NBS Source
I'm a manufacturer

"mains gas fittings"

3,150 results found

Sort by:

Showing 901-936 of 1010

Sponsored
60 Fly Screens for a Hotel

60 Fly Screens for a Hotel

The Flyscreen Company Ltd

In 2016 we were contacted by a large hotel to come up with a cost effective way of screening 60 windows to prevent insects from entering the building. We decided the box screen would be perfect as it offers ventilation and does not restrict the window from opening fully. The fitting took 3 days, the customer was happy and the screens are still as sturdy today as they were 2 years ago!
Sponsored
Hotel Waldorf, Berlin with Silent Gliss Curtain Tracks

Hotel Waldorf, Berlin with Silent Gliss Curtain Tracks

Silent Gliss Ltd

Berlin's new Waldorf Astoria Hotel next to the “Kurfürstendamm” – the first in Germany – continues the Renaissance of the old western part of Berlin. However there remains a clear commitment to the modern spirit. All rooms including conference rooms had to meet to the highest requirements and systems from Silent Gliss could fulfil those high expectations in all areas. Fitted with Silent Gliss Panel Glide systems.
Sponsored
Royal Wharf Medical Centre

Royal Wharf Medical Centre

Advanced Timber Systems

At the heart of the new Pontoon Dock development is the ‘Royal Wharf Medical Centre’. As part of the internal fit-out package we were included for the supply of bespoke internal Fire doors, Screens and Architectural Ironmongery.Laminate door-sets were chosen to provide durability and great aesthetics. With A.W.Oak Linings and screens a great overall appearance was achieved that fully complies with the stringent requirements of a demanding environment.
Sponsored
SUBSEA 7, 40 BRIGHTON ROAD, SUTTON UK

SUBSEA 7, 40 BRIGHTON ROAD, SUTTON UK

Dolphin Solutions

In 2016, the company built a 14,000 sq m contemporary, headquarter office building in London, which would allow their business to grow whilst remaining in a town that has been home to the company for many years. Subsea 7 required a high quality, innovative washroom that would complement the extensive and dynamic building. Working with ESA Architecture, Dolphin advised on the most fitting washroom solution.
Sponsored
Big Yellow Self Storage, Poole

Big Yellow Self Storage, Poole

HD Sharman Ltd.

During Phase 1 of the project, Big Yellow worked alongside Hollis Global, real estate consultants, and Welbro, specialists in the refurbishment of industrial buildings. Hollis was responsible for the project management and successful installation of the PV system by EvoEnergy. After concluding the roofs were not fit for solar in their current condition, Hollis introduced Sharmans roof refurbishment systems to bring the roofs back up to standard.
Sponsored
Goodmayes Hospital

Goodmayes Hospital

BioClad

With the client looking to achieve a fully hygienic, long-lasting finish it was only natural to incorporate BioClad’s full suite of products throughout the facility. Working with the client, it was evident that time was an important factor in the project planning process. The 15 working day turn-around of BioClad’s BioPod unit appealed to the client alongside the bespoke design of the unit which can be manufactured to fit any specification.
Sponsored
Royal Blackburn Hospital

Royal Blackburn Hospital

ASSA ABLOY Opening Solutions UK & Ireland

Royal Blackburn Hospital in Lancashire has benefited from a range of timber doorsets fitted with complete ironmongery specified by ASSA ABLOY UK Specification, a UK division of ASSA ABLOY, the global leader in door opening solutions. These robust timber doorsets are not only delivering assured safety and access at the site, but improving whole life costs too... Click on the link below to read more.
Sponsored
University of Birmingham

University of Birmingham

ASSA ABLOY Opening Solutions UK & Ireland

Chamberlain, based in Edgbaston, is a brand new student accommodation development comprised of a 21-storey tower and three low-rise blocks. The student rooms have been fitted with the Aperio® solution, which required full integration into the Gallagher Command Centre, which is an industry leading critical business platform, delivering organisational security and operational continuity... Click on the link below to read more.
Sponsored
Heathrow Primary School

Heathrow Primary School

Bushboard Washroom Systems Ltd

At Heathrow Primary School, their mission is to provide a safe, happy, caring and inclusive environment.The Kids Stuff cubicle range was specified in High Pressure Laminate (HPL). It was important that the chosen washroom design was safe, reliable and easy to maintain for the staff. The washrooms included semi-recessed vanity unit to the children’s height which fitted in perfectly with the rest of the project. Read the whole case study on our website.
Sponsored
Canterbury West Station

Canterbury West Station

AATi (Antislip Antiwear Treads International)

Network Rail’s nationwide initiative for high specification, durable AFA platform access bridges required AATi to supply re-engineered ‘Coverall’ combined stair nosing and step covers. These small design changes have again improved bridge construction techniques and the long-term performance of the stairway, and removed dirt-traps and improved drainage. AATi supplied their SN293 WL307 UR to fit the needs.
Sponsored
Sparsholt College

Sparsholt College

DYNAMIK Sports Flooring

Sparsholt's continued growth over recent years meant that a new sports hall was required to enhance their sporting facilities. The new building included a four badminton court hall along with a modern Dance/Aerobic Studio and extensive Fitness Suite. The majority of the work was completed using the area elastic Komfort Plus sprung sports flooring system finished in Tarkett solid Sports Vinyl.
Sponsored
New Product Announcement - The Quadro wooden loft ladder...

