NBS Source
I'm a manufacturer

"leadwork contractors"

1,510 results found

Sort by:

Showing 937-972 of 1085

Sponsored
Cambridge University hold our largest install of two-tier parking

Cambridge University hold our largest install of two-tier parking

Cyclehoop

In 2015, we delivered our largest ever install of two-tier cycle parking in the UK at the prestigious Cambridge University, the world’s fourth-oldest surviving university.Working with principal contractor Morgan Sindall, we installed 678 two-tier bicycle racks to provide effective and secure cycle parking for over 150 departments, faculties, schools, syndicates and other institutions. This was phase one as part of the overall requirement of 2,000 cycle parking spaces in the university which has been planned over a period of two years.Cyclehoop is the official UK supplier of Jan Kuipers two-tier bicycle racks. This Dutch company are the first in Europe to develop this unique system that uses gas-assisted moveable upper sections. Its space-saving, robust design doubles the amount of cycle parking compared with traditional cycle racks and its gas-assisted mechanism increases its usability.The Dutch Two-Tier Rack is ideal for high-density areas and can be installed at train stations, offices, schools and shopping centres and major transport hubs. Today their two-tier racks have been installed in over 180,000 places at a wide variety of locations throughout Europe.
Sponsored
Equinox

Equinox

CDM Stravitec

Equinox is a large USA gymnasium operator and their first venture in London is in High Street Kensington. The site they chose is on the 5th floor, directly above Sony Music where Simon Cowell works, and directly beneath Kensington Roof Gardens, which is a popular and very trendy night spot.Ramboll Acoustics specified that a floating floor was required to reduce impact noise levels from the gym to <55dB L’nT,w. However it soon became clear that the floating floor would have to ensure that no significant disturbance was caused to Sony Music directly beneath.Our local branch worked closely with the contractor and consultants to fine-tune the floating floor system and built several mock-ups to verify the performance.The final design consisted of a Stravifloor Channel isolation rail supporting a composite dry floor construction. The floor under Group Fitness, where all of the gym classes are held, also had layers of steel plate to optimise the low frequency performance.The on-site performance at the end of the job was measured as 35dB L’nT,w although this was dominated by background noise as the performance of the floating floor was so good. The improvement from the base concrete floor was 42dB.
Sponsored
Type C, Cavity Drainage Waterproofing

Type C, Cavity Drainage Waterproofing

Delta Membrane Systems Ltd

Delta Registered Installers, Bensleys provided a waterproofing solution on an iconic Brighton structure.Steeped in history and thought to be built on the original Brill Baths site, sits Clarendon Mansions. This large, detached structure is thought to have been built in 1870 by Charles Brill during the Brighton boom.The four-storey building facing Brighton’s famous sea front, was originally constructed as a hotel.Numerous refurbishments over subsequent periods of time, saw the structure move from a hotel to a public house, with the basement area being unoccupied for nearly a decade.The basement area boasts large, vaulted areas to the south and west elevation, with the south-side possibly being part of the original Bath structure.Bensleys were instructed by the main contractor, Pilbeam Construction on behalf of Evolution Architects, to help design, specify and install the waterproofing system.There’s no one-size-fits-all when it comes to waterproofing design. With the basement suffering from water penetration, Bensleys worked with the design team at an early stage of the project to ensure the right approach be taken, which included multiple factors such as: customer requirements, standards, robustness, cost, resources, time, skill required, safety and expectations of ground water which all translated into a design solution.
Sponsored
G-Shock, Carnaby Street

G-Shock, Carnaby Street

Armourcoat Ltd

Armourcoat’s modular panel system ArmourFX has been specified to stunning effect at the new G-Shock store on London’s Carnaby Street by Double Retail. The new flagshop concept store was designed to physically interpret the core values of the brand and clearly segment G-Shock’s extensive product range.Through the careful use of lighting and materials, such as slate flooring, hot rolled steel surfaces and concrete wall panels from ArmourFX,the environment is an embodiment of G-Shock toughness.The store has elevated this premium offering and created a versatile future-proof space adaptable for specific collections and product launches.ArmourFX concrete effect panels are ideal for a deconstructed urban look for contemporary projects. The panels offer a wealth of design options to achieve a distinctive industrial style including distressed effects or recessed ‘shutter’ markings. Off-site construction is fast becoming the method of choice for both contractors and their clients with projects under tight deadlines for completion, or where it is impractical to work with ‘wet’ plastering trades on site. ArmourFX modular solutions can be highly customized to suit the client, sent directly to site and installed in a few hours. Photography: © Max McClure
Sponsored
Wembley Park - Wade NE Channel & Streamline Gratings

Wembley Park - Wade NE Channel & Streamline Gratings

Alumasc Water Management Solutions

As part of a major transformation of Wembley Park, which includes Olympic Way, Wade Stainless Steel Linear Channels and Streamline, and perforated gratings were installed beneath the Olympic Steps to provide an effective and long-lasting drainage solution.Built by developer Quintain in a joint project with Brent Council, the Olympic Steps come at the end of Olympic Way—the stretch of road linking Wembley underground station to Wembley Stadium. It was named Olympic Way after it was originally constructed for the 1948 London Olympics.The final stages of this redevelopment were the iconic steps that lead up to the national stadium. The original ramp, known as the pedway, was built as part of the old Wembley Stadium and acted as a bridge over the old coach parks. The Olympic Steps development replaced the outdated, concrete pedway and extended the Olympic Way, increasing the width by 50% and improving accessibility for all visitors in and around Wembley Park. Volker Fitzpatrick was the main contractor on the project.“Working closely with Mick Hawkins, the Site Manager, the aim of the project was to fulfil the client’s drainage requirements to tight deadlines,” says Brian Holden-Earl, Area Sales Manager. “The area is frequently used by visitors, so it was important to deliver our services within a specific timescale.”
Sponsored
GEC Anderson Products Feature At The Hold, Suffolk

GEC Anderson Products Feature At The Hold, Suffolk

Anderson, GEC Ltd

The Hold, Ipswich, contains important historical archives, records and artefacts, pertaining to the Suffolk area and is operated by Suffolk County Council.An impressive new archive centre, sited on the Ipswich waterfront, has recently been added. Architects, Pringle Richards Sharratt were responsible for the project and the contstruction was completed by RG Carter. The new facility includes an auditorium, learning spaces, archive and restoration rooms, gallery, shop, café and significant circulatory spaces.GEC Anderson stainless steel sinks, worktops and cabinets were specified within the conservation areas. The units were supplied and installed by GEC Anderson during the first lockdown phase of the Covid pandemic of 2020. Despite the obvious difficulties presented by the restrictions associated with the outbreak, work was able to progress as planned, under the special safety arrangements imposed by the main contractor.Managing Director of GEC Anderson, Martin Tye, comments “We do feel fortunate to be included within so many interesting and imaginative projects, such as The Hold. It is always inspiring to visit site, personally. In this instance, the special challenges of the times did not make our work easier but, under the expert guidance of RG Carter, we felt safe at all times whilst on site.”
Sponsored
GEC Anderson stainless steel counter and splashbacks in St Mary’s Church, Wivenhoe

GEC Anderson stainless steel counter and splashbacks in St Mary’s Church, Wivenhoe

Anderson, GEC Ltd

A GEC Anderson stainless steel counter and splashbacks were recently deployed in the new meeting room and ancillary facilities at St Mary’s Church, Wivenhoe. The historic Parish Church of Wivenhoe is thought to be built on Roman foundations and is the oldest remaining building in this small riverside town in Essex. Against this historic background, the new space, designed by Inkpen Downie Architecture, provides a light and airy addition that includes a small kitchen and servery. Stainless steel was specified for the curved counter and for the splashbacks within the kitchen itself. The specified units were supplied and installed by GEC Anderson, under the supervision of local contractor, Bakers of Danbury.“This was a nice project to have been fortunate enough to be involved with and, in my opinion, is a great example of how well new can sit with old. Functionality goes hand in hand with the high quality, smart but informal appearance. The sense of space created by the extension to the main building is impressive and surely a great asset to the Church and its community.” Martin Tye, Managing Director of GEC Anderson.GEC Anderson specialise in made to measure stainless steel worktops, sinks, cabinets and shelving that have been successfully specified in a wide variety of projects and locations. A full measuring and installation service is also provided.
Sponsored
Soundis Acoustic Flooring at The Market Building, Brentford London

