NBS Source
I'm a manufacturer

"emergency fire shutters barriers"

7,013 results found

Sort by:

Showing 73-108 of 610

Sponsored
Forbury Place, Reading. Fire Curtains over Lift Doors

Forbury Place, Reading. Fire Curtains over Lift Doors

Coopers Fire Ltd

Coopers installed FireMaster fire curtains with smoke control over the lift door openings on each of the ground and upper seven floors and two on the basement so a total of forty eight curtains. An important part of the design of the building on the ground and first floor was to subtly integrate the fire curtain headbox and side guides into the lift opening.
Sponsored
Glan Clwyd Hospital

Glan Clwyd Hospital

Roché Systems Ltd

Glan Clwyd hospital is one of Roché’s many public sector customers.The hospital required a total of fifteen shutters: a mix of M411 shutters and fire shutters.Roché’s fire shutters are linked to the building’s modern fire control and security management system, helping to prevent the spread of fire outbreaks, ensuring the safety of patients and staff.M411 shutters are used on reception counters to protect sensitive documents and controlled areas during closed hours.
Sponsored
POSI-Glaze Protective Barrier at The London Science Museum

POSI-Glaze Protective Barrier at The London Science Museum

Pure Vista Ltd

The London Science Museum is one of London’s major tourist attractions, attracting 3.3 million visitors annually. Now using, interior glass balustrade. The museums’ collections comprise of both permanent and temporary exhibits. So, when they design each exhibit, they must consider how easy it is to change and adapt the space for any new collections. Displays can be created from many things, including an interior glass balustrade. The Science Museum aims to provide inspiring exhibitions to its visitors. The museum approached Pure Vista while looking for a barrier to protect an extremely valuable exhibit, an original prototype of the Brougham carriage. They required an interior glass balustrade in this London location, that was secure enough to prevent visitors from touching the exhibit but didn’t spoil the viewing opportunities. This also needed to be easy to move and adapt. Knowing that Pure Vista specialise in easy-to-adjust glass balustrade for both interior and exterior projects, they approached us for a solution.Pure Vista proposed a POSIglaze solution for this project.The force loading required for interior light-commercial balustrade is 1.50kN, according to UK building regulations. Which can be achieved with POSIglaze using the right type of glass (19mm or 21.5mm laminate SentryGlas). The real benefit of POSIglaze is that it’s the most adjustable balustrade system on the market, all thanks to our patented screw-clamp technology. This meant that the museum could easily remove a panel of glass in order to move exhibits in and out of this space. The adjustment of this system doesn’t require special skills or tools. 
Sponsored
East Park Exeter Case Study

East Park Exeter Case Study

PFC Corofil Fire Stop Products

At Exeter Park, PFC Corofil offered technical solutions by our ASFP trained technical team for a fully tested range of cavity barriers to enable Longworth design team to specify the correct barriers for each location throughout the open façade.
Sponsored
Industrial Strength Stainless Steel Sinks For State Of The Art Fire Station

Industrial Strength Stainless Steel Sinks For State Of The Art Fire Station

Anderson, GEC Ltd

Made-to-measure brushed satin stainless steel sinks and worktops, from GEC Anderson, have been installed in the breathing apparatus rooms, kit cleaning rooms and kitchens of the new Winchester Fire Station.The station relocated from its home of 74 years at North Walls to its new state-of-art facility inEaston Lane, Winnall,Winchester. The new five-bay fire station is operationally and strategically located on the outskirts of the city on a major access route, close to the M3. The new facility can accommodate 70-plus personnel and provides a continuously crewed facility as opposed to the previous just day-crewed arrangement, thus providing faster emergency cover over a greater area.Freestanding worktops, totalling more than 10 metres, were installed in the breathing apparatus (BA) room and kit cleaning area of the fire station. Industrial sized sinks were included to provide an effective washing facility for the fire crews specialist equipment. Sarah Collins, architect for Hampshire County Councils Property Services Department said, The specialised sinks were chosen for their ability to cope with an environment of high usage. We wanted a material that was robust enough to take the everyday knocks and last for the lifetime of the building. GEC Anderson sinks certainly met this requirement and are performing extremely well.
Sponsored
DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU Fires

DRU has installed 89 gas fires into Ebury Square, a development of luxury 1-4 bedroom apartments and 5 bedroom penthouses by Berkeley Homes in Belgravia, London. The fires were selected for their contemporary design, easy installation and high energy efficiency. They consist of single-sided and double-sided tunnel models. Berkeley Homes selected DRU because of their unique PowerVent® flue system. Due to the configuration of the apartments, the flues had to be extended up to 64 metres throughout the service ducts in the complex, with most of the fires having external PowerVent® terminals on the roof.
Sponsored
Fire Rated MySmartBox and Mailboxes