New Product Announcement - The Quadro wooden loft ladder...

Premier Loft Ladders Ltd

The Quadro wooden loft ladder is the solution when ‘standard’ is simply not good enough. It is supplied as an easy to fit, made-to-measure unit. The 3-part folding wooden ladder is contained within, and attached to, a laminated wooden hatch box and an insulated trapdoor. The Quadro wooden loft ladder offers very good energy efficiency thanks to an insulated trapdoor with an airtight 4-point locking mechanism.
Sponsored
Case Study - Woolston SEND College

Case Study - Woolston SEND College

Twinfix Limited

Woolston Sixth Form College forms part of Woolston Learning Village, which also includes neighbouring schools Green Lane Special School and Fox Wood Special School. The college educates & supports students aged 16 – 19 years old who have a range of additional needs.Following the installation of a number of Twinfix canopies at Green Lane Special school over the last eight years, Twinfix were approached by Woolston College to design, manufacture and install canopies on two separate occasions over the last two years.The initial project involved fitting a twenty-five sqm canopy with vertical glazing to one of the classrooms at the site. The vertical glazing offered weather protection and an element of privacy for the students using the canopy.The College was so impressed with the process and the installed canopy that they requested a second canopy spanning thirty-two sqm a few months later.Both canopies have aluminium frames powder coated in blue RAL 5010. As this metal does not rust in use, they will keep their good looks throughout their long life. The structures comprise of Twinfix’s innovative Multi-Link-Panel Non-fragile (NF) roof glazing system fitted with tough 16mm opal multiwall polycarbonate. The NF denotes that these panels conform to the HSE’s recommended drop test ACR[M]001:2019, as recommended by HSG33.With safety of the students being paramount, protective foam pads were fitted to each supporting post to guard the children from bumps and bangs and anti-climb guttering was also included in the design for both structures.Not only do the new canopies provide additional safe space for students to play and learn, but it also enabled them to reap the benefits that come with being outdoors.
Sponsored
Chailey School, Brighton

Chailey School, Brighton

Senior Architectural Systems Ltd

With a proven track record of successful work in the education sector, Senior Architectural Systems was more than qualified to deliver the fenestration package for this new secondary school in Brighton.The new Chailey School in South Lewes has been designed by leading architects Jestico + Whiles and features a full range of aluminium fenestration solutions including Senior’s thermally-efficient, slimline SF52 aluminium curtain wall system and robust SPW501 aluminium commercial doors. The new school has also reunited Senior with main contractor Bowmer & Kirkland, with whom Senior has an established supplier framework agreement. The two companies have collaborated together on numerous projects, with Bowmer & Kirkland being the first contractor to specify Senior’s patented low U-value PURe® aluminium window system when it was launched back in 2015. The main contractor has gone on to work with Senior and specify its aluminium windows, doors and curtain wall systems on many other education projects across the UK.Chailey School is itself part of Department of Education construction framework agreement to modernise educational facilities and improve the environmental efficiency of this sector. Senior worked closely with specialist contactor RKN Aluminium to design, fabricate and install the fenestration package for the new school building which comprises some 85 windows, 14 section of curtain wall and 12 door sets!
Sponsored
Arc Cinema, Daventry

Arc Cinema, Daventry

Senior Architectural Systems Ltd

Senior Architectural Systems has had a starring role in the creation of the new Arc Cinema in Daventry.The new cinema’s welcoming frontage has been created using a combination of Senior’s thermally-efficient slimline SF52 aluminium curtain wall system, alongside the company’s robust SPW501 aluminium commercial doors and stylish low U-value PURe® SLIDE doors. Designed to offer the perfect balance between daylighting and thermal comfort, Senior’s fenestration package was fabricated and installed by supply chain partners Acorn Aluminium for main contractor Willmott Dixon.The cinema has been designed by Marchini Curran Associates and the extensive use of glazing floods the main entrance, restaurant and bar areas with natural light during the day, and creates a show-stopping effect at dusk. The dark grey powder coated frames of the doors and curtain wall systems also perfectly complement the exterior façade design of grey and white cladding with feature multicoloured panels. The new Arc cinema in Daventry has been created as part of the wider £12.5m regeneration of the town centre.Senior has played significant roles in other cinema projects over the last few years, delivering the aluminium fenestration packages for the new Savoy cinema complex in Doncaster as well as completing work for the national chain Everyman.
Sponsored
Berwick Leisure Centre

