NBS Source
I'm a manufacturer

"fire door"

4,694 results found

Sort by:

Showing 289-324 of 497

Sponsored
Accoya curved folding sliding doors

Accoya curved folding sliding doors

Accoya

Designed and Manufactured by Simplicity Timber Solutions Accoya was chosen as the ideal wood for these curved folding sliding doors in a project called The Hermitage. Accoya was selected due to its aesthetic appearance and ability not to shrink or swell during seasonal weather changes. Keep a look out as The Hermitage project is set to be featured in the December 2016 issue of Grand Designs.
Sponsored
National College for High Speed Rail

National College for High Speed Rail

Jewers Doors Ltd

National College for High Speed Rail opened its doors to students in September 2018 following the installation of Jewers' Swift-SEW high speed, automatic bi-folding doors which completed the external structure of the workshops at both Birmingham and Doncaster.
Sponsored
The Dovehouse

The Dovehouse

SELO

Luxury later living in the heart of Chelsea.Auriens, synonymous with luxury retirement living, is renowned for crafting exceptional environments that seamlessly blend opulence, functionality, and service. Catering to the unique needs of older adults, Auriens places a premium on creating living spaces that embody comfort, safety, and aesthetic excellence.Our collaboration with Auriens involved providing tailored door solutions to enhance the safety and accessibility of their luxury retirement living spaces. Key elements of our contribution included supplying and fitting metal riser doors and sliding pocket doors, each meticulously designed to align with Auriens’ commitment to excellence.Safety was paramount in the design of Auriens’ residences. We supplied and installed bespoke metal riser doors, fire-rated for compliance with stringent safety standards. These doors, strategically placed throughout the development, contribute not only to the safety infrastructure but also to the overall design aesthetic. The unique touch came with the application of wallpaper, seamlessly concealing the riser doors and integrating them with the surrounding environment.In pursuit of a design that marries elegance with functionality, we provided sliding pocket doors with visible frames. These doors not only enhance the overall aesthetic but also contribute to space-saving solutions, a crucial consideration in retirement living spaces. The visible frame adds a touch of modernity, creating a design feature that complements Auriens’ commitment to sophistication.The sliding pocket doors play a dual role – they provide easy access between spaces while maximizing floor space. The smooth sliding mechanism ensures effortless operation, catering to the comfort and convenience of residents. The visible frame design becomes a distinctive element, seamlessly blending with the interior design while making a statement of contemporary elegance.
Sponsored
Horgan's Quay, Ireland - Pyroguard Infinity

Horgan's Quay, Ireland - Pyroguard Infinity

Pyroguard UK Ltd

The ChallengeNo. 1 Horgan’s Quay is one of the development’s three office buildings, with the upper floors of the new modern structure cantilevered over the site’s original Goods Shed. The lobby area features a large glazed partition on the first floor, helping to create an open, light space, as well as sympathetically blending the old restored structure with the new.KCC Group, a door and glazing contractor, were appointed to deliver the EI30 SWS Screen works on the project. Site Contracts Manager, Ger McNamee, said: “In order to ensure the safety of those within the building, 30-minute fire protection was required for the reception area, providing a fire barrier between the lobby and the first floor. Once we had the fire safety glass specification from the architect, O’Mahony Pike Architects, it was up to our team at KCC Group to source a supplier – this is when our relationship with Pyroguard began.”The SolutionTo ensure that the desired aesthetic was achieved, while also meeting building safety regulations, Pyroguard Infinity T-EI30/24-2 SWS fire safety glass was chosen by KCC Group and installed in the glazed partition, within a Jansen steel profile system.Pyroguard Infinity is a range of fire safety glass certified for butt-joint applications. With no vertical frame profiles required, it’s the ideal solution for providing visually appealing seamless partitions. Manufactured to EI classification, Pyroguard Infinity provides the highest level of integrity and heat insulation, protecting against flames, smoke and heat.
Sponsored
Fire Curtains to EW120 for 125 Deansgate Manchester UK

