NBS Source
I'm a manufacturer

"refrigeration installations components"

4,768 results found

Sort by:

Showing 145-180 of 1617

Sponsored
Stylefold Hinged sliding folding acoustic moveable wall
 installed at Cemar Offices

Stylefold Hinged sliding folding acoustic moveable wall installed at Cemar Offices

Style - Moveable Partition Specialists

Drawing on over 20 years of experience installing operable walls, Style was recently challenged to come up with a solution to divide a large meeting area, despite there being no suitable structure in the ceiling to utilise as a fixing point. After some lateral thinking and close communication with the client, a non-structural timber frame was created for support, with the weight of the folding wall being transferred to the ground via a surface mounted floor track. A Stylefold 120 folding wall system was chosen as the only operable wall that could realistically accommodate the room structure.The client for this project was the international company, CEMAR, which offers a state-of-the-art, cloud-based administration support and contract administration product to companies in the construction sector. As part of a substantial refurbishment project of the Gloucestershire offices, CEMAR wanted to incorporate space flexibility to the existing open-plan meeting area. This would allow the expansive space to be quickly divided into two separate meeting rooms, or opened up for larger gatherings, presentations and as a general break out space.Demonstrating their expertise in this sector, Style was able to rise to challenge of installing an operable wall in an area with insufficient ceiling structure to support a partition, delivering a high-quality solution that directly meets the clients’ needs.“We’re very proud of our ability to work with clients to overcome complications in room structure and design, and develop a solution that works perfectly for them,” said Julian Sargent, Style’s group managing director.“The final installation not only complements the room’s interior design with a white melamine finish, but also offers 46dB Rw acoustic integrity and a pass door for room access when the wall is in place.”Style is the multi-award winning, market leader in moveable partitioning walls. With 4 regional offices across the UK and a showroom in London, the company specialises in creating flexible space across a broad cross section of sectors including corporate, hospitality, religion, education, local authority and healthcare.
Sponsored
4 Building Regulations you need to know about before installing a smoke vent

4 Building Regulations you need to know about before installing a smoke vent

Trade Access Panels

There are a lot of different official documents about the rules and regulation around fire safety and smoke ventilation, which, in turn, influence the way you should choose and install your AOVs. Building regulations are minimum standards that apply to almost all new residential and commercial buildings, and also alterations to the existing ones. If you are planning to use an Automatic Opening Smoke Vent (AOV) System in your project, you will have to comply with the regulations mentioned.
Sponsored
Waterside Residential Development, Swansea - Swansea Marina residential installation smooth-sailing thanks to F. Ball

Waterside Residential Development, Swansea - Swansea Marina residential installation smooth-sailing thanks to F. Ball

Ball, F and Co Ltd

F. Ball products have been used to install floorcoverings in a waterside residential development at Swansea Marina. Stopgap 1200 Pro high-performance levelling compound was used to create a smooth base ready for the receipt of floorcoverings. Contractors then used Styccobond F44 acrylic adhesive to install oak-effect Polyflor vinyl sheet in the kitchens and bathrooms, as well as to install purple Polyflor vinyl sheet floorcoverings in the building’s corridors, stairways and other communal areas. Styccobond F46 pressure sensitive acrylic adhesive was used to install Polyflor wood-effect vinyl planks in the living areas of each of the apartments.
Sponsored
Cibes C1 Pure installed in charming grade II listed building

Cibes C1 Pure installed in charming grade II listed building

CIBES Lift UK

The Canada Water Masterplan is a significant urban regeneration project in Canada Water, Southeast London. Led by British Land and AustralianSuper, the Masterplan is set to transform a 53-acre site into a radiant mixed-use neighbourhood, over the coming 10-15 years. The development will see the creation of around 3,000 new net zero homes, circa one million sq. ft of retail, leisure, entertainment, education, and community spaces, and up to 2.5 million sq. ft of workspace. Furthermore, encapsulated within the 160 acres of existing green space, will be the first new London high street for a generation as part of 16 new streets across the masterplan, a new town square, and 12 acres of new open space including a 3.5-acre park.Situated on Surrey Quays Road, London, is the recently restored former Docks Office. The 120-year-old Grade II-listed building features 19th Century architecture and was once the base for the Surrey Commercial Docks which operated in the Rotherhithe Peninsular for decades. Fast forward a century and the Docks Office is now the marketing suite for residential property sales at Canada Water. The restoration project was approached sympathetically, with an overarching goal to return it to its former glory, whilst respecting its historical significance. The exposure of the building’s original brickwork pays homage to this and elegantly portrays its unique character and charm.Supporting effective people movement within the marketing suit is a Cibes C1 Pure Cabin Lift. Designed to be installed in just a few days, requiring minimal preparation work, the C1 Pure was the perfect solution for the listed space. Not only is the C1 Pure cost-efficient and reliable, it is a great alternative to a passenger lift. The timeless Scandinavian design successfully integrates seamlessly within the historic space, sequentially complimenting the building’s original architectural beauty and industrial heritage.
Sponsored
Price, sandbox, climbing frame — the city's playgrounds are being beautified