Berwick Leisure Centre

Senior Architectural Systems Ltd

This new £22m state of the art leisure centre in Berwick, Northumberland, has been designed by GT3 Architects and features a striking glazed façade created using Senior’s slim profile SF52 curtain wall system.Senior worked closely with specialist contractor Crown Doors and Shutters Limited and main contractor Tolent Construction Ltd to deliver the landmark leisure scheme which is set to breathe new life into the area by replacing the town’s previous leisure centre. To ensure the town’s existing Swan Centre could remain operational throughout, the new leisure centre was constructed in two phases with the project team working closely to carefully coordinate each element of the build to limit the disruption to the local community.As well as creating an inviting and welcoming main entrance, the thermally-enhanced SF52 aluminium curtain wall system will also help improve the energy-efficiency of the scheme whilst maximising the use of natural daylight.Senior’s SF52 aluminium system features attractive slim sightlines and enhanced thermal performance to help boost energy-efficiency. Available as a mullion drained system which removes the need for visible drainage slots, Senior’s SF52 curtain wall can be specified as capped, silicone sealed or as a combination of the two for even greater design flexibility. Thanks to Senior’s in-house powder coating facility, the SF52 system is available in an almost unlimited range of colours and finishes.
Sponsored
Auchmuty High School

Auchmuty High School

Allgood Ltd

Designed by Fife Council Property Services, the newbuilding constructed at Auchmuty High School inGlenrothes, Scotland, sees the new development replacethe old high school with better learning facilities andadvanced learning equipment.Allgood provided Fife Council with a complete accesscontrol and ironmongery solution, which makes the majorityof the school keyless.Allgood Trio created an advanced access control package,containing proximity readers and access control handlesets, that provide traceable audit throughout the buildingand in addition to the ability to control access to variousareas. The package also included software which allowsthe deletion of a card if it is lost or stolen, providing a betteralternative to the expensive process of replacing lost keys.Allgood Trio also supplied and installed the automatic doorset solution, which satisfied Fife Council’s requirement forthe doors to automatically drive open and remain open inthe event of the fire alarm being activated, providing smokeventilation through the main central core area of the school.The solution also allowed staff to control the main entrancedoors and pupil entrances during specific times. (i.e.granting pupils access during school; start, finish and breaktimes and being locked outside these time periods).The whole package provided by Allgood Trio was deliveredon time and within the clients budget, including theinstallation of both access control and automatic doorsetsby Allgood Trio engineers.
Sponsored
Lincoln bowl washroom revamp

Lincoln bowl washroom revamp

KWC DVS Limited

Franke Water Systems was chosen as the key manufacturer for the revamp of Lincoln bowl’s washrooms. Inspired Washrooms, a Nottingham based company were chosen to carry out the project and specified  Franke Water Systems product range to complete the refurbishment. The renovation consisted of a whole washroom revamp from flooring to washbasins, taps, urinals and even the less-abled washroom facilities. The main aim of the project was to make their washrooms stand out as much as the bowling alley itself. Franke Water Systems provided over 20 washroom products for the revamp, including a range of Dart Valley branded taps, WCs, flush valves, hand dryers and a range of Miranit composite wash troughs for the male and female toilets. The full range of products provided were: ·        2 x WC03-002 - WC flush valve kits ·        1 x WC03-002 - WC flush valve kit ·        2 x WC02-011 - Concealed plastic cistern kits ·        1 x WC02-011 - Concealed Plastic Cistern Kit ·        3 x UC07-010 - Urinal control systems ·        3 x UC00-001 - Backflow Preventers ·        3 x AT03-011 - Aquarius deck mounted A45 taps ·        1 x AT00-004 - Three station mains Kit ·        1 x ANMW411 - Single Quadro Miranit wash basin ·        1 x ANMW421 - Double Quadro Miranit wash basin ·        1 x DRYX500N - Hands in hand dryer ·        1 x F1390 - Airblast Hand Dryer
Sponsored
Emseal DSM System used to seal wide & high movement Deck Joints on New Brighton University Car Park

Emseal DSM System used to seal wide & high movement Deck Joints on New Brighton University Car Park

