NBS Source
I'm a manufacturer

"packaged wiring systems cabling"

10,323 results found

Sort by:

Showing 109-144 of 1479

Sponsored
Stanpit I-House, Karm Homes

Stanpit I-House, Karm Homes

H+H UK Ltd

The full I-House system package was used for each unit, comprising the structural inner skin, insulation, floor cassettes, roof cassettes, soffits and facias. The I-House system is manufactured offsite by Roofspace Solutions who also supply a 3-person team and crane operator to create each structure. 
Sponsored
Wick Tower

Wick Tower

Licata Building Systems Ltd

Wick Tower is an iconic building for the locals which lay derelict for 20 years. Licata Building Systems was part of the process to bring Wick Tower back to life. Our silicone render system was used to create an aesthetic façade finish. The render system used maintains it’s clean fresh look for many years to come due to its self cleaning properties and will protect the structure from moisture.
Sponsored
Epwin Window Systems - MORE Options - MORE Possibilities

Epwin Window Systems - MORE Options - MORE Possibilities

Epwin Window Systems

Working with Epwin Window Systems on any project can be like a breath of fresh air. Putting it simply, our experience & expertise in commercial projects counts. We’ll save you time & money, we’ll always work for the best overall outcome. We know that you’re the construction experts. Our job isn’t to tell you what to do. It’s to help you do what you do best, more economically & more efficiently. Simplifying the task of installation, reduce site damage & cut down on survey times while delivering the right windows & doors for all your projects. Call us.
Sponsored
Hounslow Civic Centre

Hounslow Civic Centre

Bathgate Flooring Ltd

A Raised Floor System was nominated for this project in order to ensure full access to cables / services within the flooring. This provides greatest flexibility for the long term function of any commercial building. The stunning design was created by Sheppard Robson Architects who won a design competition in 2005 to create this building. The site was developed by Linkcity with their sister company Bouygues UK as the Main Contractor. Bathgate Flooring was appointed to manufacture, supply and install over 10,000m2 of PSA steel encapsulated panels to create the raised floor system over 7 floors.
Sponsored
Food & Beverage Industrial Doors - Taylors of Harrogate

Food & Beverage Industrial Doors - Taylors of Harrogate

Hart Door Systems Ltd

Bettys & Taylors of Harrogate is a fourth generation independent family business, passionate about some of the finer things in life – beautiful tea rooms, handmade cakes, traditional breads, proper tea and top quality coffee. They are the business behind Yorkshire Tea, Taylors of Harrogate coffee and the famous Bettys Café Tea Rooms.Project/doors: 5 Speedor Super, 1 Speedor Mini, 12 Fire Shutter, 21 Pedestrian doors, 1 Electric roller shutter, 1 Insulated Roller ShutterThe challenge Due to the size and weight of the insulated roller shutter at 10.5m wide and 6.3m high, this was a difficult installation in an area where the headroom was very tight. A crane was required to lift the shutter into position after opening two holes in the building’s roof so lifting chains could be dropped through to facilitate moving the shutter into position. The solutionHart was contracted by Sir Robert McAlpine to supply and install a range of industrial doors at the Taylors of Harrogate site.  This included the installation of the three-tonne insulated roller shutter completing a work package of over 40 doors. The success The installation of the shutter concluded a project which Hart was involved with through Sir Robert McAlpine and which saw almost every Hart door product installed – from Speedor high speed doors to fire shutters, security shutters and steel personnel doors. 
Sponsored
Aggreko, Dumbarton

Aggreko, Dumbarton

Berry Systems

Berry Systems supplied and installed Internal and external vehicle safety barriers at new Aggreko, Dumbarton plant to protect; doorways, walkways, columns, site and equipment.Aggreko PLC, the world leader in the field of power and temperature control rental, has become the first company in the UK to have Berry Systems’ new Stopbollards installed at its new 170,000 sq ft Dumbarton facility.The many, internal and external vehicle doorways at the brand new Dumbarton site were identified very quickly as needing special protection. Glasgow architects Bradford Robertson considered a number of options before concluding with main contractors, Morgan Sindall, that our SlowStop bollards would prove a cost effective solution. During a collision, the kinetic energy of the impact is progressively absorbed as the post tilts, compressing an elastomeric sleeve within the base. The post is able to tilt from its vertical position to an angle of 20 before it locks within the base. After the impact the post will return back to its vertical position, ready to perform once again. A total of 104 SlowStop bollards were installed at Dumbarton, along with a variety of other products from our range.https://berrysystems.co.uk/wp-content/uploads/2024/03/Berry-Case-Study-Aggreko-Dumbarton.pdf
Sponsored
Telegraph Works, London

