NBS Source
I'm a manufacturer

"platform lifts"

407 results found

Sort by:

Showing 37-72 of 103

Sponsored
Cibes Air installed in stunning Northumberland village, Ponteland UK

Cibes Air installed in stunning Northumberland village, Ponteland UK

CIBES Lift UK

When building their forever home, Cibes Lift UK’s latest customers decided on including a Cibes Air platform lift. Guaranteeing they future-proofed themselves and their property from any potential mobility issues was a key consideration of their projected build.The customisability of the Cibes Air allowed for a perfect fit within the clients’ aesthetical palette and has since become a focal point of their new entrance hallway.Having the opportunity to design their home from scratch they benefited from a smarter, cleaner, and more flexible blueprint with the unique ergonomic design of the Cibes Air fitting effortlessly within their space. Simultaneously complimenting their lifestyle with its timeless Scandinavian design.Thanks to the modular design of The Cibes Air, your lift can be installed in as little as 2 to 3 days, with minimal structural intrusion making it perfect for renovation projects or just like our latest clients, building a home from scratch.The couple were able to find the perfect combination of colour and texture to fit in with their style, finishing their Cibes Air with a granular bamboo back plate and surestep black seagrass flooring.The panelled glass door fits seamlessly with the other modern architectural features of the home and supports in accentuating natural daylight throughout the property.A combination of intuitive design and timeless elegance makes the Cibes Air the perfect choice for a future-proofing endeavour. The Cibes Air home lift comes with a breadth of personalisation to ensure you can create the lift of your aesthetical dreams.Designed with wood, fabric, and metalClose to 300 different coloursLift shaft with panoramic glazingAvailable in 17 platform sizesReduced work and building costsMinimal interruption of your daily life
Sponsored
Cibes Air installed in stunning Northumberland village, Ponteland UK.

Cibes Air installed in stunning Northumberland village, Ponteland UK.

CIBES Lift UK

When building their forever home, Cibes Lift UK’s latest customers decided on including a Cibes Air platform lift. Guaranteeing they future-proofed themselves and their property from any potential mobility issues was a key consideration of their projected build. The customisability of the Cibes Air allowed for a perfect fit within the clients’ aesthetical palette and has since become a focal point of their new entrance hallway. Having the opportunity to design their home from scratch they benefited from a smarter, cleaner, and more flexible blueprint with the unique ergonomic design of the Cibes Air fitting effortlessly within their space. Simultaneously complimenting their lifestyle with its timeless Scandinavian design. Thanks to the modular design of The Cibes Air, your lift can be installed in as little as 2 to 3 days, with minimal structural intrusion making it perfect for renovation projects or just like our latest clients, building a home from scratch. The couple were able to find the perfect combination of colour and texture to fit in with their style, finishing their Cibes Air with a granular bamboo back plate and sure step black seagrass flooring. The panelled glass door fits seamlessly with the other modern architectural features of the home and supports in accentuating natural daylight throughout the property. A combination of intuitive design and timeless elegance makes the Cibes Air the perfect choice for a future-proofing endeavour. The Cibes Air home lift comes with a breadth of personalisation to ensure you can create the lift of your aesthetical dreams. Designed with wood, fabric, and metal Close to 300 different colours Lift shaft with panoramic glazing Available in 17 platform sizes Reduced work and building costs Minimal interruption of your daily life.
Sponsored
Stannah future-proofs new homes in the Garden of England

Stannah future-proofs new homes in the Garden of England

Stannah Lifts

Stannah Lifts has supplied and installed (and will maintain) 38 lift products in Imperial Green, a high-specification development of 75, two-, three- and four-bedroom townhouses and apartments in Hythe, a peaceful, coastal market town on the fringe of Romney Marsh. To facilitate luxurious living, and, where applicable, to enable homeowners to stay in their homes for as long as possible, a total of 38 Stannah lift products were supplied and installed: a traction passenger lift, 11 hydraulic platform passenger lifts (home lifts) and 26 dumbwaiters (service lifts). This future-proofing capability helped to secure the contract for Stannah.
Sponsored
500kg goods lift in a lightwell the perfect solution for London Home