Price, sandbox, climbing frame — the city's playgrounds are being beautified

Redlynch Leisure Installations Ltd

This year, the playgrounds in Kazincbarcika are being beautified again. The refurbishment across the city's 22 playgrounds began this spring with the replacement of rubber coatings and the refurbishment of sandboxes, followed by the necessary repairs to equipment and structural elements. The work is expected to be completed by autumn.With the arrival of spring weather, many are eager to spend time outdoors, and families with young children enjoy spending time on playgrounds. Among the city residents we surveyed, many consider the area around the Boating Lake a prime destination due to its proximity to nature and the presence of a playground nearby.It is important that children can play in the safest, well-maintained environment possible. Barcika Park Nonprofit Ltd. is responsible for the operation of 22 playgrounds, which include 220 play equipment. The company's staff continuously repair any detected faults and deficiencies, and they annually review the condition of the playground equipment. Some of the equipment is repaired on-site, while others are taken to their workshop for repairs after transportation.Parents can also assist the professionals with their observations through the city's official mobile app, KolorApp. Thanks to these reports, it was discovered that the rubber coatings on the playgrounds were worn and damaged, prompting the company to replace all of them for the safety of the children. Additionally, they regularly rake the sand surfaces, disinfect and refill the sandboxes, and refurbish or install new playground equipment, as communicated by Márton Rosza, the construction group leader at Barcika Park Nonprofit Ltd."The major replacements and repairs, for example, are taking place at the Barátság Square playground, the Völgy Street playground, the Instrument Technician Street playground, and in the Völgy Park. Currently, the replacement of spring toys, balance swings, and swinging swings is underway. We strive to show the residents potential innovations," stated the expert.Márton Rosza added: His colleagues also take care of emptying waste containers, managing green areas, caring for vegetation, and cleaning sandboxes, shock absorbers, and coatings. Safety is also ensured by a regulation that mandates a triennial review of the playgrounds, which is always performed by an expert company. Thus, everything necessary for uninterrupted and high-quality relaxation is available in Kazincbarcika. However, during the maintenance work, they ask for the patience and cooperation of the children and their parents.
Sponsored
Slough Ice Arena - F. Ball adhesive saves ice rink installation

Slough Ice Arena - F. Ball adhesive saves ice rink installation

Ball, F and Co Ltd

Styccobond F73 PLUS adhesive has been used for a rinkside flooring refurbishment at Slough Ice Arena. The flooring area surrounding the ice rink had already been prepared by removing old loose lay rubber floorcoverings, and the subfloor cleared of contaminants, including old adhesive residues. Once a suitably smooth surface was complete, the installation of rubber floor tiles commenced, using Styccobond F73 PLUS. With high initial grab and resistance to oil, grease, and water, once cured, Styccobond F73 PLUS was the perfect choice for use adjacent to an ice rink, where water deposited by skaters leaving the rink will be common.
Sponsored
AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

Automatic Systems UK & Ireland

Automatic Systems was asked by Aspex UK Limited to work with them on a project they had won at the head office of Riverside Group.Riverside is a group of complementary businesses driven by a clear social purpose, with a charitable housing association at its core.Established over 90 years ago, they have grown to become a major provider of affordable housing, care and support services in England and Scotland, with almost 56,000 homes in management. Operating at scale and across 160 local authorities, their vision is to transform the lives of the 90,000+ people they house and revitalise the neighbourhoods in which they live.RiversideGroup approached Aspex as a result of Covid to help secure and control the access of their head quarter building.SOLUTIONWith the help of Automatic Systems Aspex came up with a solution that fulfilled their criteria. This included the installation of the newly launched Firstlane and AccessLane.WORK TIMEFRAMEHaving worked with Aspex on a number of previous projects Automatic Systems were the preferred supplier when the contract was won in December 2020. Works took a week to complete as allocated in February this year.FUTURE WORKAutomatic Systems looks forward to working with Aspex on future projects.
Sponsored
Amson Solutions Install AliDeck Aluminium Decking & AliClad Soffit Solutions at Southsea Development, in Partnership with Cox Design

Amson Solutions Install AliDeck Aluminium Decking & AliClad Soffit Solutions at Southsea Development, in Partnership with Cox Design

