NBS Source
I'm a manufacturer

"internal wall coatings"

10,440 results found

Sort by:

Showing 1873-1908 of 1979

Sponsored
Sharp accents

Sharp accents

dline

The British interior designer and DIY connoisseur Luke Arthur Wells has styled the Fat lever handle in charcoal to perfection. The deep charcoal hue of the inflated lever handle becomes a sharp, elegant accent against the cream-coloured walls. 
Sponsored
Places Leisure Centre

Places Leisure Centre

Acoustic Products Ltd

The indoor sports facility has utilised one of our wall systems(Topperfo M 16/16/8) to combat sound reverberation, voice intelligibility and to lower the sound pressure levels typically created in such a large hard surfaced area.
Sponsored
Landmark Pinnacle Tower

Landmark Pinnacle Tower

Siderise Group

For what is one of London’s tallest residential towers, Siderise, leaders in the development of fire, thermal and acoustics insulation solutions, has provided cavity barriers and perimeter fire seals as part of the glazed curtain walling system for the Landmark Pinnacle Tower.
Sponsored
London Museum of Water and Steam

London Museum of Water and Steam

Chemfix Products Ltd

Project description: 8 skylights - Repair and Re-glaze in Georgian wired obscured glass.The units were in an awful condition as you can see from the pictures, showing extensive rot. All of them were stripped back to bare wood, the putty removed and glazing taken out. We then used a Sadolin Super Dec in white to bring in the parts under the window and replaced the hooked with more tradition lead ones.  Once puttied, we removed the tape as to give it the best possible line before it dried (Timbabglaze is normally paintable after just 1 hour). Once dry we re-masked and used a Dulux UK weathershield system. This was a supergrip primer, oil based Dulux weathershield under coat and finally 2 top coats of Dulux weathershield gloss. The tape was removed and you have the finished product for the first 6 windows.The last 2 windows proved to be a problem. They had been re glazed previously but had been done very badly. The wood was rotten and had to be repaired. After struggling to get the glass out as it had been silliconed in... We used Timbabuild products again. To start with we raked out all the rotten wood back to a hardish part. We then used a Timbabuild 2 part EWS wood primer to give the wood some structure and a base for the next part. Once the EWS had gone off we applied Timbabuild EHB60 epoxy repair. This was left over night (as it was applied last thing in the day) and sanded back to an edge the following day. We then used the Timbabuild ERC10 Rapid curing epoxy adhesive over the top to fill any gaps that needed it. Then a surface layer of 2 part Timbabuild FINISH. They were sanded using a 180 grit paper and received the same paint system as the other 6 windows. The glass was replaced as well as the hooks and the finished results speak for themselves. 
Sponsored
Conquest Hospital, St Leonards-on-Sea

Conquest Hospital, St Leonards-on-Sea

Rapid Ramp Limited

PROJECT BACKGROUND:As pressure continues to build on the UK’s health service, Conquest Hospital's Emergency Department urgently needed to transform their current staff welfare area with additional space, achievable with a modular extension.The design included a canteen space, toilets, shower rooms, storage areas and lockers for NHS staff.REQUIREMENT:External developments included an accompanying ramp to overcome the exterior door threshold. The works needed to be achieved within a quick turnaround time and with minimal disruption to the daily running of the department.SITE SURVEY & DRAWINGS:We responded rapidly with a site survey soon after the initial enquiry.This project benefitted from the Lidar scanning technology used by our site surveyors.The machine scanned and plotted the heights and widths of the objects in view, including different floor levels.Our in-house designer then created a 3D visual of the ramp on top of the lidar model, ensuring to draw around any obstructions.The final 3D & 2D drawings were after given to the client with their quotation.END RESULT:Once the extension was near completion, the ramp was fitted in an L shape configuration within a day, minimizing disruption.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder Coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURES INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.
Sponsored
Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Rapid Ramp Limited