Fire Rated MySmartBox and Mailboxes

DAD - DECAYEUX

Fire-rated mailboxes and fire-rated parcel lockers integrated in the same unit. Recessed into the wall.
Sponsored
Jackson Fire Rated

Jackson Fire Rated

The Safety Letterbox Company

THE PROJECTThe Jackson fire rated project features freestanding mailboxes that conform to the BS476 Part 6 & 7. The small bank of fire rated mailboxes are installed internally in a residential building to securely store mail for residents. The mailboxes have the use of support legs which are secured to the concrete floor with heavy-duty fixings. Support stands are colour coded to match the same finish as the bank of mailboxes.Mailboxes that meet the BS476 Part 6 & 7 will satisfy the demands of fire protection in most cases, and provide an affordable alternative if the surface spread of flame and non-flammable materials are acceptable. The mailboxes feature an inward sprung flap, which is a standard feature across the fire rated mailbox range. An intumescent strip is placed on the internal side of the mail flap, which expands when the temperature increases and ensures that the flap is kept closed – stopping the oxygen flow into the mailbox and reducing the risk of fire spreading through the mailbox.An alternative fire rated solution is that mailboxes are manufactured to meet the BS476 Part 22, this group of products contain a series of features and benefits that result in a ‘one-hour integrity’ rating. As a result of the comprehensive collection of features, this product range is the premium option.PROJECT DETAILSProject Type: Private ResidentialProduct: Fire Rated 2 MailboxInstallation: FreestandingFire Rating: BS476 Part 6 & 7Accessories: Identification Nametabs/Support legs
Sponsored
Leabaib Health Centre, Doha, Qatar - FireMaster Concertina and FireMaster Fire Curtains

Leabaib Health Centre, Doha, Qatar - FireMaster Concertina and FireMaster Fire Curtains

Coopers Fire Ltd

Our range of products meant all of the fire curtain requirements were met and the fire regulations could be adhered to keep the occupants of the building safe. Coopers FireMaster Concertina is a great way to offer compartmentation between floors and was installed because there were no columns at the atrium to install side guides and there is no smoke extraction system on the atrium so functional gaps were not allowed.
Sponsored
Five Guys Restaurant, Dubai Marina Mall. FireMaster Concertina multi-side fire curtain

Five Guys Restaurant, Dubai Marina Mall. FireMaster Concertina multi-side fire curtain

Coopers Fire Ltd

Coopers FireMaster Concertina is a great way to offer compartmentation between areas like a kitchen and restaurant and able to divide up these two critical areas in a public building and act as a fire break. By installing the FireMaster Concertina meant it would provide the building with an approved, non-invasive means of fire protection that would satisfy the fire regulations as well as ensuring that the open plan design remained as intended. Compartmentation and Protected Means of Escape were required as part of the fire safety solutions.
Sponsored
HASC: Top level occupational safety and emergency care