Fire Curtains to EW120 for 125 Deansgate Manchester UK

A1 Shutters Ltd

Whilst certainly not the most iconic or largest project the A1S Group has ever been involved with, 125 Deansgate in Manchester in many ways represents for us "a bread and butter project", the like of which we are involved with throughout the UK on an almost monthly basis. Despite the doom and gloom of office rationalisation during the pandemic, high end office new build and cat A and B refurbishment continues to be one of our strongest sectors. We have completed literally hundreds of office projects over the last decade including We Work premises throughout London and the UK, Goldmann Sachs, Barclays at Canary Wharf and Norfolk House in St James Square, London. Fire and smoke curtains continue to be integral to modern office design, allowing for more open spaces within the building's wider fire strategy framework. The A1S Group manufactured, installed 54 Flameshield fire curtains, all with smoke seals and multi function panels. For us, the 125 Deansgate building was noteworthy as it was the first time that we installed our high performance Flameshield EW120 fire curtain to provide a minimum of EW90 compartmentation. We also manufactured and installed our a Flameshield fire and smoke curtain system to provide 120 minutes integrity and 15 kw/m2 to protect the lift and lift shaft. This striking building is clad in a rich red terracotta with 12 storeys of flexible office and retail space all achieving BREEAM 'excellent' and is now considered one of Manchester's premier offices. The A1S Group have a long term planned preventative maintenance in schedule in place to comply with the 2005 Regulatory Reform Order.
Sponsored
Wakefield’s New £3.76m State of the art Fire Station

Wakefield’s New £3.76m State of the art Fire Station

Naylor Concrete Products Ltd

The fire station is relocating from Dale Street, Ossett, to nearer Wakefield city centre as part of West Yorkshire Fire and Rescue Authority's Integrated Risk Management Plan and replaces the current near Ossett town centre. The new location will enable crews to support the Combined Aerial Rescue Pump based in Wakefield. Coun Tracey Austin, West Yorkshire Fire and Rescue Service vice chairwoman, carried out the ground breaking ceremony. She said: "This marks the start of a very exciting project in Wakefield district and I am looking forward to seeing the new station taking shape.”
Sponsored
The Restoration of Westminster Fire Station

The Restoration of Westminster Fire Station

Lime Green Products Ltd

The Westminster Fire Station restoration and regeneration was all about creating an experience for those that live there, with sustainable and natural materials,” says Jennifer Benningfield, experienced architect and founding principal of Openstudio Architects.v “We needed to find a reliable supplier of sustainable and natural materials, which were suitable to tie in with the heritage structure. “The challenge was sourcing the right materials that were compatible with the fabric of the existing buildings. Working with Lime Green, we managed to develop a solution that matched the original building’s beautiful aesthetic and historic character. “As a key supplier of lime-based products, their flexibility and reliability helped to make our job easier – and we received a lot of praise for the high-quality and beautiful new courtyard building. The lime mortar is an integral part of the brickwork and proves that it is appropriate for contemporary, as well as historical, structures,” praises Jennifer. About the project Using a team of specialists, Openstudio Architects supported the site team in using old and traditional construction techniques to refurbish and develop buildings in a contemporary way, with beautiful results. “There were two phases to the Westminster Fire Station project,” explains Jennifer. “The first involved refurbishing the existing building, the Grade II Listed Edwardian Fire Station built in 1906 and decommissioned in 2014, to create a restaurant and bespoke housing. “The second involved developing the site further by adding a new residential building to the rear of the site surrounding a garden courtyard, which is where we used Lime Green’s mortar.” Supporting the local community “The project was situated on a very constrained and challenging site,” continues Jennifer. “With its central location, the construction works undoubtedly had an impact on those living and working in the local area, which is why we wanted to ensure the community were completely happy with the project. “As we wanted to make sure the new build tied in with the older fire station, there were inevitably challenges that we didn’t anticipate along the way. However, most importantly, we needed to ensure we sourced the right materials, which were compatible with the existing building, both in terms of performance and appearance. Selecting the right materials “We wanted to work with natural materials, which would age well and ensure robust construction that has longevity and sustainability,” says Jennifer. “We chose specific products, including handmade Danish bricks and handmade glazed bricks to give depth and texture to the new building. We wanted to ensure use mortar that had a texture and a grain to it, so it would work with the nuances of the bricks, as well as being a colour match. “Finding the right colour mortar to match the pale Danish bricks was key. These bricks were handmade, so we needed the mortar that integrated with the historic Edwardian building to create a seamless whole. “When planning the project, we recognised the importance of lime products, because of the material’s sturdiness and robustness. This means it doesn’t wear with structural movements and changes in the seasons. “That’s why Lime Green was the perfect fit for the project. With an extensive colour range, the team was able to colour-match the mortar with the materials of the new building perfectly. The consistency between the samples Lime Green gave us and the final product delivered was incredible, which was important given the scrutiny by Westminster City Council over the project and the appearance of the new building. “The flexibility of the products also helped us to minimise the amount of movement joints, as it accommodated movement in a much more forgiving way than other products, such as modern cement mortars. “We really enjoyed working with the Lime Green team – they were easy to work with, responsive and very supportive of the project. As we couldn’t store a huge amount of supplies on site, Lime Green was very accommodating in delivering exactly what we needed, at the right time. “The best part was that we were able to develop a solution with Lime Green that supported the original building’s beautiful aesthetic and historic character, with a new building that pays similar attention to detail.” A sustainable, natural and beautiful finish “People love the building, and neighbours even call it ‘the golden citadel’. It’s widely recognised in the local community for its high-quality, beautiful finish,” continues Jennifer. “One of the Fire Station’s previous residents – who had moved out during construction – has moved back after the restoration works and loves the development. That was the icing on the cake for us, it really felt as though our vision had materialised – enhancing people’s experience of new buildings made with sustainable and natural materials that stand the test of time. “The Westminster Fire Station development truly looks beautiful, and the quality of the natural and sustainable products used has a huge role to play in that. Lime Green’s product quality and customer service is outstanding. We’re already working with Lime Green on another project, and we can’t wait to see the finished result,” concludes Jennifer. “It was a pleasure to see our Hydraulic Lime Mortar used on this new development project. We’ve loved working with Openstudio Architects on Westminster Fire Station, and we’re glad to be working with them on their next project,” comments Simon Ayres, co-founder and managing director, Lime Green Products. For more information about the Westminster Fire Station project and the products used, visit Lime Green or call 01952 728 611.
Sponsored
New Windows and Doors in a Country House in Gloucestershire

