NBS Source
I'm a manufacturer

"fire hose reel systems"

8,313 results found

Sort by:

Showing 181-216 of 1761

Sponsored
Flame-Free Roofing System Supplied Due to Sensitive Contents

Flame-Free Roofing System Supplied Due to Sensitive Contents

Iko Ireland

No timber was allowed as part of the new refurb to conform to FM Global (Airbus Insurers) regarding system fire rating. IKO recommended an overlay on the existing deck, which complied with all the latest British Standards and Regulations. IKO Mach One System was chosen as it provided a flame-free System. Where detailing was difficult IKO Polimar EC/UV System was used. The roof refurbishment also included the installation of smoke vents, associated smoke control panels and accessories.
Sponsored
The Vale Apartments - London

The Vale Apartments - London

Licata Building Systems Ltd

With several stops marked out on the future Crossrail route, new-builds on the rise, and an impressive range of ‘Outstanding’ schools, this culturally diverse borough of Ealing is becoming more popular than ever. To meet this popularity new-build property is on the rise however there is strict guidance on design of new buildings. Licata Building Systems in partnership with Build-Therm Services Limited were commissioned to specify and supply the façade systems for The Vale apartments. A prestigious block on Connell Crescent, The Vale was subject to planning guidance that insisted the block remained in-keeping with the more traditional neighboring blocks. The system installed is Licata FireSafe Brick slips. Using a 7mm extruded brick slip the system is one of the lighest systems available on the market. Coupled with class A2 fire performance and a U-value of 0.039W/mK, the apartments not only met all NHBC and local planning design criteria but provides the occupant a safe and energy efficient environment.
Sponsored
Marioff HI-FOG watermist system protects one of the greenest public buildings in the UK

Marioff HI-FOG watermist system protects one of the greenest public buildings in the UK

Marioff Ltd

Marioff provided an efficient and environmentally sustainable fire protection solution.The unique structural requirements and responsibility of protecting more than 2,000 staff members, plus the public, called for a reliable and trustworthy partner in fire protection.The Brent Civic Centre, a council and community space in London, chose Marioff HI-FOG® water mist fire suppression to safeguard their sustainable building. The Centre serves as the headquarters of Brent Council, a London Borough local authority. It is situated in the Wembley Park area of Brent and opened in 2013 and was designed to be the greenest public building in the UK.The Centre needed an efficient and environmentally sustainable fire protection solution for the one-of-a-kind nine-story building. The structure features a five-story atrium, which doubles as an events venue, and a drum-shaped area that hosts a wide range of government functions, community events, and services.Brent Civic Centre chose Marioff HI-FOG as a sustainable solution. The fire suppression system put in place, validated by real fire tests, discharges fine water mist particles to efficiently cool radiant heat. This is accomplished while using significantly less water than a traditional sprinkler system — in keeping with the Centre’s sustainability focus. HI-FOG provides peace of mind to administration while safeguarding lives and ensuring continuity for the critical city hub.
Sponsored
Bolton Gate Thermafold Doors protect the Fire Station at Hong Kong Disneyland

Bolton Gate Thermafold Doors protect the Fire Station at Hong Kong Disneyland

Bolton Gate Company

When the Hong Kong Disneyland Resort was planned, the project included a 7-bay fire / ambulance station which featured a garden style theme to enable the buildings to harmonise with the green surrounding and the nearby Theme Park. Bolton Gate were specified to provide fourteen electric folding doors which included a special green powder coating, Lexan vision panels and faux louvres to each door. In addition, the doors had to be designed to resist typhoon loadings of up to 3Kpa, were manufactured in Bolton and shipped to Hong Kong where they were installed by the local agent Deacon.
Sponsored
FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property

FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property

FIREFLY™ TBA

Scotland’s biggest building services contractor has just completed upgrading the fire compartmentation within an existing West Lothian warehouse building which is being converted to serve as high bay storage facility to support the organisation’s existing distribution facility elsewhere in West Lothian and is, for the first time, making use of products from the range of TBA FIREFLY™, including APOLLO Lite™ 30:30 to create new fire barriers together with TBA’s expert advice and installer training.
Sponsored
Flowcrete UK Extinguishes Floor Failures at Edinburgh Airport’s Fire Station

Flowcrete UK Extinguishes Floor Failures at Edinburgh Airport’s Fire Station

Flowcrete – a brand of Tremco CPG UK Ltd

The fire station and training centre at Edinburgh Airport worked with Flowcrete UK to identify and install a floor finish that would be able to cope with the difficult on-site conditions. A new floor was required as the previous quarry tile surface was incorrectly laid to a fall, this caused water to run in the wrong direction - ending up at the back of the building as well as ponding between the bays.
Sponsored
FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre

FIREFLY System Upgrades Roofspaces At Ashfield Wellbeing Centre

FIREFLY™ TBA

A programme of works carried out at a Nottinghamshire hospital has seen a number of products from the FIREFLY range employed to upgrade the passive fire protection throughout the roof spaces, with the manufacturer providing site specific design details to assist the highly experienced contractor complete the project on time. DC Fire Protection Ltd., based at Wellingborough in Northamptonshire, works right across the country covering multiple sectors of the construction industry, installing active as well as passive fire protection systems.  For its 10 week contract at the Ashfield Health and Wellbeing Centre at Kirby in Ashfield, the specialist installed dozens of rolls of the Titan Lite™ fire barrier as well as the Apollo Horizontal barrier, Collaroll and two of the 1200 x 600mm FR120 Access Panels to link some of the safety zones being created. Built in 2007, Ashfield Health and Wellbeing Centre is conjoined to the existing Ashfield Community Hospital and offers extended health services to the local community, supplementing the current services by providing purpose-built rehabilitation facilities, physiotherapy, occupational therapy and other community health services.  It also offers consulting rooms, treatment rooms and an activities of daily living suite, rehabilitation and gym areas.A Director of DC Fire Protection, Daniel Mabbott, commented: “We have been dealing with FIREFLY for a number of years, including buying large quantities of the Titan Lite™ and Apollo Lite , which we use for commercial contracts as well as other work.  We often propose the use of FIREFLY systems to clients and in this instance, where we were simply given the performance standard the client required, we proposed the use of Titan Lite plus Apollo Horizontal to upgrade the exiting fire walls which no longer comply with current requirements.” “There were a number of plastic PVC-U soil stacks rising through the roof in what was specified as a Controlled Zone, for which FIREFLY provided us with a bespoke detail to protect them where they passed through the barriers, while we installed a couple of their FR120 Access Panels in addition to the fire doors which we fitted in a number of locations throughout the roof.  The project was completed on time and we have now moved onto another contract where we are again using a number of FIREFLY products.”Third party approved, FIREFY Apollo Horizontal 30:30 provides 30 minutes integrity and insulation to exceed the minimum requirements within the Building Regulations relating to fire barriers.  In common with other FIREFY products, Apollo Horizontal is manufactured using specially treated woven glass fibre fabric, being flexible and lightweight making it easy to install. Specifiers and specialist fire contractors wishing to find more information about the full range of products available from FIREFLY can visit www.tbafirefly.comImages shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
Aluminium decking fire-safe replacement for flammable composite balcony decking