HASC: Top level occupational safety and emergency care

GKD - GEBR. KUFFERATH AG

Great emphasis is placed on safety in Pasadena, a suburb of Houston, Texas. As America’s oil stronghold and home to NASA’s legendary Space Center, the region is famous for its particularly dangerous and hazardous working conditions. The Houston Area Safety Council (HASC) was therefore established back in 1990 on the initiative of local industrial operations as a non-profit institution to provide safety training. The objective here was to train workers in order to raise their safety awareness as a way of preventing workplace accidents. Some 25 years later, this idea has developed into a leading international training and occupational safety center that trains over 1,500 people every day. Construction of a dedicated occupational health clinic with emergency care represented another key step on the HASC’s holistic support program. The clinic design by Kirksey Architecture gets its distinctive face from the semicircular main entrance. GKD-USA used a new etching technique for the design of the 100 square meter roof parapet, which is made from semi-transparent Omega 1510 stainless steel mesh from GKD – GEBR. KUFFERATH AG. This led to a silhouette-like panoramic view that reflects the dynamic economic region and the everyday working life of the people that live in it.Oil and gas have been produced in Houston for more than 100 years. However, the region experienced a genuine boom from shale oil drilling and fracking. Today, around one third of all oil produced in the US comes from Texas. With its Mission Control Center, which has enjoyed worldwide fame since the Apollo flights to the moon, the Space Center Houston has been just as important for the development of the city. Space flights are still monitored here to this day and astronauts from across the globe are trained for future missions. The city’s skyline is characterized by massive production plants from the oil, gas, chemical and food industries, as well as research institutes and countless buildings of the supply industry, construction and service sectors. The huge influx of workers resulting from the oil boom led to enormous growth of the city. With 2.3 million residents, Houston is today the fourth largest city in the US – behind New York, Los Angeles and Chicago. Starting in 2009, the new campus of the Houston Area Safety Council was created in three construction stages. It was constructed on a 34 hectare site in Pasadena, just 15 kilometers from Houston, that was acquired one year previously. Local architecture firm Kirksey, which specializes in green buildings for industrial operations, planned the entire project. It designed the campus as a one-stop shop for employee selection, training and development, background screening, workplace and site safety as well as company health and welfare services. The first phase of construction focused on the 6,300 square meter training center with twelve classrooms, a 220-capacity auditorium, computer laboratories with 650 workplaces, various convention and common rooms, as well as a car park for 1,000 vehicles. It was opened in 2013 as the new HQ of the HASC. Just one year later, the campus then opened two further large areas, boasting 2,700 square meters each. Providers of tool and workplace equipment, as well as a training center for practical training, complemented the location’s offer from then on. Construction of a 1,580 square meter occupational health clinic with emergency care marked the third and last major construction phase to date. This meant that within a period of just six years a state-of-the-art campus employing the latest training facilities was established, offering 1,500 practical and computer-based training sessions every day – which represents over a million units per year. To cater to these requirements all buildings were equipped to the latest technical standards. They also set standards in ecological and energy-usage terms and are all LEED-certified.Visualization of identityThe Occupational Health Center of the HASC was also planned with a keen eye for detail. Ceiling-high windows create friendly rooms in the clinic that are flooded with light and whose inviting ambience is underlined by a carefully coordinated interior color concept. The challenge for the planners was to make the atmosphere light and pleasant, yet robust enough to withstand the rough day-to-day operations with heavy footwear or soiled work clothing of the patients. A fully-glazed semicircular entrance area underlines the building’s welcoming effect. Its raised canopy bears the clinic’s name and also creates the stage for one of the rooftop parapets made of stainless steel mesh that follow the semicircular building form. The shimmering texture combines technical aesthetics with a large number of functional performance characteristics. The mesh thereby guarantees efficient solar protection for the recessed windows on the top floor, while granting unrestricted views of the beautifully sculpted green spaces on the campus. Despite its sophisticated appearance, it also offers reliable protection from the hurricanes regularly encountered in the region. Low-maintenance, durable and almost completely recyclable at the end of its useful life, the mesh supports the LEED-certified sustainability of the building. For the architects, however, the decisive impetus for selecting this material came from the specific mesh design, which facilitates imaging by etching. Their design included an illustrated balustrade as an identity-creating element of the clinic that visualizes working life in the region and thereby also the focus of the HASC. The image developed by Kirksey shows the skyline of Houston with skyscrapers, drilling rigs, chimneys and cranes together with the people that work there. This complex perspective was applied to the stainless steel mesh in a silhouette-like form using a special etching process developed in-house by GKD-USA. The smooth surface and relatively tight structure of the Omega mesh provided ideal prerequisites for this. Using blasting abrasives, GKD modified the metallic surface in such a way that the template, which was highly filigree in places, appeared finely contoured. When using etching, all surfaces that are to remain untouched are usually masked off carefully. However, the complexity of the motif specified by the architects at Kirksey presented the mesh specialists with the challenge of designing multiple levels to lend the image the desired spatial depth. Unlike a painting, with etching it is not possible to achieve dimensions, perspective and depth simply by using different colors. In comprehensive tests, GKD therefore developed a process with which the design template could be blasted with the desired level of detail and spatial effect. This led to a visually seamless panoramic view of the hustle and bustle in the region over a total area of 100 square meters, comprising seven panels – each measuring 3.4 x 4.3 meters. Without any further surface treatment, this imagery is both permanently weather-proof and UV-resistant. Depending on the incidence of light and the viewing angle, the images can appear either transparent or opaque. At night, spotlights lend the scenery the appearance of a shadow theater using targeted light accents.
Sponsored
DRU Maestro gas fire completes transformation of classic Camden town house

DRU Maestro gas fire completes transformation of classic Camden town house

DRU Fires

Architect Tamas Deilinger and his wife chose a DRU Maestro 75 contemporary gas fire to be the main focal point in the living room of their classic town house It was installed by London fireplace specialists Acquisitions. They adapted the existing chimney, creating a larger opening for the fire and inserting the balanced flue all the way up to the roof. The Maestro 75 has the exclusive DRU Dynamic log burner, which generates high, dense, realistic flames underpinned by a comforting glow. The flame picture can be controlled with a smartphone or tablet using the unique DRU Eco Wave app.
Sponsored
Fire-rated mailboxes and MySmartBox