New Windows and Doors in a Country House in Gloucestershire

The Sash Window Workshop

The Sash Window Workshop were contacted by a couple who were looking to undertake a large project to transform a property in Gloucestershire into an elegant family home.The new wooden windows and doors had to deliver elegance and the traditional look and appearance that the customer wanted from both the inside and outside. They also needed to meet modern window performance standards, with double glazed windows and doors.They arranged to visit the workshop to have a look at how the windows and doors are manufactured and were delighted with the quality, thought and workmanship that goes into all the windows and doors they manufacture. The customer therefore decided to place an order for all the new timber windows and doors.After the work was completed, they commented that they are so pleased and happy with the end result. The customer also noted that the sash windows and doors were instrumental in the transformation of the building into a beautiful family home.
Sponsored
Eurofold Doors at Mustard Tree Manchester

Eurofold Doors at Mustard Tree Manchester

Bolton Gate Company

Mustard Tree, one of Greater Manchester’s most loved and respected charities for the homeless and disadvantaged operates from a large warehouse in the city which was in a dilapidated state. £1.6 million was raised to refurbish it and OMI Architects were appointed to design the upgrade which included replacing the external folding doors which were manufactured by Bolton Gate Company and despite being over sixty years old, were still operable and providing security. OMI specified new doors of the same type and Bolton Gate were chosen to install three new doors to the main entrance which were powder coated yellow.
Sponsored
Rockfon solve demanding challenges with intelligent ceiling solutions

Rockfon solve demanding challenges with intelligent ceiling solutions

Rockfon

Recent economic growth in Cambridgeshire has led to huge demand for new educational facilities. An ambitious £37.5 million Littleport complex comprising special educational needs (SEN) and primary schools, an Academy and a leisure centre is nearing completion. Rockfon ceilings, baffles and wall panels are installed throughout the Academy and the SEN school which opened their doors in 2017. Rockfon products were chosen because they offer excellent sound control, Class A1 fire safety, durability and are environmentally friendly.
Sponsored
Qatar World Cup Stadiums

Qatar World Cup Stadiums

Bradbury Group

The 2022 FIFA World Cup will be the first tournament held in an Arab region, taking place across a 21 mile radius of Qatar. In total, there are eight stadiums with a total capacity of just under 400,000 people, which are linked by a metro system.Bradbury Group was approached by HBK Contracting Co. W.L.L. to supply over 600 doors with high levels of security and additional fire integrity, ranging for LPS 1175 Security Rating 2 (SR2) to LPS 1175 SR3.
Sponsored
Accoya windows and doors in Paros Greece

