NBS Source
I'm a manufacturer

"electrical mains intake control gear"

4,475 results found

Sort by:

Showing 469-504 of 504

Sponsored
The Ivy, London

The Ivy, London

GDL Air Systems Ltd

Project detailsIconic London restaurant The Ivy has undergone a major renovation project that has taken five months to complete. This dramatic refurbishment was completed in time to celebrate the 100th anniversary of the restaurant. Although dramatic, much of its original identity such as the trademark stained glass windows remains.The interior design team behind ‘The Ivy’ has previously worked on other restaurants in the same group including Scott’s, the J Sheekey Oyster Bar and Daphne’s in South Kensington.The restaurant has had a modern makeover, the bar has been relocated to the middle of the room and is surrounded by pink leather and mohair bar stools, in the main restaurant booths as well as private corner tables have replaced the original seating arrangement. Project overviewWorking alongside our clients we manufactured and supplied the internal ventilation grilles and diffusers throughout the restaurant including linear bar grilles, floor grilles, linear slot diffusers and air valves.Our products provided both supply and extract ventilation with accessories and optional paint finishes to suit our clients’ exact requirements. We manufactured all our products in the UK at two locations in Glossop and Sheffield giving us complete control over the quality of our production process and lead times. Benefits of using GDL Products on the projectWe offer a full turnkey package including design, manufacture and install.We manufacture standard and bespoke products to suit your exact requirements.
Sponsored
Silk district - MEET IP

Silk district - MEET IP

Fermax UK Ltd

674 residents Across 4 phases and three buildings.Using 262 x NEO 7” IP Monitors and 412 x WIT 7” IP Monitors within the apartmentsWith 12x Marine Digital IP Entrance panels. Lift control and Concierge. 
Sponsored
Comprehensive refurbishment of the Bristol Beacon Concert Hall, featuring acoustic solutions from Rockfon

Comprehensive refurbishment of the Bristol Beacon Concert Hall, featuring acoustic solutions from Rockfon

Rockfon

After a five-year closure, a rebrand, and a £132m overhaul, the Bristol Beacon reopened in November 2023. Rockfon Eclipse acoustic islands and Rockfon System VertiQ now provide acoustic control across its various spaces, including a new performance area.
Sponsored
B2P Canary Wharf Office - Smoke & Natural Ventilation

B2P Canary Wharf Office - Smoke & Natural Ventilation

Powrmatic Ltd

OverviewThe BP2 office building was constructed on reclaimed land at the eastern gateway to the Canary Wharf estate and comprises 14 stories above ground, plus three basement levels. The building’s design places a strong emphasis on energy-efficient performance, so this was an important criterion in the selection of ventilators.OverviewThe BP2 office building was constructed on reclaimed land at the eastern gateway to the Canary Wharf estate and comprises 14 stories above ground, plus three basement levels. The building’s design places strong emphasis on energy efficient performance, so this was an important criterion in the selection of ventilators.Project BackgroundAir Design Systems Ltd provided a full design and build package for the client. This included installation of local control panels and electrical wiring, as well as micro-switches to allow a positive signal that each ventilator is fully open prior to the pressurisation system starting up. Air Design Systems Ltd also supplied and installed numerous continuous louvres to the plant wells that rise through the building and terminate at roof level.Project SolutionPowrmatic supplied a large office building ventilation solution with a combination of single and double flap Skyvent ventilators to provide natural and smoke ventilation at the BP2 building in Canary Wharf, East London. Each of the 13 BS-EN 12101 ventilators was installed by Air Design Systems Ltdonto existing upstands with insulated lids and bodies and polyester powdered coated to RAL 9007 matt.Project ResultSkyvent ventilators are designed for both smoke and natural ventilation and are available in single and twin flap versions to suit the needs of each project. They can be installed on upstands, roof sheeting and into glazing systems. They feature very low air leakage when closed, and are weatherproof when closed, as tested to BS Parts 1 & 2. Insulated options can achieve U-values as low as 0.17W/m2/K.Skyvent ventilators are available with optional aluminium (single skin and insulated), polycarbonate or glazed lids in polyester powder paint finishes to any standard BS or RAL colour. A full range of accessories is available including bird guards, security guards and insect mesh.
Sponsored
Accord Hospice