NCC – Emseal Movement Joints

Client: University of Brighton Consultant: Stripe Main Contractor: Keir Construction Specialist Contractor Thelwell Flooring Main Products Used: Emseal DSM SystemThis new multi-storey car park for the University of Brighton is part of a major redevelopment of the former Preston Barracks site in the City. There are 550 parking spaces on 7 floors, including 55 EV charging bays, plus there is a PV array on the roof with the power stored in batteries on the ground floor, which also includes 330 cycle parking spaces. The car park design uses a Vertical Circulation Module (VCM) that provides a more efficient solution for confined sites, as this contains no external ramps and traffic circulation is via slopes within the floors themselves. This creates more parking spaces in the steel framed structure in the centre, with two lift and stair cores positioned at each end. This design also made it possible to locate the necessary structural expansion joints transversely between these 3 parts of the structure and away from major traffic impact areas. The engineers specified these joints to be a nominal 40mm wide to accommodate a high movement capability of up to +/- 50% (i.e. total 100%), as they knew these could be quickly, securely, and durably sealed using the Emseal DSM System. This also saves time on site as it is installed from above, allowing other trades to continue working below, plus as it is bonded into position, there is no potentially damaging drilling for mechanical fixings.
Sponsored
Emseal BEJS used to seal Parapet & wing wall joints on the new Dodmoor Bridge A45, Daventry Link Road   in Northamptonshire

Emseal BEJS used to seal Parapet & wing wall joints on the new Dodmoor Bridge A45, Daventry Link Road in Northamptonshire

NCC – Emseal Movement Joints

Client: Highways Agency, England, with Northampton CC Main Contractor: Balfour Beatty Main Products Used: Emseal BEJSEmseal BEJS used to seal Parapet & Wing wall joints on the new A45 Dodsmoor Bridge in Northamptonshire:This new bridge forms part of the A45 Daventry Link Road at Dodmoor in Northampton, where the wing-wall joints and the parapet joints with the precast elements provided a challenge for the engineers. These joints had to be able to accommodate the anticipated high levels of movement, but the site measured widths of the joints varied from around 25-30mm up to around 100mm. The potential movement, including movement in different planes, their variable form and dimensions, were too much for any ‘normal’ preformed joints, or extruded, gun-applied, so-called ‘mastic’ joint sealants to be used. This is clearly evidenced in the inset picture, where the specified extruded sealant was already seen to be failing under this loading. Additionally, the wing-wall joints were to be back-filled with a watertight seal. Following previous experience with difficult and complex movement jointing requirements, the Balfour Beatty engineers discussed the situation with NCC and the Emseal BEJS System was identified as an ideal solution. Emseal BEJS is available in different widths that can also be precompressed further for ease of installation, it is fast and easy to install, plus importantly requires no invasive mechanical fixings.
Sponsored
Addenbrookes Hospital Surge Centre

Addenbrookes Hospital Surge Centre

Cemfloor Liquid Screeds

Addenbrookes Hospital Surge Centre2000m² Of CemfloorA temporary surge facility on the site of Addenbrookes Hospital to relieve pressure on the main hospital as part ofthe NHS' regional surge planFloor Screeding Solutions installed 2,000m2 of Cemfloor, the chosen screed for the project, which was supplied by Mick George Concrete, Cambridge.With the rising case numbers of Corona virus during the pandemic, hospitals were coming under increasing pressure for more critical care beds, and Surge Plans were put in place across the country to help alleviate this pressure.Addenbrooke Hospital in Cambridge sought to construct a ‘Surge Centre’ to cope with the additional demands on the hospital, and Cemfloor was chosen for the project due to its faster installation time and drying time compared to traditional sand and cement screeds. This helped to keep the project on track with its tight building schedule.Lewis Deck construction offered a strong light weight flooring option for the large pour area. As Cemfloor is a flowing screed, 500m2 of screed per day was poured over this by Dave Washbrook and his team from Floor Screeding Solutions, eliminating the need for on-site mixing.The main advantage Cemfloor has over other flowing screeds is the quicker drying times, and that it can accept foot traffic after 24 / 48 hours, meaning that construction could continue quickly and efficiently to meet the project deadline.
Sponsored
Bespoke Oak Versailles Parquet Flooring - Belvedere Penthouse