Telegraph Works, London

EH Smith Architectural Solutions

Working with Allford Hall Monaghan Morris (AHMM) we were able to provide a solution for the bricks and ceramic cladding for this Weston Homes development in Greenwich.The site was formerly a Telegraph Works where the first transatlantic telegraph cable was built and where transatlantic submarine cables were still built until 1975.The bespoke colours of the A1 fire rated cladding were developed by our partners Agrob Buchtal to the Architects' specification.
Sponsored
London Heathrow Airport

London Heathrow Airport

Berry Systems

Berry Systems supplied and installed perimeter and ramp barriers for new multi-storey car park incorporating very thin  concrete decks.A revised design for the new Heathrow Terminal 2 multi-storey car park called for a floor depth of just 150mm comprising a 60mm deep slab with 90mm structural topping. However, and there’s always a however, a traditional rigid safety barrier post needs fixing with 4 bolts each to a depth of 170mm. Obviously these couldn’t be used,so contractors Laing O’Rourke turned to barrier specialists Berry Systems to provide a solution and appropriate perimeter barriers for the 6 decks and the spiral entrance and exit ramps.Over many years Berry Systems have developed a range of flexible spring steel barriers that ‘give’ on impact. This not only reduces damage to both the barrier and an impacting vehicle but crucially reduces the pull out loading on the anchorage by 50% or more. This in turn allows post fixing to be achieved by using only a single bolt embedded to a depth of merely 110mm - a depth achievable into the new slabs.The specification was completed with Berry Beam safety rails to provide a more attractive appearance than the well known “Armco” style. Post extensions provided mountings for a pedestrian handrail at 1100mm high with integral anti-climb mesh where needed.The thin slabs were developed by Bison Manufacturing and are the thinnest precast concrete planks produced to date in the UK. They led to many benefits which considerably reduced the construction programme. It also allowed 6 floors in the usual height of 5, increasing capacity to 1340 spaces. But perimeter protection would have proved problematical without the expertise of Berry Systems.
Sponsored
A facelift for the skyscraper foyer - Automatic Systems - International

A facelift for the skyscraper foyer - Automatic Systems - International

Automatic Systems UK & Ireland

The Skyper building complex in Frankfurt am Main boasts a very special architecture. The three-part complex – consisting of the 153.8-metre Skyper high-rise with 39 floors, the neoclassical Skyper Villa from 1915 and the Skyper Carrée – offers a total of 53,900 m2 of office space for numerous companies and banks. When the existing single access entry systems were dismantled in the summer of 2020 as part of renovation work on the foyer, the owner opted for a new, modern solution that would blend in perfectly with the architecture of the skyscraper. Every day, large numbers of people go the foyer to get to their workplace. Numerous visitors also pass through this area. This called for a solution combining functionality, safety and an appealing design.
Sponsored
Remedial Basement Waterproofing

Remedial Basement Waterproofing

Delta Membrane Systems Ltd

When it comes to residential, commercial or any structure below ground, waterproofing is a critical component within the construction process for protecting and preserving a building. A poorly designed or installed waterproofing solution can fail leading to significant implications on the structure itself.Delta Registered Installers, Abtech (UK) Ltd were called upon to give assistance on a particularly technically complicated project where approaches to waterproofing design and installation had been incorporated, however the system had failed. For a great remedial waterproofing outcome, seek assistance from an experienced waterproofing company to inspect your site and carry out the remedial work.The property when built had a Type C, cavity drain membrane systems incorporated (not a Delta System), however there was no basement drainage incorporated into the design to manage water ingress.In principle a Type C, drainage system is a water management system. The Type C system is used to control water ingress once it has penetrated the structure.  Moisture or running water travel behind the Type C membrane within a controlled drainage system. A Type C System isn’t classified as a barrier but provides protection by means of water management. For a Type System to be successful a suitable drainage system is required to collect and discharge water ingress to a suitable and safe evacuation point (either by natural forces or a mechanical pump system).When correctly installed, groundwater drainage channels effectively relieve hydrostatic water pressure in the below ground structure. They are installed below flooring membranes at the floor/wall junction.
Sponsored
Britain's biggest domestic basement?

Britain's biggest domestic basement?

