NBS Source
I'm a manufacturer

"packaged wiring systems cabling"

10,306 results found

Sort by:

Showing 145-180 of 1444

Sponsored
Co-Operative, Birtley

Co-Operative, Birtley

Berry Systems

Berry Systems supply and installed safety barriers and balustrading to protect loading bays, warehouse racking, pedestrian walkways and the plant.The new Co-Operative Composite Distribution Centre in Birtley covers 25,600 sq metres (276,000 sq ft) and supplies a vast range of products from 3,500 lines to 262 Co-Operative stores in the North of England.Activity in the centre is extremely busy with hundreds of vehicle movements daily facilitated by 500+ members of staff. We won the contract to supply and install all the safety barriers, balustrades, loading bay barriers and racking protectors inside the warehouse, as well as the vehicle perimeter barriers and ramp barriers externally.All the products, with the exception of the galvanised spring steel barriers, were painted in high visibility yellow. The spring steel barriers are designed to absorb  impacts from HGVs and forklift trucks while retaining their own integrity and ongoing effectiveness. The Co-Op were determined to ensure their new development was as environmentally friendly as possible. Waste oil helps provide heating and the lighting system is solar controlled to eliminate wastage. It ensures a variable level of interior lighting to automatically complement exterior levels.
Sponsored
Hotel Urbano, Bogota

Hotel Urbano, Bogota

Genesis Global Systems Limited

The Hyatt hotel chain set itself the goal of building a new hotel in the vicinity of the Corferias Convention Centre in Bogotá. One key decisions in the project was the selection of a system for the control of dirt, dust and moisture entering the building, to ensure maximum care of floor coverings. The Genesis Trakmat® system. With it’s aluminium profiling system with PVC links, which makes it 100% roll-up, would guarantee its easy manoeuvrability and ease of maintenance, as well as maximum softness to the contact of the shoes and a minimum noise emission when passing guests.
Sponsored
A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

A PRACTICAL GUIDE TO ACCESS CONTROL EQUIPMENT FOR EDUCATION CAMPUS’S - Automatic Systems - International

Automatic Systems UK & Ireland

As a specialist in the automation of access control, Automatic Systems is well aware of the issues faced, especially in the light of recent events, and can offer tailored solutions that not only meet student and staff security needs but also the health and wellbeing of all.
Sponsored
REEMA Properties, Swindon

REEMA Properties, Swindon

K Systems Insulated Facades

BackgroundK Systems’ retrofit of the REEMA non-traditional construction Properties in Swindon, South-West England, is a stellar example of the company’s ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Swindon Borough Council had a development of 50+ properties in Upper Stratton all with aged facades and poor thermal qualities, some with U-values as inadequate as1.59W/m ² K.K Systems supported Swindon Borough Council, led by Projects Surveyor John Black, to completely refurbish this residential development and deliver on five primary objectives:- Improve the thermal performance rating of each home (SAP rating)- Deliver greater thermal comfort for residents- Choose a solution with acoustic benefits and non-combustable benefits- Reduce tenants’ energy consumption- Deliver an attractive aesthetic that would uplift the areaHaving a good reputation for matching systems with finishes to deliver its clients’ visions, K Systems partnered with approved installer, Rateavon Ltd, to scope out theproject and specification in fine detail, with particular focus on insulating properties and aesthetic.Our ServiceK System worked in collaboration with Swindon Borough Council and Rateavon Ltd to upgrade these poorly insulated houses and deliver a total revamp of the properties, resulting in thermally efficient homes.One of the primary requirements was to improve the performance rating of each home, with a target U-value of 0.30W/m²K. In fact, K Systems exceeded that in the project delivery by achieving a U-value of 0.29W/m²K.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Digital technology was deployed from the very beginning to produce models and CGIs (Computer Generated Imagery) to not only assure Swindon Council the finished project would meet its specific requirements, but to also guide the design process and ensure compliance with all health and safety regulations.Regular inspections and site audits were carried out alongside Swindon Council to ensure the same level of care and attention to detail that applied when specifying theproject was being applied during its implementation and delivery.Technical Project DetailsOn initial inspection, K Systems found a problematic substrate. The REEMA hollow panel non-traditional construction properties are constructed of a concrete frame with thin concrete panels to the exterior façade. This type of thin panel construction created a significant challenge for the team to find a suitable EWI fixing, but with the help from Rawlplug, one of our EWI fixings suppliers a robust and safe fixing solution was found, without compromising the existing REEMA construction.Harnessing years of EWI system design knowledge and unrivalled expertise in this field, K Systems worked closely with Rawlplug and a structural engineer to identify a suitable fixing detail and pattern which would not only be robust but also suitable for this type of substrate.With a structurally strong solution agreed, focus then turned to the appropriate insulation solution.After a comprehensive scoping process taking into consideration client requirements, project objectives, budgets and timeframes, K Systems specified the industry proven K Systems M, Mineral Wool EWI system to not only significantly boost thermal performance of the buildings but also reduce noise pollution for the tenants.K Systems 100mm Mineral Wool insulation has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the refurbishment as it would combat the increased heating costs faced by residents whilst retaining the solid foundations of the existing building and reducing the risk of condensation or mould damage.Other technical benefits which made the K Systems Mineral Wool system the ideal specification for this refurbishment include:- non-combustibility, A2-s1,d0 fire rated- its excellent acoustic properties, reducing noise pollution- its environmentally friendly composition as the insulation is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)- its workability and easy to cut format, reducing labour time across the board for the team.Having identified solutions that improved structure and thermal performance, K Systems then offered the best quality finish for the properties – an aesthetically pleasing, cost effective combination of VBriQ+ clay brick slips and Silkolitt+ silicone render that both Swindon Council and the residents would be proud of.VBriQ+ is a lightweight, highly durable, clay brick slip system and a more cost-effective finish option in comparison to tradition brick systems without compromising on quality, weather resistance, workability and durability. This made it perfect for a project of this scale – a project which required maximum and long-lasting impact without incurring maximum costs.The Silkolitt+ silicone render finish rejuvenated the properties’ exteriors and massively enhanced the area’s overall aesthetic, making it a much more appealing place to set up home.Yet again going the extra mile for clients to ensure unrivalled workmanship and longevity, K Systems finished all 52 properties with K Pro - a water-based protective treatment used to provide long term enhanced water repellent properties to external render and other masonry surfaces, helping combat the problems associated with water intrusion including efflorescence, frost, water-soluble pollutants and algae growth meaning the substrate will stay clean and dry for longer.K Systems and approved installer Rateavon Ltd delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Swindon Council, and the residents of the newly improved homes.John Black, Projects Surveyor at Swindon Borough Council, said:“Throughout the project K Systems have supported Swindon Borough Council agreeing all detailing to ensure current day Building Control Regulations were met. They supported resolutions throughout the project lifecycle and were really reactive, visiting site and supporting when required. They carried out weekly detailed spot check reports with photographic evidence and also checked batch numbers of materials. They delivered a great service. A really successful project.”
Sponsored
Healthcare | Derriford Hospital