Accoya windows and doors in Paros Greece

Accoya

Accoya® wood has been used in a distinctive residence in Paros, a popular Greek Island in the Aegean Sea. Atlas Wood, joinery manufacturer from Greece supplied 92 windows and doors to complete this project. Accoya wood was specified for the project because of its exceptional stability, class 1 durability and extended coating maintenance cycles required for this all year round warm Mediterranean climate.
Sponsored
ENSURING LONGEVITY: ESSENTIAL CARE FOR YOUR EXTERNAL DOOR HARDWARE

ENSURING LONGEVITY: ESSENTIAL CARE FOR YOUR EXTERNAL DOOR HARDWARE

ASH Door Furniture & Entrance Specialists Ltd

External door hardware face constant environmental challenges, enduring exposure to pollution, corrosive salt air in coastal regions, and the relentless elements. Unlike their internal counterparts, external hardware requires special attention to maintain optimal functionality and appearance.PROACTIVE MEASURES FOR LONGEVITY:ortunately, these issues can be easily avoided with a proactive approach to care and maintenance. Implementing regular tender loving care (TLC) with the right products can make a significant difference in preventing complications and ensuring customer satisfaction.HOW TO MITIGATE COMMON ISSUES:TEA STAINING AND FLASH RUST ON HARDWARETea staining, a common cosmetic issue on the surface of stainless steel, doesn’t compromise structural integrity but can affect the hardware’s aesthetics. To address this concern:Regular Cleaning: Tea staining can be avoided with routine cleaning. Use a soft cloth and mild soapy water to gently clean the hardware.Proper Drying: After cleaning, ensure thorough drying with a clean, soft cloth to prevent residue accumulation.Correct Cleaning Technique: Rub or wipe the hardware in the direction of the brush or polish lines to maintain its appearance.By incorporating these simple yet effective practices into your hardware maintenance routine, you can extend the lifespan of your external door hardware, promoting customer satisfaction and minimizing the need for costly call-backs. Remember, a little care goes a long way in preserving the integrity and aesthetics of your hardware.
Sponsored
Mono Glass Balustrades for Southport Community Fire Station

Mono Glass Balustrades for Southport Community Fire Station

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixOrbis OS211 Glass Infill Top Fix As part of the North West Fire PFI scheme, the Southport Community Fire Station provided improved facilities for Merseyside Fire and Rescue Service and the North West Ambulance Service.The client’s main objectives were to create well designed facilities to a high architectural standard and provide a safe and healthy environment. Designed and built by Balfour Beatty Construction, this new 6 bay station included community-orientated facilities, training facilities, rest rooms, additional office space and two staircases.In line with the client’s vision, Delta Balustrades were appointed by Balfour Beatty to design, supply and install handrails and balustrades to both staircases and an external balcony area. Combining a minimalistic look and feel with a high quality stainless steel finish, the Mono system with clear glass infill panels was chosen for the main staircase. For the rear stair and external areas, the Orbis system with powder coated uprights was chosen.
Sponsored
Coedcae Industrial Estate, Technical Fire Damage Specification

Coedcae Industrial Estate, Technical Fire Damage Specification

Garland UK

A busy recycling centre in Coedcae Industrial Estate, Pontyclun South Wales, suffered from a crippling fire that destroyed one-third of the building leaving the rest in severe disrepair from fire damage.Garland Technical Manager, Dale Thomas, was instructed by long-term partner Cushman Wakefield to assess the extent of the damage and secure the optimum waterproofing system to get the warehouse unit returned to its former glory as a hive of activity for the local area.Dale conducted a thorough condition survey and supplied a detailed written report to the client, highlighting the severity of the building damage and the poor condition of the existing roof sections and walls. Approximately 2,000 sqm were either damaged beyond repair or had fallen into a state of disrepair, meaning that a full refurbishment of all roof and wall sections was required before the optimum waterproofing system could be implemented.
Sponsored
AUTOMATED VEHICLE GATES

AUTOMATED VEHICLE GATES

Premier Security & Fire Consultants Ltd

These automated vehicle gates were designed, fabricated, and installed by Premier Security & Fire Consultants Ltd on behalf of our instructing clients, Clarion Housing Group and OPENVIEW GROUP LIMITED.The project, in Croydon, South London, required Secured by Design and BRE LPS1175 SR2 security standard, all covered by Premier’s extensive catalogue of officially tested products.For more information call us on 0208 559-8295 or go to our website www.premier-ssl.com.
Sponsored
Radisson Hotel, County Sligo

