rooflights.Axter were brought in to carry out the roof refurbishment of the main building.Overall, this project ran very smoothly and we were incredibly happy with the result. The writing on the barrel roof was a lovely added touch by our Axtershield Installer partner, Henley’s Roofing Ltd.This case study will focus on the main roof. However, as we will touch on towards the end, the client was so pleased with the work that they decided to go on to refurbish the other three roof areas.ChallengesThis was a complex project for several reasons. Several different parts of the main building had been added over time, so there was a change of level details throughout the roof.Part of the building had a barrel roof section, which added an extra level of complexity to the job.As well as this, there were a few existing features, such as a water tank on the roof surrounded by rotten chipboard, which also had to be taken into consideration when it came to planning installation methods.SolutionsGiven the age of the roof and the defects observed, it was recommended that a full overlay be carried out.As well as the specific roofing considerations, Bexley Park Sports and Social Club were looking to keep within a tight budget. For this reason, the single layer overlay solution worked perfectly to provide a cost-effective option. Our Reinforced Bitumen Membranes (RBM) combine strength with longevity to provide a durable waterproofing system with a 20-year guarantee.The rotten chipboard was removed and replaced with timber cladding. Flame free Starcoat® PMMA (polymethyl methacrylate) was used for the sections where it was necessary to eliminate fire risk. This cold-applied liquid system provided a great non-flammable solution.Systems in useExcel®Starcoat® PMMAAdditional works carried outThe client was very impressed with the quality of the work carried out on the main roof, and our ability to provide them with a cost-effective solution. The work came in under budget and they were so pleased with the job that they accelerated the project and decided to refurbish the other three club roofs – something that hadn’t been on the cards before. The initial work had provided them with the peace of mind that everything would go to plan and enhance the building, all with minimal disruption to the club. So we went on to refurbish the squash court, changing rooms and storage room roofs.Condition surveys were taken across all four of the roof areas. The additional roofing areas all needed re-decking as they were incredibly warn from ongoing water ingress.This meant we had to strip down to and remove the existing support structure, before installing a new ply deck, ready for the waterproofing works to go ahead. The changing room roof was pitched, adding an extra complexity to the job, as the shingle had to be replaced.
Sponsored
Metal Roof Coating Project in Middlesex

Metal Roof Coating Project in Middlesex

Liquasil Ltd

After first cleaning the roof and attending to rusted areas with Liquasil’s corrosion primer, it was the coated with Metalseal 20 from Liquasil, using airless spray equipment. The specification for this roof was for a special RAL colour. Only Liquasil can make silicone coatings in any RAL colour, so Metalseal 20 was specified for the project. This roof was completed in Forest Green.
Sponsored
Extra Care, Bedfordshire

Extra Care, Bedfordshire

Russell Roof Tiles

A large retirement village at Parkland Place in Bedfordshire required slate appearance roofs.
Sponsored
Social Housing – Derby

Social Housing – Derby

Russell Roof Tiles

Russell Roof Tiles supplied tiles to 3 social housing sites in Derby.
Sponsored
Maintainable Waterproofing solutions

Maintainable Waterproofing solutions

Delta Membrane Systems Ltd

The scope of the works was to design, specify and install a suitable waterproofing solution to 2 large properties engineered from ICF construction which required waterproofing. Areas where attention from a skilled specialist were required, was to the rear and two side walls which were earth/ground retaining.When specifying a suitable waterproofing solution, consideration to the final use of the building, designing a system to be maintainable and repairable along with a deep understanding of BS 8102:2009 is essential in ensuring project success.From a waterproofing design perspective, we use three grades to define waterproofing systems.These 3 grades are:Grade 1 – Some water seepage and damp are tolerable depending on the intended useGrade 2 – No water penetration is acceptableGrade 3 – No dampness or water penetration is acceptableIn existing basements and new build properties which will be habitable, Grade 3, is always required.
Sponsored
Basement and External waterproofing

