NBS Source
I'm a manufacturer

"langley"

78 results found

Sort by:

Showing 1-17 of 17

Sponsored
The Langley Hotel

The Langley Hotel

Sauna360 Ltd

Sauna360 have completed their installation of extensive thermal features at the prestigious 5 star Langley Hotel in Iver, Buckinghamshire. This comprised of two beautiful Hammam, Steam rooms, Saunas, Heated Loungers, feature showers and ice features.
Sponsored
Allenby Barracks

Allenby Barracks

Langley Waterproofing Systems Ltd

Our purposeOn behalf of Amye Defence Services, Acclaim Contracts Ltd was commissioned to address the aging roof of the building, which was leaking despite receiving patch repairs over the past 20 years. The Ministry of Defence’s Project Allenby/Connaught demonstrates the Government’s commitment to maintaining defence estates.The £1.45bn scheme is a 35-year commitment to providing modern, high quality, fully serviced, purpose built living and working accommodation for 18,700 soldiers. It involves the new build and refurbishment of more than 550 buildings across Salisbury Plain and Aldershot, including upgrading Allenby’s Building 51, otherwise known as the Sports Pavilion.Our solutionAcclaim turned to Langley to provide all the material necessary to complete the work. After stripping the original roof to the existing plywood deck, the team fitted new treated timber around the perimeter and new uPVC fascia. The current edge trims, perimeter check kerbs, and extended flues were removed to ensure regulatory 150mm clearance was achieved once the new roof covering was installed. Langley’s HT180 attachment layer was loose-laid and nailed into place to provide appropriate protection to the timber deck while the “hot works” above were undertaken. Langley’s TA-20 Flat Roofing System was installed across the roof area, with insulation to achieve the regulatory requirement of 0.18W/m2K. SA-20 Flat Roofing Detailing System was used in fire risk areas, in line with Safe2Torch guidance. The range of Langley’s TA systems complies with Broof(t4) classification and has a Local Authority Building Control (LABC) assured accreditation. Under MOAT 31, Langley’s Parafor 30 GS (cap sheet to the TA system) achieves a ‘resistance to damage” rating of R4. It is independently certified by the BBA to deliver a life expectancy of at least 40 years, one of the longest available in the UK.Acclaim fitted Langley’s ParaFurb Refurbishment Outlets to upgrade the internal outlets where possible, cleaning and priming those where the design precluded the use of ParaFurb. We installed New Code 5 lead pipe sleeves to flues and hot pipes to a minimum 150mm above the waterproofing. In addition, Langley’s ParaTrim GRP Edge Trim was fitted to all the kerbs.“It carried great weight with us that Acclaim worked in partnership with Langley, who offers an independent insurance-backed guarantee. That is indicative of pride and confidence in its work, giving synergy with Amey. It also gives us, and our client the Ministry of Defence, that the refurbished estate at Allenby will serve and be fit for purpose for decades to come.”Will Loates, Service Delivery Area Manager, Amey
Sponsored
Langley Academy Primary School

Langley Academy Primary School

SPS Envirowall Ltd

Langley Academy Primary School, is a modern 2 storey development which will house 630 nursery, reception and junior pupils in Slough Berkshire. To carry out the main works of this project, the sub-contractor was appointed to construct the building using a concrete frame and cement particle board, then wrapped in high quality external wall insulation and render materials from SPSenvirowall. Working collaboratively, this saw the installation of 1100 meters of 200mm insulation, which met the desired thermal performance of the building as well as contributing to the fire and acoustic requirements.
Sponsored
Waverley Court