Soundis Acoustic Flooring at The Market Building, Brentford London

Soundis

In 2015, Quinn London Ltd started the refurbishment of The Market Building, in Brentford which involved the conversion of Offices to residential dwellings as a ‘Material Change of Use’ project. Soundis provided acoustic solution options for this project, in order to ensure a cost effective Value Engineering Exercise, on behalf of the Main Contractor.As the 1st floor required a deep void system due to new soil pipes and waste pipes having to be installed along the corridor within the building for kitchens and bathrooms, it was agreed to utilise Soundis Cradle & Batten System. This provided a service void for the pipes of 300mm whilst the other areas of the floor were treated with the system at 80mm FFH. The Soundis cradle & batten acoustic floor was then overlaid with a Soundis a high quality, interlocking dry screed system gypsum fibreboard.The Soundis cradle & batten floor system has been installed on the existing concrete and existing timber structural floors to provide a level floor over the un-even sub-deck. The service void provided by Soundis cradle & batten system can be used for other flooring applications, such as underfloor heating.Our Cradle and Risers are manufactured from 100% recycled materials assisting to the sustainability targets of projects.
Sponsored
Junckers solid wood flooring for Carnegie Library & Galleries

Junckers solid wood flooring for Carnegie Library & Galleries

Junckers Ltd

The Carnegie Library & Galleries in Dunfermline designed by Richard Murphy Architects features over 700m2 of Junckers solid oak flooring. The original library building and an adjacent former bank, both grade B listed, have been extended and integrated to form a spectacular, award-winning space. A new museum, gallery space, café, shop and reading rooms are linked to the original library building by an ‘internal street’ connecting new and existing spaces. To provide a continuous backdrop as well as visually and aesthetically link the old and new parts, Junckers 15mm Wide Board Oak finished in Ultramatt lacquer was specified throughout the building. The attractive grain pattern of the timber adds a natural element to the interior, which is flooded with natural light. Junckers’ solid wood flooring offers a durable surface even for high traffic areas. Pre-finished in a choice of hard-wearing, long-lasting lacquers and oils from Junckers’ own professional range of finishing products, a Junckers floor is easy to install and maintain and it will last a lifetime with the right care. Particularly popular with architects and designers, Junckers’ long-length plank flooring really comes into its own in a large open space. The flooring contractor was GL Floors. 
Sponsored
John Radcliffe Hospital

John Radcliffe Hospital

Specialist Door Solutions

The JR provides acute medical and surgical services including trauma, intensive care and cardiothoracic services. It is situated in Headington, about three miles east of Oxford city centre. It is the largest of the Trust’s hospitals, covering around 66 acres.SDS was pleased to work with Mclaughlin and Harvey Contractors and to have been specified by Lewis Hickey Architects.The new extension to the existing Emergency Department was designed to provide better use of space, more diagnostic equipment and improved dignity and privacy for patients as well as improved turnaround times for ambulances.Facilities include an extra nine bays for the immediate care of seriously ill patients, including a paediatric resuscitation room and an isolation room. An additional CT scanner with control room, as well as a nurses’ bay and improved bereavement and relatives’ rooms, will also be provided in the new area.Dfendoor doors were used throughout this scheme, where impact resistant doors were key to maintaining fire door and infection control compliance throughout the busy area . A wide range of SDS colours were used from midnight blue through to lupin – also our range of wall protection products were used in matching colours to create a very impressive finish throughout.
Sponsored
Orbis Balustrades for Sapphire Ice & Leisure

Orbis Balustrades for Sapphire Ice & Leisure

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS231 Perforated Infill Top FixOrbis OS200/OS201 Vertical Bar InfillBorn from Havering Council’s vision to improve the sports and fitness facilities available in the borough, the £28 million investment is set to be a catalyst for regeneration in Romford.Named in honour of the Sapphire anniversary of Queen Elizabeth ll’s reign, the centre comprises of an eight-lane competition pool, gymnasium and first floor 56m by 26m ice rink.Appointed by contractors Willmott Dixon, Delta Balustrades were responsible for the supply of 579m’s of balustrading and 246m’s of handrails throughout the entire complex.With two extreme environments coexisting the specifications for the balustrade finishes were of upmost importance.Balustrades and handrails in the warm, chlorine filled air of the swimming pool environment received our Ultra (Marine) finish, providing a bright polished surface to prevent corrosion.First floor ice rink balustrades received our HiBuild powder coating finish, which boasts a ‘warm to touch’ feature that doesn’t allow the transfer a cold environment to bare hands.A visually striking, stainless steel staircase with perforated panels connects the floors within the ceiling void atrium spanning four floors.
Sponsored
UK Hydrographic Office

UK Hydrographic Office

EH Smith Architectural Solutions

Designed by AHR Architects, the new UK Hydrographic Office in Taunton has won numerous awards including the BCO National Awards Corporate Workplace Award and Best of the Best Award 2020 and a Regional RIBA Award, RIBA Sustainability Award and RIBA Client of the year 2019.The United Kingdom Hydrographic Office is the UK’s agency for providing hydrographic and marine geospatial data to mariners and maritime organisations across the world. The UKHO is a trading fund of the Ministry of Defence and is located in Taunton, Somerset with a workforce of approximately 900 staff.We worked with the Architects, Client and Contractors to select one of our exclusive GeoBrick range for this prestigious project. The clean sleek lines and hardwearing stone finish provide a stunning façade to this landmark building. The warm texture of the brick also gives depth and character and softens the mass of the building.“The design principles of the building called for a linear brick which was modern and unique whilst complimenting the landscape and a variety of existing brick buildings surrounding the new HQ. The EH Smith Geobrick brindle bricks stood out from all the rest and we are delighted with the results. Personally, this is my favourite material used on this project!”- Johanna Funnell New Build Project Manager - UKHO
Sponsored
The Links ELC – Coventry

The Links ELC – Coventry

Roché Systems Ltd

The Links ELC – CoventryCoventry ELC is a Pupil Referral Unit for Key Stage 3 & 4 pupils who have struggled to access mainstream school education due to Social, Emotional & Mental Health (SEMH) issues.They have recently increased security around the whole facility. Heightened door and window security was delivered thanks to our E37 electric shutters.THE CHALLENGEThe client was looking for increased security for their facility, to cover windows and doors.We worked with their contractor the Darwin Group to work out the best solution and completed the installation of 31 E37 shutters of varying sizes to the external doors and windows.THE SOLUTIONThe E37 is made from an strong extruded double skinned aluminium slat which can be powder coated any RAL colour. With a narrow 37mm slat it is capable of rolling tightly with a 2m high shutter capable of rolling into a 180mm box. It is widely used for domestic and light commercial applications for securing windows and doors up to 4m wide. It is very popular with schools, offices and modular building companies.The E37 comes with numerous control options including manual, key switch or remote control, including group control options.
Sponsored
Hatfield Close and Gerrard House

Hatfield Close and Gerrard House

Telling Rainscreens Ltd

Following the devastating effects of the Grenfell Tower tragedy, Hatfield Close & Gerrard House fell into the category of social housing buildings that needed to be reclad to meet safety standards and Terracotta cladding offered a solution that satisfied the required standards and ticked all the boxes. BackgroundOn the 14 June 2017, a disaster that shook the nation taking away the lives of 72 people, injuring many others and devastating families and a whole community became the core of public unrest and resulted in a mass scale enquiry that identified around 2,000 buildings over 18m tall clad in dangerous combustible materials in England alone. The cladding crisis exposed that not only did the buildings pose an immediate fire risk to residents but also saw flat owners facing building insurance premiums, extensive and costly remedial work and mortgage lenders deeming the properties unsafe and ceasing to lend money against them. The Grenfell tower tragedy resulted in the review of the building regulations nationally and internationally in countries including Australia, Malta and The United Arab Emirates and in a government pledge of over £5bn towards the remediation of fire safety problems in high rise buildings. The three Hatfield Close & Gerrard House blocks were identified as being clad with ACM, the cladding material used at Grenfell. The projectAlthough originally constructed as a concrete frame with brick infill sections, the Hatfield Close & Gerrard House buildings experienced weather penetration issues during the 1980s and the 1990s that led to a programme of improvements which included the introduction of an ACM rainscreen system in the 2000s which during the post Grenfell tall buildings cladding mass review was found unsafe. Only weeks later emergency works to strip the hazardous cladding began.  Although the primary objective of the project was to improve the fire safety performance of the three blocks, the project team took the opportunity to redevelop the buildings to also improve their aesthetic and structural and thermal properties. The nature of the project called for a holistic approach led by a multidisciplinary team which included Michael Dyson Associates Ltd, a housing consultancy firm that specialises in the social housing sector, social housing main contractor United Living, a Lewisham Homes & Fire risk manager, independent consultants and resident representatives. The team, with guidance from the planners selected terracotta cladding as the material of choice due to its non-combustible A1 fire rating and robustness. In addition to its essential non-combustible fire classification, terracotta offered a large range of tile colours, shapes, profiles and textures that gave the team design freedom and opened the possibility to improve the aesthetic appearance of the blocks at the same time as offering durability due to being a natural product with no synthetic dyes and a life expectancy of 60 years +. The terracotta cladding system offered the façade contractor Novo Facades a simple method that allowed them to deliver a clean and non intrusive installation process which was key as the residents were living in the buildings all along. The project became a construction referent of inclusion and savoir faire. It was a winner in the Inside Housing 2020 Resident Safety Campaign Awards, it was shortlisted for ‘Best Community Engagement’ and Won ‘Project of the Year £10 million to £25 million’ awards at the 2021 National Building & Construction Awards. SolutionTerracotta facade panels are one of the cladding resources of choice in the market because it is a natural and versatile material that gives architects freedom of expression whilst it gives cladding and envelope contractors the advantages of a quick and easy installation process. The Argeton system is one of the principal terracotta systems used worldwide not only because it is a natural and versatile material but also because it offers a technical and cost-effective solution for the residential, commercial and health and education sectors. Argeton is CE and UKCA marked and one of the most tested systems in the market including a BBA and an EPD. NHBC approved and not subject to any restrictions on building height or proximity to boundaries thanks to its Euro-class A1 Fire certification, it is no surprise Argeton is one of the materials of choice not only in new builds but also for refurbishment or re-clad. Durable and fully recyclable, ISO 14025 and EN 15804 (European BREEAM equivalent) certified, sustainability is at the heart of Argeton’s values. Argeton terracotta cladding systems are available in a range off the shelf and bespoke profiles, in lengths to suit and in natural, glazes, digital print and engobed finishes. https://tellingrainscreens.co.uk/profile-and-finishes/
Sponsored
Versapanel Case Study: Hugh Baird Community and Higher Education Centre

