NBS Source
I'm a manufacturer

"fire doors"

4,819 results found

Sort by:

Showing 217-252 of 501

Sponsored
PRESTIGE ALL PARTS - AUTOMATIC SLIDING DOOR

PRESTIGE ALL PARTS - AUTOMATIC SLIDING DOOR

Next Doors Ltd

Our client Prestige All Parts, a car dealership, aimed to establish a new showroom and office space. They sought an innovative solution that would not only set their showroom apart but also ensure functionality and appeal to visiting customers.To address our clients needs, we proposed a comprehensive redesign of the shopfront. The focal point of our solution was the integration of expansive windows to maximise the influx of natural light into the showroom. This strategic approach aimed to create an inviting ambiance while showcasing the displayed vehicles in their best light. In addition to that, the implementation of a sliding automatic door system for the main entrance allowed for enhanced accessibility and also offered a seamless and user friendly experience for customers entering.Beyond its practical benefits, such as ease of access for visitors, this feature symbolised the dealership’s commitment to modernity and innovation. By implementing these proposed solutions, our client not only transformed their physical space but also redefined their brand identity.
Sponsored
Full Steam ahead for Crittall in Birmingham

Full Steam ahead for Crittall in Birmingham

Crittall Windows Ltd

A new education facility for Birmingham City University – STEAMhouse 2 - marries the restored frontage of a former Victorian industrial building with a brand new addition designed to promote interdisciplinary courses that bring together artists, scientists and engineers with input from industry.  The locally-listed red brick and terracotta façade of the 1899 Belmont cycle works was preserved after a disastrous fire gutted the building in 2007. That now fronts a new brick building the rear elevation of which boasts Corporate W20 windows in black plus two fire-rated Crittall windows and two fire-rated Crittall doors installed in a fire escape. Beyond this is a new four and five-storey building comprising workshops and teaching spaces. The new and reconstructed buildings are linked by an open central space, beneath a transparent roof, to encourage interaction between students and trainees attending the new STEM (Science, Technology, Engineering and Mathematics) – based university courses on offer.  The Crittall profiles are sensitive to the industrial heritage of the original building while complementing the 21st century ethos underpinning the STEAMhouse’s ambitions. 
Sponsored
AOV for Smoke and Fire Safety

AOV for Smoke and Fire Safety

Surespan

Product:Surespan 140° thermally broken aluminium smoke ventilator and roof hatch designed to EN12101-2. ]The AOV also offers push-button comfort ventilation in one package! This one-stop solution for smoke vent requirements to meet building control can achieve 1m² airflow and is available in standard stocked sizes or made to any size in between 900 x 900 and 1260 x 1260. Wind deflectors to improve airflow. RE 1,000 Ventilation 10,000 Vent Offset mechanism for Roof Access Snow Load SL500 Wind Load WL1500 Temperature Class T (-15°) Fire Resistance B300
Sponsored
The Auditorium at the Fire Station - Sunderland

The Auditorium at the Fire Station - Sunderland

Vox Ignis Limited

The £11 million Auditorium at the Fire Station is a new live music and events venue in the heart of Sunderland city centre, developed by the Music, Arts and Culture (MAC) Trust, that required an Emergency Voice Communication System (EVCS). Officially opened by His Royal Highness Prince William and Catherine, Princess of Wales in 2018, the project forms a key component in the masterplan for the city’s Music and Cultural Quarter, built around the refurbished Dun Cow pub and the recently renovated adjacent Engine Room at the Fire Station.Products used - Lexicomm Network disabled refuge system, including integrated emergency assistance alarm.
Sponsored
Scottish Policy on Unwanted Fire Alarm Signals