500kg goods lift in a lightwell the perfect solution for London Home

Penny Hydraulics Ltd

The lightwell lift includes caged, enclosed sides to secure the load and prevent the risk of anything falling from the platform onto people below. Interlocked doors were fitted to prevent any accidents whilst the goods lift is in use. Interlocks ensure that the lift will only operate whilst the doors are locked shut, opening again once the lift has travelled to the level required. This provided the team with a safe and efficient lifting solution when moving their big commercial bins from below ground to pavement level. The 500kg capacity allows deliveries to be taken from kerbside to the basement.
Sponsored
Bespoke twin goods lifts enhancing space and time in Holland and Barrett’s warehouse in Staffordshire, England

Bespoke twin goods lifts enhancing space and time in Holland and Barrett’s warehouse in Staffordshire, England

Lödige Industries

Bespoke twin goods lifts enhancing space and time in Holland and Barrett’s warehouse in Staffordshire, EnglandLödige Industries installs two reliable goods lifts to increase production efficiency in the warehouseHolland and Barrett’s pick, pack and dispatch warehouse in Burton upon Trent has multiple levels. Previously goods were transferred between levels with forklift trucks and pallet gates. However, the a huge spike in orders made the forklift trucks and pallet gates inefficient and impractical. In addition, the number of forklifts operating in a congested area were a cause for concern. To meet the growing demand, Lödige Industries installed two SHERPA goods lifts with multi-level and multi-directional stops, including one for a future mezzanine level yet to be installed, thus future proofing the solution. As a result, H&B has been able to support the increase in its online processes business growth by enabling a higher throughput in its warehouseby operating in an efficient warehouse. The health and wellness market leader benefits from the advantages of quick, safe and reliable SHERPA goods lifts to stock and distribute their goods when required.SHERPA goods lifts maximise storage space in the warehouseThe rising demand for Holland and Barrett’s products meant that the company needed to store and move more goods in the existing facility. The existing lifting processes via forklifts were no longer expandable. By installing twin SHERPA goods only lifts with free standing shafts, all three floors of the warehouse can now be accessed safely and efficiently. As the SHERPA can be installed into any building without any alterations such as pits, there was limited impact during construction.A potential third mezzanine level has already been taken into account and the highest level served has a lifting height of 9.05m. The lifts now enable fast transportation between all floors and open up the possibility of further storage space. Cabin size has been tailored to Holland & Barrett’s goods to ensure the most efficient transportation processes.Integrating with Holland and Barrett’s work routines to ensure uninterrupted processesThe warehouse is a fast-paced and hard-pressed working hive of activity. Avoiding any negative impact on throughput, delivery times and processes was therefore imperative. Lödige Industries team worked closely integrated with Holland and Barrett’s operations team and partners to adjust installation work to daily warehouse routines; the experienced team of engineers were able to adjust their installation to their production times. Therefore, the installation could productivelywas accomplished without impacting warehouse performance go ahead. Fast installation and delivery ensured continuous production and early gains for the customer. Despite the challenges of COVID-19 and its impact on supply chains, Lödige Industries completed the installation ahead of schedule.Enabling construction in an existing facility- a temporary scaffold meets special customer requirementsThe existing warehouse posed a few challenges in the installation of the new lifts. Many lifts require a temporary lifting beam during installation, to facilitate multiple lifting points. However, like many modern warehouses, the facility in Burton upon Trend did not have a lifting beam. As this was required for both lifts, Lödige Industries developed a concept for an extended load bearing beam, that was created and installed by one of Holland & Barrett’s partners in this project.SolutionIntegrating with Holland and Barrett’s daily routines ensured continuous production to address the rising demands and orders.The SHERPA goods lifts are transporting goods over four floors. This allows the customer to maximise its warehouse space and move their goods quicker and more efficiently.To facilitate multiple lifting points and transport unstable loads, Lödige Industries provided a temporary scaffold platform.
Sponsored
Car Dealership Made Accessible For All