Aluminium decking fire-safe replacement for flammable composite balcony decking

AliDeck

Recent installation to a low-rise block of flats in High Wycombe. With flammable composite decking on the balconies, the building owner was keen to find a non-combustible alternative and our aluminium decking system was just the ticket!
Sponsored
Automotive - Nissan

Automotive - Nissan

Hart Door Systems Ltd

An innovative door design was required for a new manufacturing process about to be introduced in the new Nissan battery plant manufacturing facility. Project/doors:100 Bespoke Conveyor screensThe challengeNissan required a unique door for a new production facility. The doors needed to give 60-minute fire resistance and be capable of completing up to 400,000 open/close cycles a year. Further, the doors needed to meet strict air leakage criteria and be able to withstand sudden air-pressure increases. The doors also had to interface with third-party equipment such as conveyor belt controls and fire alarms. Each required an LCD display control panel that provided a quick and easy diagnosis of what each door was doing at any point in time. The solution Using an already proven design solution which Hart developed for the baggage handling system in Heathrow’s Terminal 5, Hart adapted the product to suit this new requirement. As this was not a product already on offer, invention and rigorous testing were required.The successA decade has passed since the doors were installed and commissioned. The facility continues the manufacture of the battery cells and the doors remain a critical part of the success of the plant and have proved exceptional reliability and total cost of ownership
Sponsored
ENTRANCE DOORS, GATES, BIN STORES, LOUVRED DOORS AND DRY-RISERS

ENTRANCE DOORS, GATES, BIN STORES, LOUVRED DOORS AND DRY-RISERS

Premier Security & Fire Consultants Ltd

Premier Security & Fire Consultants Ltd designed, fabricated and installed these security products for instructing clients, the Wates Group.The project in Tower Hamlets, East London included LPS1175 SR2 Secured by Design security installations including: Fully glazed entrance doors with side screen and control panel; bin store doors, vehicle and pedestrian gates, louvred doors and dry-riser box doors.For more information about Premier, go to our website premier-ssl.com or call us on 0208 559 8295. 
Sponsored
Limehouse Basin,

Limehouse Basin,

K Systems Insulated Facades

Located in East London, on a water gateway between the River Thames and over 2,000 miles of navigable canals, the six-building Limehouse Basin development comprised of a white EPS insulation board that was fixed to horizontal PVC rails that created a drained cavity between the insulated façade system and the substrate.Due to strict regulations introduced in December 2018 following the Grenfell tragedy, which states any building exceeding 18 metres in height must have walls comprised of non-combustible materials, this building was deemed non-compliant, unsafe, and not fit-for-purpose.Development owners Beckford, supported by the Building Safety Fund (BSF), required an expert team to execute the removal of the existing EWI and replace it with an appropriate alternative, without disrupting the unique aesthetic of the building.The combination of K Systems and Retrofit UK, two companies renowned for their expertise, quality of service, and superiority in the market, was an obvious choice for Beckfords.We have a good portfolio of BSF projects to date, and Limehouse Basin is another great example of how our team along with one of our approved installers can help make a building fit for purpose, whilst overcoming numerous challenges along the way. Unrivalled expertise and professional delivery are apparent in every groove and corner of this refurbishment.Our ServiceTogether with Approved Installer Retrofit UK, K Systems continued works despite Covid restrictions (adhering to Government guidelines) to deliver the Limehouse Basin project within the agreed timeframe and with minimal disruption to residents as requested by the client.Removal of the existing EWI system took place in rotation with the installation of the new system, and a robust programme was put into place by the contractor to ensure the building was not exposed to the elements for long periods of time, ensuring the residents were kept as comfortable as possible especially during the winter months. Decanting of the residents did not take place, so we worked alongside all parties to ensure the health, safety and welfare of the residents were prioritised during the works.Due to the nature of this project, technical monitoring from the K Systems team was increased, and weekly visits were planned along with a reactive approach to any on-site issues that arose from a technical perspective. Our technical teams actioned regular quality assessments and maintained open communication with all stakeholders.The result – an industry-leading insulated façade solution that fulfilled Beckfords’ criteria and delivered an outstanding architectural design and structure, fully compliant with fire regulations and boasting a better U-value which translates to better living conditions for the residents.Technical Project DetailsThe key objective for the Limehouse Basin project was to remove the non-compliant EWI system and replace it with a non-combustible system to meet current building regulations.Our team insist on being involved from the very concept of any BSF project to ensure an accurate specification could be developed and allow any initial underlying issues to be identified and rectified swiftly. Therefore, our Technical Team witnessed the removal of the existing system and inspected the substrate thoroughly.After extensive scoping, the K Systems M, mineral wool insulation, system with a silicone render finish was chosen as the preferred option, meeting the demands and needs of the client and current building regulations. This system provides high levels of fire resistance and non-combustibility (an A2-s1, d0) bringing it in line with mandatory Government requirements for buildings over 18m tall.With superb acoustic qualities and excellent environmental properties, the M System didn’t just tick the fire resistance box. The thermal performance of the building was significantly enhanced, with a U-value of 0.30W/m².k being achieved.The shape of the buildings were complex, with numerous curved areas of various facades. This meant the finish required an expert eye and a skilled hand to deliver seamlessly. Both K Systems and Retrofit are renowned for their expertise and superiority in the market, and therefore such challenges were overcome, and high standards of workmanship delivered.Another very challenging aspect of the build was the replication of the rainscreen cladding to the front of the buildings. This detail was successfully created by using tape joints, stop beads, and black silicone mastic to create a shadow gap – further testament to the expert capabilities of our team. This particular finish not only delivered the desired aesthetic but delivered an additional benefit of cost savings for the client.We worked closely with Retrofit UK throughout the duration of the refurb and as a result the Limehouse Basin buildings have a contemporary finish and attractive aesthetic worthy of the projects postcode, and one we are confident existing residents welcomed and potential residents appreciated.
Sponsored
Walkways Community Centre, Belfast