Bespoke Oak Versailles Parquet Flooring - Belvedere Penthouse

The Solid Wood Flooring Company

For the beautiful penthouse atop one of the buildings in South Bank Place, located next to the London Eye, the designers wanted a feature floor with a bespoke colour finish. We worked with the designers at Goddard Littlefair and decided on the timeless design of the Versailles parquet pattern. The designers wanted a show-stopping colour for this floor. We created the Belvedere colour finish; using a mixture of fumed, European Oak and pigmented hard wax oils to create a dark colour tone with red and golden highlights.To ensure a uniform and quick installation on site; we creating metre square panels with the Solid Oak Versailles pattern positioned by hand onto Birch plywood backing. Having discussed the fit-out process in detail with the fit-out team from SJ Eastern Joinery, we grooved all four sides of the panel and supplied the tongues loose. This gave the fitters flexibility to lay the boards as they saw fit on site. Once we had assembled the panels, the bespoke colour finish was applied; after completing multiple coats the panels were stored to fully cure and harden.Once the team from SJ Eastern had fitted the flooring on site, they protected it with a soft breathable cover and topped that with hardboard and taped the edges. This allowed the other trades to snag without damaging the floor. Once snagging was complete, the floor protection was removed. As anyone who has been on a building site knows, dust and debris are everywhere and sure enough the flooring needed a final clean and buff with oil to increase the lustre and make it perfect for the wow factor needed in such a stunning project.The expert team lead by Bardhyl Miskiqi of BRB Flooring came in and cleaned the floor thoroughly, removing plaster dust and other debris by vacuum and cleaning the floor down using a solution of Blanchon Natural Soap and hot water. Once the floor was suitably clean, they applied Blanchon Hard Wax Oil Satin on to the floor and buffed a coat into the floor using a buffing machine equipped with a white buffing pad. This fed the Oak another coat of oil which bolsters the protection against every day use and increased the lustre of the wood highlighting all the colours from that bespoke colour that had been applied at the factory.Once the oil was properly buffed in, the penthouse door was closed and the floor left to dry and cure. Once curing had completed the furniture was placed in the room and made ready for viewing by the client and new owner and a lifetime of happy memories.Please call 01666 504015 for more information or click the product image details below.
Sponsored
Bespoke Oak Versailles Parquet Flooring

Bespoke Oak Versailles Parquet Flooring

The Solid Wood Flooring Company

For the beautiful penthouse atop one of the buildings in South Bank Place, located next to the London Eye, the designers wanted a feature floor with a bespoke colour finish. We worked with the designers at Goddard Littlefair and decided on the timeless design of the Versailles parquet pattern. The designers wanted a show-stopping colour for this floor. We created the Belvedere colour finish; using a mixture of fumed, European Oak and pigmented hard wax oils to create a dark colour tone with red and golden highlights.To ensure a uniform and quick installation on site; we creating metre square panels with the Solid Oak Versailles pattern positioned by hand onto Birch plywood backing. Having discussed the fit-out process in detail with the fit-out team from SJ Eastern Joinery, we grooved all four sides of the panel and supplied the tongues loose. This gave the fitters flexibility to lay the boards as they saw fit on site. Once we had assembled the panels, the bespoke colour finish was applied; after completing multiple coats the panels were stored to fully cure and harden.Once the team from SJ Eastern had fitted the flooring on site, they protected it with a soft breathable cover and topped that with hardboard and taped the edges. This allowed the other trades to snag without damaging the floor. Once snagging was complete, the floor protection was removed. As anyone who has been on a building site knows, dust and debris are everywhere and sure enough the flooring needed a final clean and buff with oil to increase the lustre and make it perfect for the wow factor needed in such a stunning project.The expert team lead by Bardhyl Miskiqi of BRB Flooring came in and cleaned the floor thoroughly, removing plaster dust and other debris by vacuum and cleaning the floor down using a solution of Blanchon Natural Soap and hot water. Once the floor was suitably clean, they applied Blanchon Hard Wax Oil Satin on to the floor and buffed a coat into the floor using a buffing machine equipped with a white buffing pad. This fed the Oak another coat of oil which bolsters the protection against every day use and increased the lustre of the wood highlighting all the colours from that bespoke colour that had been applied at the factory.Once the oil was properly buffed in, the penthouse door was closed and the floor left to dry and cure. Once curing had completed the furniture was placed in the room and made ready for viewing by the client and new owner and a lifetime of happy memories.Please call 01666 504015 for more information.
Sponsored
Allenby Barracks

