NBS Source
I'm a manufacturer

"fire protection for building frames"

11,288 results found

Sort by:

Showing 253-288 of 1917

Sponsored
Oscar Iso-Mount Type1 achieves 90-minute fire rating

Oscar Iso-Mount Type1 achieves 90-minute fire rating

Oscar Acoustics

Oscar Acoustics achieved a 90-minute fire rating at BRE Group’s testing facility for its Iso-Mount Type1 acoustic ceiling hanger. Iso-Mount Type1 significantly reduces transmission of noise from the floor above with minimum ceiling height loss. The mount was tested to BS EN 1365-2:2014 Fire Resistance Tests for Loadbearing Elements at BRE Group’s laboratory in Watford in December 2018. Iso-Mount Type1 can be specified for projects ranging from house conversion to flats, both new build and renovation, as well as shops, restaurants and other commercial soundproofing applications.
Sponsored
A Flame-Free Solution to Reduce the Potential Fire Risk

A Flame-Free Solution to Reduce the Potential Fire Risk

Iko Ireland

The project was to refurbish the roof and improve the drainage and insulation and bring it up to current building control standards. A thermographic survey of the roof was carried out by IKO, which confirmed that it was sound enough to have an overlay of IKO UXPL bituminous membrane rather than stripping it back and rebuilding. IKO UPXL was primarily chosen by the client for the 30 year guarantee. One section of the roof to be repaired was on top of dormers. Flame-free IKO UPXL membranes were used because of the potential fire risk of the abutting pitched tiled roof.
Sponsored
LPS1175 SR2 GATES AND FENCING

LPS1175 SR2 GATES AND FENCING

Premier Security & Fire Consultants Ltd

Premier Security & Fire fabricated and installed three Secured by Design steel security gates and fencing for instructing clients MDP Communications Services at their project in King’s Cross, North London.Premier’s gates have been tested by the BRE (Building Research Establishment) achieving LPS1175 SR2 security status and sit alongside our dual-certified LPS products in a portfolio of more than 250 designs, including communal entrance doors, screens and curtain walling.Check out our website for more information. www.premier-ssl.com
Sponsored
Hospital Corridor Walls Protected by Yeoman Shield

Hospital Corridor Walls Protected by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

A busy access corridor linking one wing to another at a major Yorkshire Hospital now benefits from a wall protection system supplied and installed by Yeoman Shield.The heavy footfall, wheeled equipment and bed trolleys continually traversing the path between two busy wings was starting to take its toll on the walls and corners of the corridor in the form of marking, denting and scratching.Keen to maintain the high smart standards as well as lifecycle and sustainability of the property, the hospital choose a protection system from Yeoman Shield to overcome such damage.200mm Protection Rail was fitted “flat-back” to the wall on one side of the access way with FalmouthEx Wall Protection Panels installed below the rail.Rubber stop ends/returns (new to the Yeoman Shield range) were applied to the rail as added defence against heavily laden trolleys and carts that may come into contact.The opposing wall was also offered protection by the same Yeoman Shield 200mm Protection Rail this time installed on 60mm “stand-off” allowing the system to become a supportive rail for those who require it. The rail was again finished with the durable hardwearing rubber accessories.Matching 75 x 75 mm Corner Protection Angles were put on vulnerable corners on both sides of the walkway completing a comprehensive wall protection system that will help to reduce the time and money spent on redecoration and repair over the lifecycle of the building.More information on Yeoman Shield’s cost-effective wall & door protection systems can be found at www.yeomanshield.com or by calling 0113 279 5854.
Sponsored
Copper Building, Bristol

Copper Building, Bristol

Velfac Windows

The award winning Copper Building, designed by Ferguson Mann Architects, adds 136 new apartments to Bristol’s Lakeshore scheme, an ambitious regeneration project by Urban Splash. The distinctive, copper-clad four-storey building is a thoughtful solution to higher-density living, underpinned by sustainable building performance. Generous glazing is a key feature of the project, with VELFAC triple glazed slim-framed composite windows bringing extra light into apartments and communal spaces.
Sponsored
Clement Windows supply fire rated steel doors and screens to historic Surrey school