Fire-rated mailboxes and MySmartBox

DAD - DECAYEUX

This is what new lobbies will look like in Smart Buildings. Installed this week in the famous Lewisham Exchange in London:✔ Fire rated mailboxes✔ Fire rated electronic parcel boxes✔ Fire rated electronic control unitResidents will benefit from a secure way to receive both mail and parcels, while property management will have full control via our cloud based management platform.
Sponsored
Battersea Power Station, London

Battersea Power Station, London

Coopers Fire Ltd

Coopers Fire proudly installed multiple fire and smoke curtains in this iconic building in London.Coopers Fire was approached in 2013 to support multiple Architects and Fire Engineers to work through the difficult interface designs on the historic Battersea building that posed multiple challenges in incorporating smoke and fire strategies whilst maintaining the legacy build design.This was a great opportunity to once again put forward the innovative solutions that have attracted Architects to Coopers Fire on many occasions previously.These challenges followed with the introduction of bespoke curtain systems stretching the designs beyond the norm. There was also a need to carry out support testing to validate their capability and to offer comfort to the stakeholders.Coopers Fire offered continual support to the key stakeholders including the Architect and Fire Engineer community, giving them confidence in ongoing collaboration with Coopers Fire for future projects.The Coopers Fire product design and interfacing, complete with valid specifications, went a long way to assist a Contractors partnership decision in supplying and installing the finished product whilst enabling live design changes with the aligned Architect engaged on the project.The project required FireMaster® Concertina curtains 25m width and 12m in height of straight sections, with an integrity rating of 30 minutes.The Coopers Fire Concertina product portfolio allowed for 12m width and 8m height of straight length sections so the product needed re-designing and bespoke engineering to suit the requirements of the project.A specimen of the engineered solution was tested at an accredited fire testing lab. The specimen achieved 66 minutes integrity rating, without failure.The combined engineering design, testing and fire test data allowed Coopers Fire to meet the requirements of supplying a 25m wide and 12m high FireMaster® Open Concertina fire curtain.One major challenge of the large Concertina products was installation. The 12m drop Concertina fire curtains were installed successfully on site using a combination of scaffolding and mobile platforms and at some points with minimal headspace to work within.The Concertinas were so long that onsite redesign and engineering were required to ensure the bottom tray engaged perfectly with the headbox.The Concertina retaining guides were also so long they required onsite welding. A further four levels below the curtain drop, meant that total installation height was higher than 12 metres from the ground spanning over the voids either side of the bridge below.The Coopers Fire production and installation teams collaborated to manufacture the individual parts of the Concertina fabric off site to ensure the programme of installation was kept on time.Coopers Fire installed:47 x Vertical fire curtains7 x Concertina curtains32 x Vertical smoke curtainsThe team used for the Concertina installation specialise in this product and were able to overcome onsite challenges to ensure the huge Concertina fire curtains operated as expected and deployed effectively.
Sponsored
Kendrick Homes selects energy-efficient DRU gas fires for development of executive homes in West Midlands commuter village

Kendrick Homes selects energy-efficient DRU gas fires for development of executive homes in West Midlands commuter village

DRU Fires

Kendrick Homes has selected DRU gas fires for ‘The Ridings’, a development of nine executive properties in the commuter village of Balsall Common, near Coventry. DRU Metro 100XT frameless gas fires are situated in six of the properties, with the other three having DRU Global 70XT models in fire surrounds. Both fires are balanced flue models, which do not require a chimney and are installed into a false chimneybreast. The fires have heat outputs of 7 kW, enough for a large living room. They feature realistic log fire displays and are operated by remote control.
Sponsored
McDonald Road Fire Station

McDonald Road Fire Station

Taylor Maxwell

Refurbished and remodelled in 2021 to become the headquarters for the Scottish Fire and Rescue Service in Edinburgh, was the McDonald Road Fire Station. We were pleased to work with Robertson Construction, Smith Scott Mullan Associates and HSR Building Services to supply Argeton terracotta and Corium brick cladding to complete the project.
Sponsored
HOTEL RUSSELL, LONDON, UK

HOTEL RUSSELL, LONDON, UK

Coopers Fire Ltd

Fire separation between floors reinstated with FireMaster® Fire Curtains
Sponsored
Bespoke Joinery Manufacturer uses Fire Door Foam and Intumescent Sealant on Crawley Town Hall

Bespoke Joinery Manufacturer uses Fire Door Foam and Intumescent Sealant on Crawley Town Hall