Triton Systems

Combining all three types of waterproofing system (Types A, B and C) supplied by Triton Systems, at the time of construction this project was believed to be the UK’s largest domestic basement. The three storey habitable space below ground was retrofitted under the existing property, and extends beneath the new build adjacent luxury apartment blocks.
Sponsored
Aston University

Aston University

Excelsior Panelling Systems Ltd

The Project Aston University Student Union at the heart of the University’s campus has seen a £6.5m investment.  The new, two-story building, home to over 100 student clubs and societies, acts as the social hub for the 13000+ students at the university & replaces the old 1960’s Building. The Universities brief was to incorporate the local area into the project using images of Birmingham City Skyline. The Challenge Offer a full height cubicle system, suitable for the environment and to a specification befittng the digital imagery. Digitally render images onto Laminate and apply to the façade of the full height system. Manage the precise fabrication process through the factory. The Solution  Excelsior’s Flush 30 Cubicle System encompasses a rebated aluminium frame to the doors and pilasters. The aluminium edge detail provides a robust trim and looks innovative within this modern building, an unrivalled system within the washroom market.The images, supplied by the client were digitally rendered onto laminate by Formica Younique and applied to the façade of a full height Flush system.Max McLoughlin, CEO of the Student Union comments: ‘We want the building to make students feel proud to be at Aston University. From a design perspective, we wanted the students to feel fully immersed in life on campus & we are very happy with the result’.
Sponsored
United Utilities

United Utilities

CLD Physical Security Systems

United Utilities Group PLC (UU) is the largest listed water company in the United Kingdom. Covering 5 counties it is responsible for providing water service to nearly 7,000,000 customers.Between 2010 and 2015 it spent almost £3.6billion on upgrading its services and infrastructure to meet the ever-increasing demand for reliability and standards.The BriefTo meet the then current threat levels all fencing and gate systems had to provide the following.Anti-Climb Fencing SystemsLPS 1175 SR2 rated Fence and Gate SystemsA Minimum guaranteed delay against attackSwing and Sliding gates rated to LPS 1175 SR2 to meet the demanding nature of the sites
Sponsored
Waterproofing the Houses of Parliament

Waterproofing the Houses of Parliament

Newton Waterproofing Systems

Waterproofing this historic London landmark – external waterproofing with Newton 403 HydroBond, internal waterproofing with Newton System 500, installed by Newton Specialist Basement Contractor MacLennanUK.Newton Waterproofing were delighted to return for this project at the prestigious Houses of Parliament in London, a landmark that has dominated London’s skyline for over 150 years. Newton Specialist Basement Contractor MacLennan Waterproofing was approached to specify a guaranteed waterproofing solution for the new-build basement.After reviewing the technical drawings, MacLennan decided to bring the job to Newton, whose product range was perfectly suited to the project requirements. Newton and MacLennan are both privileged to be the companies chosen to share in securing the future of the Palace of Westminster.This complex project required the design and installation of an external waterproofing system, an internal cavity drain system, and a polyurea roofing system to ensure a high standard of waterproofing.Externally, Newton’s innovative ‘Type A’ 403 HydroBond membrane was applied extensively to ensure the necessary waterproofing around the basement, whilst internally, Newton 508 and Newton 520 membranes were both applied from floor to ceiling as part of Newton’s complete System 500 cavity drainage solution. With the finished structure in place, the waterproofing was finally completed by the application of both a polyurea coating and further drainage membrane to the roof deck of the basement.With a waterproof basement fully compliant with the requirements of BS 8102:2009, coupled with guaranteed protection against water ingress, this newly completed, large basement area, situated directly next to the River Thames, provides a durable and well-established waterproofing solution, utilising multiple Newton Systems to great effect.
Sponsored
Aluminium Sliding Door System - MasterPatio

Aluminium Sliding Door System - MasterPatio

Reynaers Aluminium

Introducing the next generation of sliding systems. MasterPatio is a high insulation and high performance lift-slide system with minimalistic look and clean design, down to the details. The system combines top thermal performance with slim sightlines and a maximum element height of 3.7 m.
Sponsored
Bradford Royal Infirmary

Bradford Royal Infirmary

Stone Cladding Systems

Architect: Broadway MalyanContractor: BAM ConstructionStone: YorkstoneThe £28M new Broadway Malyan designed Bradford Royal Infirmary Children’s Ward has now been officially opened by HRH The Princess Royal.The new wing, part of Bradford Teaching Hospitals NHS Foundation Trust, was recognised with the top honour at the Local Authority Building Control awards for West Yorkshire at Wakefield Unity Works. The Children’s ward is clad in Aztec Rainscreen with a façade of our local Yorkstone.Aztec was chosen because of its similarity to other local buildings and for its speed of installation. Bam, having used the system before were confident of Stone Cladding Systems ability to deliver a quality system on time. 
Sponsored
Blackhorse Lane