Clement Windows supply fire rated steel doors and screens to historic Surrey school

Clement Windows Group

City of London Freemens first opened in Brixton in 1854 for ‘the maintenance and the religious and virtuous education of orphans of Freemen of the City of London’. Paid for by the Corporation of London both boys and girls were enrolled from the outset making it the one of the oldest co-educational independent schools.In 1926 the school moved to Ashtead Park in Surrey. The Grade II* listed Main House at Ashtead Park had been the home of Sir Robert Howard, Chancellor of the Exchequer during the 17th century.In 2016 an ambitious development project was commenced, due to span the next decade. The modernisation of the Main House, now the Sixth Form Centre, involved a redesign of the building and the new layout required fire screens to ensure the building met with current Building Regulations. Clement Windows Group supplied the internal fire rated doors and screens at the top of the adjacent internal stairs which are access controlled and linked into the main fire control of the building.
Sponsored
Smart Fire Prevention System Installed in Luxury Apartments

Smart Fire Prevention System Installed in Luxury Apartments

Firechief Global

One Crown Place is the latest high rise addition to London’s skyline. Home to 246 luxury apartments, high-quality office space, a boutique hotel and members’ club, it is located between the City of London and Shoreditch. Designed by internationally renowned architects Kohn Pederson Fox (KPF), the development features two prismatic towers of 28 and 33 storeys.For the apartments, interior designers, Bowler James Brindley specified custom designed kitchens by Italian company Arclinea featuring a dark lacquered finish with engineered stone worktops and glass fronted cabinets.The Fire regulations which apply to high-rise living accommodation meant that the open plan kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the team of architects, designers and builders were open to the idea of an alternative, unobtrusive design-led fire prevention solution, such as the Firechief Kitchen Stove Guard.
Sponsored
Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Rutland

About the project:Dublin Doors are a distributor of door leafs to door manufacturers throughout Ireland. Since Brexit, the market in Ireland requires the EN 1634-1 fire testing standard, as opposed to the previously accepted the British Standard BS 476. A customer of Dublin Doors wanted an overhead concealed door closer combined with 44mm thick doors, and it had to pass the EN fire testing standard.The specification of the doors was: (A) 44mm PB hardwood lipped all round door (B) 38mm PB core faced with 3mm mdf, routed with 2mm decorative groove in the faceDublin Doors were very aware that EN testing is widely considered to be more onerous than BS testing. The inclusion of a drop seal was also a point of concern - many companies have found that using drop seals to control smoke can appear to make the fire test harder to pass, with some experiencing prolonged flaming at the threshold. Rutland was able to help by providing its concealed closer ITS.11204, which can be used in 44mm fire doors – one of only a handful of concealed closers on the market that can do this. Rutland was also able to tap into its network of experts and consultants to discuss possible options, to help Dublin Doors to arrive at a combination that met the specification, and was most likely to succeed in the test. Dublin Doors were also required to write a Pre-Test Verification (PTV) before the test – a requirement at many test labs now. Rutland used its expertise in compliance to help complete this specification.The outcome:The results were excellent, with both doors lasting 49 and 51 minutes respectively in the fire test, for what was a 30-minute FD30 doorset, the more onerous European standard EN 1634-1 to achieve – E30. In our experience of fire testing, this is an excellent result for a 44mm solid timber door, and the Rutland team were just as pleased as Dublin Doors that the door, along with its concealed closer, passed with flying colours.
Sponsored
Smart fire prevention system installed in London Westminster apartments

Smart fire prevention system installed in London Westminster apartments

Firechief Global

Carrick Yard in Westminster is a residential development comprising 168 one-, two-, three- and four-bedroom apartments, a community space and public sports hall as well as extensive landscaped public areas. The scheme delivers improvements to existing surrounding housing and public spaces and is part funded by Westminster City Council. It is the first development to be completed in the Church Street Regeneration area.The Fire regulations which apply to high-rise living accommodation meant that the kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the Firechief Kitchen Stove Guard was chosen as an alternative, unobtrusive design-led fire prevention solution.
Sponsored
James Jones picks EGGER Protect for latest processing plant

