NBS Source
I'm a manufacturer

"refrigeration installations components"

4,755 results found

Sort by:

Showing 1585-1620 of 1657

Sponsored
Classic Antique Brass cutain poles to London Restaurant

Classic Antique Brass cutain poles to London Restaurant

Tillys Interiors

This high class restaurant chain wanted to retain a classic dining experience and provide a haven for those who appreciated the traditional eating atmosphere. We installed a pole for the exclusive dining room and also the curved net curtain rails running along the windows, all in Antique Brass. A perfect finish for period interiors.
Sponsored
Exmouth Beach Stainless Steel Handrailing

Exmouth Beach Stainless Steel Handrailing

Architectural Street Furnishings part of WB White Foundry

ASF used the Exmouth Stainless Steel Post and Rail system to manufacture bespoke handrailing for the new handrail installations at Exmouth Beach. Manufactured in marine grade 316 stainless steel and finished bright polished to avoid discoloration, each of the 12 stepped areas required individually measuring and bespoke rails manufatured to suit.
Sponsored
With Rockfon you can have your cake and eat it

With Rockfon you can have your cake and eat it

Rockfon

Following a €12million restoration, iconic Dublin landmark Bewley’s Grafton Street, has reopened to offer seating for 500. The new interior has been described as ‘the same but different.’ Rockfon® Mono® Acoustic ceilings are installed throughout to create a comfortable acoustic environment and meet the aesthetic demands of this historic space.
Sponsored
Castle Wharf, Chester Road

Castle Wharf, Chester Road

MyDek Ltd

Superb development with inset balconies and beautiful roof terraces.This prestige development by the riverside in Manchester used the MyDek Vista board on our standard box rail and cleat support system. Renaker and their subcontractor were a pleasure to work with and were keen to ensure that they delivered a first class product and installation to complement the quality of the development.
Sponsored
Kendal Leisure Centre

Kendal Leisure Centre

Helmsman

In late 2017 Helmsman supplied and fitted approximately 70 No System 2000 lockers in a range of 1 compartment in half height lockers, 2 compartment and 3 compartment lockers with plant on doors. Helmsman Frontline Changing Cubicles Frontline Shower Cubicles and Frontline W/C Cubicles are also installed at this Leisure Centres.
Sponsored
Sweco - Wireframe

Sweco - Wireframe

Milliken

This architectural and engineering consultancy office feels calm and relaxed thanks to tones and textures of Milliken's Wireframe modular carpet. The biophilic design is installed in rich, brown Hazel and lighter tones of of Fawn. The product's Comfort Lite cushion backing absorbs distracting noise by up to 32dB helping to manage the acoustics in this beautiful workspace.
Sponsored
Behind The Scenes: How We Make a Goods Lift

Behind The Scenes: How We Make a Goods Lift

Penny Hydraulics Ltd

Made to exacting standards, Penny Hydraulics Goods Lifts are the product of a complete end to end service – including design, manufacture, and installation – all done at our own purpose-built premises, here in the UK. We also offer comprehensive product training and maintenance carried out by a member of the Penny Hydraulics team.
Sponsored
Armourcoat adds multi-faceted interest to lobby

Armourcoat adds multi-faceted interest to lobby

Armourcoat Ltd

Armourcoat Sculptural 'Basalt' has been used to great affect in the lobby areas of LVL 29 in Plano TX. A key part of the lobby interior, the 3D wall design crisply wraps around external corners leading seamlessly into the corridor areas. Henderson Design Studio and installation by Southwest Progressive Enterprises, Inc.
Sponsored
Hever Castle

Hever Castle

Aqualisa Products Ltd

Aqualisa’s HiQu™ smart showers have been installed at recently refurbished, Hever Castle, in Kent, once the childhood home of Anne Boleyn. The team at Hever Castle specified the Aqualisa product primarily for its performance, reliability and modern aesthetic, but also, in no small part, because of Aqualisa’s local Kent heritage.
Sponsored
Abbey Road, London. Featuring Deceuninck 5000 Series Next-Generation Fenestration Technology: Linktrusion

Abbey Road, London. Featuring Deceuninck 5000 Series Next-Generation Fenestration Technology: Linktrusion

Deceuninck Ltd

Fabricated and installed with specialist commercial fenestration partner, Fastframe on behalf of London and Quadrant, this £450,000 project features: Unique Linktrusion technology: top performance thermal efficiency usually associated with PVC-U with the strength, durability and design freedom of aluminium but up to 30% lower cost. Decoroc Anthracite Grey RAL 7016
Sponsored
Welcome Break