Scottish Policy on Unwanted Fire Alarm Signals

Safety Technology International Ltd

The Scottish Fire and Rescue Service (SFRS) have announced their new policy on Unwanted Fire Alarm Signals (UFAS) that came into effect at the start of this month.The policy affects all calls to the fire control operators who will confirm a fire before the incident requires the fire service to be dispatched.Scotland have a continuously high rate of false alarms attended by the Scottish Fire and Rescue Service, with over 57,000 unnecessary journeys a year. This is why the new policy adopts a ‘call challenge’ policy to reduce the number of false fire alarms attended by the service.False fire alarms cause disruption in various ways, from impacting the time and resources of fire and rescue services, implicating people’s safety and harmfully impacting the environment. False alarms are also costly procedures, not only for the Fire Service but also businesses where the false alarm takes place.These UFAS have many detrimental effects:They impact on resources available to attend real fires.They impact on time available for other valuable work, such as training and community safety activities. Where fire crews comprise on-call (retained) fire fighters, the crews may be unnecessarily taken away from their place of work.They impact on road safety, as a result of fire appliances travelling under emergency conditions.They impact on the environment from the number of appliance journeys. The new guidance on safe investigation of unwanted fire alarm signals aims to challenge calls to confirm fire or signs of fire in order to ensure resources and time are being used effectively. However, the SFRS will continue to attend calls received from automatic fire alarm systems and if the signal has been initiated by a manual call point (MCP), heat or smoke detector or sprinkler system, in premises in which people sleep. There will also be fire service attendance in non-sleeping risks if there is physical signs or technological indication of a real fire, such as the fire alarm signal triggered by a manual call point.Although the policy will significantly reduce the number of false alarms attended by fire crews, there is still more to be done to decrease the vast number of unnecessary call outs.Protective covers from STI help to reduce both malicious and accidental activations of manual call points, available in various sizes, mounting options and custom text available to suit all applications. The tough polycarbonate covers have been specifically designed to help deter false alarms and prevent vandalism of various devices. The range of Call Point Protectors are highly effective without restricting legitimate operation of the devices, meaning they are easily accessed in emergency situations.For more information on the new policy, visit the FIA website here: https://www.fia.uk.com/news/guidance-on-safe-investigation-of-fire-alarm-signals-in-scotland.html?utm_source=Fire%20Industry%20Association&utm_medium=email&utm_campaign=14001136_June%202023%20MMU
Sponsored
Sydney Light Rail Depot

Sydney Light Rail Depot

Jewers Doors Ltd

Jewers Doors’ Australian reseller, Max Door Solutions (MDS) have recently completed the installation of six sets of Swift-SEW bi-folding doors, for the new Lilyfield maintenance depot for Sydney Light Rail.
Sponsored
DRU Metro designer gas fires are centrepiece of luxury north London town houses

DRU Metro designer gas fires are centrepiece of luxury north London town houses

DRU Fires

O1A Architects oversaw the conversion of a former Gordon Ramsay restaurant in Islington into two luxury town houses with roof gardens and many unique features. O1A chose DRU Metro 100XT/2 corner gas fires for the main living areas in the properties. They utilise the balanced flue system to be flexibly located anywhere in the building without the need for a chimney. False chimneybreasts have been created in each property to house the impressive log-effect fireplaces. They also accommodate the flat screen TVs making perfect focal points and conceal the concentric flues, which exit the building through the roof.
Sponsored
Queen Elizabeth Olympic Park

Queen Elizabeth Olympic Park

ASSA ABLOY Opening Solutions UK & Ireland

ASSA ABLOY Security Doors supplied steel doorsets to Queen Elizabeth Olympic Park. To meet the performance criteria set out by Poulous, the architect re designing the Olympic Stadium for the London Legacy Development Corporation. The requirements were to supply steel doorsets that meet the fire and security standards and stand the test of time for this prestigious project... Click on the link below to read more.
Sponsored
New Product  - Fire Rated Overbox

New Product - Fire Rated Overbox

Trade Access Panels

Due to a high demand from our valued customers, we are proud to announce the latest product to our range - electric meter cover. Our Fire Rated Overboxes are a retrofit solution for keeping your gas and electrical meters safe from fire and tamper. These are ideally suited for refurbishment and newbuild products for multi-occupancy properties such as apartment blocks.
Sponsored
Queens Gate