Waverley Court

Langley Waterproofing Systems Ltd

Our purposeAs one of the UK’s leading housing associations, the Guinness Partnership prides itself on providing high quality homes that meet or exceed current Standards. It is therefore committed to a continuous programme of maintenance and asset management across its 60,000 homes estate.As part of that process, the 13-storey 1980s-built Waverley Court in Crewe was due for refurbishment, including new windows and heating for the 95 flats therein. An initial survey highlighted that the 1200m2 roof was failing and in need of upgrade to maintain its weathertightness.Our in-depth roof report also identified that the insulation was below current standards. Safety on the roof for maintenance was also an issue: the existing handrail was originally erected as a temporary fixture, penetrating the waterproofing and providing inadequate rooftop security for working at height.Our solutionThe existing waterproofing had perished beyond useability. We advised complete strip of the existing back to the concrete deck, and building up a new thermally-efficient roof to meet current standards required under the Part L of current Building Regulations.Our TA-25 W Flat Roofing System for warm roofs was installed by Approved Contractor Everlast as sub-contractor to the principle contractor, Wates. To address the poor falls on the roof, the insulation was tapered to the perimeter. We achieved an overall roof U value of 0.17W/m2K, exceeding the current Regulatory requirement of 0.18W/m2K. In line with Safe2Torch guidelines, our self-adhesive system was used to detail around roof penetrations for extractor fans and similar plant.We highlighted and designed bridging details to maintain the fire integrity around compartment walls to comply with Part B3 of Building Regulations.We designed a new, permanent and safe handrail system. This is fixed to the brick façade of Waverley Court, avoiding any penetration of the roof fabric and thus maintaining its integrity and watertightness, whilst minimising maintenance requirements.“Langley’s expertise and attention to detail has enabled us to deliver on our ambition of providing homes that people want to live in. Langley’s performance has helped us provide a dry, warm, safe living environment that exceeds current Regulatory requirement. The independent insurance-backed guarantee covering design, materials and workmanship adds value to our long-term estate asset management.”
Sponsored
Jesus College

Jesus College

Langley Waterproofing Systems Ltd

The TaskOriginally a garage for a local car showroom in the town centre, The Forum has most recently been a storage facility until the College began redevelopment of its kitchens in a 12th Century Grade 1 listed building. This provided improved and expanded catering facilities. During the works, the College still needed kitchen and dining facilities, prompting the re-purposing of The Forum.Northmores Project Management Consultants were contracted by the College to manage the project, designed by Paul Vonberg Architects, to future-proof the building.The Outcome“It was a very tricky project. Logistically, being right in central Cambridge, and during COVID, we had to ensure we were rigorous in our safe practice. Fortunately, the new internal design of the Forum meant it was easy to operate a one-way system for any internal workings making good the linings where the rooflights had been and redecorating. From a reroofing perspective too it was complex. The team at Langley devised a practical solution and were always on hand to support us with technical advice if needed.”
Sponsored
Salisbury Walk

Salisbury Walk

Langley Waterproofing Systems Ltd

Salisbury Walk is part of the Girdlestone Estate in London, and the last phase to be upgraded by landlord the London Borough of Islington as part of their commitment to delivering decent homes standards.The TaskWorking to our detailed specification, Opus stripped the existing profiled metal roof and built up our TA-30 Flat Roofing System, installing insulation to achieve 0.18W/m2K as advised by current Building Regulations. Ventilation and rooflight hatches were also upgraded and new upstands fitted.The Outcome“Having achieved such a positive result in the refurbishment elsewhere on the estate by utilising the services of Langley and Opus, it gave peace of mind for all stakeholders to re-apply that formula in other works. It brings us a valued perspective, enabling us to make informed decisions going forward about the condition of the estate, knowing we have consistency in approach, design, materials and application. We also have the peace of mind, going forward, that the roofs are all upgraded to a high standard and are assured for decades to come.”Theo Petrou, Mears Group Project Manager
Sponsored
Christ Church Academy, Birmingham