BACKGROUND: The Pavilion was being refurbished, ready to be re-open as a new café to help increase tourism to the town.Plans included creating a new terrace at the front, a small rear extension, and a portable office/store at the back.REQUIREMENT: A modular ramp to the terrace for pedestrian and wheelchair use. END RESULT:Our installers fitted a Rapid Ramp, which included a pedestrian walkway with a loading capacity of 1,000kgs. It is designed to safely support the weight of varies public traffic, including walkers, prams, wheelchairs, and mobility scooters.The installation was completed within a few hours on a snowy late evening.FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate threshold heights.Continuous Handrail - this handrail system ensures users always have a support to hold onto.Standard Colour Black - ramps are powder-coated black to create a hard finish that is tougher than conventional paint.EXTRA FEATURES INCLUDED:Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and helps users distinguish any level changes.CONCRETE VS PEDESTRIAN METAL RAMP INSTALLATIONS:Unfortunately, newly poured concrete must be protected from freezing for the first 24 to 48 hours and requires drying time before use. Therefore, concrete installations are heavily reliant on good weather conditions, and cannot be completed in snow or frozen temperatures.Unlike concrete, our pedestrian ramps can be installed in most weather conditions, including snow. Plus, the product is manufactured from galvanised steel.Galvanising is a process where a protective coating of zinc is applied to prevent rusting and to kill moss.
Sponsored
Wincanton Primary School, Wincanton

Wincanton Primary School, Wincanton

Rapid Ramp Limited

REQUIREMENT: Replacing a worn-out wooden ramp with a compliant Rapid Ramp System.The system had to be strong enough to withstand impact from electrically operated wheelchairs, support users in the case of a fall and have handrails that confirm with BS 6180: 2011. Our ramp achieves all these requirements.Plus, the steel components of the Rapid Ramp System are zinc coated, and hot dip galvanized in accordance with BS EN ISO 14713-2:2020.All ramp handrails and guardings are powder-coated to BS EN 12206-1:2004.END RESULT: Once the wooden ramp was dismantled, the Rapid Ramp system was fitted.The ramp was fully installed by the end of day one, and day two was spent evenly distributing the rubber crumb over the walkway surface.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.EXTRA FEATURES INCLUDED:Underside Mesh Hoarding - this mesh is designed to prevent children from gaining access to the underneath of the ramp.Safetread Rubber Surface - this is a soft, slip-resistant surface that reduces the impact of falls. The product is made from the same materials used in soft play areas and is ideal for nurseries, schools, and public facilities. Plus, it is available in a range of colours and will continue to perform in all weather conditions.
Sponsored
Cherry Creek Youth Justice Centre

Cherry Creek Youth Justice Centre

KWC DVS Limited

A new youth centre's development is underway to the west of Weribee, in the surronding area of Cherry Creek and Dart Valley Systems have provided products from the Safe Ensuite range for the project.The Safe Ensuite range is manufactored from Glass Reinforced Polyester (GRP) which is a single skin configuration that has three different weaves of glass fibre to give the product a good internal sttructural integrity, this is then impregnated with polyester resin to matrix it all together to produce the strong and extrmely durable composite material. GRP is virtually unbreakbale and ideal for high security and correctional facilities. The range of products provided are as follows:·       178 x VR01-010 High Security Ligature Resistant Toilet·       37 x VR01-072 V2 High Security WC Pan Less Abled with Grey Top
Sponsored
Entrance Matting at Manchester Metropolitan University

Entrance Matting at Manchester Metropolitan University

INTRAsystems

Combining the former Mayble Tylecoate and Grosvenor buildings, MMU’s new Arts and Humanities hub uses INTRAflex XT entrance matting for a classic aesthetic.With the listed portico and the internal glass vestibule providing some shelter from the elements, the architect specified a primary entrance matting system with INTRAlux Elite fibre inserts in Anthracite 607. This fibre has an exceptional tuft count to provide 5.4l/m2 of absorption, combined with the highest Class 33 Wear Rating. To enhance performance with this simple primary entrance matting system, the specification provides a substantial walk-off area.With 19,550mm wide entrance matting, entry through the main portico doors offers nearly 10,000mm of walk-off in either direction. While the adjacent pass doors are protected by entrance matting that measures 3629mm front-to-back.
Sponsored
Intermediate Capital Group