Versapanel Case Study: Hugh Baird Community and Higher Education Centre

Euroform Products

This exciting project, situated close to a major wind farm, required a sheathing board with exceptional pull-over performance; and the need for unusual board sizes meant that waste was an issue, particularly in light of the architect’s BREEAM ‘Very Good’ rating ambitions.The Project: Hugh Baird Community and Higher Education Centre, LiverpoolProject Value: £8 millionMain Contractor: Wates Construction North WestSub-Contractor: Sound Interiors LimitedProduct: VersapanelSize: 1200 — 2800 — 12mmQuantity: 2,000m2About the ProjectAn £8 million, 2,600 square metre project, the new Hugh Baird Community and Higher Education Centre in Liverpool offers an innovative mix of facilities, not only for Hugh Baird’s students and apprentices but also to the local community, schools and businesses.The facility will incorporate a University Centre, a flexible performance and exhibition space, a public library and a Jobcentre Plus. A new Business Development Centre, providing professional training for local businesses, is also to be a core feature.Architects IBI Taylor Young have created a striking modern design, incorporating a semi-rotunda feature and a three-storey overhanging box structure.The ChallengeThere were two key challenges on this project for sub-contractors Sound Interiors Limited. Firstly, the unusual design called for non-standard panel sizes. This is becoming all too common as contemporary architecture moves increasingly toward the unique and, in some cases, the downright eccentric.Secondly, the five-storey structure is located in a windy area; so windy, in fact, that, less than a mile away, you can find the Port of Liverpool 10MW wind farm, capable of generating electricity for 5,500 homes. Where wind is a factor, the pull-over performance of any building boards used is critical, particularly during construction when wind can penetrate the structure and create areas of negative wind pressure.The SolutionSize is EverythingAs modern British architecture moves away from the conventional, the challenges for construction professionals like Sound Interiors increase. Whilst, in the past, construction has largely been a logistically focused endeavour — the ‘when’ and ‘where’ of it all — increasingly, the question that dominates the pre-construction phase of a project is ‘How?’The skill and experience of Sound Interiors came into play not only in applying their technical knowhow to the challenges of constructing an overhanging box and creating a curving rotunda from flat building boards, it also influenced their choice of materials.Said John Sheeran, Contracts Manager at Sound Interiors Limited, “We opted for Euroform’s Versapanel on this project — and numerous other projects — because it’s easy to work with and reliable. Plus we get exceptionally good technical support from the team at Euroform. For the Hugh Baird project, where lots of unusual sizes were required, the fact that Versapanel is available in a larger 1200 — 2800 — 12mm size meant we could dramatically reduce wastage. This material-conscious approach also helps us support IBI Taylor Young’s ambition of achieving a BREEAM rating of ‘Very Good’ for the building.”Under PressureIt’s no coincidence that four 125-metre Nordex N90, 2.5-MW turbines, capable of producing a total of 10MW of electricity, have been strategically located just a mile or so away. This is a windy area of Liverpool. Thankfully, Sound Interiors’ commitment to Versapanel also resolved this second challenge, reducing the effects of negative wind pressure during construction.John Taylor, Business Development Manager at Euroform, said, “Versapanel makes the ideal sheathing panel for challenging construction environments. For areas of high wind load, such as coastal regions, a board with effective wind-load and pull-over performance can be extremely important. Obviously, no two projects are alike, and we’re only too happy to work closely with professionals like Sound Interiors to ensure the best possible outcome.”ConclusionThis isn’t the first time that Sound Interiors, Euroform and Versapanel have come together to overcome adverse weather condition. At Gogarth School in Llandudno, freezing temperatures and driving rain presented a significant challenge. At Hugh Baird, it was strong winds. In both cases a desire to reduce waste was a key commitment of all parties involved. And in both cases, a successful outcome was enjoyed by all.
Sponsored
Addiscombe Oaks

Addiscombe Oaks

Keyfix

IntroductionThe Keyfix Non-Combustible Cavity Tray has been installed as part of a new-build project, Addiscombe Oaks in South London, helping to safeguard the development from fire and future building regulation changes.OverviewAddiscombe Oaks is a residential housing development designed by Gardner Stewart Architects (GSA) and developed by L&Q. This new-build development offers a selection of contemporary studio, one, two and three bedroom apartments. Conveniently located in East Croydon, residents of Addiscombe Oaks will benefit from quick transport links into London Bridge, Brighton and Gatwick airport, in addition to nearby shopping centres and parks.Working alongside brickwork contractor Lee Marley Brickwork, Keyfix supplied 2,200 metres of its Non-Combustible Cavity Tray (NCCT), 434 preformed Corner Units, 1,362 preformed Reveal Returns, 8,700 weep vents, as well as Non-combustible Cavity Tray Lintels (NCCTL) over 264 openings.The primary objective for the client was to ensure that the building was constructed in line with updated building regulations, and to ensure that the building would be future-proofed against potential regulation changes. Keyfix was able to meet this objective, as its NCCT is designed to last for the life of the building. The Keyfix NCCT is a fully compliant, A1 fire-rated system, manufactured using Class A1 Non-combustible Grade 304 austenitic stainless steel, resulting in a lifespan of 125+ years for the entire system. Therefore, its use ensures that the building is protected, should building regulations become stricter in the future.ChallengeFurthermore, the main challenge the client faced on the project was keeping to the tight project timeframes. The project ran from October 2021 to August 2022, and the main contractor required an accredited solution which could be delivered in line with the tight-build programme. Keyfix resolved this challenge by supplying products which improved buildability. In particular, the provision of preformed corner units helped to significantly save time on installation.SolutionThe Keyfix NCCT was specified due to its ‘self-supporting one-piece system’ which allows for an easy and efficient installation. The NCCT’s unique design incorporates a stainless steel tray to provide rigid self-support across the clear cavity and requires no reinforcement from the internal structure using mastics or tapes. This design saves precious time for the bricklayer and eliminates clashes with other components.Likewise, the Keyfix Non-Combustible Cavity Tray Lintel was specified due to its A1 Fire Rating, high performance stainless steel, and ease of installation. As the NCCTL requires no tape or mastics, it is a system that allows the contractor to ‘fix and forget’. The design of the NCCTL also incorporates mechanically fixed Stop Ends to capture and channel water outwards via the Keyfix NCW (Non-combustible Weep). The NCCTL is the maintenance-free solution that can accommodate openings up to 2822.5mm, with lintel lengths based on brickwork opening sizes with the range based on 215mm stretcher bond as standard.Moreover, Keyfix supports its clients with the provision of a technical review of architects drawings and a comprehensive schedule and location layout plan on every project. On Addiscombe Oaks, Keyfix engaged with L&Q and Lee Marley Brickwork early on so that any challenges could be resolved before construction took place, ensuring that the project ran smoothly. Keyfix’s team attended design meetings, followed up with calls to site, and provided a Tool Box Talk and CPD webinar presentations to provide technical support and educational resources alongside its products.Martyna Kielbasa, Senior Design and Technical Manager at L&Q commented: “The non-combustible cavity tray was specified as it aligned with the non-combustible scheme throughout the whole development. Keyfix’s representatives supported our subcontractor throughout the construction process by assisting with technical reviews, itemised schedules and sign-offs on specs.”Commenting on the NCCT, Kieran Coyle of Keyfix stated, “The Keyfix Non-Combustible Cavity Tray is an A1 fire-rated system, ensuring our customers peace of mind as their buildings are future-proofed and safeguarded against fire, in addition to onsite efficiency.”Addiscombe Oaks is now complete, with the Keyfix Non-Combustible Cavity Tray system having played an essential role in the construction of a safe residential development that is future-proof against possible regulation changes.
Sponsored
Burton Green Primary School