Welcome Break

Dyson

With a 24/7 operation nationwide, Welcome Break aims to provide a great service for all of their visitors. The washrooms play a key factor within this service. Welcome Break want to ensure they have the best facilities to provide an improved washroom experience and this is the reason that they installed over 500 Dyson Airblade V hand dryers.
Sponsored
COMMONWEALTH GAMES – INNOVATIVE 7 SHAPED CCTV COLUMN

COMMONWEALTH GAMES – INNOVATIVE 7 SHAPED CCTV COLUMN

Zaun Limited

The MultiFence PAS 68 can stop a 7.5-tonne truck at both 30mph and 40mph. It has been designed to mitigate the security risks at all sites of critical importance, using leading industry technologies to combat attacks by vehicles.It combines the attributes of our standard system with additional testing to ensure it meets the stringent quality standards relating to vehicle restraint systems of BS EN 1317 Part 2. It can be used on both soft and hard ground.Featuring TVCB blocks approved by the Highways Agency for use, it is ideal for security applications at major events, as below-ground foundations are not required.Our RDS PAS68 crash fence system consists of panels and posts installed and removed within minutes. The system uses an RDS block with the appropriate post arrangement. Our RDS PAS68 fence system has been crash-tested and rated to BSI PAS68:2010 standard. This means it can stop 2.5-tonne and 7.5-tonne vehicles.The system provides the product attributes normally only found in permanent installations. In addition, its simple deployment means the on-site disruption usually associated with installing and removing a fence line is kept to a minimum.Zaun also supplied our HiSec 358 anti-climb mesh fencing to combat the issue of intruders being able to scale the fence.InnovationCPNI and the Government were concerned about the threat of a ladder or other climbing aids used to lean against CCTV columns, making it easier to scale the fencing and gain entry into the secure area.Zaun’s solution was to create a number seven style CCTV column and base, which is completely self-supported and mobile and sits back from the fence line. Zaun’s design team created an innovative CCTV column featuring a unique number seven shape. This design meant the CCTV column would project over and outside the fence line, providing excellent visibility and obliterating the external climbing aid threat. The column was constructed from a custom-rolled, lightweight profile; it was also very easily installed on-site. The unique design also included a concrete base comprising a folded steel shell filled with concrete poured on-site. It incorporated forklift holes, ensuring the base is mobile and relocatable easily using a forklift or Moffatt on site.At the top of the base, a fixing system was designed, which allowed the columns to be attached and pivoted and then subsequently raised into the upright position with ease. This system allowed the CCTV installers to mount their cameras and other equipment to the top of the column at ground level before raising the column into place and negates the need for Mobile Elevating Work Platforms or MEWP’s.Zaun designed and manufactured more than 700 CCTV columns and bases to be used at the Commonwealth Games and are deployable for other events.
Sponsored
FIREFLY’s TITAN Lite™ Selected to Protect Lewisham Roof Spaces

FIREFLY’s TITAN Lite™ Selected to Protect Lewisham Roof Spaces

FIREFLY™ TBA

Fully compatible products from the range of TBA FIREFLY™ have been chosen to compartmentalise roof voids between apartments and communal lobbies of a large apartment building in the London Borough of Lewisham, providing 120 minutes fire integrity protection as part of a wide ranging refurbishment programme carried out earlier this year.The contract on Lewisham Homes’ Commodore Court in Albyn Road has been led by the sector specialist construction company, Mulalley & Co. with London/Sevenoaks based CLM Fireproofing carrying out the installation of the TITAN Lite™ 120:60 barrier system, in combination with Collaroll and the use of ancillary products from the FIREFLY™ range.CLM Fireproofing was founded 30 years ago by Clive Miles and has established a reputation as a leader in the fields of both passive fire protection and fire-stopping; working in a variety of sectors on projects right across the UK. A regular user of the FIREFLY™ range, many of its operatives have attended courses at the company’s premises in Rochdale to become trained FIREFLY™ installers.The Site Agent for CLM, Virginijus Pasvenskas, commented: “There was initially an intention to use a mineral wool flexible fire barrier, but the product was not tested for the scenario installed around the services such as a downpipe and it was upgraded to the use of the FIREFLY™ system by the client/project team. The installation of the TITAN Lite™ and the Collaroll to wrap the trusses and the services went very well and, as well as supplying specific details for the work, FIREFLY's technical team came to site to inspect the works. We completed our contract on schedule back in the summer.”TITAN Lite™ 120:60 has been developed for use in vertical separation or compartmentation situations, offering 120 minutes integrity and 60 minutes insulation and is able to be sealed around penetrations. It is widely specified to form fire barriers within roof voids and floor voids in many different property types, including tower blocks and other HMOs.The flexible woven material is easy to cut and fix, and is chemically treated to improve its cooling properties and therefore prevent temperatures rising in adjoining areas. The system has been fully tested to BS 476 Parts 20 & 22 and is third party certified by IFC. The six metre long rolls of TITAN Lite™ 120:60 have a minimum thickness of 6mm and are installed using special staples as well as high temperature adhesive.Employed as part of the FIREFLY™ System and also to wrap the services which penetrate barriers such as PHOENIX, ZEUS Lite™ and APOLLO Lite™, Collaroll comes in a roll which unwraps to 10m long x 300mm wide with a sewn in concertinaed skirt. The skirt can be moulded to shape to seal it neatly to the upright barrier, which is usually at 90 degrees to the Collaroll and fixed into place using the FIREFLY™ high temperature adhesive. The R31 Staple Gun and Staples are used to staple the Collaroll to itself tightly around the penetration.
Sponsored
German online retailer improves its distribution centre performance