Healthcare | Derriford Hospital

Venesta Washroom Systems Ltd

To complement the opening of their new, state-of-the-art Changing Places facility, Derriford Hospital realised the need to improve the reception foyer washrooms. "We chose the System M cubicle to aid with manual handling and to provide quick access if needed. Of the products supplied, we are most pleased with the System M emergency door release system. The reaction from users has been that they are delighted with the new facilities, commenting on the extra space, increased number of cubicles, useful accessories such as bag hooks, and the colour of the cubicles." - Peter Caton, Site Services, Derriford Hospital.
Sponsored
Quick Release and Connection Systems

Quick Release and Connection Systems

BROEN-LAB

Get used to a new level of flexibility Our Quick Release and Connection Systems are the smart choice for laboratories that prioritize the ability to reconfigure again and again through the working day
Sponsored
Brunton Shaw Factory Deep Machine Pits

Brunton Shaw Factory Deep Machine Pits

SMR PROJECTS LIMITED

Waterproofing of three new heavy machine pits at Brunton Shaw’s cable winding factory located on a challenging site adjacent to the canal.
Sponsored
BoxPark Marketplace

BoxPark Marketplace

Brett Martin Daylight Systems

With the pop-up culture seen as a fast, low-cost solution to revitalising urban environments, Brett Martin Daylight Systems’ lightweight, robust Marlon CS profiled polycarbonate glazing panels have been an integral element in the creation of Boxpark Croydon, a new pop-up mall featuring shopping and dining venues built from 96 stripped and refitted shipping containers arranged around a covered courtyard space for year-round events. The project saw the creation of a transparent roof made up of Marlon CS Longlife panels which can be used to form complete roof coverings or incorporated into any corrugated metal roofing and cladding system.
Sponsored
Savills

Savills

Forbo Flooring Systems

The recent fit out of Savills' new Welsh headquarters saw commercial interior design and supply specialists, Imium, enlisted to create modern-day, cohesive working environment, while still adhering to the brand's traditional values. Forbo Flooring Systems' striking Allura Flex Luxury Vinyl Tiles (LVT) and Tessera Seagrass carpet tiles have played an integral role in the smart new interior. Rhiannon Phillips, Interior Designer at Imium, explained: "The floor comprises of both employee and customer facing areas, therefore it was important that the space was conducive for clients without affecting business as usual . We were notified by the Savills marketing department of the brand guidelines that we needed to adhere to, in terms of finishes, to make sure that the Savills story was portrayed. We took inspiration from the company's heritage and ethos and incorporated different themes within the office based on the various sectors that the firm operates in. For the customer facing area, we used a lot of silk, walnut and a splash of the colour red to reflect the residential sector."
Sponsored
Damp Proofing, Brighton

Damp Proofing, Brighton

Newton Waterproofing Systems

Newton System 800 used to damp proof a school in Brighton which required multiple damp proofing treatments as part of its refurbishment. Installed by Newton Specialist Basement Contractor CavityTech.
Sponsored
Ground Gas Barrier for Almshouses

Ground Gas Barrier for Almshouses

Triton Systems

Triton products, including liquid applied TT Vapour Membrane, were specified to form a ground gas barrier system in the redevelopment of listed almshouses situated in close proximity to a landfill site.
Sponsored
HSBC Bank Leeds

HSBC Bank Leeds

CLD Physical Security Systems

The White Rose Office Park in Leeds; is a purpose-built 27-acre business park owned and operated by Munroe K. In 2014, they unveiled a £12m office for the global banking giant HSBC.Utilising in-depth knowledge, that Munroe K had about their client and the local area; the project had a number of specific requirements that needed to be addressed from the start.The BriefSecurity and Aesthetics were the two key areas taken from the client’s requirements for their car park security fencing. These included the following:A fencing system that would provide open ventilation for the car park.Additional high security fencing to the rear of the car park due to the construction of plant and control equipment compounds.Anti-climb and anti-cut properties to all fencing systems.Aesthetically pleasing without compromising on the inbuilt security.After working through the wide range of car park security fencing systems in the CLD range, the client selected Safeogril Open Mesh Fencing for the front of the car park and Securus 358 Anti-Climb Mesh Fencing System to secure the rear. They required the front of the car park to look visually pleasing and; at the same time, fit within HSBC’s brand to complement the new offices. Alongside the aesthetics, the architects wanted the car park security fencing systems to still encompass a wide range of security features in order to keep the car park secure.The installation was completed by Davison Fencing, a member of CLD Systems Approved Contractors, working with ourselves and the architects for the duration of the installation process.
Sponsored
Trusted corrosion protection for the Queensferry Crossing