Accord Hospice

Gerflor Flooring UK Limited

When the ACCORD Hospice in Paisley, Scotland, needed to modernise its Inpatient Unit, which offers specialist palliative and end-of-life care for people with complex needs along with support facilities for their families, the uppermost driving factors were infection control, comfort and aesthetics.
Sponsored
Bitumen Case Study: Whitburn Partnership Centre

Bitumen Case Study: Whitburn Partnership Centre

Bauder Ltd

Whitburn Partnership Centre was designed by Project Architects, Matthew Fair, Neil Forrester and Jamie Bateman at Smith Scott Mullan Associates for West Lothian Council. The design of the contemporary £4M building restores the historic Whitburn Burgh Hall original façade as it is one of the towns most renowned buildings and incorporates a new-build two-storey extension.Located in the centre of Whitburn, this building is a community hub that embraces the West Lothian Council’s model of bringing together services that benefit local communities whilst delivering financial efficiencies through the decrease of council buildings. This building facilitates a library, community halls, museum and customer information service office, making it an important community resource. Project:Whitburn Partnership CentreProject type:New buildLocation:West Lothian, Scotland,Waterproofing:Bauder Total Roof System (BTRS)Roof size: 525m2Energy generated from PV array: 10.35kWp Specifier: Smith Scott Mullan AssociatesMain Contractor: Maxi ConstructionApproved contractor: ProCladd (Scotland) LimitedSolar PV installer: Intelligent Electrical SolutionsThe specificationTo support the West Lothian Council's sustainability objectives of achieving high energy efficiency, it was our responsibility to specify a waterproofing system and provide a solution for natural energy generation. The bituminous Bauder Total Roof System (BTRS) was chosen for this project as it features membranes that can withstand impact and tearing, as well as thermal insulation that met the required U-value of 0.15 W/m²K. This waterproofing system is verified by the BBA and offers a service life in excess of 35 years.The BauderSOLAR system was also specified, as it incorporates photovoltaic arrays for natural energy generation. The photovoltaic mounting system is attached to the roof without penetration of waterproofing or the deck, safeguarding the integrity of the waterproofing to fulfil its full-service life.Project challengesThe Architect’s design incorporated unusually high parapet upstands, which posed a challenge for installers. Area technical manager for Bauder, Christopher Langton, attended design meetings with the Architects and Main Contractor to discuss the best solution for installation. A mutual agreement was made for the underlayer to be mechanically fixed to prevent any slippage of the capping sheet membrane. Due to the height of the upstand, non-combustible insulation BauderROCK was incorporated into the design at these details.The installation of BauderSOLAR F uses prefabricated bituminous BauderK5K membrane sleeves to slip over the mounting plates and welded into position, anchoring the plates to the surface of the Bauder waterproofing system. Approved BauderSOLAR installers, Intelligent Electrical Solutions, installed the BauderSOLAR system, collaborating with ProCladd, approved contractor for the waterproofing installation, and other trades during the roof installation.There is a junction where the flat roof meets the original slate roof of the adjacent building, this detail fell under the torch free zone that hot air welding techniques are used to install the membranes within these areas.The resultInstallation of the Bauder waterproofing system may only be carried out by trained and certified operatives approved by Bauder. A project pre-start meeting was held by Bauder site technician, Duncan Hastings, and area technical manager, Christopher Langton inviting the Site Manager from Procladd and their Bauder badged operatives. During this meeting, they discussed the installation of the project, and identified the areas that required torch-free and torch-safe detailing. They also discussed how the project was going to be delivered in co-ordination with other trades working on the site at the same time, for example cladding and lead that was installed atop the waterproofing upstand details.Weekly site-inspections were carried out by Bauder site technician, Duncan Hastings during the project. Visiting the site frequently meant that Duncan could provide consistent support to the installers and answer any questions they may have had directly. It also meant that the quality of the roof installation was being monitored regularly to ensure it would be to a high standard, achieving the comprehensive guarantee.The approach taken to deliver this project on time and to budget was through meticulous planning and working to tight time frames. The organisation of the delivery of Bauder products to site had to be in line with the schedule to ensure that the site was ready to receive a delivery. With the project located in the busy centre of Whitburn next to a cross junction with traffic lights. This meant that timed delivery of products to site was required in addition to prebooked off-loading by pump truck and tail lift or by telehandler.Health, safety and environment was managed during the planning, design and installation of this project by advising that all installers follow the advice shown in the “Responsible Specification Checklist” produced by the National Federation of Roofing Contractors.In accordance with the Workplace (Health, Safety and Welfare) Regulations 1992, roof edge protection in the form of scaffolding was installed during installation. The project’s perimeters were surrounded by Heras fencing to isolate the construction site from the public. All scaffolds that were on the elevation next to the public had toe boarding and safety mesh where required.As standard, there was a one-hour Firewatch after the Bauder membranes have been installed using a gas torch. This was carried out by Procladd operatives each day when they were working on the project to ensure the welfare of the workforce, and the safety of other trades and that of the building. The 19kg gas cylinders were used on this project as they are easily transportable on the roof area. At the end of each working day, the cylinders were stored in a locked and designated gas storage unit on site.System installedBauder Total Roof System (BTRS)1 BauderK5KElastomeric bitumen torch-on capping sheet in charcoal grey. This product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUOA self-adhesive, elastomer bitumen underlayer. This product features distinctive technology for lap sealing.3 BauderPIR FA-TE flatboard insulationA rigid polyurethane foam board faced on both sides with aluminium foil.4 BauderTHERM DS 1 DUOA self-adhesive, elastomer bitumen air & vapour control layer.
Sponsored
Historic Restoration - Terry's Chocolate Factory York