Burton Green Primary School

Polyroof Products Ltd

Burton Green Primary School is located in the historic city of York, an outstanding school at the heart of a local community this primary school strives for excellence. The challenging and nurturing learning environment allows children to learn and grow, while achieving the highest potential possible in all areas of the 21st century curriculum.When the roof began showing signs of ageing, it was clear that a long-term solution was required. Working with Project Managers Charles Garth and Principal Contractor Castle Special Projects, Polyroof would work towards providing the best solution to refurbish the ageing roof.The work required and condition of the roof needed to be established first, to do this a survey was scheduled to take place. The survey was conducted on roofing area and it was determined that there were 6 flat roofs that required refurbishment. Areas 1 to 2 were constructed of a built up felt with mineral cap sheet, 50mm PUR insulation, bituminous vapour control, asphalt, 12mm fibreboard and a 50mm woodwood slab deck with timber joists. Areas 3 to 5 were constructed of a built up felt with mineral cap sheet, 50mm Jablite insulation, bituminous vapour control, asphalt, 12mm fibreboard and a 50mm wood wool slab deck with timber joists. Roof area 6 was made up of built-up felt with mineral cap, plywood and timber joist. The original build-up of roofs 1 to 5 needed to be stripped back to the asphalt due to the aged condition of the built-up felt, numerous leak reports were reported. Roof 6 and its original waterproofing was to be retained and made good, later this surface would act as the substrate for the new waterproofing system.Once the survey was completed, a bespoke specification was written and it was recommended that the roofing areas would all benefit from a high-performance waterproofing system. In addition to this it was specified that the roof would be thermally upgraded to reduce the risk of condensation and provide lower fuel bills and energy consumption for Primary School further adding benefits to making improvements to the roof.Liquid Roofing Limited an experienced roofing contractor and Polyroof Approved Contractor was chosen to undertake the work to this project. The proposed system for this project would be Polyroof Protec Warm Roof System. Protec’s liquid roof membrane has a unique flexible hybrid polymer formulation and can be applied to virtually all common roof surfaces.The areas that were required for installation firstly needed to be stripped and removed back to the asphalt, areas 1 to 5 required this. Area 6 was then repaired of any defects and made good where necessary. All roofs required a deep clean, removing any dirt or debris that remained from the first stage. Once this preparation was completed an Air & Vapour Control Layer (AVCL) was then installed to roof areas 1 to 5 making sure that all surfaces are smooth and without voids.Using a Polyroof Twin Pack Insulation Adhesive the Polyroof RES insulation (T&G) boards were bonded and laid to each of the 6 roof areas completing the second stage of the warm roof upgrade. Before the last stage of the installation could begin all joints in the insulation were sealed using taping matt and Polyroof Protec Resin. Polyroof’s extra-tough GRP trims were then installed to create neat and robust edge detailing for exposed perimeters before the main Protec system application commenced.During the project there were some challenging aspects that required care and attention. The project featured a large array of different details ranging from installation of new substrates and trims for parapet walls to the removal of and preservation of tiles/cladding so that the Protec system could be applied correctly. These features required delicate work so that the original tiles/cladding could be reinstated after the application of the system was completed. During the project the rooflight that was originally in place was removed and replaced with a new, before this could happen the Protec system was taken up the upstands and then sealed under flange.Once the project was completed within the relevant time frame of the client and within the budget specified, the Polyroof Technical Services team conducted a detailed inspection showing a high level of workmanship which lead to the client gaining the trusted Polyroof Accredited System Guarantee.
Sponsored
ONE Tower, Limassol

ONE Tower, Limassol

Siderise Group

Twice the height of any other building in Cyprus, the ONE Tower commands the skyline of Limassol. Sitting on the palm tree lined seafront close to both the city’s bustling business district and its quaint old town, the new development offers 83 luxurious residences, leisure and commercial opportunities set across 37 floors. Its award-winning curved design reminiscent of a yacht’s sail, stands at 170 m high which, coupled with its coastal location, presented a unique set of passive fire requirements for its facade. Key informationCompletion dateSummer 2020SectorResidential | Retail | LeisureEnd clientPafilia Property Developers Ltd.Main contractorArabian Construction Company (ACC) | JV Partners | Joannou & Paraskevaides Group (J&P Group)Facade contractorGlassline Industries LtdArchitectWKK ArchitectsDistribution PartnerDPS TechnoIndustrial Ltd Products usedSiderise RH Horizontal Cavity Barriers for Ventilated CladdingSiderise RVG Vertical Cavity Barrier (galvanised mild steel brackets)Siderise OSCI Open State Cassette Insert DesignThe sheer height of the tower meant it was vital to ensure the facade construction contained adequate passive fire protection, complying with local regulations and ensuring ongoing safety throughout the building’s lifetime. After working with our products and our Cypriot distribution partner DPS for a number of years, facade contractors Glassline specified a combination of open state Siderise cavity barriers and cassette inserts. The RV vertical and RH horizontal cavity barriers are designed to allow the facade system to maintain airflow and drain away any moisture within its construction but, in the event of a fire, rapidly close the ventilation gap to create an effective hot smoke and fire seal. Both products achieve Class A1 to EN 13501-1 and provide 120 minutes fire integrity. The barriers are complemented with the use of OSCI Cassette Inserts which are Class A2 rated. All these products have undergone rigorous third party testing to ensure dependable performance. These include single product tests and testing as part of a large-scale system, such as BS 8414 (1&2) and NFPA 285, demonstrating their performance within a complex, high-rise cladding system such as that used on the ONE Tower. For more detail about the standards the products meet, please visit the individual technical data pages. In addition to providing straightforward passive fire protection, the stonewall lamella core of the RVG vertical cavity barriers allows them to accommodate the natural movement associated with rainscreen facades. This is especially important on this exposed seafront project. It is also for this reason that the cavity barrier brackets were specified in robust galvanised steel, protecting them from corrosion caused by the sea air.InstallationAll Siderise products are designed to be easily installed— a key benefit on this large-scale project, enabling it to be finished to a high standard without compromising the project timeline. The RV vertical barriers and then the RH horizontal barriers were cut to the correct size and installed by Glassline using Siderise galvanised steel brackets and foil tape. Where the two products met, they were simply tightly abutted, and the joints sealed with foil tape to ensure continuity of intumescence and therefore fire protection. The OSCI cassette inserts were then fitted as part of the cladding system, installed directly behind the cassette panels and in parallel and centrally aligned to the RVG and RH cavity barriers. This helped to simplify detailing and ensure the ventilation gap met the project requirements. Technical support and site services were provided by our partner DPS throughout the design and installation process, in-keeping with the Siderise ethos of standing by the side of our customers to deliver optimum results.Final CommentsCreated in collaboration with a number of renowned international and local firms and suppliers, ONE Limassol Tower not only stands as a symbol of the city’s exciting future, but also of what can be achieved when diverse skills, expertise and vision are brought together. The selection of tested Siderise products chosen for the project will help to ensure that the building remains a safe and beautiful home and landmark for the people of Limassol for many years to come.Image copyright (C) Pafilia www.pafilia.com 
Sponsored
FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre

FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre

FIREFLY™ TBA

A programme of works carried out at a Nottinghamshire hospital has seen a number of products from the FIREFLY range employed to upgrade the passive fire protection throughout the roof spaces, with the manufacturer providing site specific design details to assist the highly experienced contractor complete the project on time. DC Fire Protection Ltd., based at Wellingborough in Northamptonshire, works right across the country covering multiple sectors of the construction industry, installing active as well as passive fire protection systems.  For its 10 week contract at the Ashfield Health and Wellbeing Centre at Kirby in Ashfield, the specialist installed dozens of rolls of the Titan Lite™ fire barrier as well as the Apollo Horizontal barrier, Collaroll and two of the 1200 x 600mm FR120 Access Panels to link some of the safety zones being created. Built in 2007, Ashfield Health and Wellbeing Centre is conjoined to the existing Ashfield Community Hospital and offers extended health services to the local community, supplementing the current services by providing purpose-built rehabilitation facilities, physiotherapy, occupational therapy and other community health services.  It also offers consulting rooms, treatment rooms and an activities of daily living suite, rehabilitation and gym areas.A Director of DC Fire Protection, Daniel Mabbott, commented: “We have been dealing with FIREFLY for a number of years, including buying large quantities of the Titan Lite™ and Apollo Lite , which we use for commercial contracts as well as other work.  We often propose the use of FIREFLY systems to clients and in this instance, where we were simply given the performance standard the client required, we proposed the use of Titan Lite plus Apollo Horizontal to upgrade the exiting fire walls which no longer comply with current requirements.” “There were a number of plastic PVC-U soil stacks rising through the roof in what was specified as a Controlled Zone, for which FIREFLY provided us with a bespoke detail to protect them where they passed through the barriers, while we installed a couple of their FR120 Access Panels in addition to the fire doors which we fitted in a number of locations throughout the roof.  The project was completed on time and we have now moved onto another contract where we are again using a number of FIREFLY products.”Third party approved, FIREFY Apollo Horizontal 30:30 provides 30 minutes integrity and insulation to exceed the minimum requirements within the Building Regulations relating to fire barriers.  In common with other FIREFY products, Apollo Horizontal is manufactured using specially treated woven glass fibre fabric, being flexible and lightweight making it easy to install. Specifiers and specialist fire contractors wishing to find more information about the full range of products available from FIREFLY can visit www.tbafirefly.comImages shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
Hard Days Night Hotel Acoustic Isolation Case Study