Basement and External waterproofing

Delta Membrane Systems Ltd

The scope of this ambitious project was to restore and transform an abandoned Neo-Gothic Cemetery Keeper’s Lodge with adjoining public facility into a luxurious mansion in just 12 months.  Works included demolishing the adjoining public facility to enable the construction of a new basement.The proposed new build construction would be a luxury ground floor extension which would run the footprint of the redundant public facility to offer a 4,000 square foot subterrain space with key features such as 13-meter swimming pool, 2 additional bedrooms, a tv games room and office space.Simon Gill Architect designed the ambitious project and was appointed as Project Manager.Delta Registered Installers 5 Star Basements were employed to undertake both dig out and installation of the structural waterproofing with Delta’s Technical Waterproofing Consultant, Paul Callaghan representing Delta. This approach at the design stage, allowed Paul to attend design team meetings and to ensure all criteria’s of BS8102:2009 were met.As aired on Grand Designs on 6th January 2021.
Sponsored
Lightwell Waterproofing Solutions

Lightwell Waterproofing Solutions

Delta Membrane Systems Ltd

The scope of the project was to facilitate a solution for a damp, salt and mould covered lightwell wall, which was impacting negatively on staff who thought their office views were unsightly and unhygienic.
Sponsored
Super Modern passive build, Nottingham

Super Modern passive build, Nottingham

Intelligent Membranes

Passive Purple Airtight detail a must with this huge open plan modern structure in Nottingham.
Sponsored
Passive Purple - Airtight White Edition

Passive Purple - Airtight White Edition

Intelligent Membranes

A case study of the use of Airtight White intelligent airtight liquid vapor control
Sponsored
Skydoor Roof Access Rooflight Has Helped Open The Roof Space Of Beautiful Holiday Home Located In Michigan

Skydoor Roof Access Rooflight Has Helped Open The Roof Space Of Beautiful Holiday Home Located In Michigan

Glazing Vision Ltd

Skydoor Roof Access Rooflight Has Helped Open The Roof Space Of Beautiful Holiday Home Located In Michigan Case Study
Sponsored
Private Housing – Waterlooville

Private Housing – Waterlooville

Russell Roof Tiles

Russell Roof Tiles supplied Bute tiles in Burnt Orange for a residential housing project in Hampshire.
Sponsored
Spectraplan forms roof terrace at Sandbanks Court in Poole

Spectraplan forms roof terrace at Sandbanks Court in Poole

AccuRoof

A green roof system was selected for this project as the client required a roof that would complement and accommodate the step in levels to follow timber decking lines to the 55m² roof terrace areas. IKO Single Ply’s Spectraplan SM120 light grey single ply waterproofing system was overlaid to the existing roof and newly built sun rooms, ready to receive a green roof system.
Sponsored
Roof Garden, Lamb Walk, Bermondsey

Roof Garden, Lamb Walk, Bermondsey

SureSet Resin Systems

The roof project in Bermondsey consisted of an accessible green roof for residents on the first floor and a green and brown roof at the next level. Natural Aggregate, 6mm Barley Beach. London
Sponsored
Green roof on Starbucks cafe

Green roof on Starbucks cafe

Wallbarn Ltd

This project involved a brand new Starbucks drive-thru being built in West London where the customer wanted the overlooked rooftop to be green. The customer was able to give the basic dimensions to our team and describe how they wanted the roof laid out. We then calculated the exact quantity of units needed with our inhouse software and gave delivery and installation guidance to the contractor and end client. Wallbarn also supplied the materials for the semi-extensive border including geotextile fleece, drainage board and our specially-developed substrate for a comprehensive green roof solution,
Sponsored
Asbestos roof coating installation Birmingham