Car Dealership Made Accessible For All

Guldmann Limited

The car dealer Kronsbjerg in Odense, Denmark, is a family owned company. Kronsbjerg was established in 1922 and is now run by the fourth generation with three branches on the Danish island Funen. Over the years, they have sold and serviced several, different car brands. In December 2015, Autohuset Kronsbjerg started selling and servicing yet another car brand in their department in Odense. Taking on this new car brand meant that existing facilities became too small. Therefore, Kronsbjerg decided to invest in a new, beautiful building of approx. 1500 m2 , which could accommodate both management facilities and exhibition areas for the existing and new cars. The new premises are built in split levels between the two exhibition areas that have a level difference of approx. 50 cm. Therefore, it was necessary to create accessibility for people with walking difficulties and wheelchair users – as well as to meet the Danish regulatory requirements for accessibility in new buildings.To negotiate the height differences Kronsbjerg chose the LP7 platform lift from Stepless by Guldmann both because of its elegant and light design but also because of the plug and play construction that has a very low entry level of only 50 mm. This allows for a short ramp and no need for placing the platform in a pit.  
Sponsored
Liphook Station

Liphook Station

AATi (Antislip Antiwear Treads International)

ATi Supplied anti-slip stair nosings for another AFA ‘Access for All’ footbridge at Liphook station in Hampshire. This is part of a Network Rail replacement project worth £5.3million, the bridge is set to provide better journeys for passengers and improve station access. The structure features a lift on each platform to provide the step-free access for disabled users. The footbridge with runs over two platforms, upgrading CCTV and lighting simultaneously.
Sponsored
The Office Group (TOG + Fora)

The Office Group (TOG + Fora)

Radii

This work at Holborn’s Chancery House  — The Office Group’s largest location to date spanning 127,000 sq ft — focused on a design that accommodates multiple working zones and breakout spaces, enhances wellbeing and offers an abundance of natural light.Radii’s design department provided multiple bespoke solutions for this fit out, working on four of the building’s nine floors.For glazed fronts, our elegant Parallel 50 (Rw 45 dB) double glazed partitions in emulated satin stainless steel finish — a reference to the historic London Silver Vaults that are located at the base of Chancery House — were utilised along with wraparound framing and a custom blade detail to create an eye-catching visual effect.On the Ground floor, single glazed Linear 59 partitions (Rw 39 dB) with a bespoke pocket sliding door into drywall was installed for platform lift access.Finally, E30 fire rated double doors were placed on the Lower Ground Floor to provide fire route protection.
Sponsored
North Pole Depot

North Pole Depot

Lionweld Kennedy Group

Lionweld Kennedy provided 'North Pole Depot' with the supply and installation of 2nr maintenance access gantries with integral lifting beams, end stairs, demarcation fences and removeable polyester powder coated lift out handrails.Owned by Hitachi Rail, the North Pole Depot gives direct access to both West London and North London Lines.Utalising our range of safegrids and saferails, we created a accessible and safe platform, which complies with British and European standards.
Sponsored
Penthouse Home Lift

Penthouse Home Lift

CIBES Lift UK

Installing a lift in a top floor apartment must not compromise the stability of the building. The installation of residential lift Cibes A5000 has minimal structural impact and requires very little construction work compared to a conventional lift. The lift shaft of the Cibes A5000 can be glazed on all sides, including the machinery side. Glass looks fantastic and preserves the light and airiness of the space.
Sponsored
Home lift in luxury villa

Home lift in luxury villa

CIBES Lift UK

The Cibes A4000 home lift has an exceptionally slim design which enables the lift to fit perfectly at the centre of this staircase. A beautiful lift solution for a beautiful home. Home Lift Cibes A4000 is small on the outside and spacious on the inside. The super-slim construction allows the lift to fit into very narrow spaces. With a lifetime of at least 25 years and Energy Label A, Cibes lifts are the most cost-efficient on the market. We keep technology simple so that the lift only requires very limited maintenance.
Sponsored
Wakefield Westgate ‘‘Gateway’’ Station