Trusted corrosion protection for the Queensferry Crossing

Hempel A/S

The Queensferry Crossing is a stunning piece of modern engineering. Spanning the busy Forth Estuary near Edinburgh on the east coast of Scotland, it has a total length of 2.7 kilometres, making it the longest three-tower cable-stayed bridge in the world. The crossing’s road deck is made with over 35,000 tonnes of steel, that was manufactured in China and the UK and transported to Scotland by sea. With our coatings protecting four of the world’s ten largest cable-stayed bridges – the steel manufacturer Shanghai Zhenhua Heavy Industry Co., Ltd. (ZPMC) knew our coatings were ideal for the job.
Sponsored
London Power Tunnels - Concrete for Tunnelling

London Power Tunnels - Concrete for Tunnelling

Sika Limited

Following a successful first phase in 2018, London Power Tunnels 2 (LPT2) is a project to ‘rewire’ south London. The six-year, £1bn scheme will comprise the construction of 32.5km of 3m-diameter tunnels built deep below the road network between Wimbledon and Crayford to carry high voltage electricity cables.A Hochtief-Murphy Joint Venture (HMJV) was awarded the contract in December 2019 to design and construct the tunnels & shafts and install the EHV (extra-high volume) cable brackets. The New Cross site is one of several in the overall scheme.
Sponsored
Coleg Cambria

Coleg Cambria

Forbo Flooring Systems

When Ainsley Gommon Architects was tasked with designing the new sixth form college in Connah’s Quay, it called upon Forbo Flooring Systems to ensure the interior design would easily accommodate changes in the curriculum, while clearly defining departments.Deeside Sixth, a joint development between Coleg Cambria, local schools and Flintshire County Council, is a £14.6 million state-of-the-art centre, which provides a learning environment to offer enhanced curriculum options to A Level students.
Sponsored
Early Learning Centre

Early Learning Centre

Forbo Flooring Systems

Forbo Flooring Systems’ integrated portfolio of solutions played a vital role in helping to achieve a welcoming, stimulating and caring learning environment for the early learners of a new purpose-built nursery in Hamilton, South Lanarkshire.
Sponsored
Hurlford Avenue, Glasgow

Hurlford Avenue, Glasgow

K Systems Insulated Facades

The Hurlford Avenue new build project, situated on the former Garscadden Primary School site, truly harnesses innovation and design. This ‘Modern Methods of Construction’ project, completed in partnership with CCG, showcases technical prowess and constructional excellence.Garscadden Primary School closed back in 2017 but the 1930s school building remained standing. Spotting the potential for something impressive on the site, Glasgow Housing Association proposed a modern replacement – a portfolio of properties.The key requirement was to build modern, energy efficient homes which would provide much-needed affordable housing in the sought-after area of Dumbarton and make a significant difference to the local community.After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems devised a comprehensive delivery plan using our unrivalled experience and expertise.CCG fabricated the building off-site with timber kits and incorporated elements from our Aricco system, with the final finish being completed on-site. This approach was advantageous for a few reasons, including the speed of construction and a reduction in required labour.Hurlford Avenue is a prime example of our experience with off-site modular builds and our project-specific approach to EWI solutions. We brought Glasgow Housing Association’s vision to life and delivered 28 houses and 42 flats for mid-market rent.Our ServiceThe build of the Hurlford Avenue development wasn’t without its challenges. Precision planning was required to ensure minimal disruption to the residents in surrounding estates. All traffic ways remained free for passage and noise pollution was kept to a minimum.During the build, our team encountered some detailing challenges. However, working directly with the contractor and main contractor, these challenges were quickly resolved by key colleagues within our Technical Team, and the build remained on schedule and of the highest quality.From specification and design to planning, delivery and evaluating, our team transformed a derelict site to a contemporary multi-dwelling development that rejuvenated the Dumbarton area.“I would like to thank everyone on the K Systems technical support team for their contribution in accomplishing the Aricco System project at Hurlford Avenue. The regular visits from senior technicians always go a long way to keeping any project in check and it makes the job of our management much easier by having honest, professional judgement to go back to our guys, with well earned praise on this occasion. Everyone was onboard from the outset in working around any potential difficulties and you will agree it shows in the final results.”Garry Barton, Contractor.Technical Project DetailsAs the client of this project, Scotland based construction company CCG, approached K Systems to provide a suitable façade solution that would complement their design. A build with timber kits and a drained ventilated cavity system was specified, along with a silkolitt thin coat render finish.CCG are renowned for off-site manufacturing (OSM) and manufactured the kits from their production site in near-by Cambuslang. They sourced the correct material according to our exact specification. CCG’s ‘iQ’ System was chosen, which is designed with a fabric-first approach where greater tolerances are determined by fewer junctions and thermal bridges to deliver enhanced U-values and significantly improve airtightness. By incorporating OSM and the iQ system into this project, it is just a small insight into our unrivalled knowledge and expert approach that we take to fulfil the requirements of our clients.For the supporting façade, the K Systems Aricco system was specified - a drained ventilated cavity system perfectly suited for use in low rise buildings, particularly new build projects and timber framed construction. The Aricco system is also the most compatible with offsite/modular construction techniques and boasts an A2-s1, d0 fire rating and therefore complies with the latest building regulations, ensuring the safety of all residents.The finish was just as important as the façade system, with the cost-effective, industry-leading Silkolitt thin coat render specified. Silkolitt renders provide a contemporary finish to new-build applications, something this project very much required to modernise the area. Silkolitt is simple to apply, and its hydrophobic properties makes the render low maintenance. It also has excellent vapour permeability, allowing the Hurlford Avenue properties to breathe and avoid interstitial condensation. It is the most flexible system on the market, making cracking over its lifetime less likely and therefore delivering a pleasing aesthetic with outstanding longevity.The combinations specified by the K Systems team resulted in the build of impressive dwellings boasting a U-value of 0.13W/m ² K – meaning homes were easier and cheaper to heat, a particularly attractive benefit given the current cost of living crisis.
Sponsored
Perton First School