Intermediate Capital Group

Optima

Elegant glass partitions at Intermediate Capital Group’s new headquarters Intermediate Capital Group (ICG) has recently completed the fit-out of their new London head office. Situated in a highly sought-after spot on Ludgate Circus in the City, this asset management companies’ new office provides a stylish working environment. Used extensively throughout the building, our range of glass partitions helped create an airy and modern space. Furthermore. the integration of our innovative switchable glass partitions at ICG’s new London headquarters enhances privacy within the office. Working alongside architects HLW International and main contractor ISG we created an elegant and sleek fit-out, installing a contemporary, open design built with colleagues and clients in mind.
Sponsored
Leeds Arena

Leeds Arena

Fixfast Ltd

The striking First Direct arena boasts a unique 'honeycombed' external façade that has been based on a mathematical diagram to create a pattern of varying cellular shapes, which are further complemented by glazed panels and the use of coloured lights.Creating such an unusual façade was no easy feat - Lakesmere worked very with main contractor BAM Construction to devise a specification that would satisfy the vision of the extensive design team (headed up by architects Populous), while also providing a practical and economical solution.The Lakesmere team therefore suggested the use of a built-up cladding system featuring aluminium shingles and perforated rainscreen cladding, which come to life through the use of kaleidoscopic lighting."By far, Fixfast are the best company to deal with for fixings"Richard Wingate - International Director
Sponsored
Greater London House

Greater London House

Canal Architectural

Canal Architectural were approached to design, manufacture and install a feature staircase for an iconic art Deco building in London. The commercial development is home to an array of international businesses and features a large interconnecting staircase and large terrace.The 35,000 sq ft development featured a large helical, mild steel staircase in the central atrium. The posts were fixed through the timber treads and featured 8mm steel tread plates and a satin polished handrail. The entire staircase site sprayed to suit the client specifications and blend with the avant garde surroundings.The Canal site installation team worked closely with the contractor throughout the entire process to ensure smooth delivery in line with current building regulations. Canal Architectural are proud to have engineered exquisite bespoke architectural metalwork on this iconic project.Photo credit: Signature London
Sponsored
Cherry Creek Youth Justice Centre

Cherry Creek Youth Justice Centre

Dart Valley Systems Ltd

A new youth centre’s development is underway to the west of Werribee, in the surrounding area of Cherry Creek and Dart Valley Systems have provided products from the Safe Ensuite range for the project. The Safe Ensuite range is manufactured from Glass Reinforced Polyester (GRP) which is a single skin configuration that has three different weaves of glass fibre to give the product a good internal structural integrity, this is then impregnated with polyester resin to matrix it all together to produce the strong and extremely durable composite material. GRP is virtually unbreakable and ideal for high security and correctional facilities. The range of products provided are as follows:178 x VR01-010 High Security Ligature Resistant Toilet 37 x VR01-072 V2 High Security WC Pan Less Abled with Grey Top
Sponsored
LNER Stadium, York

LNER Stadium, York

ThermoFoam

The LNER Stadium is home to York Football Club and York Knights Rugby League team.The 8,500 capacity stadium was developed by main contractor, Buckingham Group in what was a £40 Million project and completed in 2020. The extensive stadium is now home to leisure and corporate meeting facilities as well as an NHS outpatient centre, library and a plethora of retail outlets in what is a massive boost to the local community. With the four year project now complete, the stadium should help bring elite sport to the York community and allow the football and rugby league teams to progress up the league tables and into the big time!Find out how ThermoFoam delivered spray foam insulation solutions to the thermal line of the brand new stand to create thermal performance for internally heated spaces.
Sponsored
Brighton College