Christ Church Academy, Birmingham

Langley Design

THE BRIEF: External furniture for brand new Secondary SchoolChrist Church Academy is a brand new £19m Secondary School in Yardley Wood, Birmingham, creating 1,500 new school places in the area. The project was the first to be delivered under the Department of Education framework (DfE) for the Birmingham Diocesan Multi-Academy Trust and constructed under the Education & Skills Funding Agency High-Value Contractors Framework. WHAT WE DIDClean, simple aestheticThe new school also includes a sports hall, two full-size football pitches and one FA standard 3G pitch. Traditional materials have been used in a contemporary way to create a clean, simple aesthetic, whilst providing robustness and ease of maintenance. To complement the high-end schools design and feel, Willmott Dixon approached Langley Design to manufacture and install a full range of bespoke external furniture. THE RESULTFeature seating areasWe used timber elements throughout and combined this with powder-coated steel to develop a harmonious external area against the school facade.Our curved benches were chosen to create feature seating areas with matching picnic table sets in order to complement each other. The double-width timber cycle shelters with clad ends offer a high capacity and stylish storage solution in a minimal area and ties in with the cladding of the bin stores.
Sponsored
Unique Wood Louvres On a Garden House in Kings Langley

Unique Wood Louvres On a Garden House in Kings Langley

SUNSHIELD Unique Louvres

A beautiful timber frame house, made of Western Red Cedar based in Kings Langley. Kings Langley, Hertfordshire is the birthplace of Ovaltine, the soothing malt drink. The village is divided by the River Gade and endowed with a couple of beautiful lakes.It is here, at one of these lakes, that a charming timber garden house is fitted with beautiful wooden louvres. By Sunshield, in collaboration with Contrasol. We were delighted to assist the owners with custom made external louvres to provide the a much needed perfect solution to reduce glare. Our client is sensitive to light and needed an effective shading product to specifically reduce sunlight entering the internal space.Our client was looking for something to be able to control light as well as a solution to fully block out light at night. The windows are South facing; therefore the louvres were also perfect for shading purposes and heat reduction.The Sunshield team applied the popular 98W which is made from Western Red Cedar to compliment the overall building.
Sponsored
Langley Prep School

Langley Prep School

Spanish Slate Quarries UK Ltd

Langley Prep School is located at Taverham Hall in the village of Taverham not far from Norwich in the Norfolk countryside. Completed in 1858, the hall was originally planned as the home for the family of Rev’d John Nathaniel Micklethwait. In 1921, the hall was sold and became a boy’s preparatory school. It was briefly requisitioned during the Second World War before returning to its use as an educational establishment.Set amongst 100 acres of green open space, Taverham Hall is a breathtaking neo-Jacobian building with stunning period architecture to match its idyllic setting. The large chimney stacks and red brick frontage create an attractive aesthetic with the subtle grey roofing slates accentuating the property’s distinctive beauty.
Sponsored
Epsom Hospital

Epsom Hospital

Langley Waterproofing Systems Ltd

he NHS Trust commissioned Breath Energy to review its estate, recommend and manage a programme of works to significantly reduce energy costs and CO2 emissions.Central to the works was the external upgrade of the main Epsom Hospital premises, the Wells Building, to improve thermal performance and address failings in the building fabric. The existing roof areas had failed and were allowing water ingress, potentially not only damaging the building fabric and energy efficiency but essential hospital equipment.Langley’s project team had to devise solutions that enabled the whole building exterior- facades and roofs – to be upgraded while the seven-storey hospital remained operational. Added to the complexity, the project began while Covid-19 restrictions were in force.Our solution: Detailed roof surveys prior to work commencing enabled us to identify potential problems and advise on effective solutions in advance.We recommended full strip-up of the roofs, as the existing had perished beyond economical repair. We advised new construction with TA-25 W Flat Roofing System on the main roof, stairwell roof and plant room areas. The TA-25 system is independently certified by the BBA (British Board of Agreement) confirming Broof (t4) classification. It also has LABC assured accreditation to provide support with regard to building control. The inclusion of insulation meant the new roof achieved the current requirement of 0.18W/m2K.While a full strip-up of the two terraces and balcony would also have been the preferred solution, the depth of work would have been impractical as the hospital’s operating theatres were below, and in use. Our solution was to remove the existing top layer and replace with PC-20W Liquid Roofing System and install breather vents to address moisture within.
Sponsored
Blackhorse Lane