Walkways Community Centre, Belfast

K Systems Insulated Facades

BackgroundBelfast City Council designed Walkways Community Centre with the local community in mind, providing them with places to both work and play. In this £1.37m project, the original portable modular building was demolished and replaced with a new 575 square metre build. The two storeys include a creche and soft play area, a 250sqm sports hall and a series of multipurpose rooms for meetings and courses aimed at the local people. Main contractor, McKelvey Construction led the project and worked alongside Michael Whitley Architects to design and deliver the most appropriate solution for Belfast City Council and the local community. K Systems provided on-site technical support and installation guidance throughout the build which resulted in delivery of a modern, aesthetically pleasing facility that achieved the target U-value of 0.18W/m ² K. Our ServiceHaving originally specified rainscreen cladding, K Systems technical team worked with the architect to design a bespoke engineered system with the drained cavity to suit the metsec frame. Regular site visits from our team ensured support was available throughout the build. The Centre is located on a busy street with limited surrounding space, so we had to manage a very congested, condensed site with deliveries planned and arranged by appointment only. We worked closely with McKelvey Construction to manage such challenges and ensure that local access for residents was uninterrupted, as well as ensuring the overall safety of the site area. From design advice through to installation, we offered a partnership approach which ensured a smooth installation process with minimal disruption, and the delivery of a fantastic community centre for the local area to enjoy. Technical Project Details Originally rainscreen cladding was specified for the Walkways project. However during the construction process, due to spiralling material costs and budget restraints, this was deemed too expensive so alternative solutions had to be sourced. It was decided an external insulation system would be used and a ventilated cavity system was required, as this provides a secondary defence in commercial buildings like Walkways. The K Systems Exicco E drained cavity façade system was specified as it ticked all the boxes. Exicco provides excellent protection and can offer an excellent fire rating of up to A2-s1,d0, providing high levels of fire resistance and non-combustibility. The drained cavity behind the insulation in the Exicco system will ensure that any interstitial moisture will escape without detriment to the performance of the system. As EWI was not originally specified for the project, no metsec frame had been designed. This is a crucial element for the Exicco system, which meant a bespoke metsec frame had to be designed specifically to suit our system. The Exicco E system for Walkways used Expanded Polystyrene (EPS) insulation boards that were mechanically fixed and attached to 12mm BBA Approved sheathing boards to create a 25mm drained cavity. EPS boards are extremely light-weight and the system offers a great fire rating of B-s1,d0. It is a high performing, economical system that generates high levels of thermal performance and ensured the target U-value of 0.18W/m ² K. was achieved. For the finish, Silkolitt+ silicone renders ensured a clean, crisp contemporary finish that offers protection to the exterior of the community centre. The flexibility of this finish provides resistance against cracking and increases the durability, ensuring a long-lasting finish for Walkways. 
Sponsored
Home Gas Fire Conversion

Home Gas Fire Conversion

Kompozit'All UK

application area: domestic heatinguse type: gas fireplace project scope: restore fireplaces, rebuild chimney, line chimney ductadded value: 25-year guarantee on liner, quick and clean install, non-destructiveBackgroundThe camera survey revealed cracks in the chimney flue of a large victorian house in Muswell Hill. To protect against carbon monoxide leaks, the chimneys had to be lined before the gas fireplaces could be fitted. A flexible and uninflated FuranFlex tube was placed inside the chimney duct. Each FuranFlex liner is produced to fit the dimensions of the duct. Hot steam is used to inflate and harden the liner, fixing it in position.Statement of workThe installation took one day per chimney. The jointless and air-tight liner provides good draught and a clean and safe operation for the fireplaces. When FuranFlex liners are inflated they take up the shape of the chimney, providing maximum lined diameter and natural draught.
Sponsored
Vertical Aluminium Eaves System with Curved Verge at Tregolls Lodge, Truro

Vertical Aluminium Eaves System with Curved Verge at Tregolls Lodge, Truro

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Truro, CornwallProject Type: Retirement HousingDevelopment Cost: £16mProduct: Vertical Eaves System with Curved VergeMonocoque Support System100mm Round Contemporary Rainwater PipesMeridian Wall CopingsFinish: Syntha Pulvin RAL 7015 Matt Slate GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Churchill Retirement LivingArchitects: Planning Issues LtdMain Contractor: Churchill Retirement LivingSub Contractor: Roweaver Developments Ltd
Sponsored
Compact loft ladder for fire escape – Case Study from Premier Loft Ladders

Compact loft ladder for fire escape – Case Study from Premier Loft Ladders

Premier Loft Ladders Ltd

Building contractor Eversley Building Services Ltd required a roof access ladder for emergency use in the event of a fire. However, the application constraints presented many challenges, in particular the small skylight aperture. As such, a particularly compact loft ladder was needed. Furthermore, because the loft ladder would be used during an emergency, it had to be easy-to-operate and safe for its occupants. Read more about this challenging project and how the Piccolo Premium provided the ideal solution...
Sponsored
Aluminium Eaves System with Secret Fix Soffit Panels at The Gade, Hemel Hempstead

Aluminium Eaves System with Secret Fix Soffit Panels at The Gade, Hemel Hempstead

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Hemel Hempstead, HertsProject Type: Local Authority OfficesDevelopment Cost: £11.2mProduct: Aluminium Eaves SystemSecret Fix Soffit PanelsMonocoque Support System & Curtain-Wall Surround​Finish: Syntha Pulvin RAL 2001 MattFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Dacorum Borough CouncilArchitect: Aukett SwankeMain Contractor: R.G.Carter LtdSub Contractor: Drayton Windows Ltd
Sponsored
Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide,  High Movement, Structural  Movement Joints

Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide, High Movement, Structural Movement Joints

NCC – Emseal Movement Joints

Client: Bristol City Council Consultants: Chapman Taylor Architects & Arup Design Main Contractor: Bouygues UK Specialist Contractor: Optimum Dry Wall Systems Main Products Used: Emshield DFR-2 SystemOn the site of the former ambulance station adjacent to Castle Park, the largest urban green space in Bristol, this development is designed to provide 375 new homes, with a mixture of build-to-rent and affordable housing units. This comprises a new 26-storey tower, which will be the tallest building in Bristol, together with a 10-storey block, plus a third central building connecting the two, and providing a business centre and leisure facilities for the residents, as well as direct access to the park. The architects designed wide structural expansion joints to accommodate the anticipated levels of movement between the different building structures, as well as in and between the main reinforced concrete floor slabs and the structural frame of the building. They also wanted to reduce any noise transmission through the joints and to ensure that the designated levels of fire protection were maintained, which meant that the joints had to be treated to provide 2-hours fire resistance. To meet all these demands, the answer was a single solution using Emshield DFR-2 (horizontal floor joints) / WFR-2 (for vertical wall joints) systems. These produce a watertight joint, that can accommodate high movement up to 100% (+/- 50%), greatly reduce sound transmission (STC 62; OITC 52), and which are CE Marked to EN-1366-4 for up to 4 hrs fire resistance. 
Sponsored
Feltfon Linear Sound Absorption System

Feltfon Linear Sound Absorption System

LSA Projects Ltd

The sound effectAt the same time, it provides effective sound dampening with an impressive acoustic class of ‘A’ to create a harmonious environment wherever it is specified. Feltfon Linear’s appearance is akin to wool, it has a strong textural appeal and represents a further exploration of material innovation.Based on a linear design and so in keeping with Gustafs well-known design language, this iteration of Feltfon can be specified with strips of wood in between the felt ribs, creating an appealing nature-inspired surface solution.Although this solution can be customised for each project, it is a uniquely designed ready-to-use system. Unlike most felt installations, Feltfon Linear uses the standard Capax Quick-Up installation system for walls and ceilings. Fully demountableThis system is sturdy for use in high traffic environments, it has the benefit of being able to grip multiple rib widths and it is also fully demountable during or at the end of its useful life. The range has a thickness of 9mm: comparable products do not usually have such generous proportions. This means it is suitable for high-traffic commercial application, for example, in school environments and other public spaces. Gustafs Acoustex material has a fire rating of B-s1,d0, in line with Gustafs continuing commitment to the fire safety of its products.Sustainable and flexible choiceFlexible in its design, the Feltfon Linear ribs can be chosen from a mix of three wool shades of grey, with many widths and depths to choose from as well. It is a sustainable choice too, with this next generation textile composed from a minimum of 50% post-consumer recycled material.Feltfon Linear pushes the boundaries of what is expected of a felt product system creating an attractive practical solution with infinite possibilities.Feltfon LinearFeltfon Wall installationFeltfon Ceiling installation
Sponsored
Cartcraigs, Glasgow

Cartcraigs, Glasgow

K Systems Insulated Facades

The Cartcraigs high-rise project located in the heart of Southside Glasgow was a rewarding project to be involved with allowing real transformation and change in several key areas.The tower block was originally built in the 1960’s with a grey cladding finish but due to decades of inclement Scottish weather, the building was weather-beaten, tired and dated. With its stature and prominent location, the building should have been an attractive living option in Southside Glasgow but instead was unappealing to potential residents, and in desperate need of modernisation.Rising fuel prices and the current poor thermal performance of the tower block, meant it was extremely difficult and expensive for tenants to heat their flats – so much so that many occupants were considered in a state of fuel poverty.In collaboration with MAST Architects and our approved installer PWM, we designed a façade solution that not only significantly improved the thermal performance of the building, but transformed Cartcraigs aesthetically creating a modern, fit-for-purpose living space.A complete revamp which has given the building a new lease of life and delivered safe, modern and energy efficient homes for the residents.Our ServiceDue to the scale of this project, the congested location and small site footprint, we had to work closely with our approved installer, main contractor, and local authority to ensure minimum disruption to both the residents of Cartcraigs and residents of the surrounding area.Delivery routes and schedules were agreed to ensure consideration for local residents throughout the project.As part of our service commitment, our Site Application Specialists carried out regular site visits to ensure our system was installed to the highest standard and in line with our specification.They were available throughout the duration of the project to provide technical guidance, installation support and ensure the highest levels of quality. This allowed the K Systems Technical & Logistics Teams to support the schedule of the project with timely delivery of materials to site and ensuring there were no delays during the installation and inspection processes.“In conjunction with the Architects we approached K Systems to design a system to comply with fire regulations and offer a solution to make the look of the building more aesthetically pleasing along with making it a point of interest within the Southside area. Great site support was provided by Ally along with Technical/Service support from Jim and Martin. The team at PWM look forward to working on our next project with K Systems.”Kevin Fox, PWM Projects ManagerTechnical Project DetailsThe original façade incorporated a 25mm cavity with reinforced concrete inner leaf shaped panels, which could be seen beneath the then grey façade panelling. Wheatley Group, the client, had requested a clean, crisp, and smooth finish that would also comply with Scottish Fire Regulations.After numerous design meetings taking into consideration client requirements, budgets, and timeframes, we put forward our industry-proven K Systems M Silicone EWI system. The system was designed using 160mm non-combustible mineral wool insulation to meet the 0.18 (W/m2K) U-value requirement, making it the perfect choice for the refurbishment to combat the heating issues faced by residents and futureproof the building as a viable living space for years to come.Bespoke technical detailing and rigorous adherence to our high-rise policy ensured a high performing system with an A2 non-combustible fire rating, complying with all safety regulations for buildings over 11m in Scotland. The 160mm insulated grey and white façade delivered a really attractive high-rise that will now better withstand the Scottish elements.The finish used was our high-performance thin coat render, Silicone TC15. The contemporary colours of grey and white were chosen from our wide range of colours which visually transformed the 17-storey building. Our polymer rich Silicone TC15 allows ease of application, and its hydrophobic properties will provide a clean, crisp and low-maintenance finish for years to come.Our specification included bespoke detailing to provide solutions for Cartcraig’s individual retrofit design challenges. We also commissioned wind load calculations and fixing pull-out tests to determine optimum fixing patterns to anchor the EWI system to the different substrates. Ultimately, a safe, thermally efficient and visually appealing result was achieved.“K Systems provided a great overall package from the inception of this project with design advice, through the technical stages, with assistance through specification and then with the provision of weekly reports and checks once the project got on site. Cartcraigs, being a high-rise block needed monitoring and adherence to the project specification, and having the K Systems team providing regular on site checks gave the design team the assurance that all requirements were being met.”David Locke, Mast Architects
Sponsored
Private Clinic, Harrow