Wakefield Westgate ‘‘Gateway’’ Station

Naylor Concrete Products Ltd

Naylor Lintels have been supplied to another prestigious project. Network Rail awarded the Wakefield Westgate “Gateway” Station project to Buckingham Group Contracting Ltd. The overall scope of the project • The construction of a BREEAM 2011 Excellent rated Station Building including DfT Code of Practice compliant lifts providing step free access to Platform 1 & Platform 2 and an enclosed footbridge • The Station embraces a modern open plan foyer including a travel centre, retail outlets, coffee shops and First Class Lounge • Integrated transport interchange providing a functional forecourt with Taxi/car drop-off, short stay parking and bus replacement facilities
Sponsored
Bank Station Capacity Upgrade, London - Watertight Concrete

Bank Station Capacity Upgrade, London - Watertight Concrete

Sika Limited

Built in 1900, London’s Bank Station provides access to the Central, Northern, DLR, Waterloo and City lines and is one of the world’s most complicated subterranean stations.The expansive Bank Station Capacity Upgrade (BSCU) programme, commissioned by London Underground, will increase capacity by 40 per cent. In addition, it will improve access, decrease crowding and generally deliver a modern public transport facility with better ambience.Whilst the BSCU scheme as a whole incorporated a wide range of elements – new entrance, three ticket halls, six lifts, 10 platforms, two 94m travelators and a 570m tunnel & platform for Northern Line – Sika’s involvement was on the whole block site.
Sponsored
Stannah Passenger Lift for Hospice Extension

Stannah Passenger Lift for Hospice Extension

Stannah Lifts

To supply, install and maintain a passenger lift in the new hospital extension to the Countess of Brecknock Hospice. Stannah supplied and installed a traction-drive, 33-person, 2500kg-capacity passenger lift to deliver safe and comfortable movement of people of all mobility levels, including patients in beds or multiple wheelchair users, between the two floors of facilities
Sponsored
Guide to LOLER: Lifting Operations and Lifting Equipment Regulations

Guide to LOLER: Lifting Operations and Lifting Equipment Regulations

Penny Hydraulics Ltd

LOLER is an acronym, used to abbreviate Lifting Operations and Lifting Equipment Regulations. LOLER regulations cover the operation and control of lifting equipment, placing responsibility on both the company in ownership of and the employee operating lifting equipment. Lifting equipment, classed as work equipment, is also subject to PUWER, an abbreviation of Provision and Use of Work Equipment Regulations.
Sponsored
West London Platform Extensions

West London Platform Extensions

Lionweld Kennedy Group

Lionweld Kennedy designed, supplied, fabricated and installed extensions to existing platforms in order to accommodate longer trains and add a new emergency end of platform staircase . The platforms we worked on was Shepherds Bush, Imperial Wharf, West Brompton and Clapham Stations.We provided GRP deck, below deck screens, mesh litter screens, end of platform steps, fencing and lockable gates as well as associated handrails, plinths, fixtures and fittings.The GRP deck panel’s increased strength allows spans of 4000mm clear span with a 5kn/m² pedestrian loading.This meets all network rail load requirements and is fully approved and in use.Additional strengthening to the deck was required to accommodate the lighting/CCTV columns shown above.We added white and yellow edge lines and safety lines as well as the tactile pavers moulded to the deck.The gritted anti-slip surface is also ideal for this application where safety is paramount.
Sponsored
Isle of Wight Platform Stations, UK