Asbestos roof coating installation Birmingham

Liquasil Ltd

This asbestos roof is being cleaned using a closed box pressure wash, with all waste water being filtered and recovered for re-use. Once cleaned, the roof is coated with the BBA Approved Asbestoseal system which includes: SWT CORROSION PRIMER - fully rust and wet tolerant, the primer is applied to all metal fixing to stop further corrosion. NON-SAG SEALER - is applied to all fixings and small holes and cracks to permanently seal them. ASBESTOSEAL 20 is brush applied to the roof sheets to provide a new finish.
Sponsored
Contempory Look Zinc Effect Roof

Contempory Look Zinc Effect Roof

Polyroof Products Ltd

The proprietors of this domestic property in Harrogate added a large extension with a total roof area of 150m2. The client wanted the new roof sections to complement the slate work and aesthetics of the original building whilst adding a contemporary and stylish look to the extension.Originally considering a zinc sheeted roofing system, the client explored alternative materials that could achieve the same visual impact but at lower cost. After discussions with Cure Roofing Ltd, a Polyroof simulated metal finish was proposed as a roofing solution that would meet all the client’s requirements.Not only do Polyroof’s range of liquids offer cost savings over traditional metals, but they are also lighter in weight, totally seamless and can be pigmented to any RAL colour. Having no scrap value, the client also had the added peace of mind that the roof would not be a target for theft.A timber warm roof was constructed which incorporated 120mm PIR insulation to achieve a U-Value of 0.18 W/m2K in compliance with building regulations. An OSB3 TG4 deck was fitted above the insulation and Polyroof pre-formed GRP standing seam trims were fixed at 600mm centres into the deck. Next, the first coat of the Protec waterproofing system was applied over the whole roof area and encapsulating the standing seam trims. The roof was finished with a second coat of Protec pigmented to RAL 7016 providing an anthracite grey colour to the whole roof, accurately simulating the appearance of zinc roof sheets.The workmanship by Polyroof approved contractor Cure Roofing was second to none and the quality of the finish left the client delighted with their new roof. With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that their new extension could not be better protected for decades to come.
Sponsored
Private Housing – Stirlingshire

Private Housing – Stirlingshire

Russell Roof Tiles

Russell Roof Tiles supplied 26,000 Slate Grey Pennine tiles as part of a £36,000 contract for a total of 13 private homes in Falkirk.
Sponsored
Private Housing – The Limes

Private Housing – The Limes

Russell Roof Tiles

ussell Roof Tiles is supplied our Natural Range Galloway and also the profiled Pennine tile to a total of 128 new build homes in Leicestershire.
Sponsored
The Little Chapel

The Little Chapel

Polyroof Products Ltd

The Little Chapel in Guernsey was built in 1914 and, at only 16 feet by 9 feet, is said to be “one of the smallest functioning chapels in Europe, if not the world”. The chapel and its unique appeal gained national fame after an article accompanied with a colour photograph was published in the Daily Mirror, and it has since been considered one of, if not the most famous tourist attraction in Guernsey.In 2015, work began to weatherproof the intricate building, with the Protec System specified as the best solution for the job.The ChallengeHaving never been finished by its original builder, Brother Déodat, the chapel has been undergoing a long-term restoration project to create a structurally sound building that retains the beauty of the original vision. Firstly, the foundations were underpinned and properly secured for the first time since they were created over 100 years ago. The next priority was to fix the roof, as described by Pat Johnson, chairman of the Little Chapel Foundation:“The asphalt on the roof was hollow and had to be taken off. The concrete underneath was hollow. We ended up with a substrate of soil and clink, so to repair it we had to go inside and grout all the cracks in the ceiling. [The new roof] comprises three layers of concrete, 340 stainless-steel plugs, a stainless-steel mesh and a final coating of concrete”.The task of making the new concrete surface waterproof fell to local Polyroof approved contractor Sarnian Roofing Ltd. Andy Gavey (Company Director) said about the project:“As a boy I would regularly visit The Little Chapel and I’ve always been blown away by its beauty and character. To get the chance to help restore the building to its full potential is a dream come true for me – this has to be my favourite roofing project yet. Polyroof’s contribution towards the roofing works has meant that we were able to provide a top-quality roofing solution that has done justice to the amazing exterior of the building.”The SolutionWith its ability to be applied directly to the concrete to form a lightweight, seamless and durable waterproofing membrane, Polyroof’s Protec System was a clear choice for waterproofing the chapel roof.The first stage was to make the entire roof area fully watertight. Following a coating of primer to seal the porous concrete surface, the first coat of Protec was applied which incorporated fibreglass reinforcement. After 30 minutes the coating had cured and the second coat was applied to the whole roof area. To areas where new mortar was laid to re-embed the pebbles and seashells, which had been painstakingly removed from the old roof, a coating of Polyfinish was applied to provide extra protection.The architect chose a sanded decorative finish to complement the exterior of the building, which is covered in a mosaic made from seashells, pebbles and broken china. To create this finish, a third coat of Protec was applied and, whilst still wet, Quartz Sand was broadcast into the resin. After brushing off the excess sand, the whole roof surface was sealed with an application of Polyfinish Clear.
Sponsored
Coventry University green roof retrofit