Brighton College

CAT (Carpet Accessory Trims) Limited

C.A.T. AN15R stair nosings lead the way on numerous staircases throughout the centre. With aluminium castellated ATI49.5 inserts, visually the all aluminium profiles define the step edges also creating excellent slip resistance. A C.A.T. survey team member attended the site with the customer to discuss the suitability of products and requirements, which enabled faster project completion. Designed by OMA Architects, the £55m centre creates an interplay between sports and sciences. A rooftop running track with panoramic views of the sea leads down to the science and laboratory departments, auditorium, double-height sports hall, internal running track and a 25-metre swimming pool. Central to the building concept was social communication with large break-out spaces connected by wide, visually open staircases that link up departments. ​ ​
Sponsored
Leading Global Private Equity Firm

Leading Global Private Equity Firm

Radii

Radii’s Pre-Construction Design Department worked closely with architects tp bennett to deliver a number of high-end bespoke solutions at this stunning location in St. James’, London.Working across 58 offices and meeting rooms, our elegant and slimline Parallel 50 and Parallel 84 systems (both Rw 45 dB) with Glide framed sliding doors were used on Level 4 with recessed head track detailing. Detailed manifestation finishes provided vision panels into the internal spaces.For 11 private spaces on Level 5, stunning smoked oak moulded timber doors were installed with PPC aluminium inlaid trim finished to match the glazing tracks. The timber portal door frames were designed to be as deep as the adjacent drywall nibs to create a flush and seamless finish.
Sponsored
BTR Towers, Erie Basin, Salford Quays, Manchester

BTR Towers, Erie Basin, Salford Quays, Manchester

Kawneer UK Ltd

Architectural glazing systems by Kawneer were specified for their “robustness and quality” for two linked 16-storey apartment blocks on the last plot to be developed in one of Britain’s fastest-growing property hot spots - the £37 million BTR (Build To Rent) towers at Erie Basin in Salford Quays, Manchester, a stone’s throw from MediaCityUK.Kawneer’s AA®100 curtain walling features as strip curtain wall to copper-coloured rainscreen areas of the towers at Erie Basin. In addition, AA®110 curtain walling features on link bridges and as floor-to-ceiling screens facing the water. While the AA®100 system uses 50mm sightlines, the AA®110 system uses 65mm but both in this case were zone-drained. They are complemented by AA®541 open-out casement window inserts and AA®720 ultra thermally-efficient entrance doors.The Kawneer systems were installed over eight months by a team of up to 35 from approved specialist sub-contractor FK Group for main contractor GRAHAM and client Glenbrook, the privately-owned property development and investment company, who acquired the site from the Peel Group.The prominent dockside development is GRAHAM’s second project with Glenbrook, with work also underway on another £27 million BTR project in Ellesmere Street, Castlefield, Manchester, which also features Kawneer systems.
Sponsored
Engine Manufacturing Facility for Jaguar Land Rover

Engine Manufacturing Facility for Jaguar Land Rover

Norwood Group Limited

PROJECT OVERVIEW Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.OUR SCOPE OF WORKThe main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.
Sponsored
Castlehill Private Housing Development, Belfast

Castlehill Private Housing Development, Belfast

AG

AG was delighted to continue our partnership with Braidwater Homes at one of the house builder’s most prestigious private housing development, Castlehill, located just off the Ballygowan Road in Belfast.Braidwater Group’s Chief Operating Officer, Ryan Boyle said:“AG’s paving and walling products which are aesthetically pleasing, tie in totally with Braidwater’s ‘living the dream’ aspirations. For the Castlehill development we had a number of requirements, which included ensuring that the landscaping tied in with the modern feel of this high-end development.” To this end, we utilised AG’s Vertica® and Diamond® retaining walls, where appropriate, together with AG’s River Stone 3’s set pavers in contrasting tones.”AG’s Regional Sales Manager, Barry Scott commented:“We have a really good relationship with the Braidwater Group and are currently involved in a number of their sites across Northern Ireland. The Castlehill contract was an important one for us and we have worked hard to ensure we live up to their high standards. As part of our commitment to Braidwater I personally make visits to their sites to ensure their team always have the products they need. Our personal service supported by speed and ease of delivery is something they appreciate. They also like the fact that by utilising our Anchor® Diamond® mortarless/pin-less segmental retaining wall system their team can work on in wet weather with no breaks in construction.”
Sponsored
How to improve learning in the classroom with whiteboard paint