Historic Restoration - Terry's Chocolate Factory York

C-Probe Systems

Challenge: The structure was had severe structural degradation due to the ingress of moisture and water over its near 100-year life. Corrosion to the steelframe resulted in tensile forces cracking and moving the brick skin, also causing a cracked façade. Strategy: ICCP was used as a method to control corrosion whilst the cracking and movement were repaired. This involved LoCem® and +point® AACM anode mortar to be grouted in the bed joints, alongside embedded corrosion rate sensors for service life tracking (AchillesICP and AiMS). LoCem® is a low carbon cement alternative, that can also act as a cathodic protection anode. Outcome: The structure was restored to be used as high-value residential apartments, saving tonnes of embodied carbon and eliminated the option of demolition. The embedded system successfully controlled and monitored corrosion for the long term, adding an additional 100 years to the structure’s service life.
Sponsored
Rolec Provides Smart Chargepoint Solutions to North Middlesex University Hospital

Rolec Provides Smart Chargepoint Solutions to North Middlesex University Hospital

Rolec EV

North Middlesex University Hospital NHS Trust, serving over 350,000 people in North London, has been a pillar of healthcare for a century. Embracing innovation, they recently expanded their services to include on-site electric vehicle (EV) charging, aligning with the government's Net Zero goals. In collaboration with Rolec, they installed 23 dual socketed BasicCharge pedestals, providing 46 EV bays in their new parking garage. Compliant with regulations and designed for accessibility, the solution includes LED amenity lighting and a Smart back-office management system for tailored charge point management and tariff settings. This initiative reflects the hospital's commitment to both public health and environmental sustainability.Click "view more" to read the full case study.
Sponsored
Transport Hub, Porth