Coventry University green roof retrofit

Boughton Loam

Boughton’s Intensive green roof substrate has been successfully trialled in a ground-breaking analysis project at Coventry University assessing the feasibility of ‘greening’ landscapes with ecological beneficial habitats.  With the objective being to research the benefits and plausibility of incorporating green space and wildlife-friendly habitats into heavily built-up areas, Coventry University handpicked Boughton’s Intensive IN1 substrate based on its nutrient content, weight, and the inclusion of a water supply in chambers beneath the sub-base.The majority of green roofs in the UK fall into the ‘extensive’ category and are based on a low growing succulent, Sedum, which only requires a few centimetres of substrate to grow, whilst intensive green roofs provide a deeper soil depth and can support a more complex plant system. To this end, Coventry University wanted to explore the advantages of intensive green roofs, which offer greater biodiversity, often create accessible spaces, and offer the best insulation properties and storm water management. The organisation partnered with SEL Environmental, who provided its intelligent water management systems for the project.Boughton’s Intensive IN1 substrate boasts greater organic content than extensive substrates, meaning it supports larger plants and can be installed at greater depths, varying from 100-500cm. IN1 provides a stable growing medium for wide variety of plants in intensive green roof installations, including green roof lawns, shrubs and trees.Depending on the substrate depth and plant type, permanent irrigation systems (above or below ground) are sometimes installed with this substrate to as a backup for extended dry periods. They are not required for everyday irrigation, as the substrate has the ability to hold onto sufficient moisture during ambient conditions. The project, funded by Knowledge Transfer Partnership (KTP) and headed up by Sophie Barron-West, followed plant growth for four years from 2017, with a break due to Covid 19. Dr Stephen Coupe and Dr Liz Trenchard from the University’s Centre for Agroecology, Water and Resilience (CAWR) offered their research expertise.CAWR’s Dr Stephen Coupe says: “The technical requirements of Boughton IN1 were a big part of why we chose it. We also wanted the chance to get as many wildflowers in the space as possible. The nutrient levels were perfect because it wasn’t too rich. In fact, it was a ‘just right’ formulation that wasn’t going to overstimulate but would also deliver enough nutrients for what we needed. Ultimately it was going to be perfect for long-term sustainable plant growth.”He continues: “Reliability was another consideration because we knew we could get it delivered on site on time and, because of Boughton’s location in Kettering, we weren’t concerned about lead times, so that was a plus. It’s safe to say it was a studied choice.”Ground-breaking resultsAccording to the University, the trial resulted in ground-breaking analysis into how different types of green roofs can be created and maintained, as well as what their benefits would be alongside others in a built-up area.  The project successfully demonstrated the ecological impact of placing retrofit green roofs onto existing infrastructure, even with a focus on wildflower species and a relatively short development time. An independently-conducted ecological survey recorded five insect species that have national and local rarity value, including two species of bee that are deemed ‘nationally scarce’ and ‘nationally rare’. Of 457 preserved specimens taken on the green roofs at Coventry University, a total of 120 different insect species were recorded, including wasps, sawflies, hoverflies, beetles, and as many as 11 species of bee.  