AliDeck

The balconies at the Southsea development were targeted for an extensive overhaul, incorporating AliDeck’s Senior Board in Textured Silver Grey alongside the AliClad Flow soffit cladding system, complete with an Extended Gutter. Leading the project as the main contractor, McCarthy & Stone launched a significant six-phase renovation, with Amson Solutions delivering the installation across Phase 1 for our client, Cox Design.
Sponsored
Hygiene Room Changing Places Installation: The University Of East London

Hygiene Room Changing Places Installation: The University Of East London

Astor Bannerman

Nestled within the innovative hub of the Royal Docks Centre of Sustainability at The University of East London, a groundbreaking addition has been made to enhance inclusivity and accessibility for all individuals. The introduction of the hygiene room marks a significant milestone for accessibility in the area. Currently, there is only one other Changing Places facility available, making this new facility a crucial addition to meet the pressing needs of individuals with diverse mobility requirements within the Royal Docks community and its surrounding areas.Hygiene Room EquipmentAt the core of this facility lies the meticulously selected equipment:Astor ABW-CP Height Adjustable Wall Mounted Wash Basin: This basin prioritises comfort and convenience during personal care routines, with its height-adjustable feature catering to individuals with varying mobility levels.Astor OT200 Overhead Ceiling Track Hoist: The hoist facilitates secure and efficient transfers within the hygiene room.Astor Shower Trolley: Offering individuals with mobility challenges a comfortable and dignified showering experience.KwickScreen Wall Mounted Privacy Screen: Incorporating privacy and discretion, this screen empowers individuals to create a personal space within the hygiene room.Power In PartnershipLocated within the Royal Docks Centre of Sustainability, this Changing Places hygiene room reflects a harmonious collaboration between the University of East London and Astor Bannerman. Beyond meeting the highest accessibility standards, this facility seamlessly integrates into the university’s commitment to sustainability and inclusivity.As students, staff, and visitors navigate the dynamic campus of the University of East London, they can now do so with the confidence that accessibility is a priority. The establishment of this hygiene room signifies a significant stride in cultivating an environment where everyone feels welcomed, valued, and able to fully participate in university life.For institutions seeking inspiration or guidance on implementing similar initiatives, the University of East London’s Royal Docks Centre of Sustainability serves as a shining example of how collaboration and innovation can create inclusive spaces that reflect a commitment to both accessibility and sustainability.Feel free to reach out if you require assistance or guidance with your Changing Places project, or if you need additional support regarding the equipment specifications for Changing Places facilities.
Sponsored
Installation for Shakespeare's Globe, Sackler Studios

Installation for Shakespeare's Globe, Sackler Studios

Harlequin Floors (British Harlequin plc)

When Shakespeare’s Globe looked at floors for their new education and rehearsal centre, Sackler Studios, they chose a Harlequin Activity floor with a hardwood oak surface. “It’s a product I am particularly familiar with due to working in and creating different spaces over the years and was something our acoustic consultant was keen on using. From a look and feel as a working surface and as part of the sound separation between all the studios I’m tremendously pleased.” Andy Scorgie Head of Facilities Management Shakespeare’s Globe
Sponsored
Where (and where not) to install your hand dryer

Where (and where not) to install your hand dryer

Heat Outdoors & Handy Dryers

In theory, placing your hand dryer or towel dispenser in just the right location should be easy. In the simplest terms, it involves measuring the hand dryer height from the floor and planning the right hand dryer distance from the sink and other washroom features.
Sponsored
Schlüter Steps Up for Stunning North London Installation

Schlüter Steps Up for Stunning North London Installation

Schlüter-Systems Ltd

The complete transformation of a North London apartment block grand entrance hall, lobby and staircase now features a sophisticated and stunning appearance with revolutionary Porcel-Thin® tiles, and Schlüter®-TREP stair nosing profiles.
Sponsored
At the foot of the former St. Petri church in Nordhausen

At the foot of the former St. Petri church in Nordhausen

Redlynch Leisure Installations Ltd

This wonderful playground is located at the foot of the former St. Petri church in Nordhausen, Thuringia. While the giant slide tower was completed as the first construction phase as early as 2018, the playground has since been expanded with climbing towers, bridges, crawling tunnels, swings and balancing ropes. We wish the children in Nordhausen lots of fun with a wild climbing adventure. The executive planner for this project was our sales representative playconcept Tino Blumer.
Sponsored
Energy neutral with pv installation and hot water panels..

Energy neutral with pv installation and hot water panels..