Transport Hub, Porth

Cellecta Ltd

Porth Transport Hub is an integrated bus and rail interchange part of the Porth Regeneration Strategy located at the existing railway station. The hub is modern and attractive at the heart of the Town Centre, providing seamless travel across bus and rail. The development saw demolition of three buildings to include electric vehicle charging points, a taxi rank, cycle stores and several upgrades across the local Active Travel network.Cellecta’s HEXATHERM XFLOOR 300 was specified by Redstart due to its high resistance to compression and closed cell structure that provides unrivalled resistance to water absorption, making them ideal for a multitude of domestic, commercial, and educational applications.Encon Construction in partnership with Rhondda Cynon Taf Council was awarded this 530m² contract for this development in Porth.
Sponsored
Wattif Provides Funded Rolec EV Chargepoint Solutions to Mullingar Golf Club

Wattif Provides Funded Rolec EV Chargepoint Solutions to Mullingar Golf Club

Rolec EV

Recognising the growing demand for electric vehicle charging facilities, Mullingar Golf Club partnered with Wattif EV and Rolec EV to install and manage EV chargers for their staff, members and visitors.Wattif EV implemented a multi-year plan, starting with four charging bays equipped with Rolec EV Quantum 22kW dual pedestals, selected for their quality, performance and aesthetics. This solution includes load management services, user helpline, and maintenance, ensuring a seamless experience for members and guests. By entrusting EV charging operations to Wattif EV, Mullingar Golf Club can focus on delivering exceptional golfing experiences while meeting the evolving needs of its clientele.Click "view more" to read the full case study.
Sponsored
BMW Showroom

BMW Showroom

Lonsdale Patent Glazing & Rooflights

Our ThermGard Roof Light System provided the necessary profiles to achieve the considerable spans involved, some beyond 4.5m. Solar control glass was utilised to reduce heat gain and this combined with a low-emissivity coating provides year round comfort within the building environment.
Sponsored
Aston Villa Football Club

Aston Villa Football Club

Lorient

Aston Villa's current home venue is Villa Park, which is a UEFA 5-star rated stadium and the largest football stadium in the English Midlands, and the eighth largest stadium in England. Lorient supplied LVN20S intumescent air transfer grilles and talkback damper control systems.
Sponsored
Cryfield Village - University of Warwick

Cryfield Village - University of Warwick

Aspex UK Limited

Cryfield Village offers student accommodation at University of Warwick comprising of townhouses and studio apartments.Location: WarwickContractor: KierInterior Design Architect: R H Partnership Architects (rhp)Landscape Architect: Churchman Thornhill FinchAspex supplied: Salto access control
Sponsored
Science Teaching Hub, University of Aberdeen - Education

Science Teaching Hub, University of Aberdeen - Education

Aspex UK Limited

University of Aberdeen Science Teaching Hub’s development is an ambitious regeneration plan consisting 73,194sq ft teaching and laboratory space over three floors, and a plant room on the fourth.  Location: AberdeenContractor: RobertsonArchitect: RSPAspex supplied: Intercoms, & Access Control throughout the building
Sponsored
Jacksons Fencing chosen at Cambridgeshire primary school

Jacksons Fencing chosen at Cambridgeshire primary school

Jacksons Fencing

When it came to updating the school perimeter and sports fencing, Oakdale Primary wanted a solution which would keep students, staff and guests safe and provide reliable access control. To achieve both aims, Jacksons Fencing Sentry® Residential and EuroGuard® Flatform were selected.
Sponsored
St. Mary's Church Selby - N. Yorkshire

St. Mary's Church Selby - N. Yorkshire

Hafele UK Ltd

Specification / scenario -Traditional Church building requiring discrete but effective access control and partition without spoiling the ambiance of the Church interior. A glass partition was needed to limit access at certain times of the day whilst not blocking out light. Maintaining the light intensity was a key factor in design brief.
Sponsored
The Loft Holiday Home