Hard Days Night Hotel Acoustic Isolation Case Study

CMS Danskin Acoustics

Regupol studwork isolating strips helped prevent flanking sound between suites at the new Hard Days Night hotel in Liverpool.The ChallengeWhen a suitable site was finally found for Hard Days Night, the eagerly anticipated Beatles themed hotel in Liverpool, an ambitious two-year development plan was put in place to convert the historic listed building into a prestigious four star hotel.Extensive alterations to the internal area of the building created 110 guest bedrooms, which included two exclusive Lennon and McCartney suites, bars, restaurants and function rooms as well as a wedding chapel.Designed to create a unique environment with a high quality feel, it was essential that Hard Days Night lived up to the expectations of the many visitors it would welcome. Part of this meant ensuring that bedrooms were adequately soundproofed, to ensure guests were not disturbed.As with many refurbishment projects, the floor construction was timber, which left Hornport Construction, the main contractors on the project, tasked with finding a compatible acoustic treatment that would help prevent sound transfer between bedrooms.The SolutionAlthough internal wall isolation was the specified acoustic treatment, Hornport Construction was able to make the final purchasing decision as to which products would be used. After consultation with CMS Acoustic Solutions, Regupol studwork isolating strips were identified as the most cost effective solution to deliver the required acoustic performance.Manufactured from recycled polyurethane (PUR) foam, Regupol studwork isolating strips are supplied at a standard thickness of 6mm, and widths to suit specific development requirements. Sitting beneath all types of timber partitions, the studwork strips reduce structure borne noise by absorbing sound and de-coupling the connection between floor and wall constructions.Resistant to ageing and deformation, Regupol studwork isolating strips offer long-term performance and will not collapse under high point loads.Available exclusively in the UK through CMS Acoustic Solutions, Regupol studwork isolating strips are supplied with comprehensive installation guidelines, making it simple for contractors to install independently on site. Easily laid, the Regupol material is bonded straight to the subfloor, with the partition erected directly on top.The ResultAt the Hard Days Night Hotel, Regupol studwork isolating strips were used to isolate the party walls separating the corridors and bedrooms. Designed specifically for use with timber, Regupol studwork isolating strips offered the ideal solution to isolate a party wall sitting on an existing timber floor.Gerry Abraham, site manager, Hornport Construction, concludes: “The Hard Days Night is a four star hotel, so high acoustic standards were imperative. We initially looked at timber sole plates with pre-fitted isolating strips, but this was quite an expensive route. We consulted CMS Acoustics who were able to provide a cost effective and high performing alternative with the Regupol studwork isolating strip – which was just as quick and easy to use.”
Sponsored
UltraCrete prevents dangerous accident in Carmarthen

UltraCrete prevents dangerous accident in Carmarthen

Instarmac Group plc

MJ Quinn and subcontractors, HT Installations Limited, have used UltraCrete’s market-leading Flowable Installation System to repair a faulty carriageway frame and cover on the B4299 in Carmarthen.BackgroundA large section of a rural road in Carmarthen was severely damaged. The area in question is located at the bottom of a hill and over time, the relentless force in which cars and tractors have hit the road surface has severely deformed the surface.The consequence of this damage also caused structural damage to a nearby carriageway frame and cover.The ChallengeLocated on the B4299, this rural road is the main thoroughfare for the village, with tractors and cars using the road daily. The repair needed to be carried out quickly to minimise disruption, and most importantly, it needed to be a first time permanent repair to prevent any further disruption and damage to the surrounding road surface.In this instance, HT Installations Limited, the subcontractor working on behalf of MJ Quinn, the main contractor for Wales for Openreach, were only responsible for repairing the frame, cover and trim back area. However, in order to prevent further deterioration caused by the deformed road surface, HT Installations went above and beyond and replaced the heavily deteriorating asphalt on the CW2 frame and covers leading edge. This would ensure a longer life expectancy for the new carriageway frame and cover installation and avoid costly return visits.The SolutionHT Installations Limited utilised UltraCrete QC10 F flowable fibre modified concrete to repair the brickwork chamber and their Envirobed® Flowable Installation System to install the replacement CW2 frame and cover – a process used by Openreach for all their carriageway repairs.To begin, the entire area was excavated and spoil removed. The contractors assessed the chamber and utilised the Mortar Buoy® installation aid within the chamber as an alternative to formwork/shuttering. They proceeded to mix and pour UltraCrete QC10 F, rapid set flowable concrete, to repair the damaged concrete chamber. Utilising Mortar Buoy® significantly speeds up the repair process, helping to save you time and money.QC10 F sets in less than 20 minutes, so a very short time after being poured, Mortar Buoy® was re-inflated inside the chamber and the CW2 frame dropped into position ready for levelling with the existing road surface. A sand bund was then formed 50mm beyond the flange edge, as opposed to shuttering, to retain the flowable mortar.UltraCrete Envirobed® CD534 Flowable Red was mixed and applied to fully encapsulate the frame flange up to 20mm above and 50mm beyond the frame edge. Envirobed® CD534 sets within 20 minutes, allowing the sand bund to be swept clear and site prepared for hot asphalt application, really quickly.ResultsThanks to the rapid high strength gain and setting superior performance qualities of UltraCrete’s Flowable Installation System, HT Installations were able to carry out their repairs quickly, safely and permanently, much to the delight of MJ Quinn, Openreach and the local residents.
Sponsored
Continuous louvre wall for intensive ventilation Sancroft building in London

Continuous louvre wall for intensive ventilation Sancroft building in London

Duco Ventilation & Sun Control NV

Nestled in the vibrant heart of London, Sancroft is an office building that stands tall, a commanding structure that spans over 10 floors with 2 levels of basement with a GIA of circa 429,000sqft. When the building’s architects, Buckley Gray Yeoman Ltd, were tasked with providing intensive ventilation in the building, they turned to Price Engineered Solutions for advice. Price Engineered Solutions, renowned for their leadership in supplying heating and ventilation components for key projects across the UK. They recommended the architects to work with DUCO for the installation of intensive ventilation. A Breath of Fresh Air: Continuous louvre walls with value for moneyTo ensure the Sancroft building is ventilated naturally and continuously it was decided to install the sturdy, robust aluminium louvre-wall system, DucoWall Screening 70 & 75.John Biss, Contracts Manager from Price Engineering Ltd, explains: “The selection of the DucoWall Screening 70/75 was purly down to our recommendations and budget constraints. DUCO's louvre-wall system emerged as the ideal choice in terms of cost-effectivness.” Innovative design and aesthetic appearanceWhat sets this project apart is its innovative design, which distinguishes it from the neighbouring structures.John Biss continues: “This project is truly unique due to its innovative design. For instance, we had to incorporate bracketry to support a wire trelis that over time, will host climbing plants. . The sleek appearance of the DucoWall Screening adds to the uniqueness of the building”.Super-quick assembly and high airflowThe Z-shaped louvre blades of the DucoWall Screening are clicked directly onto the support section thanks to a direct clip system, ensuring super-quick assembly. The very large span and high airflow of the louvre wall ensures high ventilation values and thus an optimal indoor climate for all office workers present.John Biss : « With Duco’s patented ‘Direct Clip’ system, the louvre blades are clicked onto the support section directly, ensuring fast installation. In a world where everything has to be delivered very quickly and the next job is waiting in line, this is a very welcome asset!”Fine collaboration and postive feedbackThe collaboration between other parties, such as Britplas, leading commercial glazing specialist in the UK, and the engineers and contractors was very great. We had open communications between all parties involved which led to yet another project going off without a hitch”. Our client expressed profound satisfied, not only with the DucoWall Screening louvre wall but also with our adapt management of the design and installation process all while minimizing disruptoin to other trades” As John Biss aptly concludes,” We’ve delivered a project that exceeds expectations, offering a breath of fresh air in every sense” Architect: Buckley Gray Yeoman LtdBuilding contractor: Price Engineered SolutionsCommercial glazing specialist: Britplas     
Sponsored
Granary's Peacock - F. Ball's System LVT Range Delivers Grand Design