Radisson Hotel, County Sligo

Pilkington United Kingdom Limited

County Sligo has been blessed with a brand-new luxury hotel, the internationally renowned Radisson SAS Hotel, where the comfort of guests and staff is of paramount importance. Every precaution has also been taken to ensure the safety of residents including the installation of high quality, clear view fire-resistant glass products, Pilkington Pyrostop® and Pilkington Pyrodur®, which have been fitted extensively throughout the entire hotel.Pilkington Pyrodur® is a laminated glass with a special interlayer, developed for the optimum combination of minimum thickness, integrity fire resistance and impact performance. In a fire, the glass forms an opaque barrier to exclude flames and hot gases as well as blocking the sight of the fire, hence reducing panic. In addition to its integrity performance Pilkington Pyrodur® reduces the transfer of radiant heat significantly.Jackie Corcorran of main contractor, J J Rhatigan & Co. Galway was closely involved in the specification of the specialised glass alongside White Bros. Joinery Sligo & Jim Walsh of Greaney Glass Galway. 160 m2 of 10 mm Pilkington Pyrodur® with a 30-minute integrity rating was installed within the corridors of the building. In other areas where there is a slightly greater risk of fire, such as the kitchen area, internal doors and function room screens, were fitted with 21 mm Pilkington Pyrostop®, which provides 60 minutes fire integrity and insulation.Specialist glass & glazing contractors, Greaney Glass, were responsible for installing the fire-resistant glass and Ivan Greaney, Managing Director, comments: “For such a prestigious project it was imperative we used a fire-resistant glass we could trust. There could be hundreds of people within the hotel at any one time so we needed to use materials that would provide maximum protection under the most extreme circumstances. As Pilkington Pyrostop® and Pilkington Pyrodur® are backed by a full suite of impact and fire performance tests, we had no doubts that this was the ideal glass for this project.”Pilkington Pyrostop® and Pilkington Pyrodur® provide excellent levels of protection and have been tested and assessed to BS and EN standards. Not only do they offer excellent fire-resistance they also fully comply with impact safety tests and permit safe breakage in the manner of a laminated glass. In addition, they provide acoustic improvement over standard fire-resistant glass, an important consideration in the hotel that offers a peaceful and relaxing retreat for guests.
Sponsored
Martec Premier E door

Martec Premier E door

Martec Engineering Group Ltd

Examples of the martec Premier E door and side screens.
Sponsored
Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixThe Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases. At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost-effective, high-quality tubular balustrade solution for both staircases.The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.
Sponsored
Security Revolving Doors at Luxe Fitness

Security Revolving Doors at Luxe Fitness

Record U.K. Limited

Installation of 2 security revolving doors at Luxe Fitness, Bristol.
Sponsored
Avantage MP - AOV by Smoke Control Dampers Ltd

Avantage MP - AOV by Smoke Control Dampers Ltd

Rf-Technologies

Avantage MP AOVAvantage MP is a 1 and 2 hour fire resistant AOV smoke control damper suitable for multi compartment applications of smoke control such as lobby to smoke shaft ventilators.The product is based on a damper door design and has been tested and certified to BS EN12101-8 achieving 1 and 2 hour fire rating. This is particularly important so to maintain the fire integrity of any shaft.The Avantage AOV smoke control damper is noted for its superior airtight properties. The damper is available as a motorised version providing a practical solution for large buildings where fire safety equipment is regularly testedThe unit is completed with a decorative silver anodised aluminium grille on the front. It fixes into a fire compartment shaft wall and is direct fixed within the opening through the sides of the damper. Once the damper has been securely fixed to the structure any shaft side perimeter gaps must be caulked with intumescent sealing material.Recommended fixing details are available on request to suit an array of fire compartment walls together with safety, installation and maintenance instructions.The front face grille is fixed to the damper unit flange and has the option of being coloured black behind the grille for improved visual appearance. The grilles are attached with concealed fixings.Key featuresSuperior air tightness (tested at -1500 Pa)Minimal pressure dropImproved energy efficiency and acoustic insulationRemovable grille for easy maintenanceAuxiliary switches for remote damper position indicationEfficient robust decorative finishing grille with concealed fixingsThe wiring connection and the drive motor mechanism is accessed lobby side of the ventilator behind the decorative grilleEasy access for service and maintenanceWide range of sizes for optimal selection considering pressure drop and space available
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