Blackhorse Lane

Langley Waterproofing Systems Ltd

The purpose:Taylor Wimpey’s Eclipse development was the final phase of the large-scale modernisation and renewal strategy for the London Borough of Walthamstow Forest, known as The Blackhorse Lane Action Plan. Eclipse would offer affordable social and private housing via 500 homes in two six-storey apartment blocks.To help satisfy one of the Plan’s objectives- “to ensure new developments incorporate the highest levels of sustainable design and their impact on climate change is minimised”- we installed green roofs on both blocks. As it was the final development phase, space was limited; time was also an influencing factor in facilitating the tight build programme,avoiding delays, and enabling the client to deliver much-needed new homes.Our solutionTo enable fulfilment of the brief, we recommended our HM-40 Paratech Hot Melt Roofing System as the inverted waterproofing base for the green roof. A fully-bonded system, HM-40 is a robust, durable, and highly flexible monolithic, self-healing hot-melt waterproofing system for protected roofs, green roofs, terraces, and podium decks with a 40-year durability statement. In addition, it is firerated for unrestricted use when covered with a green or ballast roof.Unlike other hot melt systems that use fleeces, the Paratech system incorporates a reinforcement mesh: this allows the system to be rolled out, making waterproofing installation faster, thereby enabling the contractor to lay the top roofing layer of artificial grass and landscaped green roofs. Unfortunately, an on-site compound to store the roofing components was unavailable. We worked closely with T&T Roofing and Taylor Wimpey to ensure deliveries arrived in build sequence for immediate use, but without adversely impacting residents who had already moved into their newhomes.“The features of the flat roof system provided a seamless, issue-free roof installation, with rapid installation time causing minimal disruption. Langley’s technical team was always on hand to provide assistance when necessary, working collaboratively to guarantee a consistent and highquality installation.”
Sponsored
Network Rail: London Bridge Station

Network Rail: London Bridge Station

MSA Safety (Latchways) – Fall Protection

Network Rail has redeveloped the 180-yearold London Bridge station – the fourth busiest station in the country with over 54 million passengers passing through every year. To redevelop such a vast, complex site Network Rail required a team that would work together with one goal in mind and add value by presenting viable solutions. Eurosafe chose the MSA Latchways Constant Force Post (CFP) cable system for a complete rooftop fall protection solution. It is the only system approved by Kalzip, who supplied the roof at London Bridge.
Sponsored
Limehouse Basin,

Limehouse Basin,

K Systems Insulated Facades

Located in East London, on a water gateway between the River Thames and over 2,000 miles of navigable canals, the six-building Limehouse Basin development comprised of a white EPS insulation board that was fixed to horizontal PVC rails that created a drained cavity between the insulated façade system and the substrate.Due to strict regulations introduced in December 2018 following the Grenfell tragedy, which states any building exceeding 18 metres in height must have walls comprised of non-combustible materials, this building was deemed non-compliant, unsafe, and not fit-for-purpose.Development owners Beckford, supported by the Building Safety Fund (BSF), required an expert team to execute the removal of the existing EWI and replace it with an appropriate alternative, without disrupting the unique aesthetic of the building.The combination of K Systems and Retrofit UK, two companies renowned for their expertise, quality of service, and superiority in the market, was an obvious choice for Beckfords.We have a good portfolio of BSF projects to date, and Limehouse Basin is another great example of how our team along with one of our approved installers can help make a building fit for purpose, whilst overcoming numerous challenges along the way. Unrivalled expertise and professional delivery are apparent in every groove and corner of this refurbishment.Our ServiceTogether with Approved Installer Retrofit UK, K Systems continued works despite Covid restrictions (adhering to Government guidelines) to deliver the Limehouse Basin project within the agreed timeframe and with minimal disruption to residents as requested by the client.Removal of the existing EWI system took place in rotation with the installation of the new system, and a robust programme was put into place by the contractor to ensure the building was not exposed to the elements for long periods of time, ensuring the residents were kept as comfortable as possible especially during the winter months. Decanting of the residents did not take place, so we worked alongside all parties to ensure the health, safety and welfare of the residents were prioritised during the works.Due to the nature of this project, technical monitoring from the K Systems team was increased, and weekly visits were planned along with a reactive approach to any on-site issues that arose from a technical perspective. Our technical teams actioned regular quality assessments and maintained open communication with all stakeholders.The result – an industry-leading insulated façade solution that fulfilled Beckfords’ criteria and delivered an outstanding architectural design and structure, fully compliant with fire regulations and boasting a better U-value which translates to better living conditions for the residents.Technical Project DetailsThe key objective for the Limehouse Basin project was to remove the non-compliant EWI system and replace it with a non-combustible system to meet current building regulations.Our team insist on being involved from the very concept of any BSF project to ensure an accurate specification could be developed and allow any initial underlying issues to be identified and rectified swiftly. Therefore, our Technical Team witnessed the removal of the existing system and inspected the substrate thoroughly.After extensive scoping, the K Systems M, mineral wool insulation, system with a silicone render finish was chosen as the preferred option, meeting the demands and needs of the client and current building regulations. This system provides high levels of fire resistance and non-combustibility (an A2-s1, d0) bringing it in line with mandatory Government requirements for buildings over 18m tall.With superb acoustic qualities and excellent environmental properties, the M System didn’t just tick the fire resistance box. The thermal performance of the building was significantly enhanced, with a U-value of 0.30W/m².k being achieved.The shape of the buildings were complex, with numerous curved areas of various facades. This meant the finish required an expert eye and a skilled hand to deliver seamlessly. Both K Systems and Retrofit are renowned for their expertise and superiority in the market, and therefore such challenges were overcome, and high standards of workmanship delivered.Another very challenging aspect of the build was the replication of the rainscreen cladding to the front of the buildings. This detail was successfully created by using tape joints, stop beads, and black silicone mastic to create a shadow gap – further testament to the expert capabilities of our team. This particular finish not only delivered the desired aesthetic but delivered an additional benefit of cost savings for the client.We worked closely with Retrofit UK throughout the duration of the refurb and as a result the Limehouse Basin buildings have a contemporary finish and attractive aesthetic worthy of the projects postcode, and one we are confident existing residents welcomed and potential residents appreciated.
Sponsored
The Rolex Building, London