German online retailer improves its distribution centre performance

Lödige Industries

German online retailer improves its distribution centre performanceLödige Industries equips distribution centre with 12 goods lifts in 3 yearsOver a period of three years, Lödige Industries has delivered 12 SHERPA goods lifts to a newly built distribution centre in use of a German online retailer. The customer required a solution which would guarantee high throughput and availability together with compact construction. After installing nine SHERPA goods lifts in 2013, the customer decided to install two more SHERPA in 2015 and one in 2016. How does the customer benefit from relying on SHERPA goods lifts?Save spaceThe customer needed a compact lifting solution. Altogether four different elevator sizes were installed for this customer. The sizes fit the different pallets and picking trolleys, which the customer is using. Additional space was gained by reducing the floor space of some SHERPA freight elevators. Pallets and picking trolleys are moved efficiently and without disturbances between levels.Structural conditions do not complicate the installation of the SHERPA as the motor is located in the head room. Moreover, the control cabinet can be positioned remotly from the lift. Access for maintenance is provided via a maintenance gap above the upper door to the shaft head room. The area around the lifts can thus be used for other purposes.Flexible integration12 SHERPA goods lifts in total had to be optimally positioned. The foundations of the hall supports and the hall ceiling girders had to be taken into account. The Lödige SHERPA comes with a free-standing shaft structure and hence it does not require any rack modifications. By using 80 mm high ramps, it was possible to dispense with shaft pits for the SHERPA freight elevators. As a result, the freight elevators could be optimally positioned without any structural changes, thus achieving a high degree of flexibility for integration into the racking systems.High throughputMore importantly, the customer required a solution that offers a high throughput. Usually, goods lifts have a transportation speed of 0,2m/s. The 12 SHERPA goods lifts at this project offer a maximum transportation speed of 0,4m/s. This means, the lifting frequency for the customer was doubled.Challenges for the online retailer in doubling frequencyTaking structural conditions of the existing rack warehouse into account, as no change to the racks and building itself can be madeTransport of pallets and picking trolleys in different sizesDifferent lifting capacities and lifting heights necessaryIncreasing throughput of goods over several levels of the rack warehouseSolution from Lödige and benefits for the customerSHERPA goods lifts come with a free-standing shaft and no need for a pitCompact construction by installing goods lifts in two customized sizes, lifting capacities and heightsDoubled lifting speed of 04,4m/s leading to high throughput
Sponsored
1 Nine Elms Lane, London SW8 5NQ