RENOLIT Cramlington Ltd

Low environmental impact... CHALLENGE All over the world architects and building owners are trying to create buildings with a low environmental impact. For this private house, the architect wanted to combine an aesthetical finish of a metal roof in combination with PV and hot water panels. The biggest issue for the architect was the fixing of these panels without having leak problems in the future. SOLUTION The roof was waterproofed using a RENOLIT ALKORPLAN roofing membrane that is mechanically fastened onto the supporting roof structure. Two kinds of PVC profiles were heat welded onto the waterproofing membrane: on the one hand RENOLIT ALKORDESIGN profiles (for aesthetical value only), on the other hand there are RENOLIT ALKORSOLAR profiles, which function as the base to attach the hot water and the PV panels. The gable was also finished with the RENOLIT ALKORDESIGN system.
Sponsored
NIBE Ground Source Heat Pump installed for training college

NIBE Ground Source Heat Pump installed for training college

NIBE Energy Systems Ltd

South Lanarkshire College (SLC) in Scotland has opened a new, ‘zero-energy’ teaching block on its East Kilbride campus. Specifically designed with first-rate environmental credentials in mind, it boasts a whole host of efficiency-enhancing measures – including highly insulated floors, walls and roofs, triple-glazed windows, low-energy lighting and electrics, rainwater harvesting and solar PV panels on the roof. The college approached NIBE Pro Installer Anderson Floor Warming and Renewables in search of a system that would meet the heating requirements of the eight-classroom block in the most sustainable, cost-effective and reliable way possible.The SolutionSLC already has a range of NIBE products in its on-site renewables training centre, which students use for practical sessions, so a heat pump from NIBE was the natural choice to heat the new block. Mike Anderson, director at Anderson Floor Warming and Renewables, specified, designed and fitted a NIBE F1345 40kW ground source heat pump (GSHP) system to complement the building’s water-based underfloor heating, which operates at similarly low flow temperatures.ResultsNow up and running, the NIBE system is so efficient that it has been awarded a rating of A+++ in line with energy labelling criteria under the ErP Directive. SLC’s new teaching block has become the first building in the UK to achieve a BREEAM sustainability rating of ‘Outstanding’, with the facility excelling in all 10 assessment categories – from energy, waste and water to health and wellbeing.Customer Testimonials“We pride ourselves on our forward-thinking approach to sustainability at SLC, and we couldn’t be happier that our new teaching block has been deemed ‘Outstanding’ by BREEAM assessors. The NIBE heat pump system and the solar PV panels combined generate enough renewable energy to meet the block’s entire heating and power needs, making it a ‘zero-energy’ building. It really is a huge asset to the whole college – not only from a resource point of view, but also as a real-life example of sustainability in action. As well as being a valuable learning space for our construction and energy students, it’s a place for us to bring local businesses and community groups, and showcase the benefits of low-carbon, low-resource buildings first-hand.”Stewart McKillop, principal at South Lanarkshire College
Sponsored
"And It’s a Wrap" – Falco Complete the Supply and Installation of 150 Smart Bike Hangars for Brighton & Hove City Council

"And It’s a Wrap" – Falco Complete the Supply and Installation of 150 Smart Bike Hangars for Brighton & Hove City Council

Falco UK Ltd

Falco has completed the roll-out of the UK’s first ever series of smart bike hangars for Brighton & Hove City Council.The scheme which got underway towards the end of 2022, involved the manufacture, supply and installation of smart bike hangars with mobile app access, to provide the seaside resort with a total fleet of 150 bike hangars, equalling 900 secure on-street cycle parking spaces.The 18 month programme involved installing bike hangars across Brighton within four different tranches, at 39 different locations, with hangar number 150 installed on Langdale Road, Hove last week.Each futuristic bike hangar provides Brighton residents with quick and easy accessibility via the users smartphone. The user simply downloads the app, registers for a space, is granted accessibility via the back office and then can access their chosen hangar within seconds. For users without a smartphone, a physical key can be supplied instead.As well as manufacture and installation, Falco is also providing a fully managed service with both app and key rental management for the residents and bike hangar maintenance on behalf of the Brighton & Hove City Council Highways and Infrastructure team.The bike hangars have been extremely popular since installation began in the summer of 2022. More than 95% of spaces have been allocated to residents and over 2000 people are on a waiting list.The programme here at Brighton & Hove, marks the UK’s first ever smart bike hangar scheme roll-out, with a shift towards app and mobile advancement, providing fast and easy access with a users smartphone and completely eliminating the need for physical keys or swipe cards.The smart FalcoPod bike hangar as shown here in Brighton, is a simple and effective facility designed to meet the needs of cyclists who don’t have access to private cycle parking facilities. Operating like a giant bread bin, each hangar is a secure and lockable unit capable of accommodating up to six bikes each and unlike traditional cycle shelters and cycle hubs, the bike hangar can be located directly on residential streets, to provide users with a convenient, directly accessible, cycle parking facility.For more information about the FalcoPod Bike Hangar, the FalcoPod Bike Hangar service or your cycle parking scheme, please contact our helpful sales team on 01538 380080. 
Sponsored
Radisson Blu Resort, Ras Al Khaimah, UAE (Resilient 250 Installation as an Acoustic Underlay below Vinyl and Carpet Tiles).