James Jones picks EGGER Protect for latest processing plant

EGGER (UK) Ltd

Leading timber processor, James Jones & Sons Ltd, specified EGGER Protect at its new facility near Lockerbie. The 18 acre Hangingshaw development is a strategic investment for the company, and EGGER Protect contributes to its successful implementation. EGGER Protect flooring was installed on all of the high-level walkways and access platforms around the advanced production machines. This application brings health and safety benefits, with the textured surface of the board offering market-leading anti-slip characteristics.The product is durable, easy to install and keep clean.
Sponsored
Required Testing and Certification Regime For CE marked fire shutters

Required Testing and Certification Regime For CE marked fire shutters

A1 Shutters Ltd

CE marking for fire shutters to BS EN 16034, BS EN 13241 following a fire test to BS EN 1634-1 is a legal requirement in the UK. https://a1sgroup.com/blog/a1s-group-policy-when-quoting-ce-marked-fire-shutters 
Sponsored
BAML signs-up to use the FireDNA Monitoring System

BAML signs-up to use the FireDNA Monitoring System

Fire DNA Ltd

Asset management firm, BAML has signed-up to use FireDNA’s Fire Door and Doorset Monitoring Software and Mobile App.With the introduction of Regulation 10 back in January 2023 which requires the owners of buildings over 11 metres to carry out quarterly inspections on all fire doors. The FireDNA software and Mobile App allows users to undertake on-the-spot audits and inspections, capturing the data in real time; the data is then stored and managed through the FireDNA cloud.The programme is being rolled-out in 10 developments across London, managed by BAML, including Embassy Gardens in Nine Elms, Wardian London’s iconic two towers in Canary Wharf, Royal Wharf in the Royal Docks area and the Brentford town centre regeneration project adjacent to the River Brent.“We are delighted to be awarded this contract and look forward to working in partnership with BAML.” said Tony Millen, FireDNA’s Operations Director. “Across the 10 developments, our FireDNA Inspection Partners will inspect, tag and monitor 25,000 Fire Doors using our Mobile App, making the inspection process efficient and compliance easier.”(About BAML – BAML is a property management organisation providing customer-focused services to residents in more than 11,000 homes across London. This includes managing the planned maintenance, capital expenditure programmes and financial accounting and onsite services).
Sponsored
Paddington Exchange - Fire Rated Mailboxes

Paddington Exchange - Fire Rated Mailboxes

The Safety Letterbox Company

THE PROJECTPaddington Exchange is a collection of 123 high specifications one, two and three bedroom apartments arranged over fourteen spacious floors developed by Taylor Wimpey Central London.The development is located in a sought after canal-side location, situated on the site of the former North Western Community School, offering easy access to a number of high-end street cafes, restaurants and shops. A wealth of transport links around the city are found at the site of the Paddington Exchange project.THE PRODUCTThe project features multiple banks of wall recessed fire rated 2 mailboxes located in the entrance lobby area. The mailboxes contain a series of features and benefits that result in a ‘one hour integrity’ rating that conforms to the BS476 Part 22 fire standards. For more information, please visit our fire rated mailbox page.The mailboxes are finished in an IGP-DURA®xal paint using a Dark Bronze – E82987 colour. Each mailbox features engraved numbering in a COPASETIC NF font on the opening flap coloured with a contrasting black infill.The banks of mailboxes are completed with a surrounding trim used to mask the join between the mailboxes and the installation wall. Large panels are used in conjunction with the banks of mailboxes which allow for easy identification of the relevant mailbox for both the residents and postal delivery workers.
Sponsored
Roath Fire Station, Cardiff

Roath Fire Station, Cardiff

Anderson, GEC Ltd

Stainless steel worktops, by GEC Anderson, were deployed in the refurbishment of the mess room at Roath Fire Station in Cardiff. The kitchen units were supplied by Steelplan Kitchens.The continuous, high quality, stainless steel worktops provide a highly professional look and feel to the busy area within this important emergency facility. The requirements of hygiene, durability and safety are met by the worksuraces that feature integrated sink bowls as well as upstands to walls.
Sponsored
Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.