Fire & Acoustic Seals Ltd

WJL Contracts have been providing high-quality, bespoke joinery solutions to some of the largest contractors in UK construction for over forty years. Known for their expertise and design flair, their fire-rated doorsets and panels have been installed in prestigious building projects spanning the education, entertainment, and commercial sectors. They also offer a full installation service which ensures that their fire-rated and acoustic products are installed competently, setting them apart from a lot of other joinery manufacturers. One of these projects was for Crawley Town Hall in West Sussex on behalf of Kier construction. They successfully delivered bespoke joinery and acoustic panelling doors, an elliptical ceiling, a feature wall, mirrors and kitchenettes. The team overcame significant challenges to hit the deadline including managing the installation of 2700 large 2.7m doors.Fire and Acoustic Seals Fire Door FoamTM and Intumescent Acrylic Sealant were used to install all fire-rated doorsets to guarantee their compliance. Joel Mayer, Buyer & Commercial Manager at WJL comments“We’ve been using Fire and Acoustic Seals’ own-label Fire Door FoamTM and Intumescent Acrylic Sealant on our large construction projects for many years. Our team particularly like the Fire Door FoamTM because they think the quality is excellent compared to others on the market, it’s quick and easy to install and it’s backed up by specific fire door test evidence.We also love the service we get from the team at Fire and Acoustic Seals which is why we’ve continued to work with them for over a decade. They’re incredibly reliable and have a fast turnaround service which ensures our onsite team are never without the products they need when they need them. This is really important to us as we are constantly working to tight deadlines.” For more details about this and other WJL projects visit https://wjlcontracts.co.uk/portfolioContact our team for more information about Fire Door FoamTM and Intumescent Acrylic Sealant.0121 521 2179 | sales@fireandacousticseals.co.uk 
Sponsored
DRU designer gas fires specified for Television Centre, former iconic BBC HQ

DRU designer gas fires specified for Television Centre, former iconic BBC HQ

DRU Fires

Television Centre in Shepherds Bush, West London, is the iconic former BBC HQ that was opened in 1960. Architects Allford Hall Monaghan Morris and developers Stanhope have now created a multi-media environment that includes apartments, offices, studios, hotels, restaurants and retail, all based around the famous crescents that defined the original complex. DRU Metro 100XT/2 designer gas fires were specified for a selection of the apartments and were installed by DRU dealers Victoria Stone of Tunbridge Wells. They utilise the exclusive DRU PowerVent system, which enables the fires to be installed in apartment complexes and other challenging locations.
Sponsored
Dyed Veneer Firescreens Partitions and Fire Doors in Office Refurbishment.

Dyed Veneer Firescreens Partitions and Fire Doors in Office Refurbishment.

Forza Doors Limited

Split over basement, ground and three upper floors, the Charles Doll Building on Grape Street, London, offers a contemporary and functional specification in this stunning office refurbishment. The development mixes industrial elements with a crisp modern aesthetic by carefully combining characterful architectural features, including vaulted ceilings with exposed brick and steelwork.Named after its architect Charles Fitzroy Doll, the building is clad in decorative thé-au-lait (“tea with milk”) terracotta – Doll's use of grand façades is understood to have resulted in the expression, ‘all dolled up’. The first floor has been fitted out to a high standard with office furniture from Vitra, providing the perfect space for those who want to move in and get straight to work.The lobby mixes vibrate contemporary wall art with industrial light fittings and brickwork. Forza’s in-house CAD team planned the bespoke black oak Firescreen partition wall to match the architect's design. As a market leading passive fire product, this Firescreen provides both integrity from Smoke and Fire and insulation from heat. This is important because in a fire emergency heat has been shown to ignite secondary fires to items, such as curtains or carpets, that are near the other side of non-insulated partitions.Via the Thinking Space Design & Build, Forza Doors supplied twenty FD30 Fire Doors with stained frames and skirting boards to match throughout the five floors of The Charles Doll Building. Chosen to match the steelwork throughout the development, the dark satin finish of the doors was selected from Forza’s Creato range of dyed veneers. This ‘Illunis’ finish is one of twelve fashionable choices in the range. Dyed veneers are an increasingly popular choice with designers as they offer cost savings over stained veneers without compromising quality.The Doors with glass vision panels, required to allow light through to the stairwells, feature our flush and quirk bead. A minimalist design option where one side of the doors is completely flush right up to the glass vision panel and the other side has a very simple elegant bead detailing.
Sponsored
Lancaster Fire Station