Isle of Wight Platform Stations, UK

Dura Composites Ltd

GRP Rail Station Platform - Mountbridge Install | Case StudyThe Island Line and its associated infrastructure on the Isle of Wight in the UK has recently been upgraded to offer a more frequent service and introduce a refurbished fleet of Class 484 trains. Key to the project was creating improved accessibility between the train and the station platform to allow the new trains to operate effectively. This was achieved by deploying GRP Dura Platform panels from Dura Composites in conjunction with the Mountbridge™ system from Hammond ecs ltd to raise the platform gauge by up to 400mm at 5 stations on the Island Line, including Ryde Pier Head.The patented 40mm Dura Platform solution (Patent No GB 2 523 381) has a span of 1.5m per 5kN/m2 UDL and delivers multiple benefits in terms of faster, safer and easier installation, reducing time on site, therefore reducing disruption to passengers, and providing major cost savings versus traditional materials such as concrete. The platform panels can accommodate fully integrated tactile recesses, illumination of the coper and integrated heating to remove frost & ice build up and reduce the future maintenance burden of the platforms.
Sponsored
NHS Bed Lift - Royal Blackburn Teaching Hospital

NHS Bed Lift - Royal Blackburn Teaching Hospital

Sheridan Lifts

New NHS Bed Lift for the hospital, increasing mobility for all.
Sponsored
Stannah passenger lift refurb saves legs in Scottish Highlands hotel

Stannah passenger lift refurb saves legs in Scottish Highlands hotel

Stannah Lifts

Visitors of all mobilities to the Alexandra Hotel in Fort William in the Scottish Highlands are thankful for Stannah Lifts’ recent passenger lift refurbishment. Why? Because, with five floors to navigate in this 93-bed hotel, the lift takes the strain off compromised legs—of all ages and capabilities—in an area known for its outdoor challenges and sites of historic interest. The lift refurb is one of three for this eight-strong hotel group, with similar revamps in sister hotels, The Royal Hotel in Oban, and the Cumbria Grand Hotel in Grange-over-Sands, Cumbria.
Sponsored
Perry Barr Railway Station, Birmingham

Perry Barr Railway Station, Birmingham

Genesis Global Systems Limited

Perry Barr Train Station has been refurbished for theupcoming Commonwealth Games, which are beingheld in Birmingham.The Pathway Guidance System has been specifiedto help blind and partially sighted people aroundthe train station.The traditional 6mm diameter shank method or 3Madhered versions offer an incredibly versatile systemthat can provide an instant DDA and Equality Act 2010compliant tactile surface to any platform edge, stairwayor ramp due to their unique installation methods.This allows full utilisation of all facilities, with guidesdirecting to important points i.e., ticket offices andlifts to platforms.The once small, plain and dated site is now anexpanded rust coloured building with a modern finish.Installed by Luke Boorer, Richard Howells, RossNiedzielski, Oli Wilkins, Mark Lawrence, and Will Dollingfrom the Genesis Global Systems team.
Sponsored
3 Stannah goods lifts support growing CLEAN Yeovil laundry

3 Stannah goods lifts support growing CLEAN Yeovil laundry

Stannah Lifts

A trio of Stannah Goodsmaster CD goods-only lifts has been installed in the Yeovil branch of CLEAN Linen and Workwear. Installed over three years, each lift reflects and supports the depot’s ongoing development by lightening the growing workload.
Sponsored
MeadowBank Sports Centre

MeadowBank Sports Centre

Pliteq

Gym with top of the range fitness equipment, dumbbells up to 50kg, watt bikes and row machines. Lifting platforms integrated flush within the remaining gym area and colourised to highlight drop area.“We recently installed Pliteq flooring in our brand new Meadowbank facility. The product is top quality and the noise dampening in our free weights area is great. The noise from dropping weights is completely minimised making the experience of other users more enjoyable. There is also no reverb heard or felt in other rooms nearby.”
Sponsored
London Victoria Tube Station