Allenby Barracks

Langley Waterproofing Systems Ltd

Our purposeOn behalf of Amye Defence Services, Acclaim Contracts Ltd was commissioned to address the aging roof of the building, which was leaking despite receiving patch repairs over the past 20 years. The Ministry of Defence’s Project Allenby/Connaught demonstrates the Government’s commitment to maintaining defence estates.The £1.45bn scheme is a 35-year commitment to providing modern, high quality, fully serviced, purpose built living and working accommodation for 18,700 soldiers. It involves the new build and refurbishment of more than 550 buildings across Salisbury Plain and Aldershot, including upgrading Allenby’s Building 51, otherwise known as the Sports Pavilion.Our solutionAcclaim turned to Langley to provide all the material necessary to complete the work. After stripping the original roof to the existing plywood deck, the team fitted new treated timber around the perimeter and new uPVC fascia. The current edge trims, perimeter check kerbs, and extended flues were removed to ensure regulatory 150mm clearance was achieved once the new roof covering was installed. Langley’s HT180 attachment layer was loose-laid and nailed into place to provide appropriate protection to the timber deck while the “hot works” above were undertaken. Langley’s TA-20 Flat Roofing System was installed across the roof area, with insulation to achieve the regulatory requirement of 0.18W/m2K. SA-20 Flat Roofing Detailing System was used in fire risk areas, in line with Safe2Torch guidance. The range of Langley’s TA systems complies with Broof(t4) classification and has a Local Authority Building Control (LABC) assured accreditation. Under MOAT 31, Langley’s Parafor 30 GS (cap sheet to the TA system) achieves a ‘resistance to damage” rating of R4. It is independently certified by the BBA to deliver a life expectancy of at least 40 years, one of the longest available in the UK.Acclaim fitted Langley’s ParaFurb Refurbishment Outlets to upgrade the internal outlets where possible, cleaning and priming those where the design precluded the use of ParaFurb. We installed New Code 5 lead pipe sleeves to flues and hot pipes to a minimum 150mm above the waterproofing. In addition, Langley’s ParaTrim GRP Edge Trim was fitted to all the kerbs.“It carried great weight with us that Acclaim worked in partnership with Langley, who offers an independent insurance-backed guarantee. That is indicative of pride and confidence in its work, giving synergy with Amey. It also gives us, and our client the Ministry of Defence, that the refurbished estate at Allenby will serve and be fit for purpose for decades to come.”Will Loates, Service Delivery Area Manager, Amey
Sponsored
North Chadderton High School, Oldham

North Chadderton High School, Oldham

Boyco (UK) Ltd

Working with Kier Construction, BOYCO successfully transformed this secondary school's changing room spaces.Project ScopeNorth Chadderton School in Oldham, is renowned for providing a supportive, and creative learning environment. The school was challenged with needing to create additional space for students, sparking a new construction project.Team BOYCO proudly worked with Kier Construction, to help transform the newly developed learning spaces at the secondary school. Part of the Oak Trust, BOYCO supported the school’s expansion project with the design, manufacture and install of a range of changing and cloakroom furniture.The BOYCO WayBespoke DesignTeam BOYCO’s in-house design and project management teams worked closely with the Architects drawings, designers at Kier Construction, to gain a comprehensive understanding of the task at hand. We collaborated closely to create designs that showcased a range of BOYCO’s market-leading changing and cloakroom furniture that seamlessly integrated with the school's aesthetic.Our Peg Rails, Island Bench Units, and Wall Fixed Bench units were carefully chosen to maximise space, whilst meeting the practical needs of both students and staff.Quality ManufacturingFrom our factory in Greater Manchester, we ensured that every piece of furniture was crafted with precision using high-quality materials. The durability of the furniture was a key consideration to withstand the daily demands of a bustling school environment.A bespoke requirement from North Chadderton, was that Oak timber was used. This was a symbolic request from the Secondary School, as they wanted showcase being part of the Oak Trust.BOYCO also acknowledged that the cloakroom furniture would be a frequently used, with placement in a high touch point communal area.Therefore, as per all BOYCO timber, the Oak is coated with anti-microbial lacquer which is formulated to stop bacteria from surviving on the surface – preventing the spread of 99% of known bacteria. This is a suitable fit as it supports a clean and safe learning environment.All metalwork to the Benches, Units, and Peg Rails are coated with our unique ‘Hot Dip’ nylon. This also provides anti-microbial protection and is 500x more abrasion resistant than the next powder coating, a great match for the school’s changing room.Expert FittingBOYCO provided a full fit out service to complete this project. Our expert team of fitters worked to exceed expectations and meet tight timescales, completing the full fit out of all spaces during the schools Christmas Holidays. This ensured that the new learning spaces were ready for when students returned in the New Year.Project Success99% satisfaction score from Chris Gregory, Project Manager at Kier Construction.
Sponsored
Arbor Forest Products returns to Union Industries for second Ramdoor to boost productivity and cut noise pollution

Arbor Forest Products returns to Union Industries for second Ramdoor to boost productivity and cut noise pollution

Union Industries

A satisfied customer has returned to Union Industries for the fitting of a second high speed industrial door to enable it to keep production noise to a minimum, while transporting raw materials and products in and out as efficiently as possible.Arbor Forest Products, the UK’s leading independent timber importer and processor, which is based in Barrow Upon Humber, offers a bespoke milling service with the ability to process orders in 10 days.
Sponsored
Globe Works, Birmingham, ASF Corner Protection Bollard

Globe Works, Birmingham, ASF Corner Protection Bollard

Architectural Street Furnishings part of WB White Foundry

ASF's Building Protection Corner Bollard was used in the above project. The bollard is set up so that there is one quarter missing on the upright plane so that it fits perfectly on a 90 degree outside wall. The pattern can be adapted to other angles if necessary. Once in place the bollard acts as a wheel buffer for any vehicles getting too close to the corner - thus reducing the risk of damage to either the building or vehicle.
Sponsored
22 Bishopsgate, London - 60+ storeys of EuroPipe