Firechief Global

The Wilberforce Trust is a charity dedicated to helping and empowering those with sight and hearing loss and impairment in the York and North Yorkshire area to live fulfilling and independent lives. The Trust had tenants in community based supported housing and family homes around York but wanted to deliver an innovative ‘extra care’ housing scheme designed especially for people with a visual impairment and other disabilities; the first of its kind in the area.Wilberforce House offers 30 one-bed, open-plan purpose-built, self-contained apartments along with a Living & Learning Zone – providing education and leisure activities – a courtyard cafe and offices for the Trust itself, all set in four acres of accessible landscaped gardens, including a large sensory garden. The apartments utilise smart home and assistive technology personalised to their lifestyle needs.A consultant was employed to review the development’s plans with regard to fire safety. His report included recommendations for additional fire safety measures including the ability for cooker hobs to be switched off by an alarm, as kitchen fires are a significant risk with 50% of all accidental house fires starting in the kitchen. WHY THE FIRECHIEF KITCHEN STOVE GUARD? The initial solution proposed was costly as it meant hob alarms would need to be hard wired into each apartment’s fuse board. Damian Pocknell, Head of Housing, Facilities & IT at the Wilberforce Trust recalled having seen and read about the Firechief Kitchen Stove Guard and realised that this would be much more cost effective. The fire consultant agreed and subsequently signed off on the Kitchen Stove Guard as the approved solution.  
Sponsored
Lymm Fire Station Changing Place

Lymm Fire Station Changing Place

Innova Care Concepts

Lymm Fire Station was completely unique project; it was new-build station that doubled up as an educational centre. It had all kinds of different environments and scenarios built-in to give visitors the ability to learn what to do in various emergency situations. As such, they wanted to include a Changing Place facility in the new building. We’ve been working with the Changing Places campaign for a long time, and we were able to design a fully-compliant facility complete with a wall-mounted X-Y hoist system. Read all about it on our website.
Sponsored
School achieves aesthetic fire performance with MEDITE PREMIER FR

School achieves aesthetic fire performance with MEDITE PREMIER FR

MEDITE SMARTPLY

A state-of-the-art sports and learning centre in Cambridge features a dramatic space-defining acoustic based on the use of MEDITE PREMIER FR fire rated panels from MEDITE SMARTPLY.
Sponsored
XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal

XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal

Glazing Vision Ltd

XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal Case Study
Sponsored
Private Hospital London

Private Hospital London

Specialist Door Solutions

Based in Central London, this private hospital boasts a clean, sharp design.The entire hospital is fitted with bespoke products to accentuate the premium setting. This Private Healthcare branch has been refurbished to equip SDS DFendoor doorsets in Woodgrain effect combining stunning looks, durability and hygiene.This great looking project boasts many bespoke features including 3 metre high woodgrain encapsulated SDS DFendoor’s, including doors with a different finish and colour on each side and colour matched cladding. SDS is proud to have added to the overall design and execution quality.
Sponsored
Naylor Concrete supplies the Trinity Walk Wakefield project

Naylor Concrete supplies the Trinity Walk Wakefield project

Naylor Concrete Products Ltd

Naylor Concrete Ltd supplied Hi-Spec, Fire Spec and Fairfaced Lintels to the 500,000 sq ft Trinity Walk project in Wakefield. Trinity Walk shopping centre opened its doors in Wakefield in May 2011. Wakefield Council described it as “the most important City Centre development for more than 20 years” Trinity Walk is a partially enclosed shopping centre with 63 stores and 1000 parking spaces. The centre contains some major anchor stores including a Sainsburys, Debenhams, Next and Asda Living.
Sponsored
Antibacterial Paint bespoke access panels

Antibacterial Paint bespoke access panels

Trade Access Panels

We can make any size and shape access panel: Antibacterial Paint Special Antibacterial Paint available with the added benefit of an effective antibacterial agent which kills most species of bacteria, including the deadly MRSA, Salmonella, E coli and C difficile. Ceramic Tile Doors Plasterboard Faced Metal Faced Loft Hatches Fire Rated Acoustic Rated Airtight Rated Smoke Tested Special Paint Colours for your Project needs. Available Panel Sizes: 100x100mm to 3000x8000mm
Sponsored
Ideal concealed door hardware for a chic entrance area