Private Clinic, Harrow

Advanced Timber Systems

As part of our involvement in this project we supplied a bespoke reception desk and a variety of fire-rated door-sets.
Sponsored
Complete Aluminium Eaves System at BMW Dealership, Cheltenham

Complete Aluminium Eaves System at BMW Dealership, Cheltenham

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Cheltenham, GloucestershireProject Type: Automotive & RetailDevelopment Cost: £10mProduct: Complete Aluminium Eaves System2000m² Secret Fix Soffit PanelsOriel window surroundsFinish: Syntha Pulvin RAL 9016 Matt Traffic WhiteRAL 9005 Matt Jet BlackFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Cotswold BMWArchitect: MDG ArchitectsMain Contractor: Revival Developers LtdSub Contractor: Cladceil Ltd
Sponsored
Basement Pumping System, Kent

Basement Pumping System, Kent

Newton Waterproofing Systems

Newton System 500 fulfils all Listed Building requirements in this Georgian Manor House. Newton Pumping Systems installed to manage waste water, including two Newton Titan pumps and battery backup systems.
Sponsored
PREMIER SUPPLIES PREMIER INN HOTELS WITH LPS1175 SR2 DOORS

PREMIER SUPPLIES PREMIER INN HOTELS WITH LPS1175 SR2 DOORS

Premier Security & Fire Consultants Ltd

It was a partnership that was meant to happen. Premier Inn Hotels meets Premier Security & Fire Ltd.It was our absolute pleasure to assist commissioning company Mulalley by manufacturing and installing the external glass and steel communal entrance doors, industrial louvres and security gates (all to LPS 1175 SR2 standard) at the impressive Ladderswood Estate regeneration project in New Southgate, North London, a development that includes a new 85-bedroom Premier Inn hotel.New Ladderswood LLP is a joint venture between top UK developer Mulalley and housing association ONE HOUSING GROUP LIMITED, working in collaboration with the London Borough of Enfield.This major regeneration development features:93 social housing properties56 shared ownership apartments368 privately owned properties517 properties in total (426 apartments and 81 houses)There will also be:6 commercial unitsAn 85 bedroom hotelA new community centerFor more details, call us on 0208 559 8295.
Sponsored
G Park Northampton - Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton

G Park Northampton - Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton

Promat UK

Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton - providing a tailored 240-minutes fire resistance solution for Unit 4, a132,000 sq. ft speculative warehouse/distribution unit.  Situated within the popular Moulton Park industrial estate just north of the town and within 10 miles of J15 of the M1, G-Park has exceptional transport links, access to national markets, a locally skilled workforce and is home to a wide range of regional and national companies.   At short notice, the latest and final unit within the park required a solution that provided 4-hour fire resistance for the steel frame construction. Sub-contractor FAA Installation Ltd traditionally uses intumescent paints in its projects, but as this method was unable to meet the 4-hour fire protection required for the steelwork structure it was decided that boarding would be a more suitable alternative.  Promat VERMICULUX®-S and TD Boards® were specified for the project by Encon, a leading Promat distributor, as they knew that these were two of a limited number of products on the market that could meet the project’s requirements.   Promat worked closely with Encon and FAA on the final specification to provide a solution that could not only achieve the 240-minute requirement, but could also overcome the design complexities of the project, including fixing to both the structural steel and cladding rails, which most traditional boards were unable to accommodate. The completed installation demonstrates how VERMICULUX®-S and TD Boards® can interface together to create robust fire protection for warehouse and industrial applications. 
Sponsored
Lampwick Quay, Manchester

Lampwick Quay, Manchester

Senior Architectural Systems Ltd

Developer Manchester Life is transforming the residential market in the city of Manchester and Senior Architectural Systems is proud to have partnered with them to create a number of apartment schemes including Cotton Field Wharf, Weavers Quay and New Little Mill. Lampwick Quay is the fourth and most recent project to have been undertaken by Senior as part of this successful repeat business relationship.Located in Manchester’s thriving new community in Ancoats, the new Lampwick Quay development comprises 213 apartments across three blocks of five, six and ten-storeys, with ground floor retail units and communal facilities including a gym and residents club room. A mix of Senior’s aluminium windows, commercial doors and curtain wall solutions have been used extensively throughout the development and installed by supply chain partner Aire Valley Architectural Aluminium for main contractor John Sisk & Son Ltd.To help reduce heat loss and energy costs, Senior’s low U value and Part L compliant PURe® aluminium casement windows have been installed to each of the apartments to create a comfortable living space. The stylish window system also provides the perfect frame for the development’s views of Manchester’s New Islington Marina.Energy-efficiency has also been addressed in the communal, retail and ground floor areas through the use of Senior’s thermally-enhanced SF52 aluminium curtain wall system which maximises the controlled use of use of natural light.To meet the scheme’s stringent safety and security requirements, Senior’s robust SPW501 aluminium commercial doors were installed to the main entrance and exit points. The SPW501 commercial door system is ideally suited to high pedestrian use and meets the requirements of Secured By Design. Key elements of the fenestration package have also been designed to work as part of the scheme’s overall passive fire protection strategy, with the use of Senior’s SPW600 automatic opening ventilation (AOV) aluminium windows in the communal areas and stairwells. Although visually similar to Senior’s popular SPW600 system, these AOV windows are fitted with a smart actuator which allows for quick and automatic ventilation in the event of a fire, helping to remove smoke from the air.The development’s low pitch sawtooth roof design pays homage the area’s industrial heritage, with the slim aluminium frames of the fenestration package further complementing the main façade of zinc cladding, brick and coloured panels. Initially designed by CallisonRTKL, the Lampwick Quay development was delivered by jmarchitects.
Sponsored
Devonshire Mansions, Eastbourne