London Victoria Tube Station

Eurosafe Solutions Ltd

A Noracon Travelling Gantry was installed to the full width and length of the North Ticket Hall suspended from aluminium monorails concealed within the ceiling. The Gantry was designed to travel parallel to the escalators beneath utilising a rope driven trolley which removed the requirement for any electrical connections. To enable the platform to travel the full length. part of the gantry was designed to become detached from the main section, allowing it to be “jettisoned” at the point where the new lift obstructs travel. The two sections become independent allowing the gantry to travel the remaining distance.
Sponsored
Stannah Lifts Access In Award-winning Affordable Housing Scheme

Stannah Lifts Access In Award-winning Affordable Housing Scheme

Stannah Lifts

A Stannah passenger lift has made access easy for residents of Victoria Wharf Apartments, a £5.5m, sustainable and contemporary canal-side housing development for intermediate rent in Ladbroke Grove, St John’s Terrace, London W10. The eight-person lift is wall-mounted in a purpose-built, freestanding structure that rises from an exterior courtyard at lower-ground level to serve all 22 apartments ranged over five floors.
Sponsored
Glazed A5000 Hotel Lift in Finland

Glazed A5000 Hotel Lift in Finland

CIBES Lift UK

Gustavelund Hotel is family-run business offering lodging, food, activities and a wide range of services, all set against a backdrop of Finnish art, architecture and design. Given that the hotel is a protected building, it was important to select an accessibility lift which preserved the structural frame and was in keeping with the interior design of this architectural gem.
Sponsored
Cibes Lift UK at Battersea Power Station

Cibes Lift UK at Battersea Power Station

CIBES Lift UK

Battersea Power Station, a former 42-acre brownfield site, has recently undergone a major refurbishment project (£9b) to provide a mixed-use development of high-end apartments, leisure and business facilities.The Power Station itself has recently opened to the public and comprises of an event venue, food hall and plenty of shops located within the historic turbine halls.Forming parts of the redevelopment project included the restoration and installation of a new bar within the Power Station’s former control room. The bar has been built around the façade of the original control room B, featuring control desks, switch gears and synchroscopes dating back to the 1950s.Restored to its former glory and sitting on a mezzanine floor overlooking the two large turbine halls, the Control Room B bar has been made accessible to all patrons with the installation of a Cibes A5000 lift.The Cibes A5000 is designed to have a small footprint yet maximum internal space – providing an ideal discrete accessibility solution to the Control Room B bar. Featuring a premium RAL matte black colour and adonized aluminium safety bar and control panel, the lift blends seamlessly with its environment and low-lit aesthetics of the bar. Whilst the fully glass shaft allows for 360 degrees views of the surrounding power station and, screw and nut drive technology of Cibes’ products – complimenting Battersea’s industrial backdrop.Following the successful installation of the A5000, Cibes Lift UK’s technical engineering team provided stand-by services for the official launch of Phase 2 of the overall Battersea Power Station regeneration project. Throughout installation, the launch event and following, Cibes Lift UK’s engineering and service team have remained in regular communication with the client. In particular, the Project Director for Phase 2, John Leverett.
Sponsored
The Glassworks - Barnsley

The Glassworks - Barnsley

Sheridan Lifts

Barnsley Regeneration Town Centre - 7 New Passenger Lifts & 2 Escaltors
Sponsored
London 2012 Olympic Diving Platforms

London 2012 Olympic Diving Platforms

Cordek Ltd

Cordek called upon to aid with the practicalities of a formwork solution to create the six concrete diving platforms in a scheme featuring few straight lines at the iconic London Aquatics Centre, built for the London 2012 Olympic Games.
Sponsored
Stannah resurrects a 1930s passenger lift in YMCA’s The Bristol Wing

Stannah resurrects a 1930s passenger lift in YMCA’s The Bristol Wing

Stannah Lifts

Injecting present-day performance into an historic passenger lift whilst conserving its yesteryear veneer – updating access in the transformation of the Grade II-listed, YMCA’s The Bristol Wing. The site dates back to the 13th century and boasts a colourful history that includes being home to a prison, the Chief Constable, the Invisible Circus theatre troupe, a group of artists, crown courts and a fire station. The original New York-style passenger lift was around 80 years old and operated within a traditional cage structure rising through the central stairwell of the building to serve five floors.
Sponsored
Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Peabody Nods for Stannah Passenger Lifts in St John’s Hill Social Housing Regeneration