How to improve learning in the classroom with whiteboard paint

ESCREO

Today, visual learning has been recognized as the easiest way the human mind can perceive information. The more technology is developing, the more people get drawn towards the screens. While tech devices have a definite advantage in providing a highly interactive way of introducing ideas, there are also some drawbacks that most people are very familiar with. Sometimes it’s just best to use a whiteboard wall instead. When we think of a classroom we usually imagine a narrow space with a teacher podium and a wall-hung writing board. The whole attention is drawn to the front centre of the room towards a confined writing space. The teacher-student conversation is a one-sided one where students often feel pressure and inability to respond when asked to step in front of the whole class. Who likes being tested before the judging eyes of a whole room of people, anyway? Teachers understood this problem and decided to take action. Driven by the idea to bring learning closer to students, teachers from the 125th Middle School in Sofia, Bulgaria have reimagined the typical classroom with the help of a product that ESCREO has developed especially with children in mind. The school added a clear dry-erase writing space to one of the side walls of a classroom. What happened after that turned their whole teaching system upside down.
Sponsored
Chailey School, Brighton

Chailey School, Brighton

Senior Architectural Systems Ltd

With a proven track record of successful work in the education sector, Senior Architectural Systems was more than qualified to deliver the fenestration package for this new secondary school in Brighton.The new Chailey School in South Lewes has been designed by leading architects Jestico + Whiles and features a full range of aluminium fenestration solutions including Senior’s thermally-efficient, slimline SF52 aluminium curtain wall system and robust SPW501 aluminium commercial doors. The new school has also reunited Senior with main contractor Bowmer & Kirkland, with whom Senior has an established supplier framework agreement. The two companies have collaborated together on numerous projects, with Bowmer & Kirkland being the first contractor to specify Senior’s patented low U-value PURe® aluminium window system when it was launched back in 2015. The main contractor has gone on to work with Senior and specify its aluminium windows, doors and curtain wall systems on many other education projects across the UK.Chailey School is itself part of Department of Education construction framework agreement to modernise educational facilities and improve the environmental efficiency of this sector. Senior worked closely with specialist contactor RKN Aluminium to design, fabricate and install the fenestration package for the new school building which comprises some 85 windows, 14 section of curtain wall and 12 door sets!
Sponsored
Bright modern spaces created in quick timeframe with Altro Ensemble

Bright modern spaces created in quick timeframe with Altro Ensemble

Altro

IssueA rental property in Stourport-on-Severn needed a quick refurbishment, allowing the landlord to turn the property around for tenants who were keen to move in. The main areas to be refurbished were the kitchen and bathroom, both of which needed to be fully re-fitted, providing a fresh, clean home for the new residents. ApproachThe landlord had previously worked with Altro products and needed quick to install products, which would provide ease of installation, durability, and ease of cleaning. “We had received information about a new product, Altro Walls ShowerKit, and were keen to try it out. The house needed a quick turnaround as our tenants were waiting to move in. The installer was also keen to have products that were easy to manoeuvre, carry up and down stairs, and resulted in less waste” said S.Birch, Landlord.SolutionAltro Ensemble luxury vinyl tile in colour Pewter Concrete was selected for the kitchen, providing a luxury feel together with comfort underfoot and impact sound reduction.Altro Walls ShowerKit in colour Cool Mineral and Stacked Metro design was selected for the bathroom, partnered with Altro Wood adhesive-free in colour Post Oak. The combination of an Altro floor and wall results in an easy-to-maintain and safe space, giving the bathroom a homely aesthetic, with ease of cleaning and our Altro one in a million slip-resistance reassurance.
Sponsored
Deansgate Metrolink, Manchester