Ideal concealed door hardware for a chic entrance area

Sugatsune Kogyo UK Ltd

The MFU1200 door hardware was used for a walk-in closet door in the entrance area of a private residence. The goal of the product was to create a hidden door.In this article, the benefits and objectives of this product will be explored. Specifically, the purpose of this project which was to fulfil the client’s request to “have the closet door look like a wall when it is closed.”PROBLEMKey IssuesThe design goal was to create a closet door that could blend in and look like a wall when it was closed.SOLUTIONThe SolutionThe push-to-open door functionality eliminates the need for a handle to be installed on the front of the door.*The door's handle-less design enables it to flawlessly integrate into the wall and give the impression of being practically invisible.Seamless blending into walls*The MFU1200 is a push-to-open type door hardware that does not require a handle to be installed into or on the front of the door. The handle-less design allows for the door to seamlessly blend into the wall and appear to be almost invisible.*Requires handle on back side of door.Click here to see how it works. This “secret” door is only noticeable when you push it, making it a fun and functional design choice.Maximising space in closetsThe benefits of this product are not limited to its appearance.With conventional swing doors, you have to make room in the opening direction of the door to accommodate its opening radius. However, the MFU1200 allows the door to slide open laterally, maximising the space available in the closet.Maximum 70kg for heavy doorsThe door used in this project has a door height of 2700 mm, a door width of 1200 mm, a load capacity of up to 70 kg and has passed 100,000 open-close tests*, making it suitable for marble doors such as those used in this mansion.In addition, the sliding mechanism is equipped with dual dampers. As a result, the door opens and closes softly and gently, the door an upscale feel.The client commented that the heavy marble doors used with the MFU1200 “closed flat against the wall and moved smoothly.”*Internal testing.This product can be used to create wall-like doors, save space and is compatible with heavy doors making it a versatile product for a variety of home interiors.Click here for product videoClick here for installation video
Sponsored
The Emerald, Seattle, USA

The Emerald, Seattle, USA

Pilkington United Kingdom Limited

The Emerald rises 40 stories above one of Seattle's most desirable neighbourhoods. The LEED Silver certified building manages to redefine luxury living. According to the idea of Hewitt architecture studio from Seattle, high-quality, natural materials as well as the sophisticated daylight concept blur the boundaries between the interior rooms and the picturesque nature. This is particularly evident on the second and third floors where the Pilkington Profilit™ channel glass system spans the outside of the fitness centre and community meeting spaces. Large, glazed areas can diffuse extensive amounts of natural light deep into interior spaces without loss of privacy.Apart from channel glass, Pilkington Pyrostop® Line fire protection glass also ensures natural light deep into the interior. Both products were installed in systems from Technical Glass Products.A transparent façade with Pilkington fire-resistant glass was planned to separate the fitness studio from the corridor in terms of fire protection. The spacious inner façade made of glass provides plenty of light in the training area and enables the desired feel-good atmosphere in the fitness studio. At the same time, it directs a lot of light into the interior of the building.The fire-resistant glass Pilkington Pyrostop® Line was used in a Fireframe Clearview® system from TGP with Heat Barrier frames and doors from the Fireframe Heat Barrier series. This generously fire-resistant and at the same time impact-resistant solution could be implemented without a vertical frame between the individual panes, with almost colourless transitions between the adjacent glass panes and without coloured inner glass spacers.
Sponsored
Performance Door Blanks for Christ Church at Spitalfields

Performance Door Blanks for Christ Church at Spitalfields

James Latham

James Latham have supplied 40 door blanks from their Moralt Laminesse FireSmoke range to the grade 1 listed Christ Church at Spitalfields in the East End of London. The brief was to convert the crypt of Nicholas Hawksmoor’s church into a multi-purpose space for events, board meetings and a fully operating café. The door blanks with a European Oak veneer were specified due to their superior acoustic values which was of the upmost importance for keeping the outside noise out and not disturbing any events or services that will take place simultaneously.
Sponsored
Promat SYSTEMGLAS® Ferro provides assured fire protection for Dublin Landings