22 Bishopsgate, London - 60+ storeys of EuroPipe

BLÜCHER UK Ltd

The second tallest building in the United Kingdom, and tenth largest building in the world is home to an impressive amount of BLÜCHER EuroPipe! All 62 floors are equipped with stainless steel drainage, from RWP, SVP and food vacuum systems to interceptor foul drainage and disconnecting traps for rainwater.The project spanned over two years, and it was a no brainer that our lightweight, adaptable and push fit system was chosen as the sole supplier.
Sponsored
Sliding Glass Roof and Polycarbonate Curtain Walling at Cubana

Sliding Glass Roof and Polycarbonate Curtain Walling at Cubana

Breezefree Ltd

A dated conservatory area is transformed by Breezefree with a retractable glass roof and polycarbonate curtain walling. Nagan Johnson Architects approached Breezefree to refurbish a dated conservatory area as part of the fit-out of the Cuban restaurant group’s second site in London’s Smithfield district. The brief required a modern retractable glass roof, to replace the old lean-to rooflight, and translucent curtain walling, to replace the dilapidated brick walls and windows...
Sponsored
Accoya cladding at Geosouthern Energy’s corporate headquarters

Accoya cladding at Geosouthern Energy’s corporate headquarters

Accoya

Accoya selected for the renovation of the GeoSouthern Energy’s corporate headquarters. Distributed by Mason’s Mill & lumber, the Accoya cladding was milled into a Vanish Rain Screen profile with a walnut stain for the exterior of the building. Various sizes of Accoya were used ranging widths between 5”-8”. In total 80 m3 of Accoya was used for the project. Accoya was chosen due to its stability & durability making it the perfect fit for designers Kirksey.
Sponsored
Easy Move home elevator in South Africa: a perfect synthesis between the customer and our partner

Easy Move home elevator in South Africa: a perfect synthesis between the customer and our partner

Vimec SRL

DescriptionModel: Vimec Easy Move cabin liftStops: 2  Type of building: Private House  Country: South Africa  The customer’s desire was to have a lift that would allow him to move around comfortably and stylishly. After an on-site talk with our partner, in order to fit well into his home design, the customer sought a modern and robust solution like Vimec Easy Move homelift.
Sponsored
Parapet capping tops out student accommodation

Parapet capping tops out student accommodation

Pendock

Extensive use of parapet capping from the Pendock Linea building linings range has helped improve weather resistance and aesthetics at a modern student accommodation building in Kingston-upon-Thames.Bespoke manufactured from high quality aluminium with a grey PPC finish, the flat PC-F style parapet capping's are fitted to the entire building to improve the integrity of the flat roof and stop the ingress of water.
Sponsored
Perfect Integration in a Contemporary Office Design

Perfect Integration in a Contemporary Office Design

Vtec Group

Sophisticated and contemporary office designs means ensuring perfect and seamless integration to complement the space.The creative brief for this design focused on embracing the intricate architectural details of the space such as the natural shapes and overall industrial vibes.Vtec's SupaSlat System and MaxiBeam Systems were specified in this unique office fit out. With such large zones, the team achieved the precision that was required, with 3D modelling to ensure precise coordination, positioning and integration.
Sponsored
Skyfold fully automatic vertical rising Acoustic moveable wall and Dorma Variflex Glass Semi automatic Acoustic moveable wall installed by Style at The Londoner

Skyfold fully automatic vertical rising Acoustic moveable wall and Dorma Variflex Glass Semi automatic Acoustic moveable wall installed by Style at The Londoner

Style - Moveable Partition Specialists

The Londoner is the world's first super boutique hotel offering a collection of spaces, tastes and experiences brought to life across 16 elegant storeys. Delivering flexible space to cater for a myriad of impressive events, Style installed a six metre high Skyfold vertical-rising moveable wall in the main ballroom, as well as a combination of Dorma Hüppe Variflex sliding walls and smaller Skyfold systems throughout the numerous event areas. This focus on adaptable space, combined with Style’s expertise in delivering partitioning walls with impeccable acoustic performance, gives the hotel multiple options for opening out or dividing the available areas and maximising room hire revenue.Bringing an exciting new buzz to the south-west corner of Leicester Square, The Londoner boasts one of the world’s deepest habitable basements with six subterranean levels housing two cinemas, an expansive ballroom, as well as a swimming pool and spa facility. Above ground are 350 five-star rooms, workspace and meeting areas, restaurants and bars.UK partitioning specialists Style, worked closely with architect Woods Bagot, interior designer Yabu Pushelberg, and contractors Blue Sky Building & EE Smith Contracts, to deliver flexible event space throughout the hotel.The main ballroom is undoubtedly The Londoner’s centrepiece - an eye-catching statement of contemporary design for up to 850 guests. Allowing two events to run concurrently, the cavernous room is divided by a fully automatic Skyfold moveable wall. Discreetly housed in the ceiling cavity, the wall descends effortlessly into place at the push of a button and, with an incredible 59dB Rw acoustic rating, lively gatherings can take place either side of the wall undisturbed.In the hotel’s meeting rooms, Style installed semi-automatic Dorma Huppe Variflex double-glazed moveable walls with 52dB Rw acoustic ratings and fully glazed pass doors. For completed adaptability, the meeting areas are then additionally sub-divided using smaller Skyfold vertical-rising walls.“This is a spectacular installation,” said Style’s group managing director, Julian Sargent. “The main Skyfold is finished in a real oak wood veneer whilst the glass moveable walls feature chic black painted frames with reeded glass for enhanced privacy.
Sponsored
Wadham College