Devonshire Mansions, Eastbourne

K Systems Insulated Facades

BackgroundFor the perfect example of architectural excellence which not only delivered an impressive aesthetic, significant environmental benefits, and a more robust structural foundation, but also improved thermal performance, look no further than the eight-storey, three-building Building Safety Fund (BSF) project Devonshire Mansions.Situated in beautiful Eastbourne on the south-east coast of England, Devonshire Mansions were an extremely attractive choice for those wanting stunning sea views and some peace and privacy. However, due to their location in a high exposure area, the buildings were aged and weather-beaten, and required a full overhaul and refurbishment to modernise, align with current safety regulations for high rise buildings, and strengthen the buildings at their core whilst rejuvenating the exterior.Understanding and appreciating K System’s renowned ability for outstanding refurbishment projects, Pavehall contracted K Systems to completely refurbish this residential development and deliver on the following four primary objectives:- Remediate unsafe cladding- Improve the thermal performance rating of each home- Update and seamlessly replicate existing façade features- Deliver a solution with acoustic benefitsOur ServiceIn collaboration with Archiflair Design, Pavehall, and Fullers Plastering, K Systems delivered an industry-leading, insulated façade solution that fulfilled the desired criteria, achieved a U-value of 0.26 W/m²K and resulted in an outstanding architectural structure.The commitment of K Systems team, their continuous communication, in-depth level of reporting, and consistent presence on site not only ensured a perfect refurbishment, but also instilled 100% confidence in the supply chain throughout, showing exemplary levels of customer service.This project is a great example of how K Systems overcame various construction challenges to deliver within the agreed time constraints.The make-up of the façade had multiple protrusions in forms of balconies meaning that every sheathing and insulation board had to be cut to fit. Replicating this without compromising on the strict site deadlines was a challenge but under the great install team and K Systems’ expertise and onsite presence, this was achieved.Additionally, Devonshire Mansions had a problematic substrate and challenging aesthetic deliverables. Working closely with all partners, and utilising digital technology, K Systems mapped out the refurbishment and specified the ideal solution to Pavehall for implementation.Technical Project DetailsAfter a comprehensive scoping process, K Systems discovered that the existing system had a drained cavity build up and when removed, the sheathing boards were compromised by water. With the buildings being high rise, steel frame and multi-occupancy, the industry-proven K Systems Exicco Cavity Drainage EWI System was specified.In the Exicco system, the drained cavity behind the insulation ensures that any interstitial moisture escapes without detriment to the performance of the system. Due to their seafront location, Devonshire Mansions were prone to fierce rain and water exposure, so this system was the ideal choice to ensure any future moisture or condensation build up was allowed out to avoid compromising the substrate or newly installed façade.Once the strip out of the existing façade had occurred, further challenges were discovered – the substrate was far from line and level. This meant that every rail within the newly installed EWI system had to be packed out using steel shims to create a level vertical façade, subsequently adjusting the specified fixing lengths to suit.Some elements of the substrate were high strength concrete incorporating a flint aggregate which proved problematic for standard mechanical fixings. Via K Systems’ on site support, a suitable, more bespoke fixing was specified which ensured proper anchoring of rails and intumescent fire barriers. A swift solution was achieved with no detriment to the construction programme.The newly installed Exicco system was combined with the K Systems M (Mineral Wool) system. This high performing system provides optimal levels of fire resistance and noncombustibility and its installation at Devonshire Mansions meant that the fire classification of the buildings was upgraded to A2-s1,d0 meaning that the development is now compliant with the latest building regulations for all high-rise dwellings in England, further ensuring the safety of residents.Devonshire Mansions is visually impressive with its feature balconies, architectural cornices, ashlar panelling and quoin detailing. It was a specific requirement of the client to remediate the unsafe cladding without losing these exterior design features.K Systems created two specifications; one for the elevations and one for the balconies and provided bespoke detailing to allow them to seamlessly harmonise as one façade. Ashlar panelling and quoin detailing was replicated cost-effectively using varying thicknesses of non-combustible mineral wool insulation which was over-rendered skilfully by the contractor using K Systems Silicone Thincoat render.The more intricate cornice features were all bespoke manufactured using compliant non-combustible materials and integrated into the design with K Systems providing robust detailing to create a water-tight barrier and eliminating cold bridging. Decorative columns were installed at ground level to complete the façade.The eye-catching, waterfront dwellings were finished with Silkolitt+ - a versatile, easy to apply, water repellent, durable, and low maintenance thin coat render, perfectly paired and formulated for use with our Exicco systemOverall, K Systems specified a fit-for purpose, non-combustible façade with a high level of complex architectural detailing using cost effective solutions. The installation process was overseen by our unrivalled site support team who were frequently on hand to solve any issues as they arose.“Working alongside K Systems on a project of the size and nature of Devonshire Mansions was a true pleasure. From initial scope and specification to intricate detailing and innovative finishes, the K Systems team lead by example and made the process and delivery a slick and seamless operation. The refurbishment was a complex case but working together in partnership, we all delivered on excellence, and the beautiful Devonshire development is something we can all proudly put our names to.”James Fuller, Fullers Plastering
Sponsored
Full Systems Go At Tolson's Mill