Radisson Blu Resort, Ras Al Khaimah, UAE (Resilient 250 Installation as an Acoustic Underlay below Vinyl and Carpet Tiles).

Interfloor Ltd

Sonixx Resilient 250 was installed as an acoustic underlayment. It was bonded to the subfloor and a heterogenous vinyl and carpet tiles were installed on top. The installation was completed as part of a refurbishment to a bar and restaurant area within the hotel. Resilient 250 is a 2.5mm thick, high performing acoustic underlay manufactured using sponge rubber. It significantly reduces impact sound at the source, while also providing superb underfloor comfort. It is a versatile underlay and can be used below various floor coverings including carpet, carpet tiles, wood, laminate, luxury vinyl tiles, vinyl and ceramic / porcelain / natural stone tiles. At only 24kg (43 Ib) per roll, it is easy to distribute around site. Resilient 250 therefore facilitated a simple, quick, clean and cost-effective installation.
Sponsored
Mapei wood flooring adhesives used to install luxury flooring at prestigious Battersea Power Station apartments - (phase 1).

Mapei wood flooring adhesives used to install luxury flooring at prestigious Battersea Power Station apartments - (phase 1).

Mapei (UK) Ltd

Mapei products for the installation of wood flooring were specified to install floor coverings including over 63,000m2 of Domus wood flooring throughout all of the residential and penthouse apartments at Battersea Power Station, London. The construction of over 850 apartments at this iconic site has been completed during the first phase of building. With Mapei’s adhesive Ultrabond Eco S955 1K to furnish every apartment in the prestigious development. Ultrabond S955 can be used with all types and sizes of engineered and solid wood flooring, hence it’s suitability for the installation at Battersea Power Station.
Sponsored
Over half a century later Clement return to one of Bristol’s landmark buildings to install new steel windows

Over half a century later Clement return to one of Bristol’s landmark buildings to install new steel windows

Clement Windows Group

In the heart of Bristol’s City Centre lies The Pithay, now known as Programme. This immense building, originally built in the 1960s was tired and required refurbishment. After being acquired by Resolution Property in 2016 a plan was developed by Buckley Gray Yeoman, based on Resolution’s ambitious brief to revitalise the building. Clement Windows Group was chosen as the preferred company to manufacture and install the 510 new steel windows required. Clement were thrilled to win the job, particularly as the current Chief Executive Peter Clement’s father had installed the original windows back in 1966!
Sponsored
Recycled FlexiSet installed around Car Park Tree Islands in the Town Centre of Fordingbridge, Hampshire.

Recycled FlexiSet installed around Car Park Tree Islands in the Town Centre of Fordingbridge, Hampshire.

SureSet Resin Systems

SureSet FlexiSet, made of 50% recycled car tyres, was installed to support the sustainability part of the brief given by New Forest District Council. SureSet resin bound paving improves the drainage and surface water issues in the car park by allowing rainwater to flow through the paving instead of running off onto the car park surface. The benefits of a SureSet resin bound tree pit: Aesthetically pleasing Safer. Permeable Easy to maintain Guaranteed for 21-year. The EcoBatcher will save a project of this size 298 single-use plastic buckets! Read the full case study on our website.
Sponsored
Dorma Variflex Manual Acoustic moveable wall installed as 
Global Consulting Group Contracts Style Again

Dorma Variflex Manual Acoustic moveable wall installed as Global Consulting Group Contracts Style Again

Style - Moveable Partition Specialists

Delivering flexible space that can be quickly adapted to encourage collaborative working practices, moveable wall systems are fast becoming the norm for modern UK offices. Having enjoyed the benefits of a moveable wall that Style installed a few years ago, a major global consulting group recently invited them back to their London offices to install two further partitioning solutions, effectively sub-dividing a key meeting area. The Dorma Hüppe Variflex ML100 moveable walls allow the open-plan space to be closed off, creating three separate rooms. An incredible 59dB Rw acoustic integrity allows meetings to run concurrently, entirely undisturbed.
Sponsored
CB Hounslow United FC - F. Ball Help Install Premier League Flooring in Charity Football Club Build

CB Hounslow United FC - F. Ball Help Install Premier League Flooring in Charity Football Club Build

Ball, F and Co Ltd

Flooring preparation products donated by F. Ball have been used to install high-quality floorcoverings in the newly-built clubhouse at CB Hounslow United FC. Stopgap P121 acrylic primer was used to prime the subfloor before Stopgap 1100 Gypsum was applied to create a perfectly smooth surface ahead of the installation of the floorcoverings. Styccobond F41 carpet tile tackifier was then used to install high-quality, bitumen-backed Desso carpet tiles to create a border around the perimeter of the function room. Lastly, wood-effect, Tarkett vinyl sheet floorcoverings were installed using Styccobond F46 solvent-free, pressure sensitive acrylic adhesive.
Sponsored
Dorma Variflex Fully automatic Comfortdrive Acoustic moveable wall installed by Style at  Loughborough University.

