NBS Source
I'm a manufacturer

"fencing"

765 results found

Sort by:

Showing 145-150 of 150

Sponsored
Latches Close

Latches Close

Tobermore

The ChallengeFailing retaining wall needed to be stabilised and strengthened.The failing masonry wall, to the rear of Latches Close Social Housing, was braced with timber struts and remained like this for 10 years. The ‘temporary’ buttress was effective for a short time but then the wall began to move. The brick retaining wall had fractured at the corner which was a sign it was slowly inching forward. For fear of the wall’s collapse, the surrounding area was cordoned off with heras fencing. For health and safety reasons, the rear of the social housing was completely ‘out of bounds’.The wall couldn’t be taken down and replaced because there was a car sales elevated above. The car sales proprietor did not want his land to be affected. Clarion Housing Group contacted Engie to survey the failing wall and propose a solution. The SolutionSecura Grand was installed under the expert advice of Tobermore’s Civil Engineering Consultants.Engie had previously worked with Tobermore on other schemes and had experience using their Secura Grand Retaining Wall system. Following consultations with Tobermore’s Civil Engineering Consultants, Engie proposed Secura Grand as a solution to strengthen and stabilise the existing wall.Rather than replacing the entire wall, the existing wall and its timber buttress was incorporated into the retaining wall designs. This retaining wall project has restored land for the residents and property managers.
Sponsored
PlasProtek Bollard Cover Sleeve - Bristol

PlasProtek Bollard Cover Sleeve - Bristol

IAE

IAE’s PlasProtek Bollard Sleeves came to the rescue at the last minute for a new development near Bristol.The development was due to put on a promotion event but with only a few days to go before the big day, the protection bollards installed at the site had problems with their coating.The bollard had been wrapped without being completely dry, and when the wrapping was being removed, sections of the coating was coming off as well.The bollards held a prominent position at the front of the units. The damaged coating on the bollards would definitely be noticed on the promotion day and would make a bad impression on potential clients.A fast solution was needed.An attempt was made to touch up the coating with paint. However the results were considered unacceptable for what was supposed to be a brand new development as the poor finish was noticeable from a few feet away.IAE had already supplied the site with Circonomy Cycle Shelters and Vmex Perimeter Fencing, and came up with the suggestion on using its PlasProtek Bollard Sleeve to cover the bollards.A sample was rushed to site, and the sleeve was signed off as the solution to the problem.A batch of sleeves big enough to cover all the bollards on the development was shipped to site, arriving the day before the promotion event, which was plenty of time as the sleeves are so quick and easy to install.As an easy to install, and easy to replace alternative to powder coating, the developer has decided to specify the sleeves on all their bollards from the very start on future projects.
Sponsored
SMART GATE AND MESH IN PAVILION MAKEOVER

SMART GATE AND MESH IN PAVILION MAKEOVER

Zaun Limited

The Trumpington Residents’ Association and Cambridge City Council wanted to update a 60-year-old pavilion at the heart of the village in a £600,000 community project.Cambridge architects 5th Studio designed a striking colourful exterior cladding. They turned to an artist specialising in the treatment and perimeter fencing manufacturer Zaun to create the multi-coloured stripe effect with a specialist bright green protective steel mesh ‘cage’.The SolutionTrumpington Pavilion employs an unusual multi-coloured exterior treatment. An artist specialing in the technique has dribbled green, blue, red and yellow randomly onto a corrugated plastic sandwich sheet, which is then covered with Zaun’s Duo8 mesh in bright green, fixed to coloured timber battens.The pavilion includes a main building with a hall, youth room, kitchen, toilets, office and inter-connected changing rooms for two teams plus an officials’ room.The doors to the changing rooms are in boldly contrasting colours. At the same time, an eight-metre green mesh electric sliding gate protects the building but opens to provide unrestricted access to the patio and the King George V Playing Fields beyond.Zaun installed the Diamond cantilever sliding gate with Duo8 mesh in-fill, KeyFob and internally mounted switchto ensure both the safety of all users of the pavilion when the gates are operated especially children, and the security of the contents when the pavilion is not in use.The original pavilion, built in the early 1950s, was about half the size of the new main building, including a small hall and changing rooms.
Sponsored
St Mary’s Garden Village, Ross-on-Wye