Full Systems Go At Tolson's Mill

Knauf UK

Tolson's Mill, Tamworth is a new £16 million development consisting of 51 canal side apartments and 10 town houses. Set within a five-storey textile factory, each apartment and house is set to retain the industrial character of the grade 2 listed Mill building. Leading the project development was Brookland Group with subcontractors V&D Interiors fitting out each of the living spaces. In designing the building, Crosby Granger Architects placed safety and comfort as the main priorities for product specification.Given the listed nature of the building, ensuring the materials used met and exceeded safety needs was critical. Likewise, ensuring acoustic performance would be key given the luxurious nature of the apartments and town houses.    For Calvin Challis, Commercial Manager at V&D Interiors, using Knauf products was the sensible thing to do. “The goals of the architect were to ensure a quality, soundproof interior which meant that the product specification met and exceeded this expectation. That’s where Knauf came in. Not only were they always there to help and ready to listen if we had any questions, but their product were also the right choice to achieve the goals specified by the architect.” Attaining this level of performance would be achieved using Knauf performance systems products including metal partitions, which not only offer speed advantages on site, but enhance fire protection as well.Meeting the acoustic needs of the brief, standard 12.5mm and 15mm Knauf Soundshield Plus were used on the walls and ceilings. Soundshield Plus provided enhanced acoustic performance and excellent fire resistance. Importantly, Soundshield Plus can give up to 54Db acoustic sound reduction when used as part of a Knauf system. Getting the perfect finish throughout was achieving by using a mixture of Knauf finishing products. This included jointing tape, intumescent and acoustic mastic for their fire and acoustic performance attributes, and Knauf Fill and Finish. The result was a high-quality finish on partition walls with necessary performance built in.Ensuring consistency throughout the interior, Knauf Ceilings were specified for their acoustic performance and peace of mind both ceiling and wall systems would complement each other. “From a specification point of view, it was critical we knew that all products used would achieve the performance required. This was the main point for the architects but for us on site, having all the product come from a single supplier made it easier to source the right materials and know they’d install and work together easily” Calvin recalls. While efficiencies were gained on site by using Knauf systems, one of the biggest advantages this approach offered was the peace of mind through warranties. Calvin explained why this was so important: “The Knauf System Performance Warranty meant everyone knew the products would perform as intended for the lifetime of the system, with guarantees in place in the unlikely event of something going wrong.” “Having that security in place was vital for all involved, it meant we could get the support we need for installation and the main contractors and client would be protected going forwards. Especially on a listed building project, you need to have that peace of mind in place.”For added reassurance, Calvin recalls how Knauf would provide onsite support in the form of inspections “Knauf were brilliant, if we needed any help or assistance, they were more than happy to help. They came to the site a few times, to inspect the installation and provide some guidance if we were unsure of something. This was particularly helpful when it came to checking the acoustic ratings. They were able to check the acoustic ratings and ensure that they met the requirements, and that the client was satisfied.” The apartments that form part of the luxury residential development at Tolson's Mills and Tamworth were completed in November of 2022, with the houses scheduled to be finished in June 2023.
Sponsored
Bolton Gate's Contour Shutters provide fire and security at Newcastle International Airport Duty-Free Area

Bolton Gate's Contour Shutters provide fire and security at Newcastle International Airport Duty-Free Area

Bolton Gate Company

When the Duty-Free Retail Area of the airport was recently refurbished, the design incorporated large sweeping curves on plan which also incorporated the shopfronts. The demise line of the shopfronts also entailed that they needed the facility to be closed off outside trading hours from a security point of view in addition to each unit being an individual fire compartment. Bolton Gate’s Contour shutters were specified which operate laterally and coil into a box at one end - this innovative product can describe an infinite number of bends and curves whilst closing off openings up to 100 metres wide.
Sponsored
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

NCC – Emseal Movement Joints

Client: Canary Wharf Group Consultant: Adamson Associates Architects Main Contractor: Kilnbridge Construction Ltd Main Products Used: Emseal DFR-2 SystemsWood Wharf Development is certified as a BREEAM Outstanding rated, sustainable mixed-use development that covers a 23-acre site. It consists of 6 individually designed building structures that provide 2 million square feet of curated workspaces and offices, more than 3,500 new residential homes and 500,000 square feet of retail space. The site is being developed as a new 5G and Wi-Fi-6 enabled, London District to include more than 9 acres of interconnected riverside leisure space with boardwalks, squares, and parks to create an oasis of urban green space. The new multistory building structures were designed with 50mm wide structural expansion joints between floor slabs to accommodate the high levels of thermal movement anticipated, as well as the vibrations from traffic and other loadings. These joints also had to minimise any noise transmission through the floors and provide a minimum of 2-hours fire resistance, which is a key reason the consultants selected the Emshield DFR-2 System as it could easily meet all these stringent requirements. In fact the innovative Emshield DFR-2 System can accommodate more than 100% joint movement capability and is CE Marked to EN-1366-4 for up to 4 hrs fire resistance. This unique Emseal solution also has the advantages of not requiring any potentially damaging mechanical fixings into the structure, as it is easily bonded into the joint, with access only required from above. 
Sponsored
Princes Plain Clinic & Willows Clinic - Shelter

Princes Plain Clinic & Willows Clinic - Shelter

Able Canopies Ltd

The Architect from Ashley Hose Plc. contacted us because they were working on a project for two medical clinics in Bromley, Kent and as part of the project they were looking to add a buggy shelter to each of the clinics to provide a safe and sheltered place for parents and carers to leave their prams and buggies whilst visiting the surgeries.
Sponsored
Movawall Systems Ltd - Showroom

Movawall Systems Ltd - Showroom

Movawall Systems Ltd

Take a look at the various systems on display at our showroom based in Clerkenwell, London - including a range of both solid and glass partitions.
Sponsored
Newton System 500 Controls River Thames

Newton System 500 Controls River Thames

Newton Waterproofing Systems

Newton System 500 provides a complete waterproofing solution for a boathouse situated on the River Thames, installed by Newton Specialist Basement Contractor Stonehouse. Newton Waterproofing Systems were contacted to provide a solution for a delightful boat house on the River Thames.The property originally had a wet dock but this had been back filled and capped with a concrete floor. The client wished to use the ground floor as a bedroom, but during a recent flood the water level had reached 500mm internally.Newton System 500 provided the ideal solution, as it works by redirecting the water, rather than trying to hold water back – which would be impossible under such pressurised conditions. Newton 508 Mesh was chosen for the walls, Newton 520 to the floor with a Newton Basedrain ring around the perimeter. Two Newton Titan Pro pump systems were used, which included a battery back up system.Newton System 500 was installed to this property by Newton Specialist Basement Contractor Stonehouse BasementsRather than holding water pressure back, therefore, it was accepted that the river would penetrate the structure and would be pumped out. The system is designed so that ingressing water is depressurised by the Basedrain and then moved around the Basedrain ring to the two Titan sump chambers. The chambers each had 40mm discharge lines exiting the structure. Both pump systems had non-return valves so if the river rose over the level of the pipe the pumps would still be effective.The full waterproofing system was installed in a little over a week. The major test came when the River Thames rose against the property to a depth of over one metre! The Newton System 500 waterproofing system coped with the water ingress as designed. At the height of the flooding, all three pumps in each sump chamber were operational. The system proved to be fully successful.
Sponsored
Complete Eaves System at St Sidwell's Leisure Centre