Perton First School

Excelsior Panelling Systems Ltd

The Project Perton First School has been open for over 40 years and the infant washroom facilities are in need of modernisation.The school prides itself its family ethos and has seen generations of families come the doors.The ChallengePropose a system with children of nursery age in mind. Consider the height of the doors & partitions.Peardrop range is not supported by an overhead rail and the frontage is fixed at the floor and gable walls only.Flooring substate needs to be at lease 60mm thick and stable to ensure a secure fixing point at the base of the foot.Deliver a non-standard laminate to enhance the systems aesthetics. The SolutionExcelsior, working alongside G Evans and Entrust, are excited to have installed our Harlequin Select Range at Perton First School. The school chose our Peardrop Range with low level accessible doors and magnetic locks, perfect for the classroom environment. The cubicles doors were finished in our vibrant Lolly Pop Digital Print & the area was surveyed to ensure suitable fixing points.Harlequin Peardrop is the ideal system for children of nursery age, the system is self-supporting on an aluminium leg; the legs ability to perform is reliant of the strength of the floor substrate which in this case proved suitable, enabling the client to proceed with this infant friendly system.The full system is professionally manufactured with children in mind providing easily accessible doors for children whilst ensuring efficient dimensions for adults to supervise.SpecificationProduct Range: Harlequin Select HPLDoors: 18mm High Pressure Laminate, Lolly Pop Digital PrintPilaster: Polyrey C018 ChardonPartition: 18mm High Pressure Laminate, Polyrey C018 ChardonIronmongery: SBAA 
Sponsored
The Old War Office

The Old War Office

Schlüter-Systems Ltd

Originally designed by British architect William Young, the transformation from former Old War Office into The OWO has been overseen by the award-winning EPR Architects. Schlüter-Systems supplied a comprehensive selection of waterproofing solutions.
Sponsored
Berwick Leisure Centre

Berwick Leisure Centre

Senior Architectural Systems Ltd

This new £22m state of the art leisure centre in Berwick, Northumberland, has been designed by GT3 Architects and features a striking glazed façade created using Senior’s slim profile SF52 curtain wall system.Senior worked closely with specialist contractor Crown Doors and Shutters Limited and main contractor Tolent Construction Ltd to deliver the landmark leisure scheme which is set to breathe new life into the area by replacing the town’s previous leisure centre. To ensure the town’s existing Swan Centre could remain operational throughout, the new leisure centre was constructed in two phases with the project team working closely to carefully coordinate each element of the build to limit the disruption to the local community.As well as creating an inviting and welcoming main entrance, the thermally-enhanced SF52 aluminium curtain wall system will also help improve the energy-efficiency of the scheme whilst maximising the use of natural daylight.Senior’s SF52 aluminium system features attractive slim sightlines and enhanced thermal performance to help boost energy-efficiency. Available as a mullion drained system which removes the need for visible drainage slots, Senior’s SF52 curtain wall can be specified as capped, silicone sealed or as a combination of the two for even greater design flexibility. Thanks to Senior’s in-house powder coating facility, the SF52 system is available in an almost unlimited range of colours and finishes.
Sponsored
The Richard Pate School

The Richard Pate School

Concept Cubicle Systems

Concept Cubicle Systems provided a complete washroom supply and installation for the school’s Nursery and Reception areas. They required a durable washroom solution that allowed for teacher supervision whilst maintaining student privacy.Read the full case study on our website.
Sponsored
Temple Carrig School

Temple Carrig School

Forbo Flooring Systems

Inspired by the mountainous views to the west and seaside views to the east, McCarthy O'Hora (MCOH) architects reflected the colours of the natural world that surrounds Temple Carrig School by specifying an array of vibrant shades from Forbo Flooring Systems' Marmoleum range.
Sponsored
Marineside, Bracklesham Bay

