NBS Source
I'm a manufacturer

"knauf"

394 results found

Sort by:

Showing 73-83 of 83

Sponsored
The Marshall Building London School of Economics

The Marshall Building London School of Economics

Knauf Ceiling Solutions Limited

Improve the Student and Staff Experience at LSEThe new building, which opened its doors in January 2022, demonstrates the School’s ambition to create a world class estate and university quarter in the heart of London. Designed by Dublin-based Grafton Architects, the large, multi-purpose building occupies a pivotal position at the southern corner of Lincoln’s Inn Fields. The Marshall Building is LSE’s largest building with ten storeys plus two basement levels. It accommodates the Departments of Accounting, Finance and Management, as well as the Marshall Institute of Philanthropy and Social Enterprise, the Systemic Risk Centre and the Financial Markets Group.HERADESIGN® Fine and HERADESIGN® Superfine were chosen for its acoustic performance, aesthetics, economy and low carbon. The impact resistant type was also specified for the sports areas. Alongside, Armstrong METAL R-H 200 panels provide a sophisticated open and contemporary look. They were chosen for areas where more service access was required but where a consistent aesthetic was also important. The metal panels were also used as ‘floating canopies’ so a high perimeter was specified to give a finished look at all sides.
Sponsored
Class A Acoustics for New Student Environment

Class A Acoustics for New Student Environment

Knauf Ceiling Solutions Limited

Paradise Street student village, Coventry, provides 893 quality homes and 1,400sqm of social space including common rooms, café/bar, cinema and gym.Our HERADESIGN® ceilings have been fitted in the acoustically-demanding areas to help create an environment that’s conducive for both study and relaxation.HERADESIGN® was the first choice for FBM Architects as they had used it in another recent student accommodation project in Coventry and valued its aesthetic properties, acoustic credentials and durability. “We chose HERADESIGN® because of its textured effect that would provide a tactile quality and soften the space, both acoustically and visually.”
Sponsored
Chelsea Football Club Westview Hospitality

Chelsea Football Club Westview Hospitality

Knauf Ceiling Solutions Limited

Blue Is the ColourChelsea Football Club stadium’s refurbished Westview Hospitality Area represents the biggest single investment in years and is hailed a triumph by enthusiastic club supporters.To dramatically improve the match day experience of fans by providing new state-of-the-art hospitality facilities at Chelsea’s landmark stadium in London.Merging two small hospitality restaurants with an upper Guest Area concourse area into one single wide open plan space represented a technical and design challenge.Now on offer: a new welcoming open and flexible concourse, two panoramic bars offering views of the stadium interior and west London, with ample room to take a seat, new comfortable padded seats in the stands and three additional video screens.
Sponsored
One Elmwood, a Net Zero Ready Building

One Elmwood, a Net Zero Ready Building

Knauf Ceiling Solutions Limited

Queen’s University is a member of the Russell Group, and one of the United Kingdom and Ireland’s leading universities which continues to shape and serve the world through research and teaching. Based in the heart of Belfast, Queen’s University is committed to enhancing its historic campus and the surrounding conservation area while providing 21st century facilities for education and research.With the entrance atrium combining various double and triple-height spaces over different floors, Armstrong METAL Cellio was the perfect choice to provide a sleek contemporary ceiling that connected and unified these spaces into one recognisable volume, with a sense of lightness and transparency.HERADESIGN® was used throughout the building as a recognisable and repeated element that provided good acoustic performance with texture and pattern. From a wall and ceiling installation highlighting the reception area, to acoustic absorption on the walls in meeting rooms and subtle black hanging baffles in a bar space.
Sponsored
Top Architecture University Utilises HERADESIGN® in New Studios

Top Architecture University Utilises HERADESIGN® in New Studios

Knauf Ceiling Solutions Limited

Northumbria University’s Grade II Listed Sutherland Building, home to its Architecture and Built Environment Department, now boasts a state-of-the-art architecture studios. Page\Park worked closely with ESH Group to deliver the new-build for which functionality and design were key. HERADESIGN®, a high-performance product which effortlessly retains ambient sound whilst reducing disturbing background noise, provided the acoustic and aesthetic solution required for the project. HERADESIGN® Superfine tiles are a versatile material and Page\Park were able to work with the tiles to deliver a distinctive, geometric herringbone design on the ceilings for maximum design impact.
Sponsored
HERADESIGN® Acoustic Ceilings for St Columba’s School in Cork