Queens Gate

SELO

An existing Mews dating back to the 1860’s in close proximity to the Victoria and Albert Museum. The highly sensitive nature of this site required NLA to work closely throughout the planning and construction phases with LBKC to make sure the ambitious yet sympathetic design, bespoke to the client’s requirements was realised. In addition to a full refurbishment, complete with new basement, reworked layout and contemporary interior design, a double height atrium was introduced at the heart of the dwelling allowing natural daylight to permeate throughout each individual level whilst providing a secluded garden sanctuary away from the bustling streets of London.For this refurbishment, our Una was used which are the solution for timber leaf risers. Una utilises a timber door leaf with a concealed metal frame. Made to suit custom sizes, provided as a flat-packed kit prepared for all ironmongery. The wood door leaf comes with hinge cut-outs and can be primed for on-site finishing or pre-finished in our factory. Choose from non-fire rated or fire rated to E30 or E60.
Sponsored
11-12 Wellington Place

11-12 Wellington Place

Planet

Planet’s northern contracting team joined Wates and architects tp bennett to work on the Cat A fit out of 11 & 12 Wellington Place, manufacturing and installing 40 pairs of double leaf FireTec Ei60 fire rated doors with bronze handles across over 250,000 sq ft of grade A office space on Levels 1 to 10. These doors were installed to be ‘future proofed’ to facilitate any future automation requirements once sub-let to tenants.Manufactured using an ultra-slim precision engineered framework, the durability of the FireTec system suits high foot traffic areas while providing fire route protection and acoustic performance up to 39dB Rw.The multi-award-winning 11 & 12 Wellington Place achieved a BREEAM ‘Outstanding’ sustainability rating and is the first UK building outside of London to attain a NABERS Design for Performance rating of 5* or above.Wates handed over the completed shell and core works to clients MEPC in early 2023, with the building already securing several high-profile companies as tenants.
Sponsored
Adelphi Wharf Case Study

Adelphi Wharf Case Study

PFC Corofil Fire Stop Products

To meet the fire stopping requirements for a major new residential development in Salford, PFC Corofil has provided a proven range of fire-stopping insulation systems.
Sponsored
Port of Tyne

Port of Tyne

Hart Door Systems Ltd

The Port of Tyne is one of UK’s most efficient deep-sea ports, handling a diverse range of cargoes from cars to containers and bulk goods to renewable energy across five continents. They offer a unique end-to-end solution ensuring goods move safely, securely and efficientlyThe project4 Speedor Storms designed, manufactured and installed to mobile hoppersThe challenge:A key part of the port’s ship unloading procedure required fast and reliable doors to compliment their logistics process. Materials such as wood pellets are unloaded into hoppers which simultaneously load directly into lorries that drive into the hoppers. The process generates dust which must be controlled as a residential area is close by. These hoppers are in highly exposed areas and require a product that withstands strong winds.The Solution:The mobile hopper systems originally came with rigid doors that blew out as they were rated Class 3 and were not fit for purpose. We resolved the issue by installing robust Speedor Storms, the Speedor variant with exceptional wind resistance up to Class 5 (over 90 mph). Their automatic action and robust design ensured that the doors worked during all weather conditions ensuring the efficiency of the port is maintained.The success:The original project was to install 2 doors to the hopper systems. Due to the reliability of the first 2 doors, a further 2 Speedor Storms were installed a few years later. 
Sponsored
Bramall Music Building