Deansgate Metrolink, Manchester

Hardscape Products Ltd

Almost four years on we look back at a distinctive Manchester tram stop within a landscaped park setting that boasts a ‘living wall’ of plants and wildflowers surrounded by extensive landscaping, offering a calm and peaceful environment for passengers who are waiting for the tram.
Sponsored
SIEGENIA vents now available in Trimble Nova software

SIEGENIA vents now available in Trimble Nova software

Siegenia-Aubi Ltd

The data sets for SIEGENIA's ventilation units can now be found in the CAD/CAE software Trimble Nova. This enables architects and planners to carry out easy and reliable planning with the facade and wall-mounted ventilator data as well as components contained in the software.
Sponsored
Jaguar Land Rover, Body in White Building, Castle Bromwich

Jaguar Land Rover, Body in White Building, Castle Bromwich

Tata Steel

The Body in White Facility is an extension (60,000sqm) at the Castle Bromwich site of Jaguar Land Rover. This new facility utilises an interesting blend of Trisomet and Trimapanel roof and wall cladding and also benefits from the Colorcoat Renew transpired solar collector system.
Sponsored
Kestrel Aluminium. Case Study:  Mary Webb School, Pontesbury, Shropshire

Kestrel Aluminium. Case Study: Mary Webb School, Pontesbury, Shropshire

Kestrel Aluminium Systems

The Mary Webb School & Science College in Pontesbury, Shropshire has undergone major refurbishment. The first phase of the project was to install a completely new front to the main school building, replacing the old windows with Kestrel thermally efficient windows and curtain walling.
Sponsored
Kestrel Aluminium. Case Study: Coton House Estate

Kestrel Aluminium. Case Study: Coton House Estate

Kestrel Aluminium Systems

Walsall based fabricators Aluminium Glazing Solutions (Midlands) Ltd won the contract to manufacture and install Kestrel Aluminium’s curtain wall and window systems for a prestige development of five and six bedroom detached houses on the Coton House Estate, near Rugby.
Sponsored
Rescuing a Poolside Deck from failed Decking Oils

Rescuing a Poolside Deck from failed Decking Oils

Owatrol UK Ltd

We’re always pleased to hear about how our products have helped customers with their renovation projects. However, we were particularly delighted when one of our Partners Roger, of R and A Pressure Washing Services, sent us these photographs of a poolside deck renovation he recently completed.The customer had previously treated their poolside deck with a decking oil, purchased on the high street. As you can see from the photo, the decking looked dull and tired and was not at all complementing the lovely rooftop views from the pool.We’ve had many customers tell us that the high street decking oils they had previously bought had failed. They were continuously having to sand and re-oil their decking to keep it looking smart. By investing in a good quality product, you could reduce both the time and money it takes you to constantly strip and re-oil your decking and replacing it with easy, low maintenance decking.Aquadecks, for example, is water-based and is easy to apply and maintain, with no sanding or stripping required. Sometimes, it’s worth investing in a more expensive product, such as Aquadecks, at the beginning, to save you money in the future.So, how did Roger rescue his customer’s poolside deck?Firstly, he mechanically sanded the deckingTo remove all the old oil from the surface of the decking, Roger sanded the decking with an electric sander. How the decking looked after sanding can be seen in the photo below.Whilst this step is often completed by professionals, for the DIYer it’s going to be easier to remove the old oils using Aquanett wood oil remover (if it’s a different sort of coating you’re removing then use Dilunett or Prepdeck).If you don’t want to sand back your decking, follow the steps below if you’re removing oils.Aquanett can be used to remove teak and other oils from all woods blackened by UV rays. It will prepare your decking for a new coating and improve penetration and adhesion. Its gel-like consistency means that it’s easy to apply.Even better, it’s suitable for environmentally sensitive areas, as it does not contain solvent or paraffin and it’s biodegradable.If you choose to use Aquanett instead of sanding, you’ll then need to neutralise the decking with Net-Trol before applying your finish.Then, he applied AquadecksNo matter how many times we see photos of decking renovations using Aquadecks water-based penetrative wood finish, we’re always really impressed with how it turns out.First of all, Roger applied a liberal amount of Aquadecks. Applying in the direction of the grain, he worked in sections that he could complete within 30 minutes.As soon as the ‘wet look’ of the first application had disappeared, Roger applied a second coat. He then allowed this to penetrate for 15 minutes.He then removed any excess Aquadecks that hadn’t penetrated the decking. This avoids it drying as shiny spots on the surface. The place for Aquadecks is in the wood, not on the surface.As Aquadecks is water-based, Roger was then able to clean his tools with soap and water.We think that the decking now looks as good as new – if not better!
Sponsored
Great West Quarter (GWQ), London