1 Nine Elms Lane, London SW8 5NQ

Rapid Access Ltd

1 Nine Elms Lane, London SW8 5NQAs Europe's largest regeneration zone, Nine Elms is the most ambitious regeneration project undertaken in London for decades. Located on the south bank of the River Thames in Nine Elms, No. 8 and No. 9 Thames City are impressive new 53-storey residential towers. With their prime central and riverside location, they offer a vibrant destination for city dwellers and visitors.Nine Elms, London's dynamic urban district, is marked by its soaring residential towers. Ensuring the safety of the residents and the protection of the property is paramount. This case study highlights the successful collaboration between Nine Elms London's newest 53-storey residential towers and Rapid Access Ltd, a leading supplier of 920-minute fire rated Riser Doors with smoke seals.Challenges:1. Towering Heights: The residential towers reached considerable heights, increasing the complexity of fire safety and evacuation procedures.2. Stringent Fire Safety Standards: Compliance with stringent fire safety standards, including resistance to fire for a prolonged duration, was a primary concern.3. Smoke Control* Preventing the spread of smoke in the event of a fire was a vital aspect of the fire safety strategy.Solution:Rapid Access Ltd, renowned for their expertise in fire-rated access solutions, was chosen to address the specific needs of Nine Elms London's newest 53-storey residential towers. The solution included the supply and installation of 90-minute fire rated Riser Doors with smoke seals, designed to meet the following key criteria:1. 90-Minute Fire Rating: Rapid Access Ltd provided riser doors with an exceptional 920-minute fire rating, exceeding the fire safety requirements for such high-rise structures.2. Smoke Seals: The riser doors were equipped with smoke seals to prevent the spread of smoke and enhance the safety of residents during evacuation.3. Safety and Compliance: The installation adhered to the most stringent fire safety standards, ensuring the protection of residents and property.Implementation:The supply and installation of 920-minute fire rated Riser Doors with smoke seals by Rapid Access Ltd were executed with meticulous attention to safety and compliance. The installation process was conducted to meet the highest fire safety standards and the specific requirements of the residential towers.Conclusion:The collaboration between Nine Elms London's newest 53-storey residential towers and Rapid Access Ltd exemplified the successful integration of advanced fire safety solutions in high-rise structures. The installation of 920-minute fire rated Riser Doors with smoke seals not only met regulatory and safety needs but also provided an exceptional level of fire protection and peace of mind for the residents. This case study underscores the critical importance of selecting the right access solutions provider for projects that demand the highest levels of fire safety.
Sponsored
Jack Tyreman Therapy Room - F. Ball helps create therapy room for Jack

Jack Tyreman Therapy Room - F. Ball helps create therapy room for Jack

Ball, F and Co Ltd

Floor preparation products donated by F. Ball and Co. Ltd. have enabled an outbuilding to be turned into a therapy room for Jack Tyreman, from Burythorpe in Yorkshire, who was left with severe head injuries after a road accident four years ago when he was 18.The room provides a space with amenities, including an entertainment system and sofa, where Jack can relax and enjoy spending time, with the potential for it to house exercise equipment to assist with rehabilitation in the future.After a botched construction left the original building unusable while exhausting initial funds raised for the project, local tradespeople, including Richard Forbes, owner of Forbes Flooring, stepped up to offer their services for free to complete the project. F. Ball technical representative for the North East, John Rowlands arranged for the donation of flooring installation products. Floorcovering manufacturer Interface also donated LVT and carpet tile floorcoverings.A team of three fitters from Forbes Flooring began the flooring installation by grinding the surface of the new concrete screed to ensure it was suitably smooth. A moisture test indicated that subfloor relative humidity levels were low enough to proceed with the installation without the requirement of a moisture management solution.Contractors then primed the subfloor using P131 general-purpose primer before applying Stopgap Fast-Track 30 levelling compound – the fastest setting levelling compound on the market allows floorcoverings to be installed in as little as 45 minutes after application.Once the levelling compound had cured, a combination of Luxury Vinyl Tiles (LVTs) and carpet tiles was installed over the 40m2 area. Styccobond F46 pressure sensitive adhesive was used to adhere Interface ‘Studio Set’ wood grain LVTs on one half of the room. Styccobond F41 carpet tile tackifier was used to secure Interface graphite-coloured ‘Employ Lines’ carpet tiles. The adhesive dries to a permanently tacky film that will hold loose-lay carpet tiles securely in place when subject to normal foot traffic while allowing them to be lifted and replaced at a later date should they become damaged or worn.Commenting on the project, Richard Forbes said: “At first, we were asked if we would undertake the work for a fee, but we didn’t want any payment for it. Things can be very cutthroat nowadays, and it’s good to be able to look out for other people. I’d like to thank David Edmondson at Interface as well as John Rowlands at F. Ball for supporting the project. Using F. Ball’s Fast-Track 30 meant that we could achieve a quick turnaround, allowing other trades to do what they needed to.”On the benefits of the therapy room for Jack, his mum, Julie, added: “It’s got all the things in it a young lad needs and to help him get on with life, as well as a place to relax on his own and with other people. He loves it.”
Sponsored
South Stack Lighthouse - F. Ball shines in lighthouse refurbishment