Bramall Music Building

Allgood Ltd

When designing a new music department for BirminghamUniversity, Glenn Howells Architects faced the challengeof creating a new construction to fit in with the surroundinggrade II listed buildings, whilst meeting contemporarystandards of accommodation and acoustics.The Bramall Music Building provides a home for thedepartment of music, with a 450-seat auditorium,a domed rehearsal room, various studios, offices andteaching rooms. Working in conjunction with the architect,Allgood created an ironmongery specification that wasclosely aligned to the design concept of the building;classically designed whilst meeting contemporaryperformance standards. The choice of FSB bronze doorfurniture throughout the public areas compliments theaesthetic of the interior but also links the building to themore traditional materials associated with the design of theexisting buildings.The architect wanted to extend the bronze aestheticthrough to the mechanical hardware which provided achallenge as options are limited for fire rated mechanicalhardware in a bronze finish. Allgood were able to applythe unique, simulated Bronze finish to satin stainless steelhardware, continuing the bronze finish throughout thebuilding. Not only did this complete the visual aesthetic butit meant that the hardware would meet all of the fire andbuilding regulations.In addition, Allgood provided electromagnetic holdopen units, signage and door furniture to allow the maincirculation doors through to the auditorium to be held openin pockets. This created a clean, architectural detail thatprovides clear opening widths for visitors to enter through.
Sponsored
Kingston University, STEM Building

Kingston University, STEM Building

Allgood Ltd

Allgood doorsets are helping to provide exceptional fire safetyat the new state of the art science, technology, engineeringand maths (STEM) facilities at Kingston University, London.The University, which has roots going back more than 100years and has approximately 19,500 enrolled students, beganconstruction of new science and technology facilities in thesummer of 2016.Replacing the former teaching rooms on the second andthird floors of the main building, the new chemistry andpharmaceutics laboratories are providing students at theUniversity with a modern environment, packed with the lateststate-of-the-art equipment.As with any science laboratory, the consideration of safety wasof paramount importance when it came to specifying elementssuch as the doors, due to the use of flammable, toxic anddangerous chemicals.Additionally, because of the amount of traffic through theSTEM department and thus the doors’ regularity of use, theuniversity felt that reliability and durability were integral when itcame to the ironmongery.As such, Allgood supplied 15 doorsets with traditional exposedlippings. The exposed lippings provide extra protection tothe door faces and ensure they can be easily repaired andreplaced if necessary. Along with the doorsets, Alite levers,latches, surface maglocks and hinges were installed, providingthe laboratories with fire protection for up to 30 minutes.The Alite ironmongery range developed specifically for usein busy commercial environments was ideal for the KingstonUniversity STEM environment – providing a robust and hardwearing ironmongery solution.
Sponsored
Fire Escape Hatches - Under Ground Metro, Portugal

Fire Escape Hatches - Under Ground Metro, Portugal

Surespan

Project:Surespan manufactured and supplied a series of fire escape hatches at Portugal’s €950 million underground Metro in Porto. The huge double-leaf hatches automatically open if the fire alarm system is activated to allow passengers safe exit to ground level. In addition, they can be manually opened with the touch of a button. This project was undertaken after Surespan successfully carried out similar work at Athens Metro.
Sponsored
Fortis Quay Case Study

Fortis Quay Case Study

PFC Corofil Fire Stop Products

PFC Corofil’s proven range of fire-stopping insulation systems form part of the façade system and will maintain fire compartmentation at a stylish new high-rise residential development in Manchester.
Sponsored
Tate Britan

Tate Britan

Allgood Ltd

Situated on Millbank in London, Tate Britain is a tourist hotspotdedicated to the finest British art dating back to the 16th century.The site originally housed the Millbank prison which was the maindeparture point for criminals being sent to Australia. Following thedemolition of the prison, the National Gallery of British Art (Tate Britainas of 2000) was opened in 1897 by Sir Henry Tate, making it the firstof the four Tate galleries.The building has gone through numerous renovations since it’s 19thcentury opening. In 1987, the Clore gallery was opened and wenton to win a Royal Institute of Architects award the following year.More recently in 2006, Caruso St. John architects began a long termdevelopment and renovation project which aimed to create ninenew galleries. The redevelopment featured a number of differentrenovations spanning seven years, whereby Allgood were chosento supply an Ironmongery and an access control solution in the newgalleries.Working on such a prestigious project, it was evident that aestheticswere of paramount importance. The architect desired a unique finishon items, so Allgood worked closely to produce a shot peened finishon some of the stainless steel furniture. To create a clean aestheticon doors which required push plates and signage, Allgood createdan all in one solution by shot peening stainless steel plates, blankingoff areas to create contrasting areasfor signage to be screen printedwithin.Many doors within the gallery space were of traditional archeddesign which caused a challenge on fire doors with self-closingrequirements. Allgood’s solution to this issue was to specify floorsprings combined with projection hinges to provide a specificationthat would self-close in conjunction with the door geometry.Furthermore, to minimise the aesthetic impact of the floor springs,bespoke tile trays with access holes were created to conceal thefloor springs whilst providing easy access for floor spring adjustment.This provided an aesthetically pleasing solution for a very technicalapplication.Having previously worked with the museum on their Mantonshop, Allgoodwere well prepared for this project and the existingrelationship enabled a smooth operation that was completed on timeand within budget.
Sponsored
Accoya selected for beautiful cottage doors