Lancaster Fire Station

Stone Cladding Systems

Architect: Frank Shaw AssociatesMain Contractor:  John Turner Construction GroupInstaller: Cubic FacadesLancaster Community Fire and Ambulance station was the first purpose built integrated fire and ambulance station in Lancashire. Designed by Frank Shaw Associates the project involved the construction of a new appliance bay while the facility remained fully active. Accommodating 2 fire engines, 7 ambulances and the North West Blood Bikes team. The bays are clad in Aztec Rainscreen faced with Peakmoor Sandstone in keeping with the area.Completed in September 2018 the stations Aztec cladding was fixed by Cubic Facades and has had excellent reviews including a commendation at the Lancaster & District Design Awards 2019.
Sponsored
160 fire and smoke protection doorsets between the antarctic and rainforest ensure the safety of the visitors to Klimahaus® Bremerhaven 8

160 fire and smoke protection doorsets between the antarctic and rainforest ensure the safety of the visitors to Klimahaus® Bremerhaven 8

Teckentrup UK Ltd

Klimahaus® Bremerhaven 8° is a spectacular exhibition complex, north of Bremen, Germany. The idea behind the large project is a simulated journey around the world measured at eight degrees 34 minutes east. This is the longitude of Bremerhaven and all the other locations on the journey: Switzerland, Sardinia, the Sahel, the African rain forest, the Antarctic, Samoa, Alaska and the north Frisian island of Langeness. Teckentrup provided smoke and fire doorsets to ensure unobtrusive and safe everyday passage and emergency egress for visitors to the exhibition. Almost every doorset was individually planned.
Sponsored
Southwyck House (the Barrier Block), Brixton, London

Southwyck House (the Barrier Block), Brixton, London

Vestre

In 2016 award-winning landscape designers, The Edible Bus Stop, were commissioned by the Brixton BID to deliver a legacy installation for the Brixton Design Trail as part of the London Design Festival.Their brief was to create a parklet at the entrance to this famously foreboding building. The space had been habitually populated by street drinkers and labelled an anti-social environment by the residents and neighbouring businesses. The brief was to challenge the notion that the addition of seating and creating a space to dwell would increase anti-social behaviour and, on the contrary, that good design could improve perceptions of safety and empower a sense of wellbeing in a community.During the summer, planting beds were refurbished and many edibles and herbs, including fruit trees, were planted. Several Vestre Stripes elements were installed to punctuate the space with communal seating. The parklet was an instant success and quickly populated by residents of all ages, passers-by and visitors to local businesses. As a result, the ‘test-bed’ has now become a permanent legacy; an exemplar of how local stakeholder commissioning and intelligent socially minded design can be an agent of social change to create spaces of genuine community value.Client: Brixton BIDLandscape Design: The Edible Bus StopAddress: Southwyck HouseColdharbour LaneBrixtonLondonSW9 8TX
Sponsored
Temple Back Fire Station

Temple Back Fire Station

Kingspan Insulation

The size and poorly insulated design of the Avon Fire & Rescue Service's existing building makes it uneconomically expensive to maintain and run. To address this, the building is being demolished in stages with a new fire station being built on a much smaller footprint. The energy performance of the building envelope was a key consideration. A target U-value of 0.23 W/m²·K was set for the walls of the building. To help achieve this Kingspan Kooltherm K15 Rainscreen Board was specified. This has allowed the Service to not only save lives, but also energy and money.
Sponsored
Darlington Fire Station

Darlington Fire Station

Ronacrete Ltd

MJF Group completed the coating of Darlington Fire Station using RonaFloor HB200. The bays were completed using dark grey with the borders in brick red. Before the application of RonaFloor HB200, they were required to install a damp proof membrane and opted for our RonaFloor Epoxy DPM which can be applied to substrate with an RH of up to 97%.
Sponsored
UBS Broadgate

UBS Broadgate

Roché Systems Ltd

Broadgate, at the heart of the City of London, is home to a mix of prestigious buildings and architectural designs. One of the latest building designs is UBS’s new headquarters, by Ken Shuttleworth of Make Architects, which promises to be one of the world’s greenest buildings.With the project well underway, ISG Construction called-upon Roché to assist, thanks to our track record in handling unique, high-profile projects. We installed a number of fire curtains, fire shutters (including a bespoke design 9m-wide fire rated shutter) and V77 vision shutters.
Sponsored
London Stadium

London Stadium

Hart Door Systems Ltd

London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.Project/doors:21 Fire and Security shutters (2010)50+ Fire and Security shutters (2015)The challengeHart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.The solution2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena. The successHart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.The review:“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Sponsored
Fire Rated Decking and Class A substructure