Promat SYSTEMGLAS® Ferro provides assured fire protection for Dublin Landings

Promat UK

Assured passive fire protection for a spectacular central atrium in Dublin city centre’s largest and most prestigious new commercial development has been provided by over 300m2 of Promat SYSTEMGLAS® Ferro. The system was selected thanks to its 360 degree ‘wheel of assurance’, which ensures all the fire resistant glazing screens are checked for compliance at every stage from design and specification, through manufacture and installation. The proven butt-jointed, steel framed fire resistant glazing system has been used to create all the glass screens which encapsulate the atrium at the heart of No. 1 Dublin Landings.
Sponsored
Slimdrive SL NT automatic sliding door system

Slimdrive SL NT automatic sliding door system

GEZE UK Limited

Product name Slimdrive SL NTType Door openers / closersDoor type suitability Sliding doorsOperation ElectromechanicalInstallation Door surround mountedGrade CommercialMax. size of door leaf 120kgOperator dimensions (mm) 70mm highPart of the Slimdrive range, the SL NT is an electronic automatic sliding door system that offers flexibility, reliability, functionality, efficiency and safety.The extremely slim design of the SL NT makes it possible for the operator to be concealed in any facade, giving architects the freedom to design stylish entrances. Extremely versatile and suitable for a wide range of applications, the Slimdrive SL NT can be used for single- or double-leafed internal or external doors. GEZE Slimdrive SL NT also benefits from quick and easy assembly and installation.The Slimdrive SL NT is an intelligent automatic door system that is perfect for busy entrances to buildings such as shopping centres, hospitals and stores - anywhere where there is a high volume of traffic and where manually operated doors are not appropriate.The Slimdrive SL NT is suitable for a variety of applications, from the simple installations to grand all-glass facades. Two or more SL NTs can be combined to provide a draught-proof lobby.Key featuresOne of the most compact sliding door operators availableOperator height only 7cmEasily integrated into almost any facadeEnvironmentally friendly due to economical use of materials and energyDimensionsOpening widths: 700 to 3000mmWeight: up to 125kg per leaf
Sponsored
Specialist Speed Doors for a well-know British baker.

Specialist Speed Doors for a well-know British baker.

Tekta UK

This well known producer of bakery products was experiencing repeated damage and rising repair costs on their loading bay roller shutter doors. Beings a BRCGS accredited site, they could not afford to have their external doors damaged (or left open) for any period of time, as this creates an ingress point for rodents. Tekta were pleased to work with this site to create an effective solution. The Rapidor Impact high speed door was specified due to it's self-repairing feature and it's anti-rodent functionality. Click the "View More" button above to view the full case study.
Sponsored
Specialist hygienic door design for Cambridge Biomedical Campus (CBC)

Specialist hygienic door design for Cambridge Biomedical Campus (CBC)

Dortek Ltd

Cambridge Biomedical Campus. (CBC) created a vibrant and groundbreaking health care community at the forefront of science and medicine.Dortek’s brief was to supply and installation of doors to a very specific programme, across primarily 3 floors.Our Dortek doors were installed within the BRF rooms, laboratories, holding room, procedure rooms, CL3 labs, equipment store, changing rooms, and circulation routes. The type of doors we installed were GRP hinged and sliding in stainless steel frames, many with integrated privacy panels.SolutionThe particular project requirements that made our doors suitable was the durability, acoustic performance, non organic door quality of our SS frame which ensures suitability to this environment. The SS frame had previously been used at Francis Crick Institute also. We fulfilled the clients expectations by meeting the specification and programme, and working closely with planners to interface with other trades. There was some complexity about the project as most doors are very large for equipment access and some have acoustic requirements, also to include is there are a lot of doors in a concentrated area.
Sponsored
Stationers Hall

Stationers Hall

3v Architectural Hardware Ltd

Peregrine Bryant were appointed to design a scheme for Stationers Hall to improve access and rationalise the internal layouts to enhance the building as a function space. The building, located near St Paul’s Cathedral, has a history that stretches back to before the Great Fire of London and any work requires a lot of co-ordination as parts of the complex range from Grade I listed to Ancient Scheduled Monuments.3v were asked to provide a full hardware service for this historic building which included scheduling all new and existing doors, rationalising ironmongery throughout and undertaking a full review of fire requirements. All new ironmongery was finished in antique brass with the exception of the toilet areas which use a split finish of antique brass externally and satin stainless steel internally. The main task was to ensure there was more continuity in the ironmongery used throughout the building so that it complimented both the aesthetics of the building and the function as an events space.

Showing 289-324 of 497

Feedback