Accoya selected for beautiful cottage doors

Accoya

Designed and Manufactured by Simplicity Timber Solutions this curved folding sliding door system was crafted for an opening of 9 linear meters. This was designed to enable a 10 door leaf system to be effortlessly opened, plus it folds and slides in the same direction. To seamlessly bring the room together, Accoya was also used for the 16 sided hex decagon lantern light ceiling feature. Dimensional stability is key for large joinery installations such as this.
Sponsored
Grand Lisboa Palace

Grand Lisboa Palace

Lorient

Grand Lisboa Palace is a $5 billion development in Macau,China, with 1,900 guest rooms and suites in the GrandLisboa Palace Hotel, Palazzo Versace Macau, and KarlLagerfeld Hotel. Lorient supplied a combination of AURA® AAS8501 dropseals, Batwing®, FirtreeTM and LAS7001 perimeter seals,LAS3006 door bottom seals, LAS6002 magnetic seals andRP2004 fire seals.
Sponsored
River Street Tower

River Street Tower

The Safety Letterbox Company

THE LOCATIONThis brand-new student accommodation development is situated in the River Street neighbourhood of Manchester. The striking appearance of the development is down to the architectural design and materials used including the Cor-Ten steel alloy cladding which pairs perfectly with the dark blue painted panels.THE PROJECTThe development comprises 792 student bed spaces including a mix of studios and apartments and offers affordable, stylish, and accessible accommodation in the heart of Manchester whilst being a safe environment for students to learn, grow and live.THE PRODUCTSafety Letterbox discussed the design, layout and fire specifications of the project. After a few options were presented the client chose our FR2 mailbox. The FR2 mailbox is horizontal in front/ out front 2-hour fire-rated (integrity only) mailbox.Our 2-hour fire-rated mailbox range is commonly used within an evacuation route as they are capable of holding backfire or containing a fire for at least 2 hours, satisfying building and fire regulations.The mailboxes we’re powder coated in special colour – MATT Pearl Gold (RAL 1036) giving the mailboxes a stunning high-end aesthetic finish whilst being practical and completely secure. Multiple keys were also supplied, and doors were engraved for easy identification
Sponsored
ALL TYPE ROOFING - AUTOMATIC SLIDING DOOR

ALL TYPE ROOFING - AUTOMATIC SLIDING DOOR

Next Doors Ltd

Due to the bustling activity of our client’s builders merchant business, we recognised the need to enhance the accessibility and user-friendliness of their commercial unit. The existing setup featured a pedestrian entrance alongside a roller shutter entrance designated for goods in bay, which posed challenges in accommodating the high traffic flow and meeting customer expectations.To address these concerns, we proposed a comprehensive solution that would transform the customer entrance into a wider, more inviting space. A framed shop front system was strategically installed just inside the loading bay entrance, creating a seamless transition between the outdoor and indoor spaces. To ensure continuity and functionality, a short canopy roof was added, along with a heavy duty brush seal to bridge the gap to the roller shutter entrance.The focal point of our solution was the integration of a heavy duty commercial grade silent automatic bi-parting sliding door system. This innovative addition not only enhanced user-friendliness for customers but also facilitated rapid opening and closing, crucial for a busy builders merchant environment. By combining functionality, convenience, and efficiency, we successfully transformed the customer entrance into a welcoming and efficient gateway that catered to the needs of our client’s thriving business.
Sponsored
Local Crescent Case Study