Great West Quarter (GWQ), London

Sotech Ltd

Sotech worked with installers Stanmore on the Barrett Homes Residential Development Westgate House, which was a £500 million mixed-use regeneration project, designed by London-based Assael Architecture and located in Brentford, Middlesex. Westgate House is an NHBC (National House Building Council) project, and Sotech initially became involved in the project because the original specified cladding did not fit NHBC requirements. To provide an alternative, we worked with installers Stanmore to specify our Optima IPC Interlocking Pressed Plank Rainscreen cladding system for the project, which is both NHBC approved and full independently CWCT tested.Over 2000sqm of secretly fixed Interlocking Pressed Plank panels were used on the Westgate House development. 4 different colour panels were specified; 3 with a matt powder-coated finish and one using a bespoke, pre-coat, high gloss special finish.The combination of a series of PPC matt panels arranged in bands, combined with a reflective high gloss panel stripe created a sophisticated, modern appearance for the building’s exterior.There were some design challenges involved in this project, but all were tackled successfully through the development of bespoke areas of the system. Initially, Sotech had to develop a new, bespoke joint method between the Optima IPC rainscreen cladding panels to avoid slab deflection because a lot of the panels spanned floor slab areas. These customised joints allow the panels to move between the slabs like a damper while maintaining a pristine exterior.For the curved area of the building, Sotech developed a bespoke substructure for the Optima IPC panels with a different panel depth than that used for the flat rainscreen cladding. This involved setting the grid behind the IPC panels differently to the rest of the project, ensuring a seamless line from the flat areas to the curved areas. Although it was a complex design challenge, the solution was effective and ensured a uniform, flawless appearance.Our secretly fixed Optima IPC system was specified in particular because the long narrow panels were ideal for bringing the architect’s vision to life, and because it could be easily adapted where necessary.As well as the IPC rainscreen cladding, Sotech provided all the fascias and soffits required for the development.Westgate House involved the regeneration of iconic Grade II listed Art Deco building Wallis House and the construction of over 800 residential apartments spread across 17 new buildings.The site used advanced construction techniques to minimise waste and also ensured that homes benefit from solar panels and other renewable energy techniques.In addition to new housing, the Westgate House development also offers communal gardens, a health and fitness centre, a convenience store, a medical surgery and hotel, as well as cafes, bars and restaurants.The training facility and showroom at Sotech is open to specifiers and contractors, where all of our Optima Rainscreen Systems are on display alongside the widest selection of materials and finishes, including pre and post coat aluminium, ACM, Copper, Zinc, Stainless Steel and Anodised.
Sponsored
A14 Integrated Delivery Team, A14/M11, Cambridge to Huntingdon.

A14 Integrated Delivery Team, A14/M11, Cambridge to Huntingdon.