Marineside, Bracklesham Bay

K Systems Insulated Facades

BackgroundWith stunning southerly views across to the Isle of Wight and also westerley along the Solent to Hayling Island, Portsmouth and the Millenium Tower, Marineside, a development of three-storey properties at Bracklesham Bay, is a dream location for anyone to live.However, whilst a prominent beachfront location comes with spectacular sunsets and unrivalled tranquillity, it does leave buildings highly exposed and prone to weather damage.This was the case with the Marineside development which showed signs of high coastal corrosion and were in severe need of regeneration both aesthetically and internally to address thermal underperformance.K Systems teamed with CBG, Envirorend SE, and Harrington Design to complete the low-rise refurbishment project, with three main objectives:- Remediate problematic substrate- Improve thermal performance for the benefit of residents- Revitalise a tired and unattractive exteriorAs with all projects, K Systems began a detailed scope and specification process with full involvement from all parties, including deploying digital technology to provide an inspirational viewpoint for the client to understand what the refurbishment would look like at completion.Our ServiceFollowing extensive planning, K Systems brought the client’s vision to life and created a beautiful collection of revitalised waterside homes on the banks of Bracklesham Bay.The refurbishment of Marineside wasn’t a straightforward project and required comprehensive scoping to ensure optimal delivery and 100% satisfaction levels amongst current residents.Therefore, it is a notable triumph for K Systems to have delivered a successful project, within budget, without delay or compromise on quality, that not only met but exceeded the requirements and expectations of the client.Each structurally sound, aesthetically pleasing dwelling boasted excellent thermal performance properties, achieving a U-value of 0.30W/m²K, allowing residents to benefit from more thermally efficient homes and experience a reduction in energy consumption.K Systems in collaboration with CBG, Envirorend SE and Harrington Design delivered beautiful, clean, crisp, aesthetically attractive properties, each with a protective exterior finish which will provide resistance to the elements for years to come.Technical Project DetailsOnce the existing façade was removed it was clear that the block substrate had high level corrosion due to the harsh coastal environment it had endured since being built in the 1940s.Multiple areas of the three buildings had to be completely removed and replaced using a medium density block that achieved superior pull-out test results. This was a recommendation by K Systems which enforced confidence with not just the client but the homeowners too as the best way to ensure longevity of the buildings.The removal also revealed that the substrate was uneven and unsafe. K Systems identified that extensive dubbing out was also needed with these buildings. Dubbing out meant the insulation boards were installed line and level giving a crisp and professional finish.The Marineside buildings were solid block construction making them extremely inefficient and presented an expense to the homeowners during winter months due to insufficient thermal performance.Utilising its years of unparalleled expertise, K Systems specified the industry-proven Mineral Wool insulation system for the project to address the aged façade and significantly boost the thermal performance of the building.K Systems Mineral Wool insulation (a mat of rock fibres which prevents the movement of air) has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the Marineside refurbishment as it would combat the heating issues faced by residents whilst retaining the solid foundations of the existing building.Other technical benefits which made the K Systems 110mm Mineral Wool system the ideal specification for this refurbishment include:- its level of fire resistance and non-combustibility, ensuring the building met all safety regulations required for residential buildings in England- its excellent acoustic properties, ensuring coastal noise absorption further enhancing the peaceful and tranquillity of the area- its environmentally friendly composition as it is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)Due to the coastal location and exposure to the elements, it was vital that this refurbishment guaranteed total water tightness. K Systems worked closely with the roof installers ensuring that the parapet details were correctly detailed making the system as a whole watertight.The exterior finish was just as important as the internal construction and detailing. The Bracklesham Bay area has a level of prestige and the aesthetics needed to reflect that. K Systems finished the Marineside complexes with a silicone thin coat render, which is extremely breathable and resistant to the elements, in shades Limestone White and Granite. This completely transformed the aesthetic of the residential blocks making them much more appealing to potential dwellers.Envirorend SE commented:“ We secured the refurbishment works at Marineside , for a good client and works started in January 2022. The scope of works was to make the 3 blocks more energy efficient. Situated directly on the beach, the location made the install very challenging as the weather was not very forgiving at that time of year. The existing substrate was all over the place so a lot of effort was put in to get the walls looking line and level while staying within the remit of the specification. Works were completed in July 2022 and to a very high standard for all to see. “
Sponsored
GameChanger LED Flooring system

GameChanger LED Flooring system

Reflex Sports Ltd

The Reflex GameChanger flooring system was installed at this leisure centre.
Sponsored
St Hila's Cresent

St Hila's Cresent

Wetherby Building Systems Ltd

St Hila's Cresent - Wetherby's Modular Facade System
Sponsored
Bishop Auckland, Durham

Bishop Auckland, Durham

K Systems Insulated Facades

The Bishop Auckland refurbishment project, is a stellar example of K Systems ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Durham Homes commissioned K Systems to refurbish its residential development of 120 terraced houses. The primary aim of this project was to improve the thermal performance rating of each home. The challenge for K Systems was to provide a suitable EWI solution whilst retaining the character of the homes by replicating the existing brick and stone walls.Due to this unique mix of required finishes, we were presented with an extremely complex project that required careful attention of several aesthetic and design considerations.Having a good reputation for matching systems with finishes to deliver clients’ visions, we worked in collaboration with our approved installer Westdale Group, to scope out the project and specification in fine detail, with particular focus on insulating properties and aesthetic.These poorly insulated brick and stone terraced houses were given a thermal upgrade to enhance occupier comfort. An attractive brick render finish was used over insulation to provide an aesthetic finish that is in keeping with the current street scene.This satisfied the client’s requirements whilst providing a total revamp for the properties, which has resulted in energy efficient and aesthetically pleasing homes for the client and residents.Our ServiceWe worked in collaboration with Durham Homes and approved installer Westdale Group to upgrade these poorly insulated brick and stone terraced houses and deliver a total revamp of the properties, resulting in thermally efficient homes.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Our Application Specialists visited the site regularly throughout the project working in collaboration with the approved contractor to ensure correct installation and detailing.As a result, we delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Durham Homes, and the residents of the newly improved homes.Joe Rogers at Westdale Group, said:“To deliver such a large project (120 houses), it requires multiple teams to work seamlessly together and have absolute trust in the other’s skill, vision, and judgement. That’s exactly what we had with K Systems on this Bishop Auckland project. The team’s innate understanding of pairing systems with finishes for optimal performance is second to none and together we delivered a best-in-class refurbishment which was an absolute pleasure.”Technical Project DetailsEffective demand planning and technical detailing ensured that the Durham Homes project was completed on time in March 2022.Having comprehensively assessed the project requirements, taking into consideration thermal u-value target, aesthetics and cost, our K Systems E BrickRend EWI system was specified. This high-performing system is lightweight utilising expanded polystyrene (EPS) panels that are enhanced with graphite to further enhance thermal performance.The E BrickRend system has a fire performance rating of B2-s1,d0. It’s low moisture absorption and resistance to mould growth ensures a high level of durability.The system was specifically tailored to meet the thermal performance criteria of the project. Utilising 90mm EPS panels, the target U-value of 0.30W/m2K was achieved, delivering the benefits of improved thermal comfort and lower heating costs for residents, whilst helping the local authority achieve it’s environmental carbon reduction targets.Several finish options were considered to meet the client’s requirement of replicating the existing brick/stone appearance of the properties whilst remaining within the project budget.K Systems specified BrickRend, a bespoke, specially formulated polymer render which was colour-matched to the existing masonry. It was then down to the skill of our approved installer to apply pigments to tint and shade the render surface and simulate the appearance of real stonework. The surface is then sealed to provide a long-term durability. A dash render finish was applied to the rear of the Bishop Auckland properties.This particular finish didn’t just ‘fit the bill’ at the time of delivery, but is an economic, durable, lightweight solution, easily applied, with an increased bond strength compared to sand and cement, which will protect the insulation and structural fabric of the homes from environmental deterioration in years to come.This customised finish and attention to detail is a perfect example of how K Systems works with all clients to fulfil any specific design criteria and go above and beyond the standard requirements to deliver superior quality.
Sponsored
Manchester Construction Site