The Rolex Building, London

nVent Thermal Management

nVent was brought in to employ a variety of heating solutions at the London Rolex Building. Rolex was looking to convert its heating to a simpler, lower cost single pipe system requiring less maintenance. nVent provided hot water services using the RAYCHEM HWAT single pipe hot water temperature maintenance system. More than 400 meters of cable were installed to provide hot water all the way to the point of use, 600 metres of pipe freezeprotection to safeguard the chilled water supply lines from freezing. In addition, the entrance foyer welcomes visitors with the warmth of RAYCHEM QuickNet floor heating systems.
Sponsored
The Distillery, Glassfields

The Distillery, Glassfields

Lusso Systems Ltd

Glassfields is a new high-spec office development which forms the gateway to Bristol’s Temple Quarter. The completed building offers the perfect environment for how businesses work today.With 93,000 square feet of high-quality office space, it has been designed with the tenants’ well-being in mind and provides a flexible, adaptive, and creative space. The design of the interior called for an industrial look which made Lusso 25 Geometric glazed partitioning system, with its black powder coated frames and banded look, the ideal choice. High acoustic Silenzio doors and Lusso 25 frameless single glazed system, also powder coated in black, were used to complement the design. The overall look provides a stunning, dramatic, and classy environment in which to attract and retain talent.The building has achieved BREEAM Excellent accreditation and an EPC rating A, embracing industry best practice, energy efficiency measures and sustainable technology.
Sponsored
World of Books

World of Books

Concept Cubicle Systems

World of Books is the UK’s largest online retailer of second hand books. As part of the ongoing improvements to their head office, they were looking to refresh their existing washrooms to a hard wearing cubicle system that is durable enough to withstand daily use from its staff.Read the full case study on our website.
Sponsored
Lawrence House

Lawrence House

Dunhams Washroom Systems

Dunhams were tasked with designing upscale, premium washrooms to complement the newly refurbished office spaceFull Height Vista flush front cubicle systemFull height IPS duct panels to conceal plumbingBespoke Solid Surface washtroughs in Corian Glacier WhiteBespoke matching HPL mirror frames
Sponsored
Edinburgh College

Edinburgh College

Forbo Flooring Systems

For the refurbishment of Edinburgh College’s busiest campus, its FM team called upon Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for its unique ability to be installed quickly and easily, while reducing downtime and disruption to day-to-day college life – as the floor covering could be walked on immediately after installation.
Sponsored
Devonshire Mansions, Eastbourne