Trief Cadet Containment Kerbs provides protection to a Victorian road bridge in North Wales.

Brett Landscaping

Trief Cadet GST1A were used across Vale Road bridge which connects the Rhyl to its rail station. Cadet offered a unique solution to protect the Victorian bridge structure without compromising the existing access across the bridge. Vale Road bridge had many design aspects which included protecting the structure from the rigours of passing traffic, without reducing the width of the carriageway available for traffic to pass and maintaining access for pedestrians. A further challenge was the effective drainage of rain water build-up to the rear of the kerbs. To view the whole case study please click the link below.
Sponsored
Protection of bridge footpath and parapet with Trief GST2

Protection of bridge footpath and parapet with Trief GST2

Brett Landscaping

A Bradford railway bridge near a junior school needed a proven solution to keep road users and the young pedestrians safe as part of a renovation. The solution for this project was the use of our Trief GST2 kerbs to protect both the footpath and the parapet to each side of the railway bridge and to stop vehicles from deviating onto the pavement and, ultimately, accidental incursion onto the railway lines. To view the whole case study please click on the link below.
Sponsored
Watergate Bay Hotel, Cornwall

Watergate Bay Hotel, Cornwall

DRU Fires

DRU Polo gas stoves bring warmth and comfort to Cornish hotel suitesDRU Fires, in partnership with leading Cornwall fireplace dealer Kernow Fires, has supplied five DRU Polo balanced flue gas stoves for the new beach lofts at one of Cornwall’s leading hotels.Watergate Bay Hotel on the north coast of Cornwall, originally designed to a be a railway terminus hotel, has been developed into an inclusive year-round destination. Its spectacular clifftop setting and location just a short hop from Cornwall Airport Newquay makes it a primary choice for travellers from all corners of the UK and beyond.The recent closure of Jamie Oliver’s Fifteen restaurant on the site paved the way for the £1.4 million development of the seven new beach lofts by contractors GSI and interior designers Dynargh Design, right above the beach. Described as ‘surf-in surf-out’ accommodation, the lofts have floor-to-ceiling windows with panoramic sea views. All have been designed to feel like modern city lofts, with warm textures and sustainable materials.High energy efficiencyThe DRU Polo gas stoves were chosen by Dynargh Design for their contemporary design, fitting in with the overall design and aesthetic of the beach lofts. In addition, they were selected for their A energy rating, 92% efficiency and the convenience of gas with easy remote-control operation. They have all-year-round use and are suitable for chilly autumn days and cool summer evenings. Their balanced flue system offers flexibility of installation, as they require no chimney and only need proximity to an outside facing wall. This enables them to be installed in the living space, bedroom or bathroom subject to the design of each individual suite.The beach lofts were completed in time for Cornwall’s peak 2021 tourist season, which has been hugely successful due to many more people taking their holidays in the UK during the Covid 19 pandemic. Impressive outlooks and sustainabilityKernow Fires owner Simon Breckon commented: “We’re pleased to have contributed to the success of the beach lofts and have seen strong growth in Cornwall’s domestic and commercial fireplace markets this year.”Watergate Bay Hotel CEO Will Ashworth said: “The beach lofts are our best rooms. They are sized very generously and the interior design represents our new approach to contemporary Cornish beach living.” Dynargh Design director Matt Hulme said: “The lofts have some of the most impressive outlooks of any hotel in Cornwall. But the interiors also needed to have enough appeal in the winter, when it’s dark at 5pm, that it feels warm, natural and enticing.”Sustainability was also an important factor in the design. “Getting active in the beautiful natural environment is at the heart of the Watergate Bay experience, and we’re committed to minimising the environmental impact of our design choices,” adds Will Ashworth.For further information visit: drufire.com, kernowfires.co.uk and watergatebay.co.uk
Sponsored
Wall Protection - UCLH, National Hospital for Neurology and Neurosurgery