Manchester Construction Site

CLD Physical Security Systems

Eric Wright Construction are an organisation based in the North West of England, providing high quality construction services to customers for over 40 years.Back in 2017, work started on one of their new residential redevelopment projects in Manchester. Due to services and potential contaminates running directly underneath the construction site, they were in need of a zero ground strike fencing system that still held high security properties.The BriefThe brief was outlined by Eric Wright Construction through their specific requirements on the compound that CLD Fencing Systems and Wallbank Fencing needed to follow. Due to their inability to break ground, a permanent fencing system was not going to work.Zero ground strike fencing due to potential contaminates and servicesCompetitively pricedOperation and installation flexibility
Sponsored
Type G200 - Duff & Phelps

Type G200 - Duff & Phelps

Movawall Systems Ltd

Kroll (previously Duff & Phelps) operate within the risk and financial advisory sector, with UK offices based in Manchester’s Northern Quarter for which we had the pleasure of providing a Type G200 folding partition system during a recent refurbishment. The operable wall allows the space to be transformed from a large open plan area into two separate rooms as and when required.The Type G200 system offers impressive acoustic, achieving up to Rw 47dB when fully closed – minimising noise transfer between the two spaces, without compromising on light transfer. In this instance, a fully glazed, full height pass door allows for easy access between the two smaller rooms when the system is in use.
Sponsored
UWE Business School

UWE Business School

Lusso Systems Ltd

The £50m Business School for the University of the West of England, located in the proposed ‘Heart Zone’ of the Frenchay Campus masterplan, provides a new home for the Faculty of Business and Law. The vision behind the design was around transparency, visibility, and collaboration. The 17,000 square metre iconic building, which spans seven floors, includes large areas of collaborative space for students, visitors and staff to meet.Impressive AtriumCirculation around the Bristol Business School is obvious and highly visible from the main atrium where the Lusso 105 frameless double glazed system was installed. The system needed to be designed for imposed line load and potential wind load within the space. The glazed atrium, which is the heart of the building, incorporates a variety of social learning and flexible meeting spaces.Sleek DesignThe two wings of accommodation contrast to reflect the accommodation uses within and the orientation of the building on the site for environmental purposes. For these, the Lusso 105M double glazed framed system which complimented the other atria screens and enabled the slim ghost post mullion to incorporate the integral blind control mechanism.The multi award winning project was delivered to Building Information Modelling (BIM) Level 2 maturity. The FIS, a representative body for the finishes and interiors sector, presented Lusso with the Silver Award in Partitioning for the Business School at their annual awards ceremony. These awards are held annually and are designed to ‘promote and encourage highs levels of craftsmanship’.  
Sponsored
Gaywood House, Bristol

Gaywood House, Bristol

K Systems Insulated Facades

Improving the thermal fabric performance and replicating the existing lookThe primary aim of the project was to improve the thermal fabric performance of the block and also to replicate the existing look. To achieve this, the client’s key requirements were two-fold. Firstly, to match the original external style as closely as possible in both colour and texture to satisfy the local authority’s requirements. The second key criteria was to ensure that all the systems used on the project were fully approved regarding fire performance, to meet the current regulations for buildings over the height of 18 meters in England. Delivering a robust, safe and aesthetic system solution to meet the project requirementsWe specified a combination of K Systems M VBriQ and K Systems M VBriQ+ to ensure we met the aesthetic planning requirements and comply with building regulations for resistance to fire in high-rise buildings. Our system incorporate mineral wool insulation which has an outstanding A1 non-combustible fire rating, which improves the thermal comfort and reduces heating costs for residents, whilst supporting Bristol City Council to meet their carbon emission targets.Our VBriQ acrylic brick slip finish was specified due to its lightweight characteristics and wide range of colours. Our Acrylic slips have a high UV resistance which will ensure the building maintains its appearance over time. Our VBriQ+ clay brick slip finish was specified for the ground floor and surrounding garage areas because of its robust and durable characteristics.Meeting the project deadlines and minimising disruptionsWe worked in collaboration with our approved installer Rateavon Ltd to ensure there was minimum disruption to the residents of Gaywood House. Our Technical team carried out regular site inspections to ensure the systems were installed to the highest standard with timely responses to technical detailing requests.
Sponsored
BISF Housing, Motherwell