Local Crescent Case Study

PFC Corofil Fire Stop Products

For a major new residential development in the Salford area of Greater Manchester, PFC Corofil has provided a proven range of fire-stopping insulation systems as part of the façade system and to maintain fire compartmentation of the buildings.
Sponsored
Bodmin Community Fire Station

Bodmin Community Fire Station

Gerflor Flooring UK Limited

When Bodmin Community Fire Station in Cornwall needed a hardwearing, hygienic, and safe flooring solution for their fitness room and gym, they turned to international flooring specialists Gerflor. Its’ Taraflex® sports flooring was supplied and would deliver to the highest standards required by the site users. In acknowledgement of the brave and hard work of Cornwall Fire Service crews, Gerflor donated 60m2 of this world-renowned sports flooring in the colour ‘Red’.
Sponsored
Queenborough School & Nursery - Coniston wall mounted canopy

Queenborough School & Nursery - Coniston wall mounted canopy

Able Canopies Ltd

The BriefQueenborough School and Nursery in Kent were looking to upgrade their outdoor space to create an all-weather outdoor learning and play area adjacent to one of their classrooms. As such, they contracted Carré Consultancy to source a supplier to help them create this new area and they chose Able Canopies.They wanted to create an outdoor area which could be used all year round. This created some challenges; outdoor spaces can become wet and slippery during rainy periods and too much exposure to UV rays can be harmful to our health.The SolutionThe staff at Queenborough wanted the area to look good whilst also offering functionality for lessons and play. As such, we proposed a 17.04m x 4.65m Coniston Wall Mounted Canopy that was supported by rear steel goal posts as the supporting wall was not suitable for a wall mounted structure. It was agreed that the canopy should feature side fills on both ends to block wind driving in from either side of the canopy and would be enclosed along the front with secure roller shutters and commercial fire doors. As we offer the whole package, we were also able to include the supply and installation of soft play safety surfacing underneath and leading to the canopy.
Sponsored
What The Real Cost Of Fire Protection Means In Buildings

What The Real Cost Of Fire Protection Means In Buildings

Trade Access Panels

When you design a building that will be used by lots of people, like a tower block, you need to make sure that the building has the correct level of fire prevention and fire protection equipment. In instances where this isn’t the case, tragedies like the Grenfell Fire can happen. The importance of passive and active fire protection methods are vital for the safety of the intended occupants, but how can you ensure they’re going to be safe?
Sponsored
London Commercial Workspace Winner: The White Collar Factory, Old Street Yard, EC1

London Commercial Workspace Winner: The White Collar Factory, Old Street Yard, EC1

Shadbolt International

For this incredible work space Shadbolt was asked to supply an array of products, all bespoke & FSC certified. The co-ordination of such a variety of products was a challenge, one that we rose to, ensuring that our project co-ordinating team managed the needs of the client. •Black Grey RAL 7021, Pale Green RAL 6021 & Pure White RAL 9010 factory paint lacquered FD30, FD60, FD90 & FD120 fire performance doors & framesets. •PAS24 certified security doorsets •High performance (42dB SRI Rw) doorsets •Stain finished SG European oak, veneered 3 panel pattern, toilet cubicle flush rebated doors, pilasters & interconnecting dividers.
Sponsored
Fingersafe door safety at home