Blackhorse Lane

Langley Waterproofing Systems Ltd

The purpose:Taylor Wimpey’s Eclipse development was the final phase of the large-scale modernisation and renewal strategy for the London Borough of Walthamstow Forest, known as The Blackhorse Lane Action Plan. Eclipse would offer affordable social and private housing via 500 homes in two six-storey apartment blocks.To help satisfy one of the Plan’s objectives- “to ensure new developments incorporate the highest levels of sustainable design and their impact on climate change is minimised”- we installed green roofs on both blocks. As it was the final development phase, space was limited; time was also an influencing factor in facilitating the tight build programme,avoiding delays, and enabling the client to deliver much-needed new homes.Our solutionTo enable fulfilment of the brief, we recommended our HM-40 Paratech Hot Melt Roofing System as the inverted waterproofing base for the green roof. A fully-bonded system, HM-40 is a robust, durable, and highly flexible monolithic, self-healing hot-melt waterproofing system for protected roofs, green roofs, terraces, and podium decks with a 40-year durability statement. In addition, it is firerated for unrestricted use when covered with a green or ballast roof.Unlike other hot melt systems that use fleeces, the Paratech system incorporates a reinforcement mesh: this allows the system to be rolled out, making waterproofing installation faster, thereby enabling the contractor to lay the top roofing layer of artificial grass and landscaped green roofs. Unfortunately, an on-site compound to store the roofing components was unavailable. We worked closely with T&T Roofing and Taylor Wimpey to ensure deliveries arrived in build sequence for immediate use, but without adversely impacting residents who had already moved into their newhomes.“The features of the flat roof system provided a seamless, issue-free roof installation, with rapid installation time causing minimal disruption. Langley’s technical team was always on hand to provide assistance when necessary, working collaboratively to guarantee a consistent and highquality installation.”
Sponsored
Colchester County High School

Colchester County High School

Langley Waterproofing Systems Ltd

The purpose: Water penetration into classrooms alerted theOfsted “outstanding” rated Colchester County HighSchool for Girls in Essex to a problem with its roofs.Its premises advisors, Archer Building Consultancy,turned to Langley to offer technical support for themost efficient best-value rectification, with fundingprovided by the school’s governing body, The AlphaTrust.Our solution: We carried out an in-depth roof condition report which highlightedthat the four flat asphalt and 10° pitched copper standing seamroofs urgently need repair.We advised the most efficient solution and use of resources wasto strip the copper roof back to the plywood deck and form a newwaterproof layer from our TA-30 Flat Roofing System and theasphalt roofs overlaid with TA-30 and our Liquid Roofing System.By leaving the original roof, we were able to minimise disruption.In the process, we assessed the roofs for their suitability forphotovoltaic (PV) installation, then helped address energy costs:one over a three-storey building was deemed appropriate. Finally,in partnership with Archers, we supported the detail required toapply for Salix funding to cover the supply and installation of thePV array.
Sponsored
The Telford Langley School - Telford & Wrekin Council