Granary's Peacock - F. Ball's System LVT Range Delivers Grand Design

Ball, F and Co Ltd

Products from F. Ball and Co. Ltd.’s System LVT range, including the company’s fast-track, fibre-reinforced transitional adhesive, Styccobond F58 PLUS, have been used to install luxury vinyl tiles in an ambitious, modern self-build property in rural Cambridgeshire.Flooring contractors began by thoroughly vacuuming the building’s concrete subfloor to remove dust and debris. F. Ball’s technical service team recommended treating the subfloor as a newly installed screed for the purposes of moisture management, despite being installed months earlier, as it had been left exposed to the elements since. Therefore, Stopgap F77 waterproof surface membrane was used to create a barrier to prevent excess subfloor moisture attacking adhesives and floorcoverings, potentially causing floor failure.Once the waterproof surface membrane had cured, the surface was primed using Stopgap P141. Stopgap 300 HD heavy-duty levelling compound was then applied over the entire ground floor to create a perfectly smooth base for the receipt of floorcoverings. The product’s high compressive strength and excellent self-levelling properties help create a flawless finish when installing LVTs, while ensuring a long-lasting, aesthetically pleasing floor finish even when subject to high levels of wear.The contractors then used Styccobond F58 PLUS and Styccobond F49 Hybrid PS temperature tolerant, moisture resistant, pressure sensitive adhesive to install wood-effect LVTs over the 372m2 area. Styccobond F49 was used where floor-to-ceiling windows were likely to cause temperatures to rise significantly as a result of solar gain.Styccobond F58 PLUS was used to install vinyl tiles everywhere else. The fast-track adhesive enables floorcoverings to be installed from as little as five minutes after application, transitioning from a wet-lay adhesive to become fully pressure sensitive. Reinforcing fibres in the formulation provide resistance to lateral movement, holding tiles firmly in place and reducing the potential for them to slide around when working. The adhesive’s high bond strength and strong initial tack also prevent excess adhesive oozing between joints, facilitating easier application.All of the products used in this installation feature in the F. Ball System LVT range: subfloor preparation products and adhesives which, used in combination, can help achieve optimum results when installing LVTs.Commenting on the project, Richard Argyle of 4 Floor Fittings, said: “It’s the best screed I’ve ever done. The levelling compound had no imperfections whatsoever. Styccobond F58 PLUS allowed floorcoverings to be installed over large areas in one go while helping with the precise alignment of LVTs. The result is a visually striking finish in keeping with the rest of the project.”
Sponsored
Southfields Veterinary - F. Ball proves to be the top dog at new veterinary centre

Southfields Veterinary - F. Ball proves to be the top dog at new veterinary centre

Ball, F and Co Ltd

F. Ball’s Stopgap Fill and Prime thixotropic primer and Stopgap 1200 Pro levelling compound have delivered a fast-track solution for installing floorcoverings in one of the largest small-animal referral hospitals in Europe.Flooring contractors installed vinyl safety flooring and luxury vinyl tiles throughout a total area of 1100m2 at Southfields Veterinary Centre, in Basildon, Essex.Requiring a timesaving solution for working over chipboard as an alternative to overboarding with plywood, the contractors contacted their regional F. Ball technical representative, who advised preparing subfloors with Stopgap Fill and Prime prior to the application of a suitable levelling compound.Stopgap Fill and Prime is a cement-based primer that is designed for use over raised-access panels and flooring grades of plywood, chipboard, MDF and oriented strand board (OSB 3). It has a thixotropic consistency, meaning that it flows freely when stirred but sets to a gel-like consistency on standing, enabling it to fill gaps between panels to prevent imperfections transferring to the finished installation.Stopgap 1200 Pro levelling compound was then applied in all areas to create a perfectly smooth base for floorcoverings. The product is fast-setting and fast-drying and can also be applied over old adhesive residues, in which case there is no need to prime subfloors beforehand.Polyflor vinyl safety flooring was installed in the treatment rooms using Styccobond F44 solvent-free acrylic emulsion adhesive, which is designed to give a strong initial tack, high bond strength and a long open time.In the canteen, Forbo Allura Flex Wood luxury vinyl tiles were adhered using Styccobond F46 pressure sensitive adhesive, which provides instant grab, preventing floorcoverings from sliding as tiles or planks are subsequently placed. The adhesive is designed to minimise the incidence of trowel serrations showing through thin vinyl flooring and potentially affecting the finished appearance of the installation. Styccobond F46 was also used to secure Polyflor vinyl safety flooring in the corridors connecting the treatment rooms.Capping and coving were installed in the corridors using Styccobond F60 contact adhesive. The formation of an instant bond makes it suitable for securing floor and wallcoverings on vertical surfaces.Commenting on the project, Ben Montgomery, head of projects at Veatu Flooring, said: “While we use a lot of F. Ball products and they’re our first choice because of their quality and availability, it’s the first time we’ve used the tech rep service. They came out and provided a tailored specification for the project we were working on, which ended up saving us a lot of time and expense.”Before any floor preparation work was carried out a moisture test was conducted, which determined that subfloor moisture levels were low enough that a moisture management solution was not needed.
Sponsored
Borrisokane Community College

Borrisokane Community College

Bauder Ltd

Borrisokane Community CollegeBauder Thermofol PVC single ply waterproofing systemSynopsisOriginally constructed in the 1970s on the site of former workhouses in County Tipperary, the Borrisokane Community College building needed to be demolished and replaced, having exceeded its serviceable life. The client wanted to bring a modern and refreshed appearance to what is a site of great historical significance and the new building’s roof played an integral role in achieving this; with the majority of the roof areas sloping inwards towards the open central courtyard area making them highly visible.Bauder Building BoardProject:Borrisokane Community CollegeLocation:BorrisokaneRoof Area:3,650m²Specifier:Healy & Partners Architects Main Contractor:JJ Rhatigan & Co.Approved Contractor:Priority Roofing & CladdingThe specificationRoof areas totalling over 3,000m2 were fitted with Bauder’s Thermofol single ply fleece backed membrane, which is lightweight, visually appealing and possesses a high tensile strength of ≥ 1100N/50 mm. The system build-up included 160 mm of Bauder’s Thermotech Glass Insulation for superior thermal performance, ensuring the roof achieved the required 0.19 U-Value, and PVC roof profiles were also installed as a cost effective way of replicating the appearance of a standing seam metal roof. Bauder supplied new rooflights to deliver high standards of illumination, insulation and ventilation, and smaller single storey roofs were waterproofed with its bituminous Bauderflex system.Products appliedBauder ThermofolA high quality single ply PVC system with a life expectancy in excess of 30 years.Bauder ThermotechAn efficient PIR insulation board with a coated glass tissue facing on both sidesThe result Despite the various design and logistical challenges encountered, all roofing works were completed to budget and in time for the start of the inaugural school term much to the delight of everyone involved in the project. System installedBauderThermofol PVC single ply waterproofing system1 Bauder Thermofol U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder ThermotechAn efficient PIR insulation board with a coated glass tissue facing on both sides.3 BauderTEC KSD FBSA 2.5mm depth, self-adhesive air & vapour control layer with a mica finish.AdvocacyHealy & Partners Architects:“Bauder delivered a roofing solution of the highest quality, providing expert technical support throughout the project. Their single ply waterproofing system has undeniably helped in transforming the appearance of the college and most importantly given the client total confidence with regards to their roof’s long term future performance.”
Sponsored
easyHotel, Cardiff

easyHotel, Cardiff

Alumasc Roofing

Derbigum + BluRoof = Sustainable Drainage Solutions Mitigate your risks with Alumasc BluRoofs Think Stormwater Management - Derbigum BluRoof SolutionsA 5-minute hop from Cardiff Queen Street and you’ll find the first blue roof in Wales. Upon what was formerly 1960’s office accommodation the Cromwell House site has been transformed into an 8 storey, 120-bedroom easyHotel with a rooftop stormwater management system. OUR DESIGN PROCESSOur clients at Carter Lauren Construction were interested in learning about the benefits of a blue roof to meet planning conditions. ” Working in a compact city centre environment where ground attenuation was not possible, it made sense to install a blue roof. The Alumasc team demonstrated how their BluRoof System attenuates stormwater via controlled discharge over a 24-hour period at roof level.” Kevin Jenkins, Surveying Director, Carter Lauren Construction. CLIENT BRIEF AND DESIGNWorking closely with the appointed consulting engineer and architect, our team of technical experts designed a solution for stormwater attenuation to comply with planning and meet all other project objectives. Alumasc’s Matt Davies, Area Technical Manager - Mid, West & South Wales commented, “Given the urban location, the Alumasc BluRoof system was the perfect fit in providing a fully warranted single-source waterproofing and sustainable drainage solution.”The Alumasc technical team provided a full specification service and specialist drainage design using key data from the project brief. By incorporating our BBA Accredited Derbigum APP polymer modified bituminous waterproofing system the longevity of the total solution is assured with a proven track record since 1967. Other key components comprise of a BluRoof geotextile filter fabric, BluRoof interlocking void former, flow control outlets, and overflow system.ENVIRONMENTALLY FOCUSSED SOLUTIONExtreme weather events are now the new normal, says the World Meteorological Organisation. Our rainfall patterns are becoming increasingly unpredictable, and we must plan accordingly to adapt the built environment to help alleviate flood risk. PARTNERSHIPWorking with the contractor to construct the first blue roof in Wales. Kevin Jenkins, Surveying Director, Carter Lauren Construction, “Matt and the Alumasc team were available throughout the design and installation process. We knew that installing the BluRoof by Alumasc was the right decision for the future of the easyHotel and the benefit to reduce pressure off the drains.” SAFETY PERFORMANCEThe easyHotel has a 35-year warranty for the works and life expectancy of up to 50 years.ABOUTEasy Hotel Cromwell House, Cardiff - Wales’s first blue roof. Completion: Spring 2021 Main Contractor: Carter Lauren Construction Architect: Axiom Architects 
Sponsored
Hethel Engineering Centre