Fingersafe door safety at home

Fingersafe® Group

We recently received this review from a customer who had enquired about finger safety guards for her home. We were more than happy to advise and help prevent this kind of awful accident happening in her house again.“I first saw the Fingersafe door guard at my son’s specialist school in the office after he stuck his finger in the bathroom door at home and broke it. In a panic being told there was a 4-5 hour wait for an ambulance I went straight to school where he was bandaged up properly but advised to go hospital. My 7 year old attends a SEMH provision and has autism and no sense of danger. The fact his school has these guards I knew who to call after we returned from hospital. I only wish I had bought them sooner.  I made 1 phone call and sent some snaps in and now my house is Fingersafe protected on every door including 2 bedrooms, bathroom, kitchen, living room and the garden door. Whatever the door Fingersafe have the right guard for you. The service I had from my initial telephone was reassuring and incredible. This company took away all my worries and concerns and genuinely felt my pain. I couldn’t recommend Fingersafe highly enough. Personally, these guards should be in every home whether you have a SEN child or not. Until my son broke his finger, I never knew how unsafe my doors were. Delivery was next day. I have included some pics of the products too. Thank you to Gina and Sue. Fingersafe went above and beyond to prevent future accidents”The finger safety guards products we recommended for her home can be found across our website and included the MK1A Fingersafe® MK1A | Buy Now | Door Finger Protection | Fingersafe UK (fingersafegroup.com) and the MK1B FINGERSAFE® MK1B | Fingersafe Door Protection | (fingersafegroup.com) both as shown fitted onto her doors in the photographs.Also, as we have various colours available of all our Fingersafe products, we were able to supply the MK1C in different colours to match her external uPVC doors too FINGERSAFE® MK1C | Shop Now | Fingersafe Door Protection Products (fingersafegroup.com)
Sponsored
Fire Rated Roof Hatch - Killeen, Texas

Fire Rated Roof Hatch - Killeen, Texas

Surespan

Surespan designed and manufactured several fire-rated roof hatches for the Killeen ISD East/West Ward Elementary School, in Killeen Texas.  The Project:Huckabee is the architect behind the East/West Ward Elementary School, tasked with replacing two 60-year-old campuses, by combining them into one new holistic learning environment. The planning behind the architecture focuses on efficiency, function and ease of wayfinding. From simple to navigate corridors, modernised classrooms and glazing to illuminate the interior with natural light. East/West Ward Elementary School blends district design standards with innovative thinking to achieve spacial efficiency and maintain equitability.Product:Surespan designed and manufactured five 35.5-inch x 35.5-inch Fire Rated Roof Hatch with an integral guard hand railing attached. These hatches are thermally broken and have been designed and tested with 4-hour fire resistance for integrity to EN 1634-1:2014.  Features:These hatches are using environmentally friendly materials such as non-combustible minerals and fireboard cladding to achieve a top-performing thermal efficiency. All the hatches were finished in a light grey polyester powder-coated finish for an aesthetically pleasing solution. The coating is set to last many years, just like the durable masonry veneer that is featured in the building, helping to maintain the space for years to come. 
Sponsored
Replacing Doors in parcel warehouse

Replacing Doors in parcel warehouse

Bradbury Group

In October 2021, Martin Roberts supplied T Clarke with a replacement steel door for the UPS Warehouse in Tamworth, UK.
Sponsored
RHS Hilltop

RHS Hilltop

HAG Ltd. - The Door Specialists

OverviewThe UK’s first dedicated horticultural scientific centre of excellence has opened to the public – protecting the future of plants, people, and the planet at the iconic RHS Garden Wisley, situated in Woking, just 30 minutes outside London. RHS Hilltop has been dubbed The Home of Gardening Science, and at a cost of £35 million, is the largest ever investment in horticultural science. The site boasts 3 purpose-built laboratories, a herbarium and digitisation suite, learning studios & a teaching garden, interactive displays and a world class collection of horticultural exhibits across 3 gardens that brim with ideas that reflect the latest research. RHS Wisley’s library and archive contain rich and varied collections, including botanical art, 28,000 horticultural books & records, which places itself as the most complete record of the UK’s horticultural heritage. PartnershipHAG Ltd. were chosen by Geoffrey Osborne Ltd. to work on RHS Wisley’s impressive and forward-thinking purpose-built space to offer fire protection & security solutions across the site, including in the herbarium and café. With over 35 years of industry experience, and being well known for our quality, integrity, and reliability, we were the perfect choice to offer solutions to fire protection and security needs, meaning a more streamlined experience for the main building contractor. Andy Jasper, Programme Director of the Wisley Strategic Investment Programme:“We are so proud to announce the opening date of RHS Hilltop – The Home of Gardening Science. Working so closely and collaboratively with Contractors and Consultants was wonderful and together we have overcome the challenges of Covid-19. We would like to express our most sincere thanks to all the teams and individuals involved in this project who have worked so hard and with such passion and commitment.” The ProjectLike many new builds, RHS Hilltop used the very latest in environmentally friendly techniques in their build process. This included installing their own renewable energy sources, using high levels of insulation and astonishingly, 99% of waste during construction was recycled. The RHS Hilltop facility measures 4,750 square meters and was part of a wider 5-year transformation program at RHS Wisley. With an investment of £35 million, it is easy to see how seriously the Royal Horticultural Society are taking their legacy and setting themselves in good stead for scientific research in the future. HAG installed fire curtains and fire shutters across the site, which are essential to ensure safety and time to exit the buildings in the event of fire. Our insurance-certified roller shutters were supplied and fitted to their exacting standards and are fully covered by LPCB Certification, to give optimum security protection. We were pleased to be involved in such a stunning development and look forward to working with both Geoffrey Osborne Ltd and the RHS again in the future.
Sponsored
Baldovie EFW CHP