South Stack Lighthouse - F. Ball shines in lighthouse refurbishment

Ball, F and Co Ltd

The history of a 200-year-old lighthouse has been brought to life with a little help from F. Ball flooring installation products, which have been used to refurbish a popular visitor attraction on the North Wales coast.South Stack Lighthouse stands just off Holy Island and is the most westerly point on Anglesey. Built to warn passing ships of the perilous rocks that lie beneath it, the 28m-tall lighthouse is still operating today. Visitors to the landmark attraction can see the lamp up close, tour the original engine room, and learn about its history in an adjoining exhibition centre.Flooring contractors opted for Styccobond F46 adhesive to install Altro vinyl safety flooring throughout the centre’s 100m2 display rooms, as well as staff areas, toilets, corridors and kitchen. Extreme weather conditions meant there were logistical challenges, with several attempts required to deliver materials to the remote island via sea and air before contractors could begin work on the job.The visitor centre subfloor, comprising mostly old wooden floorboards, was subjected to moisture testing using a Protimeter MMS2 in WME mode, the results of which provided readings below the 17% threshold, enabling contractors to proceed with overboarding the subfloor with plywood which was then primed. A finishing compound was used to fill indentations formed by screws used to affix the panels and the joints between them in order to prevent imperfections showing through the final result.After sufficient time had been allowed for the finishing compound to dry, Styccobond F46 acrylic adhesive was used to secure the vinyl safety flooring. A solvent-free, pressure sensitive adhesive with a high-bond strength, Styccobond F46 is designed to minimise the effect of trowel serrations shadowing through thin vinyl flooring to give an aesthetically pleasing finish. The product dries to a permanent tacky film and it also has an infinite open time, is protected against biodegradation and is suitable for use over normal underfloor heating installations.A similar process was followed in the toilets, though this time, a concrete subfloor was levelled using a fast-track levelling compound, and capping and coving were installed at wall junctions using Styccobond F60 contact adhesive. The instant bond formed by the adhesive means that it is suitable for securing vertical flooring accessories. It will also withstand normal wet cleaning techniques.Commenting on the installation, Gary Hughes, Director at Oakwill Flooring, said: “As a business, we pride ourselves on high quality workmanship, using only the best products and suppliers, and if you’re putting down a floor with a 20-year guarantee, F. Ball is the go-to choice. The lighthouse was a challenging job, but we managed to turn mission impossible into mission complete.”
Sponsored
Flitwick Football Centre, Bedfordhire - Codale Junior

Flitwick Football Centre, Bedfordhire - Codale Junior

Able Canopies Ltd

The BriefFlitwick Football Centre is a charity in Bedfordshire that aims to provide excellent opportunities to grow and develop sport in the local community of Flitwick. They had a 15m x 9m patio terrace on their grounds and required a canopy that would provide protection from the rain and the sun, so they could use it as a permanent marquee for events.They had browsed our website and liked the look of the Codale Junior Free-Standing Tensile Canopy and requested an estimate for a 15m x 9m structure. Shortly after, they also requested prices for 10m x 6m and 10m x 5m structures.Requesting prices for different sizes and products is a great way to discover your perfect shade and shelter solution that fits within your budget. We’re always happy to discuss your options and find the perfect product for both your needs and available funds.The Solution The volunteers at the football club were pleased with the prices and the specification of the Codale Junior, opting the 10m x 5m option and requested a full site survey so we could provide a firm quotation.To enable the football club to gain the maximum usage from their canopy, they were looking into the possibility of having lighting added to the canopy as well as side panels. These are both possible with the Codale Junior. Cables for lights can be run through the canopy posts as long as they are outdoor IP rated cables and are set within trunking.We also supply tensile fabric side panels for the Codale Junior that can be rolled up when not required. We can supply and install the side panels at a later date so there was no need for the club to make any commitment when ordering the canopy.Upon receipt of the canopy order, we organised a pre-site meeting to finalise the power connections, dimensions, access points, health and safety measures and contacts at the location. This is a standard procedure that applies to all canopy orders before the installation.At the pre-site stage, it was established that planning permission was required however, Able Canopies offer a free service and can submit planning documents, removing any unnecessary stress from our customers. A few years previous in 2019, we installed a canopy nearby at Flitwick Children’s Centre which also required planning permission, so having dealt with the local council before, we liaised with our existing contact to ensure we covered any issues that could arise, ensuring a speedy and smooth planning process.The Installation Once planning was approved, the canopy was installed as scheduled over two days in June 2021 and went ahead smoothly. The volunteers at Flitwick Football Club were pleased with their new shade and shelter structure and were looking forward to gaining a lot of use from it, especially as summer was in full swing.
Sponsored
Clarendon Place

Clarendon Place

Wienerberger Ltd

For this project, Wienerberger's 20/20 roof tiles in Antique Slate were used to reduce installation costs and completion times. A ground breaking feature of the tile, which was previously considered impossible, is that it is guaranteed for use at roof pitches down to 15°, where as traditional plain tiles usually can only go down to 35°.
Sponsored
White Mint Honed Sandstone Staircase Project