Devonshire Mansions, Eastbourne

K Systems Insulated Facades

BackgroundFor the perfect example of architectural excellence which not only delivered an impressive aesthetic, significant environmental benefits, and a more robust structural foundation, but also improved thermal performance, look no further than the eight-storey, three-building Building Safety Fund (BSF) project Devonshire Mansions.Situated in beautiful Eastbourne on the south-east coast of England, Devonshire Mansions were an extremely attractive choice for those wanting stunning sea views and some peace and privacy. However, due to their location in a high exposure area, the buildings were aged and weather-beaten, and required a full overhaul and refurbishment to modernise, align with current safety regulations for high rise buildings, and strengthen the buildings at their core whilst rejuvenating the exterior.Understanding and appreciating K System’s renowned ability for outstanding refurbishment projects, Pavehall contracted K Systems to completely refurbish this residential development and deliver on the following four primary objectives:- Remediate unsafe cladding- Improve the thermal performance rating of each home- Update and seamlessly replicate existing façade features- Deliver a solution with acoustic benefitsOur ServiceIn collaboration with Archiflair Design, Pavehall, and Fullers Plastering, K Systems delivered an industry-leading, insulated façade solution that fulfilled the desired criteria, achieved a U-value of 0.26 W/m²K and resulted in an outstanding architectural structure.The commitment of K Systems team, their continuous communication, in-depth level of reporting, and consistent presence on site not only ensured a perfect refurbishment, but also instilled 100% confidence in the supply chain throughout, showing exemplary levels of customer service.This project is a great example of how K Systems overcame various construction challenges to deliver within the agreed time constraints.The make-up of the façade had multiple protrusions in forms of balconies meaning that every sheathing and insulation board had to be cut to fit. Replicating this without compromising on the strict site deadlines was a challenge but under the great install team and K Systems’ expertise and onsite presence, this was achieved.Additionally, Devonshire Mansions had a problematic substrate and challenging aesthetic deliverables. Working closely with all partners, and utilising digital technology, K Systems mapped out the refurbishment and specified the ideal solution to Pavehall for implementation.Technical Project DetailsAfter a comprehensive scoping process, K Systems discovered that the existing system had a drained cavity build up and when removed, the sheathing boards were compromised by water. With the buildings being high rise, steel frame and multi-occupancy, the industry-proven K Systems Exicco Cavity Drainage EWI System was specified.In the Exicco system, the drained cavity behind the insulation ensures that any interstitial moisture escapes without detriment to the performance of the system. Due to their seafront location, Devonshire Mansions were prone to fierce rain and water exposure, so this system was the ideal choice to ensure any future moisture or condensation build up was allowed out to avoid compromising the substrate or newly installed façade.Once the strip out of the existing façade had occurred, further challenges were discovered – the substrate was far from line and level. This meant that every rail within the newly installed EWI system had to be packed out using steel shims to create a level vertical façade, subsequently adjusting the specified fixing lengths to suit.Some elements of the substrate were high strength concrete incorporating a flint aggregate which proved problematic for standard mechanical fixings. Via K Systems’ on site support, a suitable, more bespoke fixing was specified which ensured proper anchoring of rails and intumescent fire barriers. A swift solution was achieved with no detriment to the construction programme.The newly installed Exicco system was combined with the K Systems M (Mineral Wool) system. This high performing system provides optimal levels of fire resistance and noncombustibility and its installation at Devonshire Mansions meant that the fire classification of the buildings was upgraded to A2-s1,d0 meaning that the development is now compliant with the latest building regulations for all high-rise dwellings in England, further ensuring the safety of residents.Devonshire Mansions is visually impressive with its feature balconies, architectural cornices, ashlar panelling and quoin detailing. It was a specific requirement of the client to remediate the unsafe cladding without losing these exterior design features.K Systems created two specifications; one for the elevations and one for the balconies and provided bespoke detailing to allow them to seamlessly harmonise as one façade. Ashlar panelling and quoin detailing was replicated cost-effectively using varying thicknesses of non-combustible mineral wool insulation which was over-rendered skilfully by the contractor using K Systems Silicone Thincoat render.The more intricate cornice features were all bespoke manufactured using compliant non-combustible materials and integrated into the design with K Systems providing robust detailing to create a water-tight barrier and eliminating cold bridging. Decorative columns were installed at ground level to complete the façade.The eye-catching, waterfront dwellings were finished with Silkolitt+ - a versatile, easy to apply, water repellent, durable, and low maintenance thin coat render, perfectly paired and formulated for use with our Exicco systemOverall, K Systems specified a fit-for purpose, non-combustible façade with a high level of complex architectural detailing using cost effective solutions. The installation process was overseen by our unrivalled site support team who were frequently on hand to solve any issues as they arose.“Working alongside K Systems on a project of the size and nature of Devonshire Mansions was a true pleasure. From initial scope and specification to intricate detailing and innovative finishes, the K Systems team lead by example and made the process and delivery a slick and seamless operation. The refurbishment was a complex case but working together in partnership, we all delivered on excellence, and the beautiful Devonshire development is something we can all proudly put our names to.”James Fuller, Fullers Plastering
Sponsored
Donabate Library