Dorma Variflex Fully automatic Comfortdrive Acoustic moveable wall installed by Style at Loughborough University.

Style - Moveable Partition Specialists

As part of a £1.7m investment, Loughborough University recently remodelled Quorn Hall into an impressive 560-seat lecture theatre. Adding functionality to the new facility, Style was contracted to install a 57dB Dorma Hüppe Variflex ComfortDrive moveable wall system with fully automatic operation, allowing the vast space to be divided into two separate areas. A complex project, Style was specified by Core Architects to design a system that not only accommodated the exceptionally high ceiling but that also incorporated the stepped-rise of the seating.
Sponsored
NHS Manchester Royal Infirmary - Bespoke planters

NHS Manchester Royal Infirmary - Bespoke planters

WoodBlocX Ltd

The original timber sleepers used for Manchester Royal Infirmary external areas had begun to rot away quite early in their lifespan. We were tasked with replicating the existing footprint of planters to replace them within the confines of the existing paving. All installation works were undertaken in a busy hospital with minimal impact on patients and workers. Using a typographical survey we created CAD outlines for each planter, a number of existing structures featured extremely tight angles, which meant we needed to modify our corner cuts to ensure a perfect match.Our components were all pre-cut ready for installation so there was no need to use any heavy machinery on site. WoodBlocX modular system is guaranteed for 15 years and because the structures are made up of a series of individual blocks, held together by strong dowels, they will not warp or distort, nor will they rot, thanks to the pressure treatment used.WoodBlocX components are manufactured in five different sizes and work in the same way as bricks, in addition, any capping and angled parts are pre-mitred, which saves installers significant build time and eliminates the need for sawing, drilling and disposing of waste. With WoodBlocX you receive a guaranteed standard of material. From the planting of the trees to harvesting of timber all the way through to cutting the WoodBlocX components, we keep on top of every aspect of each process - maintaining the highest standards of timber quality. Using WoodBlocX, specifiers can be safe in the knowledge that the supply chain of their timber products is sustainable and reliable.
Sponsored
A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

BioClad

This study aimed to compare levels of bacterial contamination isolated from surfaces in a busy kitchen situated in a UK care home. The study’s main objective was to compare bacterial contamination on the antimicrobial wall cladding with other surfaces in the kitchen. The care home kitchen had been fitted with BioClad PVC wall cladding at the time of construction in 2011. All walls in the rectangular-shaped room were fitted with BioClad from ceiling to floor. The antimicrobial performance of the wall cladding was to be appraised according to the findings of the study.
Sponsored
Eco-home scores high with low temperature heat pump installation

Eco-home scores high with low temperature heat pump installation

Daikin Ltd

Mark Lewis’s newly self-built two-bedroom cottage for his retired parents has a low temperature heat pump at the centre of an eco-friendly lifestyle design for maximum comfort, economy and efficiency.
Sponsored
99 Eclisse pocket doors installed in exclusive Islington Square Development

99 Eclisse pocket doors installed in exclusive Islington Square Development

Eclisse UK

17 Esther Anne Place in Islington, originally a post office building, has been converted into luxury flats and warehouse style apartments. It is a development that builds on the richness and variety of the area, mixing Edwardian flair with modern living. It retains the redbrick facade of the sorting office at ground level, combined with a zinc-clad frame on the upper floors making it an eye catching centre piece to Islington Square. Product: Classic 99 Eclisse pocket door systems Location: Upper Street, Islington Developer: Sager / Cain Hoy Architect: CZWG Development: 169 private units Completion: Q4 2017
Sponsored
PATTRESS PLUS makes PATTRESS installation faster and safer at Queensferry High

PATTRESS PLUS makes PATTRESS installation faster and safer at Queensferry High

MEDITE SMARTPLY

A newly built Queensferry High School in Edinburgh, replacing the one currently in use, has had its internal fit-out completed ahead of schedule after the project was speeded up through the use of SMARTPLY PATTRESS PLUS.
Sponsored
Top 5 Benefits of Installing a Warehouse Lighting Winch System

Top 5 Benefits of Installing a Warehouse Lighting Winch System

Penny Hydraulics Ltd

The challenge of working at height can be a constant headache when it comes to lighting. While the shift to more reliable LED warehouse lighting fixtures has reduced maintenance requirements, the need to access fixtures at a high level remains. In this guide, we explore the top 5 benefits of fitting a warehouse lighting winch to high bay lighting fixtures.
Sponsored
Penny Hydraulics Mezzanine Floor Lift Installed at Faversham Laundry