White Mint Honed Sandstone Staircase Project

Stoneworld Oxfordshire Ltd

In this project Stoneworld have supplied and installed a totally bespoke sandstone staircase, created by cladding a poured concrete structure. Stoneworld create a digital template for each piece by using the latest portable scanning equipment onsite. This data is then used to waterjet individual pieces for the step treads and step risers. Read on to see the details of this project
Sponsored
Cibes A5000 Platform Lift For Newcastle Student Accomodation

Cibes A5000 Platform Lift For Newcastle Student Accomodation

CIBES Lift UK

This Cibes A5000 is installed in a listed building for students attending Newcastle University. The A5000 is one of our most popular models, there are eight different platform sizes to choose from, and the capability to taking a load of up to 4-5 people (400-500kg), the A5000 model is designed to fit seamlessly into both new and existing buildings.
Sponsored
Metrotile & New World Business Centre

Metrotile & New World Business Centre

Metrotile UK Ltd

Metrotile is often utilised as a ‘problem solver’ material, chosen when a development needs a new roof that not only requires all of the security and aesthetics a roof should provide, but can also be installed rapidly - this is true of both new-build and refurbishment works. This lead to specification on this exciting Bristol-based office development (more at link)
Sponsored
Percy & Founders Restaurant

Percy & Founders Restaurant

The Solid Wood Flooring Company

To lay over 300 square metres of wood floors complementing the designs and finishes in four separate areas of a luxury London restaurant. Percy & Founders is a stylish and innovative new luxury restaurant and bar in the heart of Fitzrovia meeting the needs of young, affluent executives working in the area. The wood flooring was installed by HS Wood Flooring.
Sponsored
Pondwick's Close, St Albans

Pondwick's Close, St Albans

Fixfast Ltd

The Fixfast living roof retention system has been used as part of a stunning Sky Garden green roof installation in Hertfordshire, which featured on Grand Designs. 175m of 100mm EdgeGuard aluminium retention angles surround the perimeter of the living roof, preserving its unique appearance, and maintaining the integrity of the gravel fire breaks.
Sponsored
Smart Kids Kindergarten

Smart Kids Kindergarten

Forbo Flooring Systems

The modern Smart Kids Kindergarten in Gdansk, Poland, is inspired by the Finnish teaching method, now recognised as one of the best methods in the world. The Finnish model is geared towards supporting creative activity. The Kindergarten impresses with an inspiring, stylish interior in subdued colours. On the floor Forbo Sphera homogeneous vinyl flooring has been installed.
Sponsored
Cutex integrated within building foundations

Cutex integrated within building foundations

Geofabrics Ltd

Japanese knotweed was identified on a site where refurbishment was due, including small extensions to the building and new paving to the outside space where Japanese Knotweed was located Following a limited level excavation to remove most of the knotweed rhizomes in the soil, CuTex composite root barrier was installed horizontally and vertically to cap any remaining rhizomes.
Sponsored
KitchenAid Store Wigmore Street, London

KitchenAid Store Wigmore Street, London

LSA Projects Ltd

Architect: Maestria Installer: Battistini Augustus LtdProduct: Durlum PolylamCompleted in 2016 the KitchenAid flagship store in Wigmore Street, London was the first Durlum project completed by LSA Projects.LSA supplied 160m2 (almost 1000 linear metres) of Durlum Polylam baffles in faux Oak Dur-Graphic print to the store. 
Sponsored
Barrow Hall Primary School

Barrow Hall Primary School

Boyco (UK) Ltd

Boyco worked with Ellis Williams Architects in Warrington to design the ultimate coat & bag storage solution for Barrow Hall Primary School, ensuring maximum storage for each pupil. The contract was awarded to Robertson Construction, and Boyco worked with Robertson's to supply & install the equipment smoothly within the given timescales, to ensure a seamless delivery of the project.
Sponsored
Unite - Wembley

Unite - Wembley

BTS Fabrications Limited

One of our largest jobs to date approx. 3,800 m² of Vantage MF panels adorning the Unite Building at the everchanging landscape of Wembley. The façade comprises of Aluminium Vantage MF mechanically face fixed flat and slot perforated panels, powder coated to YW273F Jaisalmer finish, expertly installed by Metclad Contracts Ltd.
Sponsored
Hippodrome Casino

Hippodrome Casino

AATi (Antislip Antiwear Treads International)

One of the most famous buildings in the West End had a £40million refurbishment. AATi have the safest and the longest-lasting stair nosings on the market installed throughout the Casino.There was only one safe bet when the stair nosings were chosen! AATi Anti-slip stair nosing type - SN9/55 in Cast Aluminium.
Sponsored
Bank of England Leisure Club