Wall Protection - UCLH, National Hospital for Neurology and Neurosurgery

Gradus

A complete wall protection system from Gradus has been installed at the newly refurbished Lysholm Department of Neuroradiology at the National Hospital for Neurology and Neurosurgery (NHNN). Supplied and fitted by the Gradus Contracts Team, the system includes wall guards, corner guards, kickplates and bollards from the stainless steel range, plus handrails from the 450 timber range, which is designed to meet guidelines in Approved Document M, BS8300:2009+A1:2010 and HBN00-04.
Sponsored
Trief Kerbs used to protect major South Yorkshire Distribution Centre.

Trief Kerbs used to protect major South Yorkshire Distribution Centre.

Brett Landscaping

The £50million development is situated on the Doncaster iPort logistics estate, and is the hub for more than 53 supermarket stores based across South Yorkshire, the Midlands and Lincolnshire. With more than 3,900 pallets leaving the site via HGV each day 2,500 Trief GST2A kerb were installed to the perimeter of the large distribution centre building, site entrance points and security booths to protect them against accidental vehicle impacts damaging the structures. To view the full case study please click the link below.
Sponsored
EGGER Protect at Ochiltree Community Hub

EGGER Protect at Ochiltree Community Hub

EGGER (UK) Ltd

The Ochiltree Community Hub is in the heart of the Cumnock community in Ayrshire, Scotland. EGGER were delighted to donate EGGER Protect structural flooring boards and Joint & Joist Adhesive to this community project. Located less than 2 miles from EGGER’s Barony plant in Auchinleck, the contribution to the redevelopment by the company helps to benefit the residents of the local area. The aim of the community centre development has sought to support the local community and surrounding areas with a number of initiatives in line with their charitable aims.
Sponsored
Lewisham Hospital - Fire Doors

Lewisham Hospital - Fire Doors

Advanced Timber Systems

A comprehensive fire door replacement programme throughout the 5-storey Ladywell Unit which provides mental health services including a psychiatric intensive care unit.Advanced Timber Systems supplied fully PVC encapsulated ‘Vanta-form’ Door-sets and specialist anti-ligature hardware to give a robust, compliant and durable solution in this complex environment.Glazed Side screens were supplied with toughened security glass to enhance the safety for patients and staff without compromising visibility through corridors.
Sponsored
London Fire Stations choose Jacksons in state-of-the-art refurbishment

London Fire Stations choose Jacksons in state-of-the-art refurbishment

Jacksons Fencing

In 2013 the London Fire Brigade received £51.5 million from central government to rebuild nine fire stations. A consortium led by construction group Kier, along with BDP architects, was given the contract following a detailed procurement process. Jacksons were specified to supply access gates for eight of the stations undergoing refurbishment.
Sponsored
Neaco balustrade called into service at new fire station

Neaco balustrade called into service at new fire station

NEACO Ltd

Improving accessibility has always been a recurring theme in the specification of Neaco’s products and so it proved again when the company’s balustrade systems were called into service for entrance ramps at Humberside Fire and Rescue Service’s new cutting-edge Hull Central Fire Station. Jefferson Sheard Architects sought to design an accessible and welcoming facility to serve the local community. Neaco’s contribution was integral to this objective with aluminium handrails and balustrade to steps and two extensive ramps at the main entrance. The system was also specified with glass infill panels for a first-floor terrace.
Sponsored
Fire-rated MySmartBox and mailboxes unit - Bronze finish

Fire-rated MySmartBox and mailboxes unit - Bronze finish

DAD - DECAYEUX

Fire-rated smart parcel lockers (MySmartBox) and mailboxes (FR120MBH) in Bronze finish installed in a high end lobby in Oxford Street (London).
Sponsored
Royal Liver Building

Royal Liver Building

INTRAsystems

Overlooking the River Mersey, the iconic Royal Liver Building is the most prominent structure in Liverpool’s famous skyline. Classic on the outside yet modern, light and chic on the inside, the recent programme of investment aimed to reposition the building offering, with a new reception area, large open plan grade A office suites, gym and café. A first-class offering is key to attracting and retaining tenants – and Intraform Low Profile entrance barrier matting protects the flooring to maintain the interior aesthetic and create the right first impression. Read the full case study to learn more...
Sponsored
Fire Rated Floor Access Covers - Hong Kong International Airport.