Baldovie EFW CHP

Hart Door Systems Ltd

Baldovie EFW CHP Facility is a energy from waste site using around 110,000 tonnes of residual waste per year from Dundee and Angus to generate electricity. Project/doors:7 Insulated Roller Shutter Doors1 High Speed Door - Speedor StormThe challengeDue to the nature of the build and technical challenges from the onset, Hart worked direct with the contractor and the consultants in the design phase to provide a solution to suit each challenge faced such as corrosion, odours, noise and infestationThe solutionInsulation is a key feature of an energy saving environment. Insulated roller shutters have a thermal value of minimum 0.69w/m.sq.k and 18db to minimise operational noise. The Speedor Storm is an extremely robust door with wind class 5 up to 8m. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt controlling the escaping dirt, odours and noiseThe successFollowing extensive communication with the contractor and the consultants to ensure the smooth running of the project, the steelwork was designed and installed correctly to allow for the timely installation of the Hart manufactured doors. Each door was made to measure and each activator and safety device fitted to suit the environment
Sponsored
Sancta Maria, Swansea

Sancta Maria, Swansea

Specialist Door Solutions

SDS were pleased to work with Kier Construction and IBI Architects on this exciting project, manufacturing and delivering bespoke Dfendor PVC postformed doorsets for the Theatres and Endoscopy areas. The design team chose from our wide range of finishes for the scheme, opting for the ever popular snowflake and carbon colours. Dfendoor offers a well proven solution for heavy use areas within a hospital. The doors for Sancta Maria were designed with x-ray and laser protected viewing panels, ideal for their environment. This combined with the robustness of these doors, makes them an effective, functional and competitive choice.
Sponsored
Assured fire safety depends on sticking with a quality specification

Assured fire safety depends on sticking with a quality specification

Promat UK

Dame Judith Hackitt’s assertion that the building industry routinely puts cost before quality will come as no surprise to architects and contractors who often see their specifications being challenged, and changed, just to save a few pounds. ‘Value engineering’ has become synonymous with an industry obsessed seeking to do everything at the lowest possible cost. Fire rated glass, framing materials and other components must be evaluated and scrutinised at the product specification stage. Once specified, passive fire protection products must stay specified, as the slightest change to the specification can compromise the expected level of fire resistance.
Sponsored
Renovating communal buildings with Newton Doors

Renovating communal buildings with Newton Doors

Bradbury Group

In June 2021, work finished on the regeneration of a social housing project in Glasgow, Scotland.The project saw the replacement of 34 doors for Parkhead Housing Association, which were in poor condition due to the age and constant use of the existing door sets.
Sponsored
UAE Civil Defense Stations

UAE Civil Defense Stations

Jewers Doors Ltd

Jewers Doors have recently completed the supply and installation of nine sets of large Osprey sliding-folding doors to secure three new Civil Defence stations in Dubai located at Nad Al Sheba, Al Mizhar and Jebel Ali.

Showing 217-252 of 501

Feedback