The Loft Holiday Home

BPD Building Product Design Ltd

With 50 years’ experience in the modular build industry, the challenge for Tingdene Homes was to deliver a cutting edge solution for a new two-storey holiday home construction which was to be built entirely offsite in a controlled factory environment, with the objective of delivering speedier construction, factory engineered quality and cost-effective design.
Sponsored
Littleport Academy, Cambridgeshire

Littleport Academy, Cambridgeshire

Rockfon

An ambitious £37.5 million Littleport complex comprising special educational needs (SEN) and primary schools, an Academy and a leisure centre. Rockfon ceilings, baffles and wall panels are installed throughout. Rockfon products were chosen because they offer excellent sound control, Class A1 fire safety and durability.
Sponsored
Elephant and Castle Re-Development - London

Elephant and Castle Re-Development - London

Aspex UK Limited

Elephant Park, London, is one of the world's most sustainable inner-city projects using technologies such as a net zero carbon heat network and other innovations. Location: LondonContractor: LendleaseArchitect: MultipleAspex supplied: Ironmongery, Integra Living doorsets as well as Salto fusion access control
Sponsored
National Physical Laboratory

National Physical Laboratory

KWC DVS Limited

The National Physical Labratory, the UK’s National Metrology Institue, was due a washroom upgrade and Dart Valley Systems provided products for the project. Developing and maintaining national primary measurement standards, the NPL has been responsible for building eliable and successful measurment foundations that help towards evolving antibiotics to tackle resistence, more effective cancer treatments, superfast 5G and unhackable quantum communications. The range of products provided are as follows: • 40 x AT03-011 Aquarius DM A45 tap spout only in s/steel with pex hose • 40 x WC02-013 Concealed plastic cistern kit – vertical – 1 ½“ • 40 x WC03-013 Low voltage WC flushvalve with programmable sensor (1 ½“ base c/w mains PSU) • 17 x WC02-001 Concealed plastic cistern – cistern only – 1 ½“ • 17 x UC00-002 Auto-Syphon for cisterns – 8 ¼“ x 1 ½“ BSP • 12 x AT00-007 Two station mains kit low pressure 0.5-1 BAR • 3 x AT00-003 Two station mains kit standard pressure 1-10 BAR • 1 x AT00-002 Single station mains kit standard pressure 1-10 BAR • 1 x AT00-004 Three station mains kit standard pressure 1-10 BAR • 2 x AT00-006 Single station mains kit low pressure 0.5-1 BAR • 2 x AT00-008 Three station mains kit low pressure 0.5-1 BAR • 7 X UC01-024 Flushmatic downlighter kit for suspended ceilings in White - Mains • 24 x AC17-047 Thermostatic mixing valve 4in1 15/22mm Our DVS no-touch WC flushing system is an electroincally operated drop valve which replaces the traditional syphon and delivers a measured volume of water from the cistern to the lavatory bowl. A simple wave of a hand past the fitted sensor will acitivate the electronic Flushvalve.The system typically saves 30% on water costs, is vandal proof and easy to install a maintain. For over a hundred years, the NPL has worked with it’s customers to convert scientific proficiency into economic success, proficent employment and the enhanced quality of life. As an insitute that has aided in saving lives and protecting our enviroment National Physical Labratory has played a huge role in helping the British public feel safe and secure. 
Sponsored
National Physical Laboratory