Fire Rated Floor Access Covers - Hong Kong International Airport.

Surespan

Project:Surespan were approached to develop and supply a series of 4 hour fire rated flush floor access covers for the Midfield Concourse expansion project at Hong Kong International Airport. The HK$10 Billion dollar project was completed in 2015 following extensive design and planning processes utilising BIM modelling. Product:Our SAC covers were specified for their fire rating and ease of customisation. The covers were specially adapted with a 200mm upstand and enhanced fire-rated materials to achieve the 4-hour rating. Sizes Supplied 1050 (41”) x 1050 (41”) 1050 (41”) x 850 (33”) 750 (29”) x 600 (23”)
Sponsored
Case study - Walraven Pacifyre Fire Sleeve on The Shard

Case study - Walraven Pacifyre Fire Sleeve on The Shard

Walraven Ltd

Walraven's Pacifyre MKII fire sleeve was specified throughout the risers in The Shard due to its ability to allow pipe movement and still remain effective.
Sponsored
Protecting Christian Dior’s Flagship London Store

Protecting Christian Dior’s Flagship London Store

Newton Waterproofing Systems

Internally and externally waterproofing the below-ground developments of the extended Christian Dior store on New Bond Street, with Newton 403 HydroBond, Newton 107F and Newton System 500.New Bond Street has been one of the most prestigious retail streets in London since it’s 18th Century beginnings, and in 2011 was named as the second most expensive retail street in Europe after the Champs-Élysées in Paris. The Christian Dior name has also been synonymous with haute couture and luxury retail since its own inception in 1947.This project required both the internal and external waterproofing of the extended basement area of Christian Dior’s flagship London store. A significant extension of the existing floor space on this stretch of famous London road, the extensive basement area will be used as stock rooms, changing rooms, and staff and shop floor areas. It was therefore a crucial requirement to achieve a completely dry internal space.The property line construction between two existing buildings meant that there was a requirement for waterproofing both new and existing structural elements, including pile caps, underpinning, a new reinforced concrete slab, existing foundations, and also existing vaulted areas at the front of the building which extend below New Bond Street.Because a completely dry internal environment was required, (defined as Grade 3 by the BS 8102:2009 Code of Practice for The Protection of Below Ground Structures From Water From The Ground) the proposal put forward by design specialists G05, in consultation with Newton, was a combination of Type A and Type C waterproofing systems. Due to the fact that the build was between the flank walls of two existing structures, the Type A system comprised of a combination of the hydrophilic, fully-bonded Newton 403 Hydrobond membrane pre-applied below the new concrete slab, and was linked to the cementitious, flexible Newton 107F membrane, which was applied to the internal faces of the walls and the prepared internal areas of the vaults.Following the application of the Type A system, a Newton System 500 Cavity Drain membrane system (Type C) was applied to the internal wall and floor areas by Newton Specialist Basement Contractor Advanced Preservations Ltd, who also guaranteed the work. The system included perimeter drainage using Newton Basedrain, and two Newton Titan-Pro pumping systems. The under-pavement vaults were lined internally with the Newton 500 system.Not only was continuity achieved with the waterproofing systems across numerous below-ground building mediums and scenarios, but the waterproofing system also conformed to the recommendations of BS 8102:2009 for combined waterproofing protection, where even the slightest form of water ingress is unacceptable.The internal areas were also successful in achieving an environmental Grade 3 with regard to their degree of water tightness, meaning that they will be suitably fit for purpose and use by both Christian Dior’s staff and customers.
Sponsored
Bramall Music Building