Fire Rated Decking and Class A substructure

Wallbarn Ltd

Refurbishment of terrace with Class A fire rated non-combustible decking system. Exadeck porcelain decking boards were fitted to Wallbarn aluminium rail substructure with Class A MetalPad EX adjustable height pedestals. Retro-fitting of entire terrace to comply with fire regulations Approved Doc B and BS 8579.
Sponsored
Tough, heavy duty asphalt for fire station

Tough, heavy duty asphalt for fire station

Tarmac

The new, purpose-built Community Fire and Police Station on a two acre site in Prescot required a durable surface for the main yard area, car park and access road. This was a large site, incorporated three fire engine bays, a practice drill tower and community meeting rooms. Having replaced two local fire stations it was expected to be a busy station used by a range of vehicles. With each fire engine weighing up to 13 tonnes and using power-assisted steering the new surface would be subject to extreme turning forces. It would need to offer long-term durability and loss of aggregate due to surface abrasion. After considering the options, Tarmac’s ULTIPHALT HD was chosen, a tough, high performance 10mm asphalt with advanced modified binder. ULTIPHALT HD has been proven to deliver enhanced resistance in challenging environments like container ports and distribution centres. The modified binder enhances durability but also helps to maintain workability and aid compaction, even in low temperatures.
Sponsored
ExCel London Phase II - Fireroll Acoustic

ExCel London Phase II - Fireroll Acoustic

Bolton Gate Company

The SiteExCel London opened in November 2000 and was the integral component of a huge regeneration project in the area of the Royal Victoria Docks next to the River Thames. The Phase 2 project had the primary objective of increasing the existing flat floor space by 32,500m² resulting in an incredible one million square feet of flexible floor space. This projected the already highly regarded Excel  London into the position of a world class exhibition and conference venue.  Close to London City Airport and with it’s own dedicated station on the Dockland Light Railway the centre manages to attract millions of visitors per year and is a major employer within the local community.The ProjectHaving worked with Sir Robert McAlpine on numerous projects, Bolton Gate Company were extremely pleased to be chosen to again work alongside this Main Contractor particularly on this prestigious project.   The contract initially involved the supply and installation of a range of 30 and 60 minute fire rated shutters to satisfy the requirement for fire compartmentation between different exhibition spaces and to communal walkways throughout the Exhibition Centre. As the fire strategy developed it became evident that, for particular areas including some of the largest openings (7m x 10m), the fire shutters were required to provide fire integrity but this also had to be combined with an acoustic rating of up to 17dB RW. At the time, acoustic rated fire shutters did not exist on the market as a single product solution and consequently it was typical to supply two separate shutters with one to satisfy each requirement but, given space limitations, this was not a viable option. The SolutionDrawing on years of experience, Bolton Gate Company were committed to developing a workable solution in order to fully satisfy the project requirements.  Moving away from the standard ‘single skin’ type fire rated rolling shutter, efforts were concentrated upon manufacturing a new insulated type shutter that would be capable of providing the acoustic rating. The new shutter design was subjected to a series of rigorous testing, include both fire and acoustic tests all of which were in keeping with the very latest standards. The testing proved to be highly successful and we were pleased to complete our contractual obligations using the very first Fireroll Acoustic shutters which had achieved an E120 fire rating and 22dB RW acoustic rating. The Fire Shutter - Fireroll Acoustic provided a compact, hard wearing, yet aesthetically pleasing single shutter solution which was entirely suitable for incorporation into such a highly regarded exhibition and conference centre.   
Sponsored
Long Melford Fire Station

Long Melford Fire Station

Jewers Doors Ltd

Suffolk Fire and Rescue Service recently commissioned Norwich-based Cooks Industrial Doors to replace failing vehicle access doors at Long Melford Fire Station in rural Suffolk. As a major reseller and installer, Cooks contacted Jewers Doors to design and manufacture state-of-the-art sliding-folding doors which would replicate the style of the original doors.
Sponsored
Platform Lift for Fire Station

Platform Lift for Fire Station

CIBES Lift UK

This colourful Cibes A5000 platform lift is installed in an old fire station in Falun, Sweden.
Sponsored
Strategic Partnership with Willmott Dixon