Penny Hydraulics Mezzanine Floor Lift Installed at Faversham Laundry

Penny Hydraulics Ltd

The work environment at the laundry is busy and given the nature of the work, laundry needs to be moved back and forth throughout the premises multiple times throughout the day. The company required a really durable goods lift to quickly enable staff to move laundry in trolleys between the ground level and second floor within the premises throughout the working day. This was to be an essential work tool in their production cycle.After a no-obligation site visit to the laundry in Kent, the Penny Hydraulics goods lift surveyor specified a 500kg maximum working load mezzanine floor lift as the best goods lift to suit their needs.
Sponsored
Large public recreational park with Wall-Holla in Poland

Large public recreational park with Wall-Holla in Poland

Redlynch Leisure Installations Ltd

In 2013, the largest and most impressive Wall-Holla in the world was sold to Ketteler Hof - a family-owned Play Park that wanted something truly extraordinary to add to its playground. After extensive research, planning, and customisation tailored to their unique needs, they got exactly what they wished for - an incredible 36m wide Wall-Holla with not one but three thrilling Drop Zone elevators!Turning unused space into a popular family oasisThe Czyżyny Park Avia is an example of how public participation can help create vibrant recreational spaces that benefit the whole community. It provides an opportunity to get outdoors and enjoy nature while engaging in physical activity with friends and family. The park is located in the area of the former bus depot and part of a disused airport where used to be 3 hectares of asphalt and concrete.The playground includes climbing frames, carousels, swings, and a vertical playground Wall-Holla with challenging obstacles that will keep kids entertained for hours. There is also an outdoor gym with Lappset's metal gym equipment.The end result is a very popular recreational family place in the city of Kraków with a nice story still referring to its previous function: planes and buses are part of the pattern on the EPDM surface at the playground.The project was part of THE GREEN CITIES EUROPE AWARD – 2022 and it has been praised for its quality recreational spaces and innovative value.
Sponsored
HIDDEN INSTALLATION OF VERTICAL SLATS AT THE ALDAPETA MARÍA IKASTETXEA SCHOOL, BY IDOM

HIDDEN INSTALLATION OF VERTICAL SLATS AT THE ALDAPETA MARÍA IKASTETXEA SCHOOL, BY IDOM

Parklex Prodema

Architects: IDOMLocation: Donostia, SpainPhotography: Iñaki BergeraMaterial: NATURSIDING-WFinish: RustikThe Aldapeta María Ikastetxea School is the interpretation of modernity, sustainability, and innovation poured into architecture. With the original building demolished, which dated back to the 19th Century, the new school building accompanies the view of education into the future, leveraging new technologies.Efficiency has been key to this project through the use of geothermal energy and natural light used as a shaping tool of space. Our durable rain-screen system wood panels embrace the refinement and warmth typically of wood into the structure in juxtaposition with other materials such as concrete and metal resembling Japanese architecture, with its pure lines, rhythm, dynamism, and sobriety.To accentuate the rhythm and promote harmony between concrete and wood, we have opted for the vertical placement of the slats that evokes the patterns of the wood framework. Achieving such effect is possible given the aesthetics enhanced by the small piece that attains a harmonious relationship between wood and concrete. With an innovative setup in the architectural sphere composed of a hidden system with no visible screws or rivets, the slatted cladding can be placed vertically even in large buildings, and in an easy way that provides a sense of strength and uniformity to the whole. The PARKLEX PRODEMA panels new setup system allows achieving distinctive finishes with the warmth of the wood, longevity, durability, and limited to no maintenance requirements.
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

Firechief Global

The Wilberforce Trust is a charity dedicated to helping and empowering those with sight and hearing loss and impairment in the York and North Yorkshire area to live fulfilling and independent lives. The Trust had tenants in community based supported housing and family homes around York but wanted to deliver an innovative ‘extra care’ housing scheme designed especially for people with a visual impairment and other disabilities; the first of its kind in the area.Wilberforce House offers 30 one-bed, open-plan purpose-built, self-contained apartments along with a Living & Learning Zone – providing education and leisure activities – a courtyard cafe and offices for the Trust itself, all set in four acres of accessible landscaped gardens, including a large sensory garden. The apartments utilise smart home and assistive technology personalised to their lifestyle needs.A consultant was employed to review the development’s plans with regard to fire safety. His report included recommendations for additional fire safety measures including the ability for cooker hobs to be switched off by an alarm, as kitchen fires are a significant risk with 50% of all accidental house fires starting in the kitchen. WHY THE FIRECHIEF KITCHEN STOVE GUARD? The initial solution proposed was costly as it meant hob alarms would need to be hard wired into each apartment’s fuse board. Damian Pocknell, Head of Housing, Facilities & IT at the Wilberforce Trust recalled having seen and read about the Firechief Kitchen Stove Guard and realised that this would be much more cost effective. The fire consultant agreed and subsequently signed off on the Kitchen Stove Guard as the approved solution.  
Sponsored
GRANVILLE ROAD - MULALLEY - Metz Non Combustible Cavity Trays