HERADESIGN® Acoustic Ceilings for St Columba’s School in Cork

Knauf Ceiling Solutions Limited

Design and acoustic performance were key criteria for this project, which is why HERADESIGN® was installed in all the classrooms as floating canopies and throughout the school, in the main corridors, where bespoke swing down access panels were also installed. Reddy Architecture commented, “We really love the architectural raw wood wool quality of HERADESIGN®. The visible texture provided the required aesthetic contrast.” A calm neutral colour palette with HERADESIGN® specified in warm-white provided a gentle contrast with the soft charcoal walls and floors - the perfect backdrop for bold bursts of colour at the entrance to the classrooms.
Sponsored
HERADESIGN® Spins its Acoustic Magic at Cycle Culture

HERADESIGN® Spins its Acoustic Magic at Cycle Culture

Knauf Ceiling Solutions Limited

Acoustic consideration was critical for the design of a new generation cycle studio in London. An isolated sound box was constructed to form the studio with stud walls built to separate it from the café – using a lift shaft model allowing for air and acoustic separation.To complement the paired back industrial ‘Scandi’ design and monochrome pallet, HERADESIGN® in black was specified throughout. Joe Stuart of Warehome Architects said, “Heradesign was perfect for this project. It provides excellent acoustic properties and we love its natural, raw wood wool texture. Specified in black it is really striking.”
Sponsored
The Post Building: HERADESIGN® Specified in Iconic 1960s Site

The Post Building: HERADESIGN® Specified in Iconic 1960s Site

Knauf Ceiling Solutions Limited

Complementing the exposed services and industrial design aesthetic, whilst fulfilling modern acoustic requirements was a challenge.HERADESIGN® with its acoustic credentials and raw wood wool texture ticked all the boxes. Specified in Grey, HERADESIGN® was installed throughout the main reception area, office spaces and the lift lobbies, providing a strong visual contrast to the exposed structural elements. Architects Allford Hall Monaghan Morris, “The conversion retained the original irregular structural gridlines of the building, so we had to create a consistent pattern across the ceiling- but HERADESIGN® is a really versatile material that worked exceptionally well in the space.”
Sponsored
55 Whitehall, London - Knauf Hugo18 - Overlay to existing Raised Access Floor

55 Whitehall, London - Knauf Hugo18 - Overlay to existing Raised Access Floor

Access Floors Distribution

55 Whitehall was previously a Government occupied office space. This iconic building has undergone a complete re-design. There was existing steel encapsulated raised access flooring throughout. Rather than remove or replace the raised floor, it was retained. Hugo18 was specified here to use as an overlay solution to the raised access floor. It offers a non-combustible, high performance substrate for a range of finishes, in this case - ceramics
Sponsored
Kings Cross Residential Acoustic Flooring System

Kings Cross Residential Acoustic Flooring System

Access Floors Distribution

Capella Development, Handyside, Kings Cross LondonDeveloper: ArgentMain contractor: Laing O’Rourke Architects: Chapman TaylorSub Contractor: InstaGroup120 newly built residential apartments received InstaCoustic's 'dry' cradle & batten system combining under floor heating & topped with Knauf GifaFloor FHB25.Original plans were to install a T&G chipboard to finish the acoustic floor system, however it was determined that there were deflection risks around the proposed large format tile finish.As a result, the chipboard was replaced by the high density, gypsum fibreboard Knauf GifaFloor FHB25. This resulted in:Quicker install & less use water than a wet screed systemImproved acoustic performanceImproved fire performanceImproved thermal efficiency resulting in reduced energy costs for the end userHigher loading performance, creating a solid substrate for the finish to be applied directly toReduction in overall embodied carbon & installation of a product that offers a high recycled contentLifetime guarantee of the buildingClick the link below to read the full case studyhttps://www.instacoustic.co.uk/case-study/kings-cross-london-n1c/
Sponsored
Nova N2 Development - London - Modular Washrooms

Nova N2 Development - London - Modular Washrooms

Access Floors Distribution

This new 160,000 sq. ft, 18 storey office building evolves the successful Nova formula with a sustainability conscious design, a progressive approach to work and wellbeing, and a vibrant, connected community in the heart of Victoria, London.Throughout the commercial space, a range of off-site constructed washrooms & toilet pods were manufactured in Scotland by Modular Interiors. There was a requirement to increase the finished floor height to allow this space to work effectively.The Knauf GifaFloor system is the ideal partner to this project, particularly to help with efficient programming.FHB38 1200x600mm installed on a pedestal understructure was specified as it creates a solid monolithic floor which can be installed quickly and allows for follow on trades within hours of install. Compared to traditional wet screeds, there is no long drying time, no mess or complicated health & safety issues.GifaFloor is the ideal partner to ceramic finishes such as this project. The ceramic tiles can be adhered directly to the panel, without the need for de-coupling layersThe GifaFloor FHB system offers a high acoustic performance, A1 non-combustible fire rating, limits response to moisture or heat and is manufactured from low carbon gypsum fibre.

Showing 73-83 of 83

Feedback