Bank of England Leisure Club

Sauna360 Ltd

Helo installed a steam room and sauna to extend the wet leisure facilities at the Roehampton Club. The project was to provide two attractive, contemporary styled thermal rooms in the existing space. We provided a clean, simple design in both sauna and steam rooms providing good capacity yet with a spacious feel. Delivered on time and on budget
Sponsored
Forbury Place, Reading. Fire Curtains over Lift Doors

Forbury Place, Reading. Fire Curtains over Lift Doors

Coopers Fire Ltd

Coopers installed FireMaster fire curtains with smoke control over the lift door openings on each of the ground and upper seven floors and two on the basement so a total of forty eight curtains. An important part of the design of the building on the ground and first floor was to subtly integrate the fire curtain headbox and side guides into the lift opening.
Sponsored
100 Embankment, Manchester

100 Embankment, Manchester

Sylan

Stunning Sylan High Pressure Laminate installed at 100 Embankment, Manchester.Located on the site of Manchester’s historic Exchange Station and overlooking the city’s Cathedral, 100 Embankment is a £65 million development brought to life by main contractors BAM Construction.The 9 storey, 166,000sq ft BREEAM Excellent Grade A office building sits alongside its sister building, 101 Embankment. Together they have created a new civic centre for Salford by attracting new businesses, boosting jobs, growth and investment within the city centre.Sylan worked closely with BAM Construction and local installers TBS Fabrications, to ensure that the vision of Flanagan Lawrence architects was brought to life. No area of the prestigious building was overlooked with Sylan being selected for the washrooms for the whole 9 floors.Sylan in High Pressure Laminate was chosen for both the male and female toilets throughout the building. With invisible fixings and 44mm thick doors the cubicles ooze style and elegance. The mortice lock machined flush into the door and pilaster rebates, alongside the flush fronted finish ensures privacy for users, whilst adding to the luxurious feel of the washrooms themselves.With 34 laminate colours to choose from, Flanagan Lawrence went with a classic and neutral colour scheme. Charcoal was selected for the fronts of the cubicles with Ash lipping, alongside Linen partitions. The Sylan washroom cubicles were complemented with co-ordinating High Pressure Laminate IPS Ducting also in Linen.Bespoke Mirror Box Units with LED strips were supplied to both sets of washrooms adding a functional and atmospheric element. Solid Surface Vanity Tops in Avalanche, with underslung basins and bin chute cut outs, added the finishing touch to the luxurious washrooms, delivering a beautifully smooth and stylish finish that will sit alongside the Sylan cubicles and last for years to come.Sylan Products Supplied:High Pressure Laminate Toilet CubiclesFlush frontedStylish and elegantInvisible fixing systemFull height cubicleAvailable in over 30 laminate coloursNo hefty price tagSolid Surface Countertop VanityTimeless designHardwearingCantilever bracketsQuick and easy to installAvailable in 12 Solid Surface coloursHigh Pressure Laminate Duct Panelling SystemAvailable in over 30 coloursQuick and easy to install
Sponsored
New Care Unit at William Harvey Hospital

New Care Unit at William Harvey Hospital

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Yeoman Shield were assigned by main contractors Bauvill Construction to install a wall and door protection system as part of the scheme to create a new Cardiac Critical Care Unit (CCU) and Cardiology ward along with an access corridor at William Harvey Hospital in Kent.The access corridor was fitted with Yeoman Shield’s Guardian Twin Handrail in a stunning colour combination of burgundy and mid grey with matching accessories and attractive stainless steel connective brackets helping to add a unique touch to the décor of the area.Chosen for its dual functionality the Guardian Twin handrail incorporates an ergonomic upper handrail as support for people who require assistance and a lower robust protection rail, which sitting slightly forward guards both the handrail and the walls from marking and damage caused by the passage of wheeled equipment.The same Guardian Twin Handrail system was also deployed in the CCU this time with a red lower rail, a striking contrast to the mid grey handrail. Matching red Corner Protection Angles, both 90° and 135°, were installed to vulnerable corners protecting from impact damage.Fire doors in the unit also benefitted from the installation of Yeoman Shield’s fire rated door protection products, shielding the door from impact damage that can be detrimental to the functioning of a fire door.Fire rated door edge protectors to both meeting and hinged edges as well as door protection panels were added to the door without affecting the integrity of the original fire door.Yeoman Shield were able to assist with exacting time scales on the project by a quick turnaround of product and service with a site survey, manufacture and installation of the product being completed in 2 weeks.Paula Stone, Head of Operational Facilities Management at East Kent University Foundation Trust commented “The lower wall protection element of Yeoman Shield’s Guardian Handrail now fitted in our high traffic areas will reduce the cost of repairs and maintenance overtime. The upper handrail of the system will help less abled patients get around hospitals giving them something to grab on to if needs be, helping to prevent falls.“The design of the rail has the added benefit of being easy to clean which adheres to our infection control policies.”
Sponsored
Stromness Travel Centre on the Orkney Islands Cycle Hub