Donabate Library

Forbo Flooring Systems

Donabate Portrane Library, recently refurbished by the Fingal County Council, is now a warm and inviting community library as a result of products chosen from Forbo Flooring Systems. The Marmoleum and Tessera products were chosen for their practicality, cleanliness and variety of interesting designs. And Sarlon Topography from Forbo’s acoustic vinyl collection was a must providing a quiet reading or studying environment.
Sponsored
President Kennedy Academy

President Kennedy Academy

Brett Martin Daylight Systems

8 Marvault Vaulted Rooflight Systems were installed at President Kennedy Academy to admit natural daylight into corridors. This formed part of a wider framework project in which Brett Martin Daylight Systems installed rooflights in seven educational facilities. President Kennedy is based in the area local to Brett Martin Daylight Systems and prides itself on its ‘no barriers’ approach to education in which it is committed to ‘Building Brighter Futures’ for its students.
Sponsored
ASF LED Illuminated Quayside Posts

ASF LED Illuminated Quayside Posts

Architectural Street Furnishings part of WB White Foundry

ASF utilised the ever popular ASF 211 Quayside post profile to manufacture a bespoke LED illuminated system for this site at Merthyr Tydfil. The finished product was a curved quayside post with 4 rails and 4 tension cables, with the LED lighting cassettes situated into the top rail, angled to provide down lighting for the waterside path. There were straight profiled versions made for the non waterside area to create a seamless transition between the water front and the inland pathway.
Sponsored
The Vale Apartments - London

The Vale Apartments - London

Licata Building Systems Ltd

With several stops marked out on the future Crossrail route, new-builds on the rise, and an impressive range of ‘Outstanding’ schools, this culturally diverse borough of Ealing is becoming more popular than ever. To meet this popularity new-build property is on the rise however there is strict guidance on design of new buildings. Licata Building Systems in partnership with Build-Therm Services Limited were commissioned to specify and supply the façade systems for The Vale apartments. A prestigious block on Connell Crescent, The Vale was subject to planning guidance that insisted the block remained in-keeping with the more traditional neighboring blocks. The system installed is Licata FireSafe Brick slips. Using a 7mm extruded brick slip the system is one of the lighest systems available on the market. Coupled with class A2 fire performance and a U-value of 0.039W/mK, the apartments not only met all NHBC and local planning design criteria but provides the occupant a safe and energy efficient environment.
Sponsored
The Gateway Student Accommodation

The Gateway Student Accommodation

Epwin Window Systems

Nearly 600 PVC-U tilt-turn windows in the Profile 22 system were chosen for The Gateway, a £22million student accommodation in Lincoln. The tilt-turn windows were fabricated by Profile 22’s Approved Window Contractor, Polar Windows, using the fully chamfered system, foiled with smooth finish RAL 7016 Anthracite grey as a special order to colour match the aluminium design scheme. The work was carried out in line with strict deadlines, and the project was completed in good time ready for the beginning of the academic year.
Sponsored
Friargate, Coventry

Friargate, Coventry

Excelsior Panelling Systems Ltd

The Project  Friargate One is a 150,000 sq ft, 13 storey, low energy building forming part of a £700m project to create a new business district in Coventry.  The building sets the standard for the remainder of the 37 acre Friargate scheme that will include 13 more office buildings, two hotels, homes and shops all set to transform the area around the train station. This project is the largest development in the West Midlands Combined Authority.   The Challenge Deliver a product to satisfy the architects design & meet the highest standards offered within the industry. Provide a full range of accessories to compliment the system. Manufacture bespoke boxed out mirror units complete with rebated lighting strip. Ensure the system is installed to highest standard to create a seamless fronted wall of cubicles and superloos across varying floors.  The Solution Floor to ceiling Flush 44 system installed throughout male & female washrooms and unisex superloos situated over two floors.   The system encompasses a 44mm MR core with a hardwood rebated edge detail. The overall finish is modern and sleek creating a seamless flush wall of cubicles with complete privacy and comfort for the users.Close management of each phase from site survey through CAD drawings, call up and manufacture ensured we had complete control of the project and were able to accurately survey the areas and install the seamless system desired by the client.SpecificationProduct Range: Flush44 HPLDoors: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPilaster: HPL Bonded onto 44mm MR Core, Formica Graphite F7837. Hardwood rebated edgesPartition: Partition: HPL bonded onto 38mm MR Core, Formica Folkstone F7927Ironmongery: Stainless SteelAvailable Finishes:These Systems Are Available In The Following Finishes:• Natural Wood Veneer• High Pressure Laminate• High Gloss LaminateAccessories Product Range W/C'sSpecificationProduct Range: AccessoriesMirror Backing Panels: Blanc Menuires B015 with 4mm Safety Backed MirrorsWaste Bins: Prestige Waste BinOther:Paper Towel HoldersWaste BinToilet Roll HoldersSoap Dispenser
Sponsored
Coca-Cola Enterprises, Wakefield