Complete Eaves System at St Sidwell's Leisure Centre

Dales Fabrications Ltd - Aluminium Eaves Products

Project type: Leisure Centre Location: Sidwell’s Leisure Centre, Paris Street, Exeter, EX1 2JX Project Cost: £44m Product: Complete Eaves System Including: Fascia Soffit (Facetted and Tapered), Hidden Aluminium Gutter Finish: United Anodisers Anodised Aluminium: Anolok Bronze 541 Fire Rating: A1 – Non-combustible Support method: Dales Monocoque Support System Architect: Space & Place Architects  Architect: Gale & Snowden Architects Contractor: Kier Western Ltd Sub Contractor: Massey Cladding Solutions Ltd
Sponsored
Sto Insulation System Specified For New Hospital Building

Sto Insulation System Specified For New Hospital Building

Sto Ltd

Sto has supplied the StoTherm Mineral K external wall insulation system with StoLotusan render for the new Day Case and Eye Unit building at Chorley and South Ribble Hospital. Specified by Gilling Dod architects of Chorley, who worked closely with the main contractor Tilbury Douglas, the StoTherm Mineral K system combines impressive insulation with excellent fire protection characteristics. With an A2-s1, d0 reaction to fire classification in accordance with BS EN 13501-1, the non-combustible mineral fibre insulation is fully bonded to the substrate and therefore no additional firebreaks are required. Ideal for both new-build and refurbishment projects, its efficient single-leaf construction also means that interior space within the building is not reduced.  For this project, the system’s mineral fibre insulation boards were secured to the lightweight steel frame and sheathing board substrate with mechanical fixings and StoLevell Uni adhesive and levelling mortar. A StoLevell Duo Plus reinforcing coat embedded with Sto-Glass Fibre Mesh was then applied to the face of the insulation boards, with StoLotusan and StoSilco renders used for the final finish on different sections of the building, using light colours from Sto’s architectural colour range.  StoLotusan is the only render available that uses Sto’s patented Lotus-Effect® technology which delivers impressive water and dirt repellence. It forms a unique surface texture, similar to that of the lotus leaf, that causes the rainwater to run off the render quickly and easily, removing any dirt or dust as it goes. Providing outstanding resistance to the growth of algae and fungus, the building will retain its looks for many years to come.  The new Day Case and Eye Unit is the result of a major £17.5 million investment in developing enhanced ophthalmology and day case services. The new Day Case and Eye Unit now offers an extensive range of diagnostic and treatment facilities for patients with medical eye conditions.
Sponsored
DIVAN RESTAURANT AND BAR WRAPPED IN A2 FIRE RATED TIMBER CLADDING

DIVAN RESTAURANT AND BAR WRAPPED IN A2 FIRE RATED TIMBER CLADDING

Technowood UK

A place to meet and great, socialise and eat. An expanding brand of modern eateries are enjoying the versatility of Technowood’s ability to adjust with this changing restaurant environment.An existing client since 2009 has enjoyed the qualities of TechnoWood cladding; for many of the chain restaurant facilities that it has in its portfolio.The client did say “a friend of mine laughed the other day when he said – you should have used Technowood instead of that solid wood.” He said this to the MD of Technowood… they then both laughed.The goal of the designer in charge of the group has created a serene social destination for local visitors. Our design motto being ‘’Design a Vision, Make an Impression, Create an Experience’’The Café element features 2 floors with the usable space spread over 827 square metres; the terrace flows from inside to out thus creating this multi-use space for all weathers.Vertical pilasters in varying forms, all designed and fabricated off site by technood to facilitate a rapid installation where labour is reduced. Cladding in the main is a simple click to install system. The click system is a rapid installation for a cladding facard; the backing track is fixed to the substrate and the cladding simply clicking over the backing track in literally seconds.The colour has lasted well since it’s installation in 2013; the client has had the cladding re-varnished and the project looks like new and ready for the next 10 years or so.Further informationFor further information please get in touch 01494 773344 office@technowood.uk You’re more than welcome to visit our showroom at The Sky House Design Centre  We are open Monday – Friday and Saturday’s by appointment. If you’re an Architect or Designer we would be delighted to visit your office and present our CPD and provide a full set of samples.
Sponsored
Balcony Waterproofing and Fireproofing, London

Balcony Waterproofing and Fireproofing, London

Newton Waterproofing Systems

As part of the Wandsworth regeneration programme to increase the number of affordable homes, Wates Residential were awarded the contract to build a new, six-storey block of apartments on the Shuttleworth Road.The structure included 59 concrete balconies, all requiring waterproofing with a product with a minimum fire rating of A2-s1-d0, tested to BS EN 13501-1.Not only were Newton able to recommend a product that had already been used on a similar project this year, they were also able to recommend the expert services of Newton Specialist Contractor Arti Structural Waterproofing.The minimum fire rating of A2-s1-d0 now precludes the polyurethane and polyurea products that were commonly used on balconies, so Newton recommended the cementitious and modified-polymer Newton 103-S membrane. As well as carrying the required fire rating, 103-S can resist extremely high positive and negative water pressure, forming a hard, durable coating with a degree of elasticity that makes it ideal for protecting concrete.Arti also used Newton 203-RM to create smoothing fillets, and Newton 912-RT to reinforce the 103-S over the joints, details and changes in direction.On site, Arti also needed to work flexibly, as the programme could not proceed without the waterproofing and fireproofing of the balcony upstands. However, due to the propping of the concrete formwork to the floors above, Arti had to execute their installation in two phases of efficient and detailed waterproofing.Thanks to a meticulous eye for detail, as well as careful planning and thorough preparation of the concrete balconies, Arti were able to complete the waterproofing of all 59 balconies in two stages. This was managed as well as delivering the required A2-s1-d0 fire rating, and the installation was completed quickly without compromising the programme of the build.

Showing 181-216 of 1761

Feedback