Stromness Travel Centre on the Orkney Islands Cycle Hub

Falco UK Ltd

This is the latest cycle hub designed, manufactured, supplied and installed this month by Falco for Stromness Travel Centre, located on the southwestern area of the picturesque Orkney Islands mainland.Installed on behalf of the Orkney Islands Council, the new cycle hub provides visitors to the Travel Centre with up to 20 secure cycle parking spaces utilising traditional Toaster cycle racks.In addition to the cycle parking, the cycle hub has been provided with 24 convenient lockers for the storage of helmets and personal equipment. The cycle hub makes use of toughened safety glass and bespoke branding graphics chosen by the client with powder coated applied to the galvanised steel framework in an attractive ‘Sapphire Blue’ RAL colour.The images attached show the new cycle hub installation, taken on a windy Wednesday afternoon and located on Ferry Road, near to the Stromness Ferry Terminal.Stromness Travel Centre is a tourism office providing visitors to the island with all travelling and sightseeing needs within one stop - with leaflets, timetables, booking services and a souvenir shop available to use and now secure sheltered cycle parking.The FalcoLok cycle hub as shown here at Stromness Travel Centre, is a contemporary cycle store manufactured from a combination of a galvanised steel frame and reinforced safety glass, designed to be sympathetic to the surrounding area. The FalcoHub was developed by Falco’s in house design team to ensure it met the client’s specification including structural calculations so that the whole design meets the UK/European CPR regulations EN1090 and is CE marked as per UK law.In addition to the cycle hub shown here for Stromness Travel Centre, Falco has also recently installed cycle hubs for many locations across the UK including Crewe, Runcorn, Birmingham International, Warrington Bank Quay and Carlisle station for Avanti West Coast, Bradford Royal Infirmary and St Luke’s Hospital for Bradford Teaching Hospitals NHS Foundation, The Royal Oldham Hospital for Pennine Acute Hospitals NHS Trust, Ninewells Hospital & Medical School in Dundee and a bespoke cycle hub for Leicester City Council.For more information about the scheme here at Stromness Travel Centre, or how Falco can assist your cycle parking project, please contact our helpful sales team at sales@falco.co.uk.
Sponsored
Kilmarnock Football Club Take Delivery of Classic FalcoSail Cycle Shelters

Kilmarnock Football Club Take Delivery of Classic FalcoSail Cycle Shelters

Falco UK Ltd

These are the classic FalcoSail cycle shelters recently manufactured, supplied and installed by Falco for Scottish Premiership team - Kilmarnock Football Club.Falco installed two 6m FalcoSail cycle shelter bays complete with the popular Toaster cycle rack to accommodate 16 bikes per bay. Each bay is made up of a standard 3m starter section with 3m add-on section, complete in a traditional galvanised steel finish.In view of the iconic Rugby Park stadium, the first cycle shelter bay was installed outside the Chadwick stand - towards the north of the stadium, with the second installation adjacent to the main entrance - outside the Frank Beattie Stand, off Rugby Crescent.Kilmarnock FC is a Scottish professional football team founded in 1869 and based in the town of Kilmarnock, East Ayrshire.In addition to Kilmarnock, Falco has supplied many other professional football clubs with cycle parking infrastructure and street furniture including Manchester United, Manchester City, Tottenham Hotspur, Arsenal, Wolverhampton and Aston Villa football clubs. Like all Falco structures, the FalcoQuarter cycle shelter not only meets the EN1090 Construction Products Regulations but also comes hot dip galvanised to EN1461 as standard. All products can then be powder coated in any of the 192 RAL colours in our own production facility. The shelter is clad in robust polycarbonate providing a maximum flow of light.With the addition of a simple walkway cover and optional gates front and rear, the FalcoQuarter can easily be made into a very versatile storage compound. Again with up to 5m variants, it is possible to create enclosed, weather proof spaces of any size.There are a wide range of cycle parking systems which can be incorporated into the FalcoQuarter including traditional Sheffield Stands, Toast racks, A-11 racks, Ideal racks, Perfecto stands and FalcoCam cycle stands.In addition to a cycle shelter, the FalcoQuarter design can also be used as a smoking shelter, waiting shelter, wheelchair shelter or storage shelter.For more information about the scheme here at Kilmarnock FC or how Falco can assist your cycle parking scheme, please contact our helpful sales team on 01538 380080.

Showing 1585-1620 of 1657

Feedback