Wadham College

Bauder Ltd

Wadham CollegeBauder Bakor 790-11 Hot Melt structural waterproofing system with BauderGREEN componentsSynopsisThe University of Oxford’s Wadham College graduate centre project was a complex refurbishment. Led by Lee Fitzgerald Architects and main contractor Feltham Construction it involved the careful restoration, adaptation and extension of the 1960’s grade II listed building.Bauder Building BoardProject:Wadham CollegeLocation:OxfordRoof Area:439m²Specifier:Lee Fitzgerald Architects​Main Contractor:Feltham ConstructionApproved Contractor:Deane Roofing & CladdingThe specification The brief for the project was to renovate the graduate centre and to link to the main college by creating a new entrance to the building. This led to the construction of a new building, the McCall MacBain Graduate Centre, which also now provides access to the Barbara Naylor rooftop gardens above the different reading, media and seminar rooms of the graduate centre. With the ageing existing waterproofing exceeding its life expectancy, the roof garden terrace was in need of a replacement roof system.As an accessible area which will experience a significant amount of foot traffic, the Bauder Hot Melt was determined to be the best solution for this roof. With a durability to match the expected life of the building and a self-healing system, the Bauder Bakor Hot Melt System is ideal for use on protected roofs such as inverted, paved, ballasted and terrace roofs.The resultApproved contractor Deane Roofing & Cladding carefully removed 439m² of the existing waterproofing, stripping the rooftop back to the concrete deck surface before installing the different layers of the Hot Melt system.The completed roof terrace now provides a modern and peaceful garden area where graduate students can relax and socialize between their work periods. Following several site visits by Bauder’s expert Site Technicians and a final leak test, a 20 year guarantee was issued for the roof terrace.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Uttoxeter, Boston and Long Eaton Railway Station Cycle Storage

Uttoxeter, Boston and Long Eaton Railway Station Cycle Storage

Falco UK Ltd

Falco has completed the roll-out of a new tranche of cycle parking facilities across East Midlands Railway’s Uttoxeter, Boston and Long Eaton stations. The scheme which got underway at the start of this year involved the manufacture, supply and installation of a number of cycle parking facilities with associated shelters to allow commuters and visitors to securely park their bikes whilst on the go.Two key products of this tranche of the East Midlands Railway scheme includes the open and spacious FalcoZan-180 cycle shelter and the UK’s leading FalcoLevel-Premium+ two-tier cycle rack, providing mass, sheltered and secure cycle parking across the network.To date, Falco has supplied the East Midlands Railway network with the following cycle parking infrastructure:Long EatonFalcoZan-180 cycle shelter with FalcoLevel-Premium+ two-tier cycle racks to securely accommodate 36 bikes. UttoxeterFalcoZan-180 cycle shelter with with FalcoLevel-Premium+ two-tier cycle racks to securely accommodate 18 bikes. BostonBespoke FalcoLok secure store with FalcoLevel-Premium+ two-tier cycle racks to accommodate 16 bikes.The FalcoLevel-Premium+ as installed at all three East Midlands Railway stations, is the UK’s most user friendly two-tier cycle parking system which makes use of both steel and aluminium to create a significant reduction in noise pollution and a much smoother transition of the upper tier.The FalcoZan-180 shelter, as installed at two stations, is a straightforward two-tier cycle rack shelter manufactured from a combination of hot-dip galvanised steel and sustainable hardwood slats.Pictured here is the new cycle parking facility at Long Eaton Station, installed at the main car park off the B6540, the new cycle parking facility installed at Uttoxeter station at the main carpark off station road and the new cycle parking facility at Boston station next to the main carpark off Station Approach.For more information about Falco’s scheme for East Midlands Trains or how Falco can assist your cycle parking scheme, please contact our helpful sales team on 01538 380080. 

Showing 901-936 of 1010

Feedback