National Physical Laboratory

Dart Valley Systems Ltd

The National Physical Laboratory, the UK’s National Metrology Institute, was due a washroom upgrade and Dart Valley Systems provided products for the project. Developing and maintaining national primary measurement standards, the NPL has been responsible for building reliable and successful measurement foundations that help evolve antibiotics to tackle resistance, more effective cancer treatments, superfast 5G and unhackable quantum communications. The range of products provided are as follows: ·       40 x AT03-011 Aquarius DM A45 tap spout only in s/steel with pex hoses ·       40 x WC02-013 Concealed plastic cistern kit – vertical – 1 ½“·       40 x WC03-013 Low voltage WC flush valve with programmable sensor (1 ½“ base c/w mains PSU)·       17 x WC02-001 Concealed plastic cistern – cistern only – 1 ½“ ·       17 x UC00-002 Auto-Syphon for cisterns – 8 ¼“ x 1 ½“ BSP ·       12 x AT00-007 Two station mains kit low pressure 0.5-1 BAR·       3 x AT00-003 Two station mains kit standard pressure 1-10 BAR ·       1 x AT00-002 Single station mains kit standard pressure 1-10 BAR ·       1 x AT00-004 Three station mains kit standard pressure 1-10 BAR·       2 x AT00-006 Single station mains kit low pressure 0.5-1 BAR  ·       2 x AT00-008 Three station mains kit low pressure 0.5-1 BAR·       7 X UC01-024 Flushmatic downlighter kit for suspended ceilings in White - Mains ·       24 x AC17-047 Thermostatic mixing valve 4in1 15/22mm  Our DVS no-touch WC flushing system is an electronically operated drop valve that replaces the traditional syphon and delivers a measured volume of water to the lavatory bowl from the cistern. A simple wave of a hand past the fitted sensor will activate the electronic Flush valve. The system typically saves 30% on water costs, is vandal-proof, and is easy to install and maintain. For over a hundred years, the NPL has worked with its customers to convert scientific proficiency into economic success, proficient employment, and an enhanced quality of life. As an institute that has aided in saving lives and protecting our environment, National Physical Laboratory has played an enormous role in helping the British public feel safe and secure. 
Sponsored
22 Bishopsgate, London

22 Bishopsgate, London

Boon Edam Limited

22 Bishopsgate accommodates a community of up to 12,000 occupiers and visitors. In an emergency or evacuation, a highly reliable entrance control solution was required to ensure safe, secure, and seamless access for the building's community. The specification called for unobtrusive, slim-speed gates to maximise throughput while providing effective protection against tailgating.
Sponsored
Gore Street, Manchester

Gore Street, Manchester

Genius Facades Limited

System - Genius EdgeMain Contractor - SIR ROBERT McALPINE
Sponsored
Versatile Orbis Balustrades at Accrington & Rossendale College

Versatile Orbis Balustrades at Accrington & Rossendale College

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS221 Midrail Infill Top FixOrbis OS201 Vertical Bar Infill Top FixOrbis OS251 No Infill Top FixThe £4million campus modifications at Accrington & Rossendale College create a transformational green space to enhance the campus environment. Wildflower meadows are the backdrop to improved access, ensuring ease of movement around campus.A modern and refined aesthetic has been created at the new main entrance with the installation of Orbis balustrades with toughened laminated glass infill. Whilst powder coated Orbis with vertical bars guides the way from the street level access elevator to the main entrance.Incorporating Orbis with midrail infill to provide extra support for the high traffic main entrance steps, ensuring safety is paramount on campus.
Sponsored
Ashchurch Villas benefit from a variety of Jacksons Fencing solutions

Ashchurch Villas benefit from a variety of Jacksons Fencing solutions

Jacksons Fencing

Ashchurch Villas is a £30 million residential project in Hammersmith, West London undertaken by Balfour Beatty. The project included 15 villas and 7 stylish mews houses and required over 450m of Jacksons fencing with a contemporary design to provide safety and security to residents as well as automated and manual gates to provide access control.
Sponsored
O-Box roller blinds in Picci House

O-Box roller blinds in Picci House

Bandalux Industrial SA

Extension and renovation of an existing building in front of Lake Como, Italy.The building is able to manage on its own: once the construction is finished, thanks to the geothermal, solar thermal, photovoltaic, controlled ventilation and air conditioning systems, coordinated through home automation management, the building can be considered to all effects as energetically independent.
Sponsored
Hydrostop AH-25 liquid roofing offers fast track solution at Gatwick Diamond “Blue-Light” offices