Bramall Music Building

Allgood Ltd

When designing a new music department for BirminghamUniversity, Glenn Howells Architects faced the challengeof creating a new construction to fit in with the surroundinggrade II listed buildings, whilst meeting contemporarystandards of accommodation and acoustics.The Bramall Music Building provides a home for thedepartment of music, with a 450-seat auditorium,a domed rehearsal room, various studios, offices andteaching rooms. Working in conjunction with the architect,Allgood created an ironmongery specification that wasclosely aligned to the design concept of the building;classically designed whilst meeting contemporaryperformance standards. The choice of FSB bronze doorfurniture throughout the public areas compliments theaesthetic of the interior but also links the building to themore traditional materials associated with the design of theexisting buildings.The architect wanted to extend the bronze aestheticthrough to the mechanical hardware which provided achallenge as options are limited for fire rated mechanicalhardware in a bronze finish. Allgood were able to applythe unique, simulated Bronze finish to satin stainless steelhardware, continuing the bronze finish throughout thebuilding. Not only did this complete the visual aesthetic butit meant that the hardware would meet all of the fire andbuilding regulations.In addition, Allgood provided electromagnetic holdopen units, signage and door furniture to allow the maincirculation doors through to the auditorium to be held openin pockets. This created a clean, architectural detail thatprovides clear opening widths for visitors to enter through.
Sponsored
The Octagon, Birmingham

The Octagon, Birmingham

OBEX Protection Ltd

Location: BirminghamMain Contractor: Midgard LtdThe Octagon is a 155m tall residential skyscraper in Birmingham. The 49-storey tower will be the first residential octagonal high-rise building in the world and will deliver 370 quality homes in the heart of Birmingham.Each apartment will enjoy a generous 13-metre facet of the Octagon and a much larger than average outlook, bringing ample daylight into the ‘radial’ arrangement of the internal spaces.Quality Apartments : 370Storeys: 49
Sponsored
Derbyshire | Longhouse SIP Self Build Passive House

Derbyshire | Longhouse SIP Self Build Passive House

SIP Build UK

Derbyshire Longhouse | SIP Self Build Passive House | As Featured on Grand DesignsDerbyshire, traditional, windy with undulating hilly countryside scattered with farms and buildings that have a familiar similarity about them. A shape that is long and follows the lines of the hills, a Longhouse a venerable type of building which dates back thousands of years. They were designed to protect the human inhabitants but also the livestock from the elements all living under one roof.Being city dwellers whilst their family grew up Mike and Sarah bought an 18 ½ acre small holding in the Derbyshire dales to live a very different life. Sarah has become a fulltime shepherdess Mike a busy director, a massive change of lifestyle. The plan is to move both sets of parents into a new house.Planning history for the site showed 26 previous residential planning applications for the farm – all of which had been refused.Jillian the architect told them that the only real route for them to get planning permission was to through a special section of the planning regulations called ‘paragraph 79’ – it had to be a house of exceptional architectural quality that could only be built in the landscape surrounding it so it becomes part of the landscape. After 2 years of application approval was granted.21st century interpretation of a Derbyshire long house – a series of interconnected spaces arranged in a line. A way the family could come together so it was multigenerational living.2 existing barns were knocked down. Foundations laid and 45tonnes of steel formed the frame of the building. The entire structure was then clad in SIPs. Walls clad in corrugated steel and standing seem roof all encased with triple glazed aluminium windows and doors.500m2 of living space. Spacious open planned living quarters, kitchen sitting room and a majestic double height dining room all with breath taking views of the dales. Downstairs contained a living accommodation for Mikes parents, upstairs housed bedrooms for Mike and Sarah and the girls, at the back of the house independent living accommodation for Sarah’s mum. 3 generations of family. However in this modern longhouse the animals will be living outside!The issues faced by the site were numerous, building to near Passive House standards, a roof that mirrored many roof planes and the need to transport all of the building down a track no wider than 3.5m wide and a steel frame that looked like something from Battlestar Gallactica!At every stage through numerous design team meetings and many telephone calls emails and every other form of correspondence this project wound its way like the undulating hills it was to be built in to a conclusion.SBUK had 8 weeks to deliver and install the SIP cladding to the building which was within the 8 – 10 week build program allowed. Our costs were delivered within the parameters of the final estimate for the project despite the time lapse in between.The overall project suffered from delay due to late delivery of the standing seam roof. Delays due to the pandemic and the struggle for materials added a couple of months to the overall program and the budget increased by 7%. Inflation during this period has been running in excess of 10%!!In all reality our package stayed the same despite timber costs rising by over 50% and SIP panels rising by 32% in the same period. We have been able to achieve this for the client by better optimisation of the SIP panel cutting which reduced what should have been enormous wastage due to the triangular shape of the panels.Optimisation ultimately was nearer to normal due to hard work and diligent panel landing by our design team.From the very beginning of the project the clients have looked to build an energy efficient fabric first building that will last the test of time.The ultimate use of the house was to house 3 generations of family. The consistent search for improvements in the materials and airtightness of the building whilst striving to achieve a passive house has led to a building that has incredibly low cost for heating.Recently whilst the snow was laying on the ground the inside temperature was 22c despite no heating being used.SIP panels are inherently airtight, add to that a VCL that has wrapped the building throw in the mechanical heat recovery and the building outperforms virtually anything that is currently being built.It was very important to the client to outperform standard SIP panel thicknesses so they opted for our largest panel thickness at the time. This will keep paying back for years to come whilst keeping all 3 generations warm.
Sponsored
Protecting the groundbreaking O2 tidal energy turbine