BISF Housing, Motherwell

K Systems Insulated Facades

BackgroundThe BISF (British Iron and Steel Federation) constructed the Newarthill properties in the 1940’s, utilising steel-framed walls that were initially coated in cement render and vertical steel panels.In previous renovations overseen by the Local Authority, the upper level of the building was clad in PVC weatherboard, while the lowest floor had its exterior re-rendered. The building is characterised by its non-traditional construction style.The houses had extremely poor thermal performance and the flats were difficult and expensive to heat, especially with the rising fuel prices and current cost of living crisis, meaning some residents were in a state of fuel poverty.North Lanarkshire Council required an EWI solution that would achieve the following three key objectives:- Improve the thermal performance of the property portfolio- Specify a system that would achieve a U-value of 0.17 W/m²K and would involve as little technical detailing around the property as possible- Ensure the properties had a modern and aesthetically pleasing look as the current exterior was tired and datedUnderstanding and appreciating K System’s expertise in this sector and innate ability to deliver best-in-class refurbishments, North Lanarkshire Council appointed the partnership of K Systems and Ailsa Building Contractors to tackle the low rise refurbishment project.Our ServiceAs the Newarthill development was already occupied, a key element of this project was to deliver the refurbishment with minimal disruption to current residents and / or neighbouring houses.This is one of K Systems strengths, ensuring jobs are delivered in a timely fashion, without delay, without disruption, and with full disclosure of each phase given to residents throughout the project to build rapport, trust, and confidence.On this particular low rise refurbishment, which had limited access points for all traffic in and out surrounding its immediate vicinity, K Systems had to work closely with the contractor, main contractor, and local authority to ensure they were working in harmony to negate any unnecessary commotion.K Systems’ technical team also carried out regular site visits to make sure the system was installed to the highest standard, in line with specification, and to ensure all involved parties were delivering to time and budget.The refurbishment of the properties is a great example of K Systems’ unparalleled ability to deliver constructional excellence that not only meets but exceeds the expectations of its customers.Technical Project DetailsOn initial scope, the K Systems team identified that a major challenge for this project was going to be the technical detailing between the timber frame sheeted ply at the top storey and precast concrete slab at the bottom. Several U-value calculations were completed by the experienced K Systems team to support the Council’s request of minimal detailing around the property and the target U-value.To meet these requirements, the K Systems P EWI system was specified, which utilises phenolic foam insulation boards. This insulation is lightweight and has a high thermal performance, allowing for thinner sections of insulation to achieve optimal thermal efficiency - perfect for this project, achieving the target U-value of 0.17 W/m²K , up from 0.32 W/m²K.It is a suitable solution for buildings that are restricted in expanding their footprint due to pavements or nearby properties, and can be easily installed on masonry structures, as well as non-traditional structures - an ideal solution for the Newarthill properties.Addressing the request for a modernised aesthetic, a dash render finish was specified. This render is extremely robust, hard-wearing, and low maintenance, ensuring the properties’ refreshed exterior would remain for years to come. The dash render was also complementary to the existing local property portfolio which was something the Council wanted to achieve.This refurb completely transformed cold, weathered, distressed housing in a Scotland suburb into warm, comfortable, aesthetically pleasing homes that met the exact requirements of North Lanarkshire Council and reduced the energy bills for residents due to improved thermal performance.
Sponsored
Emirates Air Line, London

Emirates Air Line, London

Howe Green

Howe Green’s 5000 Series and 7500 Series access covers were specified for the Emirates Air Line, the first urban cable car in the UK. The cable car crosses the Thames from Greenwich Peninsula to the Royal Docks and links two former Olympic sites. The access covers were required to provide easy and reliable access to essential services within the North and South Terminal buildings. A bespoke aluminium bar was also designed and made for the project. The bar comprises a decorative trim featuring a semi-circular section with a 10-metre radius and a 6mm visible edge.
Sponsored
AluOne - Herbert Road

AluOne - Herbert Road

Balco Balcony Systems Ltd

AluOne is a self-supporting, lightweight and recyclable open balcony system. Designed for structural simplicity and ease of installation, whilst stylishly complimenting the building facade. Manufactured at our state-of-the-art production facility, and constructed using a four column self-supporting lightweight system, AluOne ensures ease of implementation on site. Suitable for new builds, renovations and retro-fitting to existing buildings. We have a suitable solution for every building. Guaranteed durability, practicality and a high quality finish, AluOne is a truly bespoke modular system.Available in a wide-range of RAL colours, AluOne can be customised specifically for each project with a choice of balustrade and floor tile options. AluOne comes with a tiled floor of concrete paving slabs. The plates have been carefully sandblasted to allow the natural stone ballast in the plate to appear. Thanks to our manufacturing method, this plate has an unique colour resistance. The paving slabs are 400 x 400 in size and available in three colour shades. Always designed with drainage management in mind, AluOne has a hidden system in the balcony for optional rainwater drainage. The water flows discreetly under the paving slabs, allowing it to move into the drainage pipe via a gutter in the balcony frame. This is connected to the building's drainage system or to a drainage pipe that ensures the balcony rainwater discharge is properly managed. AluOne is available ins 12 different sizes. You can choose between four different widths and three depths, each in convenient increments of 400mm.
Sponsored
Bournemouth University | Bespoke Solar Canopy