Stannah Lifts

Five Xtralifts and two sets of Xtralift duplexes will support access-for-all to 153 apartments ranged over five and seven floors, in two distinct blocks. To match the heavy duty demand of this environment, the nine 8-person lifts are fitted with higher-grade stainless steel lift cars and Dewhurst push-button controls. Eight are traction, without motor rooms, and one is hydraulic, with a motor room. All the lifts have been installed with a range of options, with a mix of vandal-resistant categories 1 and 2. Two models are equipped as firefighter lifts.
Sponsored
Light-illuminated Stannah passenger lift inspires visitors at Winchester Cathedral

Light-illuminated Stannah passenger lift inspires visitors at Winchester Cathedral

Stannah Lifts

Winchester Cathedral, a place of worship for over 900 years, has been brought up to modern accessibility standards with a light-filled passenger lift from Stannah. The installation now sits comfortably alongside the fine craftsmanship within the extraordinary Grade I Listed building. This is one of the first passenger lifts to be installed in a medieval cathedral in the UK, paving the way for other heritage buildings to offer step-free access for visitors. 
Sponsored
Stannah lift products star in spectacular new entrance to Leeds Station

Stannah lift products star in spectacular new entrance to Leeds Station

Stannah Lifts

Opened on 3rd January 2016, the new southern entrance to Leeds Station features four Stannah escalators and two passenger lifts. Following multiple escalator and lift installations at the Midlands hub of Birmingham New Street and Grand Central for Network Rail and Mace, Stannah were again the chosen supplier and installer of all vertical transport within the southern entrance building (known as the LSSE scheme.), this time working with main contractor Carillion to fulfil the brief. The work was completed by the Stannah Escalator & Moving Walkway Department and Stannah Major Projects team in just twelve weeks.
Sponsored
Pendock Linea Range - Lift Reveals

Pendock Linea Range - Lift Reveals

Pendock

Durable and decorative lift reveals, manufactured from stainless steel, aluminium and laminated plywood, provide a practical and aesthetic enhancement to lift installation and refurbishment projects, as well as lift lobby upgrades.Every lift reveal is designed and manufactured by us to meet the exact specifications of each individual project with great attention to the detail, fit and finish of every component.All linings are manufactured to comply with the relevant safety legislation, incorporating safe edges and corner radius detail.
Sponsored
Emergency Evacuation Passenger Lift Rebuilds Access in Restoration of the Chapel, Royal Victoria Country Park

Emergency Evacuation Passenger Lift Rebuilds Access in Restoration of the Chapel, Royal Victoria Country Park

Stannah Lifts

Situated in an existing stairwell, the lift had to be installed within Historic England guidelines: the guide brackets could not be fitted to the Chapel’s historic walls, so the lift was supplied and fitted within Stannah’s FX structure—a cost-efficient, shaft-within-a-shaft solution that overcomes such obstacles. This BS 9999-compliant evacuation lift plays a vital role in an evacuation strategy by a designated warden for t
Sponsored
A Stannah Goods Lift Solves Bike/Bin Storage in City Office Refurb

A Stannah Goods Lift Solves Bike/Bin Storage in City Office Refurb

Stannah Lifts

Where do bikes and bins go in slick commercial buildings in space-strapped cities? A big question answered by a Stannah Goodsmaster 1000 CD Plus goods attendant lift in the revamped Kings House office building in central London. The 1000kg through-car lift moves bicycles and a 1100 litre wheelie bin between the ground floor and the basement storage facility in this extensively reconfigured and refurbished building located on King Street.
Sponsored
END Clothing - Manchester

END Clothing - Manchester

Sheridan Lifts

Glass Lift in luxury fashion retail store in Manchester

Showing 37-72 of 103

Feedback