Hethel Engineering Centre

Bauder Ltd

Hethel Engineering CentreBauder Thermoplan FPO single ply system with Bauder solar PV systemSynopsisHethel Engineering Centre supports high performance engineering companies located throughout Norfolk. The original building at the centre had been operating at maximum capacity and they urgently required a new building to satisfy increasing levels of demand. The client wanted the new facility to meet a high level of sustainability, achieving a BREEAM excellent rating and using key renewable technologies, such as photovoltaics (PV) to minimise its environmental impact.Bauder Building BoardProject:Hethel Engineering CentreLocation:Hethel, NorfolkProject type:New buildRoof size:2,500m²Specifier:NPS GroupApproved contractor:Voland AsphalteThe specificationBauder’s Thermoplan single ply membrane was specified for the new building’s 2,500m2 roof due to its longevity. Roof areas totalling 500m² were fitted with 160 PV Modules, enabling the centre to generate at least 44.23 mWh of solar power each year and annual CO² savings of 23.40 tonnes. The PV system was installed without any penetration of the waterproofing or roof deck, ensuring the integrity of the roof is completely upheld. The simplicity of the installation also meant that approved contractor, Voland Asphalte, could install the entire PV array in just one day.Products appliedBauder solar PV system160 solar photovoltaic modules were installed with an expected energy generation of 44.23 megawatt-hours and a kilowatt peak of 47.20 along with Bauder's Thermoplan single ply membrane.  Project challengesThe centre remained operational throughout the works, which caused logistical challenges, however all deliveries were timed as not to conflict with vehicles moving in and out of the facility. The work at HEC was completed on time and to budget, providing the client with an innovative roof that boasts extraordinary environmental credentials.System installedThermoplan Single Ply System 1 Bauder Thermoplan FPO FPO membrane with laminated fleece for adhered installations; pre-coated cross weave polyester reinforcement for high levels of tear resistance.2 BauderPIR M 60An efficient PIR flatboard insulation with aluminium foil facing on both sides and rebated edges to remove a thermal bridge.3 BauderTEC KSDA technically advanced self-adhesive elastomeric bitumen air and vapour control layer with an aluminium foil facing for vapour impermeability.AdvocacyKarl Manning at NPS Group: “Hethel Engineering Centre is a perfect example of a project where outstanding workmanship and top quality products can harmoniously come together to deliver an exceptional, sustainable roofing solution. The Voland team in collaboration with Bauder provided the highest degree of technical support throughout the project, helping us overcome any issues we encountered promptly and efficiently.”
Sponsored
Hailsham Community College Primary Academy | Wall Mounted Canopy

Hailsham Community College Primary Academy | Wall Mounted Canopy

Able Canopies Ltd

Product:1no. Bespoke Coniston Wall Mounted Canopy: 74.26m x 3m – 3.5m2no. Standard Coniston Wall Mounted Canopies: 8m x 2.1m and 8.9m x 2.1mCanopy Frame Colour: Light Blue RAL 5012, matt finishInstallation Date: August - September 2019Contractor: Morgan SindallArchitect: Miller Bourne ArchitectsThe BriefIn September 2018, an invitation to tender was received by Able Canopies from Morgan Sindall Construction Ltd for a number of canopies at the brand new two-storey, primary and nursery school for which they had been awarded the contract to build to form part of the Hailsham Community College Academy Trust.After reviewing the tender documents we put our recommended products forward, which was a large Kensington wall mounted canopy and two Coniston wall mounted canopies.The architect then contacted us directly to detail that the main building frame was made up of large timber SIPS panels and the large steel posts were required to support the roof. However, they were also decorative in essence and played a significant part in the building aesthetic appeal, and they required Able Canopies to supply and install them as part of the package as they would run through the larger canopy.The original design and price we submitted did not require the inclusion of the steel posts, however we were then asked to include in our canpy costs. We therefore went back to the drawing board to come up with a canopy design which would fit the aesthetic and structural features required.The SolutionWhilst in talks with the architect, they explained that they favoured our Coniston Wall Mounted Canopy system and also requested the NBS spec for the product which wasn’t a problem as our products are all listed on the NBS National BIM Library.We therefore looked at the Coniston system and worked with the structural engineer to ensure the steel beams could be incorporated into the canopy. This enabled us to supply the contractor and architect with an estimate so we could secure the works as an early package enabling them to cast the foundations required within the main slab.Because the bespoke Coniston would have the required large steel beams through the roof, we designed a solution to ensure the canopy would still be a fully waterproof system. This was easily achieved with the Coniston because we were able to comfortably flash/dress around the roof support columns, to create a seamless walkway with a watertight roof.However, the large steel beams and underside required a lot of design work, we diligently designed bespoke connections for the posts to the beams, bespoke connections for the roof bar to the steel beams and bespoke guttering & gutter connections. This replaced the Coniston’s standard integral guttering system with an external gutter system that worked with the design perfectly.Click the link to continue reading..... https://www.ablecanopies.co.uk/c/wall-mounted-canopy-case-studies/hailsham-community-college-primary-academy-case-study.html
Sponsored
RHS Hilltop

RHS Hilltop

HAG Ltd. - The Door Specialists

OverviewThe UK’s first dedicated horticultural scientific centre of excellence has opened to the public – protecting the future of plants, people, and the planet at the iconic RHS Garden Wisley, situated in Woking, just 30 minutes outside London. RHS Hilltop has been dubbed The Home of Gardening Science, and at a cost of £35 million, is the largest ever investment in horticultural science. The site boasts 3 purpose-built laboratories, a herbarium and digitisation suite, learning studios & a teaching garden, interactive displays and a world class collection of horticultural exhibits across 3 gardens that brim with ideas that reflect the latest research. RHS Wisley’s library and archive contain rich and varied collections, including botanical art, 28,000 horticultural books & records, which places itself as the most complete record of the UK’s horticultural heritage. PartnershipHAG Ltd. were chosen by Geoffrey Osborne Ltd. to work on RHS Wisley’s impressive and forward-thinking purpose-built space to offer fire protection & security solutions across the site, including in the herbarium and café. With over 35 years of industry experience, and being well known for our quality, integrity, and reliability, we were the perfect choice to offer solutions to fire protection and security needs, meaning a more streamlined experience for the main building contractor. Andy Jasper, Programme Director of the Wisley Strategic Investment Programme:“We are so proud to announce the opening date of RHS Hilltop – The Home of Gardening Science. Working so closely and collaboratively with Contractors and Consultants was wonderful and together we have overcome the challenges of Covid-19. We would like to express our most sincere thanks to all the teams and individuals involved in this project who have worked so hard and with such passion and commitment.” The ProjectLike many new builds, RHS Hilltop used the very latest in environmentally friendly techniques in their build process. This included installing their own renewable energy sources, using high levels of insulation and astonishingly, 99% of waste during construction was recycled. The RHS Hilltop facility measures 4,750 square meters and was part of a wider 5-year transformation program at RHS Wisley. With an investment of £35 million, it is easy to see how seriously the Royal Horticultural Society are taking their legacy and setting themselves in good stead for scientific research in the future. HAG installed fire curtains and fire shutters across the site, which are essential to ensure safety and time to exit the buildings in the event of fire. Our insurance-certified roller shutters were supplied and fitted to their exacting standards and are fully covered by LPCB Certification, to give optimum security protection. We were pleased to be involved in such a stunning development and look forward to working with both Geoffrey Osborne Ltd and the RHS again in the future.
Sponsored
Cromer Road Primary School, New Barnet