The Telford Langley School - Telford & Wrekin Council

Falco UK Ltd

Falco has completed the fourth cycle hub installation at The Telford Langley School in Telford as part of a new tranche of secure cycle hubs located at key areas across the borough.The scheme which got underway last year involves the design, manufacture, supply and installation of bespoke cycle hubs coupled with associated FalcoLevel-Eco two-tier cycle racks to allow commuters, residents and visitors to quickly and conveniently park their bike whilst on the go.The latest 6m x 4m cycle hub as shown here at The Telford Langley School, is based upon the UK’s most popular cycle hub design – the FalcoHub, which is manufactured from a combination of a hot-dip galvanised steel frame with reinforced safety glass cladding. FalcoLevel-Eco two-tier cycle racks have been installed providing secure accommodation for up to 28 bikes.A convenient FalcoFix 2.0 cycle station has been supplied allowing cyclists to inflate tyres and carry out basic cycle maintenance whilst on the go.The secure cycle hub also comes complete with proximity LED lighting, eye-catching ‘Travel Telford’ branding graphics and powder coating in an Anthracite Grey RAL colour.In addition to the cycle hub here at The Telford Langely School, Falco has also manufactured and installed three other cycle hubs for Telford & Wreking Council, with other cycle hubs located at Rampart Way – across the bridge from Telford Central Station, at Wellington Civic & Leisure Centre – to the right of the car park entrance, next to the Wellington Town Council building and at Oakengates Station – situated to the right side of the main entrance.The FalcoHub, as shown here for Telford & Wreking Council, is a contemporary cycle store manufactured from a combination of a galvanised steel frame and reinforced safety glass, designed to be sympathetic to the surrounding area. The FalcoHub was developed by Falco’s in house design team to ensure it met the client’s specification including structural calculations so that the whole design meets the UK/European CPR regulations EN1090 and is CE marked.For more information about the scheme here for Telford & Wrekin Council or how Falco can assist your cycle parking scheme, please contact our helpful sales team on 01538 380080.
Sponsored
Erith and East Ham Fire Station

Erith and East Ham Fire Station

Langley Waterproofing Systems Ltd

The purpose: Energy savings of £¼million over 20 years at just two of its sites are predicted to be achieved by London Fire Brigade through effective roof refurbishment using our Roofing Solutions. The brigade identified that the roofs at Erith and East Ham Fire Stations were in need of refurbishment. Numerous intermediate repairs had already been undertaken. An efficient solution was needed to help London Fire Brigade optimise best value in its asset management and reduce its requirement for planned- or unplanned- maintenance.London Fire Brigade therefore turned to Currie & Brown construction management consultants to oversee the design and execution of the refurbishment projects under a contract management framework agreement in place between the two organisations. We was called in to assess the roofs and advise on a course of action. Data driven roof condition reports from surveys were taken across the two premises. We highlighted that the roofs were beyond economical repair and needed new waterproofing and insulation- a U value of 5.00W/m2K was discovered in one roof area, against the Regulatory threshold of 0.35W/m2K and best practice 0.18W/m2K. Our solution: We advised that in the main, overlaying of the existing roof covering with CP-20 Paracoat Cold Polyurea Liquid System (warm roof) application was the most-efficient and cost-effective solution.The over-laying using the CP-20 system satisfies London Fire Brigade’s policy of preference for flame-free, with no roof replacement needed this minimised waste to landfill.Our Approved Contractor CWG Group won the contracts to undertake the upgrading, working to Langley’s detailed individual specifications for each site.At East Ham Fire Station, four main roof areas plus a separate ancillary building were addressed.LangGuard free-standing safety rail was installed around the perimeter of roofs 1 and 4.The final touch for the field roof area was provided with Paracoat Fast SF slip-inhibiting finish to agreed walkway areas.At Erith Fire Station, the refurbishment involved upgrading two roof areas including a rooftop tank room and adjoining canopy of corrugated PVC over the Station building, and a separate stores roof.
Sponsored
Hurricane Court, Slough

Hurricane Court, Slough

Cellecta Ltd

Hurricane Court is a conversion of offices into 84 one and two bedroom contemporary apartments and studios. The name is derived from the Hawker Hurricane aircraft manufactured here in the 1940’s. Within five miles of Heathrow, this development is the first ever courtyard scheme and residential private balcony terraces in Langley. By developing a gated residential space, this project becomes a microcosm, a community within the already idyllic community of Langley.Cellecta’s RUBBERfon Cradles were specified by p-ad due to them being Robust Detail FFT2 compliant and allowing easy integration of an underfloor heating system. RUBBERfon Cradles utilise incremental high impact plastic packers and elevation blocks to level an uneven structural floor quickly and easily. Softwood battens are then used to support the floor decking board.Nacropolis Group was supplied 2,500m² of Cellecta products to develop these apartments in the village of Langley in Berkshire.
Sponsored
Cast Iron Cellar and Basement Vents