Coca-Cola Enterprises, Wakefield

Rapid Ramp Limited

REQUIREMENT: Able-bodied access to the cabin. ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.END RESULT:Our expert installers fitted a step system as shown. FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.THE COMPLETE RAMP PACKAGE:An all-inclusive, stress-free option which we managed in-house.This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 
Sponsored
Rejuvenating Headland Hotel

Rejuvenating Headland Hotel

Schlüter-Systems Ltd

Schlüter-Systems supported Lilly Lewarne Architects in the design and specification of the Aqua Club, a stunning swimming and wellness centre with specialist waterproofing products.
Sponsored
Epping Forest College, Essex

Epping Forest College, Essex

nVent Thermal Management

Architects Morgan Sindall was charged with creating a state-of-the art, energy efficient building including the hot water distribution system. A specific requirement was for the system to be able to raise temperatures monthly, for the prevention of legionella. A single-pipe solution was designed, using 1.8km of nVent RAYCHEM HWAT-R self-regulating cables to maintain 60°C. Supported by 15 nVent RAYCHEM HWAT-ECO smart controllers, the necessary legionella prevention cycles could be met, pipe temperatures could be varied (to provide setback temperature savings) and thermal boosts to 65°C implemented during times of non-occupancy.
Sponsored
Hilton Syon Park Waldorf Astoria Hotel, London

Hilton Syon Park Waldorf Astoria Hotel, London

nVent Thermal Management

M&E contractor ‘The All Group’ designed 2.5km RAYCHEM of HWAT-M self-regulating cables in a single pipe hot water system throughout the hotel. Controlled by RAYCHEM HWAT-ECO smart controllers, the system provided the benefits of energy efficiency plus savings in material costs, labour and space. Pipe freeze protection was delivered using 5.5 km of RAYCHEM WinterGard, controlled with RAYCHEM RAYSTAT-ECO-10. Underfloor heating was installed in the bedrooms, using RAYCHEM T2Red with T2Reflecta. In addition, RAYCHEM T2Quicknet 160 was installed in the en-suite bathrooms and the hotel’s luxurious spa.
Sponsored
Pure Cars, Wakefield

Pure Cars, Wakefield

Senior Architectural Systems Ltd

When it comes to showcasing prestige cars from the likes of BMW, Maserti and Mercedes, it’s vital to find the perfect setting and at the new Pure Cars premises in Wakefield, the slimline SF52 aluminium curtain wall system has helped create a building as impressive as the stock inside.The flexibility of the SF52 curtain wall system has brought the vision of architects The Harris Partnership to life, from the crisp lines of the showroom’s entrance to the smooth curve of the main façade. The eye-catching building boasts a prime location on the approach to the city centre, with the slim sightlines of the curtain wall highlighting the cars on display and offering panoramic views of the surrounding areas for the enjoyment of staff and customers within.The thermal-efficiency of the SF52 system will also help to prevent heat loss from the extensively glazed building which is a flagship dealership for the Pure Cars brand which specialises in the sale of used luxury and prestige cars.With a proven track record of work across the retail sector, Senior has been involved in a number of other car showroom projects across the UK. Senior curtain walling and glazing systems have been designed to help specifers working in this market meet the required environmental requirements by creating high-visibility shop frontages that minimise solar gain to create a comfortable consumer experience.Senior Architectural Systems’ stylish SF52 aluminium curtain wall system has been used to great effect at a new luxury car showroom in Wakefield, creating an eye-catching and thermally-efficient façade that maximises the use of daylighting. The flagship Pure Cars showroom has been designed by The Harris Partnership, with Senior’s fenestration systems fabricated and installed by Vision Aluminium Systems for main contractor Glass Walls and Doors.

Showing 109-144 of 1479

Feedback