Hahn Plastics Ltd

The ChallengeIn 2015 a joint venture of Balfour Beatty, Costain, and Skanksa (A14 integrated delivery team) was awarded £1.5bn by Highways England to improve the A14. These improvements included a new major 12-mile bypass, the widening of the A1 and the existing A14, improving the junctions on the A14, and building new access roads.The A14 carries around 85,000 vehicles per day; 26% of this is HGV traffic. It is frequently congested and traffic is often disrupted by breakdowns, accidents, and roadworks.As part of the A14 major scheme, a new retaining wall was needed to be constructed as new road works were encroaching on the pre-existing embankments. A durable, long-lasting, and low-maintenance wall solution with a Highway Authorities Product Approval Scheme and British Board of Agreement (BBA) certificate was required.The SolutionA vast number of EcoCrib mass gravity retaining walls are now constructed to support the embankments along the A14. The EcoCrib Mass Gravity Retaining Wall began its erection on 24th July and was completed on 10th October 2019. With a design life of over 120 years, EcoCrib is durable, and the most highly sustainable retaining solution. Designed, supplied, and installed by PC Construction, certified by the BBA and HAPAS in 2012.EcoCrib profiles are manufactured entirely from recycled UK plastic (bottle tops, car bumpers, etc) with any wastage or surplus material re-processed to form new EcoCrib profiles. Developed from timber crib technology, the 50mm x 125mm EcoCrib profiles are considerably more durable than treated timber but hold many environmental benefits.EcoCrib can be recycled when it reaches the end of its useful life.When considering solutions for developments of all kinds, the lifetime cost means EcoCrib is the more efficient choice.1838 SQM of EcoCrib was used in the scheme, equivalent to 212 tonnes of plastic waste diverted from landfill.
Sponsored
Spacepod

Spacepod

Cyclepods Ltd

The Spacepod is a highly configurable product which uses up to 50% less space than traditional bike storage. The Spacepod offers 2 secure separate locking points and is an ideal solution where space is at a premium or where only wall space is available.
Sponsored
Full Ward Upgrade At Prominent NHS Trust in Yorkshire

Full Ward Upgrade At Prominent NHS Trust in Yorkshire

BioClad

This case study highlights an entire ward refurbishment that was completed using BioPod’s IPS at a prominent Yorkshire based NHS Trust. Units included wash hand basins, WC and WHB for disabled toilets, IPS to cubicles and full wall IPS to consultation rooms.
Sponsored
Festival Hall ERL - Austria

Festival Hall ERL - Austria

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

1,400m² of PanDOMO® Floor, and 700m² PanDOMO® Wall provided the luxurious seamless finish required by Delugan Meissl Architects. At its opening in 2012, the orchestra pit was the largest of its kind globally and is reputed to provide some of the best acoustics in Europe.
Sponsored
Clamart, France

Clamart, France

BEMO Project Engineering UK Ltd

Complex geometry and a combination of roof and wall cladding, without welded joints, required BEMO's MONRO freeform standing seam panels on this prestigious project. Produced in stucco embossed aluminium, the panels were manufactured on site, and designed by the BEMO in-house technical team
Sponsored
Southampton Solent University

Southampton Solent University

DYNAMIK Sports Flooring

This large project installed DYNAMIK Komfort Elite in their Performance Sports Hall, Fitness Studios and Multi-Use Sports Hall. Complementing the floor they chose DYNAMIK Solid and Acoustic (Perforated) Sports Wall panels in Galiano Oak CPL wood-effect finish.
Sponsored
Hilton Garden Inn, Terminal 2, Heathrow Airport

Hilton Garden Inn, Terminal 2, Heathrow Airport

Smart Balustrades

SMART were contracted to design, manufacture and install 250m of stainless steel with glass balustrade, 200m of wall fixed handrail, 100m of trolley bump rails as well as 100m of 1500mm high 3.0kN loading structural glass balustrade to the roof top bar.

Showing 1873-1908 of 1979

Feedback