Cast Iron Cellar and Basement Vents

Cast Iron Air Brick Company

Originally used during Victorian and Edwardian period as sewer vents or "stench flaps", these cast iron vents with 100mm round spigots are making a bit of a come back. We've replaced the flaps (that used to allow air in but not out) with mesh so air flows freely in both directions and they've become quite a hit with specifiers ventilating basements and cellars and new builds. As well as sending a shipment to Abu Dhabi we've also had orders from closer to home - Travis Perkins, Midas, Bryen & Langley and 800 Group
Sponsored
White Rhino House Heating - Whipsnade Zoo

White Rhino House Heating - Whipsnade Zoo

Powrmatic Ltd

Zoo Animal Enclosure Heating SolutionIn partnership with HEVAC Services Ltd of Kings Langley, Powrmatic was approached to develop a heating solution for the White Rhino’s House at Whipsnade Zoo, which saw the installation of an overhead gas-fired (LPG) continuous radiant heating system, as the previous electric heating system inside their indoor habitat was not efficient enough and heat was escaping through the timber structureProject BackgroundThe White Rhino house at Whipsnade Zoo is the home to a herd (also known as a “crash”) of seven southern white rhinos, Sizzle being the only male – the six females are; Mikumi, Bertha, Tuli, Jaseera, Fahari, and Nandi. Sizzle and Tuli are the parents of the latest baby rhino Nandi born in August 2021.The heating inside their indoor habitat at Whipsnade was not efficient enough. Localised electric heaters were spread around the large space to create coverage, but the heat was escaping through the timber structure. It was decided to upgrade the structure by foam insulation to the internals of the asbestos roof and to provide a new continuous gas-fired overhead radiant heating system providing blanket heat coverage to the complete floor area of the house.  Project SolutionHEVAC Services Ltd of Kings Langley, Hertfordshire, who undertake servicing of HVAC equipment at Whipsnade Zoo on behalf of Pareto FM for the end client ZSL (Zoological Society of London), approached Powrmatic to develop a heating solution for the rhino’s house. The brief was to provide an overhead gas-fired (LPG) radiant heating system to blanket cover the complete floor area of the rhino house, but also design it so that it could be zone controlled, should one of the herd have a need to be in an area of a higher or lower temperature.The LPG propane tanks for the heating system needed to be sunk into the earth at the edge of the rhino house to avoid having to remove any trees, thus maintaining the conservation ethos of ZSL. For a structure such as the rhino house, being the size of a large sports hall, a Powrmatic SRP-PCV+ continuous gas-fired radiant tube system comprising; 4 x 73kW burners was the proposed solution, arranged in 4 temperature zones, with the new MC400/C controller and just the one flue discharge to atmosphere.Project ResultThe installation of the new PCV+ continuous overhead radiant heating system was skilfully undertaken by HEVAC Services Ltd, with the contract programme being driven by the daily habits of the rhino herd! Whether they wanted to be in their house or out on the field. Thus, the logistics of undertaking the heating installation were unique compared to working in a standard commercial/industrial environment.The White Rhinos now have a refurbished home and a heating system that delivers radiant heat in exactly the same way that we (and the rhinos) receive energy in the form of heat from the sun. Radiant heating systems efficiently radiate infrared radiation, which is the transfer of energy in waveform from a hot surface to a relatively cooler surface without heating the medium between. Thus, the rhinos can bask under the radiant heat, whether indoors or outside under the sun.The ZSL Whipsnade Zoo White Rhino Enclosure now benefits from a highly energy-efficient Powrmatic SRP-PCV+ system, listed on the Carbon Trust Energy Technology List (ETL), endorsing the Seasonal Space Heating Energy Efficiency of; 92.1%, and thus delivering low; energy usage, fuel bills and carbon emissions minimising their impact on the environment.

Showing 1-17 of 17

Feedback