Bournemouth University | Bespoke Solar Canopy

Able Canopies Ltd

University of BournemouthProduct: Two Bespoke Kensington Solar CanopiesCanopy Colour: Anthracite Grey RAL7016Canopy Size: 21.9m x 4.9m eachInstallation Date: September 2017The project in briefAs part of a major infrastructure development Bournemouth University created a new transport hub to connect the University to the wider area. Shelter for waiting passengers was part of the plan. Uniquely it had to fit in with the wider design themes of the development and deliver on the University’s sustainability goals by utilising solar technology. To meet those requirements Able Canopies created a bespoke canopy design based on our stylish Kensington system. The addition of solar panels, effective drainage, plus seating and under canopy wind protection, were all elements that the adaptable Kensington can handle. The result was a standout look for a practical transport hub that provides effective weather protection and longer term pay back via renewable energy generation.Growth at Bournemouth UniversityThe new Talbot Campus development at Bournemouth University is an important and prestigious project, not just for the University but for the local area which benefits from the success of the University and its students. The £3 million investment in new campus buildings and other infrastructure is a long-term commitment that will see the University widen its learning provision and all-round facilities. Part of the benefit for students, and the wider Bournemouth area, is the construction of a new transport hub that will provide joined up public transport connecting the University campus to Bournemouth itself.  A key part of the new transport hub is the weather protection provided to passengers as they wait for buses. To ensure that this essential part of the development met the standards required of the project Able Canopies entered early design discussions with the University. This evolved and in April 2017 Mildren Construction awarded Able Canopies the works for the new bus hub.Project Proposal & InstallationThroughout the development and design process we thought that our Kensington Dual pitch would be the ideal product for this installation. The more the design developed and requirements were added, such as the solar roof panels, the more convinced we were that it was perfect for the client’s needs. The Kensington is a robust, steel frame system that will stand up to all that the weather has to throw at it. Its architectural good looks mean that it makes a strong aesthetic statement, which was a key requirement here. We worked closely with the solar panel provider Polysolar who had overall control of the installation. Their panel fitted perfectly into the Kensington roof with some minor alterations to our working method to provide clean, efficient and sustainable energy for the transport hub. In addition, we had to consider how all cables were concealed and accessed at later dates. To achieve this access panels were installed in the 2 higher posts, one dealt with DC cables from the solar panels and the other with AC cables for the lighting. The final 2 lower posts on each canopy were designed to be integral rain water pipes and dispersed all water from the roof into a drainage connection below the paving.The Finished CanopiesAs the images show, the canopies look great and they are doing their job effectively in the transport hub which is now up and running. The solar panels are producing energy efficiently and help to provide a safe and comfortable shelter for the Campus’s transport users.The Tech SpecsMain Structure 21.9m x 4.9m overall canopy size (each)Powder coated and hot dip galvanised steel frame Inclined from 3m low end to 4m high end126 PS-CT Series Solar Panels per canopy (8mm thickness)Bespoke laminated glass end panelsMicro connectors to all solar panels to ensure all cabling was discreteSabre Architectural LED lightingBespoke underground drainage connectionsBespoke electrical access panels18kw system in totalGalvanised steel cable trunking & aluminium cable trays Underside Windbreaks10mm toughened glass windbreaks fixed to heavy duty steel frameGalvanised steel & hardwood benchesStainless steel glass clamps
Sponsored
B2P Canary Wharf Office - Smoke & Natural Ventilation

B2P Canary Wharf Office - Smoke & Natural Ventilation

Powrmatic Ltd

OverviewThe BP2 office building was constructed on reclaimed land at the eastern gateway to the Canary Wharf estate and comprises 14 stories above ground, plus three basement levels. The building’s design places a strong emphasis on energy-efficient performance, so this was an important criterion in the selection of ventilators.OverviewThe BP2 office building was constructed on reclaimed land at the eastern gateway to the Canary Wharf estate and comprises 14 stories above ground, plus three basement levels. The building’s design places strong emphasis on energy efficient performance, so this was an important criterion in the selection of ventilators.Project BackgroundAir Design Systems Ltd provided a full design and build package for the client. This included installation of local control panels and electrical wiring, as well as micro-switches to allow a positive signal that each ventilator is fully open prior to the pressurisation system starting up. Air Design Systems Ltd also supplied and installed numerous continuous louvres to the plant wells that rise through the building and terminate at roof level.Project SolutionPowrmatic supplied a large office building ventilation solution with a combination of single and double flap Skyvent ventilators to provide natural and smoke ventilation at the BP2 building in Canary Wharf, East London. Each of the 13 BS-EN 12101 ventilators was installed by Air Design Systems Ltdonto existing upstands with insulated lids and bodies and polyester powdered coated to RAL 9007 matt.Project ResultSkyvent ventilators are designed for both smoke and natural ventilation and are available in single and twin flap versions to suit the needs of each project. They can be installed on upstands, roof sheeting and into glazing systems. They feature very low air leakage when closed, and are weatherproof when closed, as tested to BS Parts 1 & 2. Insulated options can achieve U-values as low as 0.17W/m2/K.Skyvent ventilators are available with optional aluminium (single skin and insulated), polycarbonate or glazed lids in polyester powder paint finishes to any standard BS or RAL colour. A full range of accessories is available including bird guards, security guards and insect mesh.
Sponsored
Nile Street - Grad Decking System

Nile Street - Grad Decking System

Alfresco Floors Ltd

Alfresco Floors were commissioned to refurbish the external terrace of a top floor apartment located on Nile Street, London. The brand new GRAD invisible fixings clip system was supplied and installed by Alfresco Floors, their first ever GRAD installation in the UK. The unique clip and groove design at the heart of the GRAD system means that decks can be installed about 30% faster than competing products. The GRAD system can be retrofitted onto existing timber joists, installed from scratch on top of a new timber sub-frame, or mounted onto the bespoke rail system.

Showing 145-180 of 1444

Feedback