Strategic Partnership with Willmott Dixon

Fire & Acoustic Seals Ltd

We’ve been a strategic partner with Willmott Dixon for several years now, ever since our Fire Door FoamTM was mandated on their ‘Yellow Book platform’.  The online manual exists to enable their staff and supply chain partners to use verified products on their projects. To meet their careful criteria we had to demonstrate the foam’s high-performance fire-stopping capabilities when installed between different substrates and timber fire doorsets.  As such a safety-critical component, we also had to provide its third-party test certification from Certifire, IFC and Warringtonfire to assure them of its credentials.Ryan Atkinson, Senior Strategic Buyer at Willmott Dixon comments“Fire and Acoustic Seals Fire Door FoamTM is now listed on our ‘Yellow Book platform’ – Willmott Dixon’s online guide to preferred materials, site installation and workmanship best practice. The foam went through our rigorous diligence checks to ensure it meets the set criteria required to become a specified product in the guide and to become a key component of the Willmott Dixon standard kit of parts. This product represented a rounded view of quality, cost and time which are some of the key factors we consider when selecting products for our ‘Brand Standard’.”Our Fire Door FoamTM has since been used on many Willmott Dixon projects across the UK. One of these is the high-profile Perry Barr Residential Scheme in Birmingham which will provide 1,400 much needed new homes in the city when complete.Ashley Devonport, Senior Quality Manager at Willmott Dixon comments“Fire and Acoustic Seals Fire Door FoamTM has been used to seal the gaps between the door and substrates on the apartments, risers, and communal areas on the prestigious Perry Barr Residential Scheme. This product is mandated on our Yellow Book platform and was selected for its excellent fire-proofing properties and independent test evidence. Julian and the team also provided excellent product training and speedy technical support when needed.”Contact the team for more information about Fire Door FoamTM. 0121 521 2179 | sales@fireandacousticseals.co.uk 
Sponsored
Taking the right steps to combat fire

Taking the right steps to combat fire

Premier Loft Ladders Ltd

A fire rated loft hatch and ladder provides safe and convenient access into a loft or attic, while still providing up to 120 minutes of fire resistance. It can also provide high levels of thermal insulation and therefore help to keep energy costs down. Premier Loft Ladders has released an application solution guide for fire rated loft ladders. It provides useful tips and advice on subjects such as the choice between aluminium or wooden fire rated loft ladders, as well as considerations such as thermal insulation and strength. You can also find details of their fire rated product range.
Sponsored
Fire Door Safety Maintained at West Lothian Schools with Yeoman Shield Fire Door Services

Fire Door Safety Maintained at West Lothian Schools with Yeoman Shield Fire Door Services

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

West Lothian Council schools, Deans Community High School and Armadale Academy, are maintained by Bellrock Group under a contractual PPP3 project agreement. Taking on this maintenance management for the two school buildings places the Bellrock management team as the Responsible Person when it comes to compliance to fire safety maintenance which incorporates fire rated doors.With this in mind, Martin Igoe, Senior FM for Bellrock, engaged with Yeoman Shield Fire Door Services when it came to assessing and protecting the condition of the schools’ fire doors with an impact protection system.As a brand name of Harrison Thompson & Co. Ltd. who are a registered FIRAS Warringtonfire (a UKAS accredited scheme for fire door and passive fire resisting products installation) company, Yeoman Shield Fire Door Team were able to undertake a conformity survey of the doors in both schools.This consisted of an assessment of the condition of the fire doors, noting remedial work required to improve the doors functionality, replacement of doors where required as well as noting advisory door protection products that could improve the look, condition and extend the life cycle of the doors by solving impact damage problems.After an itemised quotation for the work had been raised and accepted, Yeoman Shield directly employed fixing operatives carried out the work simultaneously at both school sites simultaneously in accordance to Bellrock’ s programme.Remedial work to both frame and fire doors, replacement doors as well as Yeoman Shield Fire Rated Protection products which were Door Protection Panels, Door Edge Protectors and PVCu clad Glazing Beads were fitted by the accredited teams following best practice guidance.Martin Igoe commented “Having previously used Yeoman Shield on school projects in Aberdeenshire I was more than happy to again collaborate with Yeoman Shield for the Deans Community High School and Armadale Academy.“Their door protection products are great; not only have Yeoman shield re-certified the old fire doors for conformity, they have also extended the life of the doors by fitting a hard-wearing cladding to each. This makes them more durable for the rigours of school life, they look amazing and are so easy to clean.Further phases of the fire door work have been scheduled for later in the year.
Sponsored
AOV for Smoke and Fire Safety

AOV for Smoke and Fire Safety

Surespan

Product:Surespan 140° thermally broken aluminium smoke ventilator and roof hatch designed to EN12101-2. ]The AOV also offers push-button comfort ventilation in one package! This one-stop solution for smoke vent requirements to meet building control can achieve 1m² airflow and is available in standard stocked sizes or made to any size in between 900 x 900 and 1260 x 1260. Wind deflectors to improve airflow. RE 1,000 Ventilation 10,000 Vent Offset mechanism for Roof Access Snow Load SL500 Wind Load WL1500 Temperature Class T (-15°) Fire Resistance B300

Showing 73-108 of 610

Feedback