Protecting the groundbreaking O2 tidal energy turbine

Hempel A/S

A significant milestone for not just the tidal sector, but for the development of renewable energy technology, Scottish engineering company Orbital Marine Power, Ltd. (Orbital) will soon launch the Orbital O2 – the world’s most powerful tidal turbine – in the waters off the Orkney Islands.We have been involved in the project since Orbital’s prototype SR2000 turbine was built in 2015, proving their technology and leading the way for the further optimised O2. As well as high-performance anti-corrosion coatings to protect the steel structure, we supplied Hempaguard X7 for the turbine rotor blades.
Sponsored
Flameshield Fire Curtain with EW120 enhanced radiation control

Flameshield Fire Curtain with EW120 enhanced radiation control

A1 Shutters Ltd

The ideal fire curtain when radiation tenability is of concern.
Sponsored
9-11 Richmond Buildings

9-11 Richmond Buildings

Sika Limited

Owing to its congested built environment, almost any construction project in London requires working within tight physical constraints at the best of times, but the logistical restrictions at 9-11 Richmond Buildings in Soho, London, were exceptionally challenging.Situated immediately adjacent to The Soho Hotel in a district of Westminster, the tightly bounded site required the replacement of an existing building, the deepening of a basement and the creation of a new seven-storey, composite-framed building.
Sponsored
PhotonCheck-A1 VCL Protects Katara Lusail Hotel Qatar

PhotonCheck-A1 VCL Protects Katara Lusail Hotel Qatar

Thermic Technology Ltd

PhotonCheck-A1 VCL Protects Katara Lusail Hotel Qatar
Sponsored
Smart fire prevention system installed in Rochdale town centre apartments

Smart fire prevention system installed in Rochdale town centre apartments

Firechief Global

The Riverside development in Rochdale includes two nine storey apartment blocks comprising a mix of 240 one- and two-bedroom properties for private rent. The Rochdale town centre Riverside regeneration project also includes a 147-bedroom hotel and 43,000 square feet of office space. The Fire regulations which apply to high-rise living accommodation meant that the kitchens in the apartments would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the Firechief Kitchen Stove Guard was chosen as an alternative, unobtrusive design-led fire prevention solution. 

Showing 253-288 of 1917

Feedback