Coventry University’s findings revealed that the innovation in green roofs has improved and increased the total constructed habitat for rare insects. Research has also enabled better water management alongside habitat enhancement. This research has been incorporated into SEL’s product range, where green roofs are now used across four sites in Coventry, London, Aylesford and Blackburn. CAWR’s Dr Stephen Coupe said: “Ecology, biodiversity and wildlife are largely forgotten by planners, designers and builders in developments. Most green roofs installed in the UK are based on sedum, and, while there are additional features that can be added to these green roofs to improve biodiversity, they are rarely incorporated. Our findings, using Boughton’s Intensive green roof substrate, are that the retrofit of green roofs is feasible and, more than four years into development, IN1 has supported verifiably diverse green roofs. The plants on these roofs supported several insects that have rarity status in the UK, which is very positive.” Dr Coupe adds: “Whilst it is probable that substrates take many years to develop anything like the maturity comparable to natural soil, after just four years, IN1 went from having no recordable eukaryotes, to a concentration of organisms, including worms, soil mites and rotifers.”  Boughton Business Development Manager, Jason Lock comments: “Boughton was delighted to be part of this groundbreaking project and buoyed by such positive findings. Our products have been used successfully in a number of iconic green roof developments around the country over the years but it was a pleasure to be involved in such an important trial that would deliver verifiable results assessing the potential for green roofs to create new habitats in urban environments and enhancing local ecological diversity. Boughton offers an extensive range of green roof substrates and we welcome any research that helps further innovation around the application of green roofs.” The experiment at Coventry University is ongoing and the team are set to feed back again at the end of the summer about how prolonged dry weather has affected results. Dr Coupe says: “The beauty of this project is that there is no general timeline for a piece of green space. We need funding to support our ongoing investigations but there are options and opportunities for long-term research. It can last for the lifespan of the site and I think we will see really interesting developments. There is no reason why, over time, these green spaces would be indistinguishable from an existing habitat.” Boughton’s portfolio of green roof substrates are specifically engineered for different types of roof greening, both for domestic and commercial projects. A full product specification is available for each of Boughton’s Green Roof Substrates, and other landscaping products, making exact specification simple and straightforward. There’s also a section on each product listed online, titled ‘to specify (copy & paste)’, designed to make your job even easier. To enquire about your next project, contact Boughton by calling (01536) 510515 or email sales@boughton.co.uk.
Sponsored
Retractable Glass Roof at The Hawk's Nest

Retractable Glass Roof at The Hawk's Nest

Breezefree Ltd

The largest SolaGlide retractable glass roof in the UK is the talk of the town! Installed by Breezefree at The Hawk's Nest in London’s Shepherd’s Bush.Working with the team at Birdhouse London, we were presented with the challenge of transforming their outdoor space at The Hawk’s Nest into a flexible all-year space, whatever the weather. Challenges included satisfying the requirements of TfL due to the tube line running immediately above, as well as the venue’s request to have a space to trade in during construction work.The result is a chic hospitality space with a sliding roof that offers options for open airiness or full enclosure from the elements. The roof also offers significant soundproofing, reducing impact on neighbours on their most lively nights. The transformation means that the venue can offer their delicious cocktails, and pizzas that have to be tasted to be believed, underneath an elevated and stylish roof that will help draw diners and revellers for years to come.
Sponsored
Shopwyke Lakes, Chichester

Shopwyke Lakes, Chichester

Russell Roof Tiles

Russell Roof Tiles supplied Taylor Wimpey with 180,000 Bute tiles, a thinner leading edge tile, in Burnt Orange for its Shopwykes Lakes development in Chichester.

Showing 217-252 of 512

Feedback