Cromer Road Primary School, New Barnet

Velfac Windows

Sector:     EducationArchitect:  Innes Associates Specified for: ·      Sustainable construction·      Inner timber frame ·      Durable external aluminium·      Design versatility·      Competitive pricingDesigned by architects Innes Associates, the latest addition to Cromer Road Primary School is a distinctive, L-shaped red-brick classroom building which wraps around a newly landscaped play space. VELFAC slim-framed windows and doors are a key feature of every facade, with dark grey external frames emphasising the pattern of shadows created by textured brickwork and inset window apertures. The VELFAC system has also helped architect Corrie Rounding meet challenging regulatory and sustainability targets while maximising usable space, increasing natural light and improving ventilation. ‘We pushed the contractor to specify VELFAC as we knew the composite frame was the right fit for the Cromer Road project,’ says Corrie. ‘The sustainability of the VELFAC system, and its low energy performance, met Department of Education requirements, while the robust external aluminium frame is ideal for a busy school environment. The design of the windows and doors also met our aesthetic brief, especially the inner timber frames. These are clear lacquered to emphasise the wood, provide a link with the trees surrounding the new building, and to deliver a less ‘sterile’ finish than aluminium or uPVC.’The VELFAC system could also meet key ventilation, daylighting and budget targets: ‘To manage costs, and maximise daylight in the right places, we concentrated our glazing allowance at the areas of most activity,’ explains Corrie, ‘but we also used windows to maximise the usability of the interior. For example, we used tall slim VELFAC units to illuminate the staircase but placed larger windows directly under the stairs to create an additional and useful breakout space.’The Cromer Road building is naturally ventilated, unusual for a Department for Education funded primary school project, with VELFAC units carefully configured to support an efficient flow of fresh air: ‘We wanted to make sure the building could stay comfortable without the need for mechanical cooling, even through the hottest summer,’ says Corrie. ‘This meant the placement of smaller windows on south facing facades, to manage solar gain, and the specification of multiple opening units across the building, including high level teleflex-operated lights. These are especially important in the classroom window screens where ventilation is guided by CO2 monitors.’ To ensure the security of children and staff, all windows also feature restrictors, with finger guards fitted to doors as an additional safety measure.Corrie was also pleased with the support provided by the VELFAC team, especially in the early stages: ‘VELFAC provided the estimates and performance data we needed to convince the contractor that VELFAC was the ideal solution for this project,’ she says, ‘and the school was certainly very happy with the end result’.
Sponsored
Uni of Reading Library, Berkshire

Uni of Reading Library, Berkshire

Sika Limited

A £40 million investment, 13 roof areas, eight different roof levels, and a steady stream of visiting students to keep happy throughout – the University of Reading (UoR) Library’s complete refurbishment was a large and challenging project spanning three years.Originally opened in 1964 and later extended in 1985, the library’s internal and external revamp was designed to increase space, improve facilities for individual study, provide better access and security across the building, and improve energy efficiency.In addition to a new-build Café extension, a new entrance canopy, a new ground-to-roof level lift and stair core extension – each featuring a new flat roof area – there were also 10 existing flat roof areas refurbished, coupled with the replacement of windows and re-cladding of the building’s exterior.Following a competitive tender based on an outline specification, Owlsworth Roofing, Sika Sarnafil single ply flat roofing specialists, impressed with the level of detail included in their quote and were awarded the contract by main contractor ISG.Roofing:Sika® Sarnafil G410-12 ELF.Sika® Sarnafi G410-12 EL.Sarnavap®-5000E SA.Sarnavap® HD SA.Primer 600.Sikatherm® PIR Insulation and Sarnacol®-2162.
Sponsored
Starbucks, Llanelli

Starbucks, Llanelli

Senior Architectural Systems Ltd

A selection of our high-performance aluminium fenestration solutions has been used for this new café and drive-thru at a popular shopping destination in Wales.The new Starbucks at Parc Pemberton Retail Park has been designed by G1 Architects and built by Trojan Construction, with the aluminium fenestration package skilfully delivered by specialist contractor Sherwood Aluminium Systems.The project features both our cost-effective SCW aluminium curtain walling and our robust SFG shop front glazing system, which are both ideally suited for use in the retail sector as they combine slim sightlines with a robust and durable construction. Our curtain wall system has been used to create a bright and airy interior in the café, and the SFG system has been integrated with our SD aluminium doors to provide safe access at the entrance and exit. Our SD aluminium commercial doors have also been used on the drive-thru building, with the powder-coated aluminium frames perfectly complementing the use of timber cladding and grey façade design.The new Starbucks outlet has benefited from both Trojan Construction and Sherwood Aluminium Systems’ extensive experience undertaking similar schemes for the retailer across the UK, with Sherwood Aluminium Systems named as a preferred supplier for Starbucks.
Sponsored
The Queen's Terminal - Heathrow Airport T2

The Queen's Terminal - Heathrow Airport T2

Knauf Insulation Ltd

ChallengeKalzip were tasked, alongside contractors Lakesmere, to develop a roofing structure that would be vital to the overall appearance of the building and one that would fulfil the stringent acoustic criteria – whilst working to tight deadlines.SolutionFollowing extensive testing, Knauf Insulation Rocksilk® RS45 product in 50mm and 75mm were specified within the 40,000m2 Kalzip System in the AluPlusPatina finish.Heathrow’s new Terminal 2, also known as The Queen’s Terminal, boasts exceptional architectural design and is 40% more carbon efficient than the previous building. Kalzip’s large waveform roof bestows one of the iconic features of the terminal.A multi-layer approach was taken when it came to installing Knauf Insulation Rocksilk® RS45. By layering the insulation products in different densities across the Kalzip standing seam roof, rigorous sound absorption and sound transmission measures were met, whilst retaining the form and functionality required by the designers.As a robust, resilient and dense Rock Mineral Wool insulation slab, Knauf Insulation Rocksilk® RS45 has excellent acoustic properties that help to reduce the impact of airborne and rain impact noise. It also has an excellent thermal conductivity of 0.035W/mK, helping to provide passengers with a comfortable environment.
Sponsored
SubFloor Acoustic Raised Flooring Transforms and Enhances Luxury Hotel Apartments in Fowey, Cornwall.

SubFloor Acoustic Raised Flooring Transforms and Enhances Luxury Hotel Apartments in Fowey, Cornwall.

Floor Levelling Systems Ltd

This case study focuses on a prestigious project in Fowey, developed and constructed by Bailey Partnership and Brady Construction Services. In these luxury hotel apartments a raised acoustic flooring system, known as SubFloor, was successfully implemented. The project highlights the simplicity, speed of assembly, and flexibility of SubFloor, providing architects and contractors in the construction industry with a practical and efficient solution. Additionally, SubFloor's user-friendly features, such as easy height adjustments, garnered praise from the carpenters, enabling them to work more comfortably and efficiently. By offering a seamless and rapid installation process, superior acoustic performance, and convenient adjustability, the SubFloor system surpassed expectations and contributed to the project's overall success.Products:Wooden Joist 45 x 45 mmSubFloor Screw 300 mmScrew Foot Acoustic Constructions:Joist separation c/c 400 mmBuilding height: 73 – 323 Data:System weight: 3.43 kg/m²Acoustic damping: Up to 28 dB [rating according to ISO 717-2]Point Load 50 x 50 mm (c/c 400 mm):13.96 kN/m² - Next to screw over joist[According to SS-EN 1195:1998] Materials:Pine T0-C24Fibre-reinforced VitamidePolyamide + Rubber Damping Element
Sponsored
George Eliot Hospital

George Eliot Hospital

FAAC Entrance Solutions UK

An entrance that needed reviving and improved functionGeorge Eliot Hospital is based in Nuneaton, Warwickshire. It provides a full range of emergency and elective medical services to the local area, including maternity services.Project Year: 2022Product: UniturnProject Background: We were contacted directly from the hospital’s Estates Department to review an existing traditional sliding door entrance, with a view to proposing a solution to upgrade to a high capacity revolving door. An important need was to improve the temperature in the reception area, enabling climate control.The existing entrance lobby was too narrow to accommodate both the revolving door and necessary adjacent pass doors to meet Equal Access requirements and so we had to come up with a different solution.Solution: To overcome the narrow lobby entrance we proposed to locate the revolving door in front of the existing lobby’s footprint, which in turn required the building’s foundation slab to be extended under the revolving door location.This solution required detailed technical and design input from FES to the client’s nominated building contractor and design team to ensure that the build was both structurally sound, aesthetically pleasing and met the relevant building regulations.The Uniturn has improved accessibility in and out of the hospital and has provided energy savings and temperature control, resulting in a successful project.
Sponsored
London Screen Academy, Islington

London Screen Academy, Islington

Kawneer UK Ltd

Architectural glazing systems by Kawneer, including aluminium heritage-style GT70S windows appropriate for the conservation area, have helped to transform the façade of an old radio and television factory into the new four-storey London Screen Academy building at Highbury Grove in Islington, north London.Kawneer’s GT70S slimline renovation open-in windows were the “focal new element” of the renovation of the façade of the four-storey building at Highbury Grove in Islington, north London, where Kawneer’s AA®100 zone-drained curtain walling and series AA®190 TB entrance doors also feature.The GT70S windows with narrow sightlines were installed over 12 weeks by a team of eight from specialist sub-contractor and Kawneer dealer JPJ Installations throughout the 8,050m2 building, with the AA®100 curtain walling, which also has narrow 50mm sightlines, used on the rear elevation and the series AA®190 TB severe-duty welded doors used on the main entrance.This cutting-edge new free school by the Department for Education provides world-class film industry focused vocational training, including behind-the-camera roles, costume design, production management, distribution and marketing, alongside a broader curriculum, for 17 to 19-year-olds.

Showing 937-972 of 1085

Feedback