St Mary’s Garden Village, Ross-on-Wye

Broxap Ltd

Ross-on-Wye’s skyline has formed the inspiration for new community facilities at a residential development.The iconic St Mary’s Church spire is reflected in the play area and recreation space created by Hand Made Places for families of St Mary’s Garden Village.The secure play area is surrounded by timber picket fencing and accessed via a bespoke arch double leaf gateway.The planed and sanded softwood arch is engraved to read St Mary’s Garden Village.Four further bespoke archways make up a fun walkway leading to a custom-built version of our Milton Play Unit.The play tower features a slide, rockhold ramp, ladder wall and stepped platform with a church-style spire to one end.A Hawkley Adventure Trail, Swing Steps and Bird’s Nest climbing frame are available for older children.And no play area is complete without the swings, with a Double Cradle Swing installed for little ones as well as a Nest Swing.A Star Stage brings role play to life for little ones, with timber Modular Radius Seating, including a bench engraved with the location, also available. Our cute little Hedgehog Animal Face is watching over everyone. Our installers laid a Bound Rubber Mulch safety surface in neutral green and brown colours.In addition to the play area installation, our parent company Broxap Street Furniture manufactured and supplied six Harrogate Senior Cycle Stands for community use. Four cast iron Blackburn Seats, finished with hardwood slats and a black frame, were provided along with a Derby Standard litter bin.
Sponsored
Novotel Hotel, NineB Restaurant – Leicester

Novotel Hotel, NineB Restaurant – Leicester

Roché Systems Ltd

THE CLIENTThe Novotel Leicester is a modern hotel in the heart of the city, convenient for business or leisure guests. The hotel boasts easy access to many of Leicester most exciting attractions, close to the Leicester Tigers Stadium and King Power Stadium, the National Space Centre and The Curve Theatre. THE CHALLENGETo provide shading to expand their outdoor dining area for the NINEB Restaurant, as well as added brand visibility with the addition of sign writing on the awning and side blindsTHE SOLUTIONThe Markilux Pergola was chosen for the frame and roof, with the addition of Markilux 790 side blinds to offer additional wind protection, partitioning and brand awareness.Markilux PergolaThe Markilux Pergola awning shelters large areas from the sun. Two slender support posts at the front provide excellent stability, even during showers, and unobtrusive lateral guide tracks. The pitch of Markilux Pergola is easily adjustedMade to measure and manufactured in GermanyRated for wind speeds up to 30mph (Beaufort 6)Water resistant, dirt proof, non fading acrylic fabric with UPF 50+ sun protection4 frame colours and hundreds of fabrics choices as standardChoice of electric or remote control operationExtended product and workmanship guarantee availableMarkilux 790The Markilux 790 is simple to operate and has a compact cassette which fits to the wall vertically. It extends manually and fixes to a freestanding post or bracket fixture on a fence railing.Made to measure and manufactured in GermanyWater resistant, dirt proof, non fading acrylic fabric with UPF 50+ sun protection4 frame colours and hundreds of fabrics choices as standardExtended product and workmanship guarantee available
Sponsored
Victoria Station's 100-strong cycle and repair hub

Victoria Station's 100-strong cycle and repair hub

Cyclehoop

In 2014, Cyclehoop was commissioned by Network Rail to find a cycle parking solution for Victoria Station.These improvements were to ensure a more cycle-friendly environment, to encourage more people to combine rail and cycle travel and to reduce congestion within and around the station. Used in conjunction, bicycles and trains can help reduce carbon, provide a door-to-door commute and deliver huge environmental benefits, all of which are issues that Cyclehoop are incredibly keen to encourage.The locations that were chosen for the cycle parking were the front and the rear of the station by the car park and taxi rank, due to convenience for users and also the CCTV coverage which enhances bike security.We designed the 100-strong custom made cycle parking facilities in line with Victoria Station’s interior aesthetic. This comprised Two-Tier Cycle Racks, maximising its footprint, as well as fencing securely enclosing the racks, adding an extra deterrent to thieves.The success of the cycle parking prompted a request several months later from Network Rail to upgrade the facility into a repair hub. We installed our Public Bike Pump and Repair Stand to provide a convenient repair hub for commuters in an emergency situation, or just for a quick shot of air. The idea of adding pumps and repair stands at major stations prevents abandoned bicycles and ensure people who cycle can get to their destination swiftly in the event of any fault with their bicycles.“Overall we have found the racks have been a source of positive feedback from station users. They significantly increased capacity, coverage by CCTV and a more convenient location allows us to provide a more effective customer service to our passengers. Equally their design allows a more efficient use of space at the station and offers a modern and user friendly experience.” – Adrian Gogay, Network Rail

Showing 145-150 of 150

Feedback