GRANVILLE ROAD - MULALLEY - Metz Non Combustible Cavity Trays

METZ Non-combustible Cavity Trays

Working with Miers alongside Mulalley and Woodhurst Brickwork Contractors on 132 new build properties in Barnet, Metz Non Combustible Cavity tray has been chosen Metz Non combustible cavity tray's flexibility onsite is a key component in the installation and speed of work.Another great project Metz is proud to be involved with.
Sponsored
NIBE Exhaust Air Heat Pumps installed in large apartment complex

NIBE Exhaust Air Heat Pumps installed in large apartment complex

NIBE Energy Systems Ltd

Royal Winchester HouseComer Homes is renowned for the high quality of its residential and commercial developments, which span London, Hertfordshire, Dorset and throughout the South East. Its latest project is Royal Winchester House, a landmark building of one and two bedroom apartments at the heart of Bracknell's new town centre. As a planning requirement of Bracknell Forest Council, Comer Homes was required to provide a sustainable, low energy form of heating that would offer a reduced carbon footprint, as well as being affordable to run.The SolutionComer Homes specified F730 Exhaust Air Heat Pump systems from NIBE for all 337 apartments on the development to ensure they could meet their renewable targets. The new homes builder employed MKP Consultants Limited to undertake the building services design as they had previous experience of NIBE systems on other apartment developments in the area.The NIBE F730 Exhaust Air Heat Pump system was an ideal solution, as it offers mechanical extract ventilation, alongside heating and hot water in a compact design. The heat pump units were installed in a service cupboard in each apartment, as they have a small footprint of only 0.6m2.NIBE F730 operates by recovering energy from the ventilation air and, if desired, extracted from outdoor air, the heat energy is absorbed by the heat pump using a vapour compression process and subsequently transferred to the water-borne heating system, in this case an underfloor heating system. The integrated 180L domestic hot water cylinder also ensures a plentiful supply for the one- and two-bedroom properties.A sustainable solution, NIBE F730 keeps energy consumption to a minimum. The efficient control system automatically adjusts the indoor climate for maximum comfort for the occupant, using a combination of weather compensated control and the low energy inverter driven compressor.Each apartment is also fitted with a NIBE RMU 40 room controller, to allow greater flexibility of control for users and if required can be easily connected to NIBE’s internet remotely monitoring and control platform UPLINK™.Thanks to this innovative heat pump system, residents at Royal Winchester House are set to benefit from lower energy bills and a reduced carbon footprint.The ResultsThe NIBE F730 system complies with Parts L, F and G of the building regulations, and helps to meet planning requirements designed to reduce energy consumption and carbon footprints within residential housing developments. External noise is kept to a minimum and building aesthetics are unaffected by the need for external plant.TestimonialHead of Projects at Comer Homes, Jack O’Brien explains: “We were looking for a heating and ventilation system that would be both sustainable and affordable to run. We have been impressed with the performance of NIBE’s heat pumps, with their high efficiency, low noise and low running costs further enhancing the sustainability of the whole development.”About Royal Winchester HouseRoyal Winchester House is a landmark building of high specification 1 and 2 bedroom apartments available to rent. The unique design and architecture of Royal Winchester House creates a striking and impressive presence from the ground floor retail spaces up to the luxury penthouse levels.Royal Winchester House has been built for the private rental market and the development is being managed by Chancellors estate agency. The apartments benefit from high standards of insulation and air tightness. In addition to the NIBE heat pumps, the whole development has been fitted with a biodigester for the repurposing of food waste, as part of reducing waste sent to landfill and to add to its sustainability.
Sponsored
Dorma Variflex Glass Semi automatic Acoustic moveable wall installed by Style at Wellington Place

Dorma Variflex Glass Semi automatic Acoustic moveable wall installed by Style at Wellington Place

Style - Moveable Partition Specialists

Working with architect, Sheppard Robson, and contractor, Overbury, Style was specified to install two Dorma Hüppe semi-automatic Variflex glass moveable walls in Wellington Place, a group of prestigious, mixed-use developments in Leeds city centre. Separating the catering facility from meeting areas in a key office building, the glass operable walls deliver an impressive 52dB Rw acoustic integrity, providing outstanding privacy for meetings and gatherings whilst maximising the use of natural light. Addressing the ongoing need for social distancing, moveable wall systems can be effectively utilised to create discrete employee ‘bubbles’ by dividing office space into smaller areas.

Showing 145-180 of 1617

Feedback