Hydrostop AH-25 liquid roofing offers fast track solution at Gatwick Diamond “Blue-Light” offices

AccuRoof

Hydrostop AH-25 liquid roofing was chosen as a better alternative to built-up roofing for installation to a new build Surrey County Council office development. The Hydrostop AH-25 system was applied over a concrete substrate with a bituminous vapour control layer with Eurodeck liquid roofing board and cut to falls insulation.
Sponsored
David L Douglas - Scandinavian Interior

David L Douglas - Scandinavian Interior

Rubio Monocoat UK

This project was designed, manufactured and installed by David L Douglas. The design inspiration was Scandinavian; the client wanted something completely different from the traditional look of their main house. With the exterior of the building being cladded in Larch timber, their design team decided to use oak timber internally. The main items that were finished with Oil Plus 2C, was the oak flooring, wall panelling, doors, mock beams, the staircase, and even on the dartboard housing!
Sponsored
Guide to LOLER: Lifting Operations and Lifting Equipment Regulations

Guide to LOLER: Lifting Operations and Lifting Equipment Regulations

Penny Hydraulics Ltd

LOLER is an acronym, used to abbreviate Lifting Operations and Lifting Equipment Regulations. LOLER regulations cover the operation and control of lifting equipment, placing responsibility on both the company in ownership of and the employee operating lifting equipment. Lifting equipment, classed as work equipment, is also subject to PUWER, an abbreviation of Provision and Use of Work Equipment Regulations.
Sponsored
Forbury Place, Reading. Fire Curtains over Lift Doors

Forbury Place, Reading. Fire Curtains over Lift Doors

Coopers Fire Ltd

Coopers installed FireMaster fire curtains with smoke control over the lift door openings on each of the ground and upper seven floors and two on the basement so a total of forty eight curtains. An important part of the design of the building on the ground and first floor was to subtly integrate the fire curtain headbox and side guides into the lift opening.
Sponsored
Genesis Care

Genesis Care

Gerflor Flooring UK Limited

The vast swathe of Gerflor products installed at GenesisCare in Windsor includes over 120sq m of Taralay Impression for the chemotherapy rooms, 1200sq m of Taralay Impression Control safety flooring for a host of public areas where slip resistance is a must, together with 200sq m of Mipolam Accord EL7 being installed in the MRI areas.
Sponsored
Park Quadrant Residences, Glasgow

Park Quadrant Residences, Glasgow

Aspex UK Limited

Park Quadrant Residences presents a collection of timelessly classic yet contemporary apartments, duplexes and penthouses combining bold, modern designs with a graceful sensitivity to the area’s celebrated 19th Century architecture and landscaping.  Contractor: PQ ResidencesArchitect: Holmes MillerProducts supplied: Intruder alarms, CCTV, Access Control and Video Intercoms
Sponsored
cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca

Norwood Group Limited

PROJECT OVERVIEWThe project comprised the design, manufacture, supply and installation of a new 8000m2 footprint of a highly specified Packing Facility. The brief was to provide nine GMP Grade D packing cells, each of which required strict temperature, humidity and pressure control to enable primary packing of pharmaceuticals in a clean environment with no risk of contamination. Each of these Primary Packing cells connects to a common, secondary packing area. OUR SCOPE OF WORK To meet the project specification and environmental requirements, Norwood proposed our 100mm Mediline Partition. Following a rigorous selection process, our solution was a preferred option over four alternative systems. Working closely with the client’s team and the main contractor, we designed and developed bespoke solutions such as Flush Coving, Fire Rated Vision Panels, Bulkheads and Half Height partitioning. Cleanability has been ensured through the hygienic finish of the partition panels and, in particular, by incorporating recessed radiused coving at ceiling to wall joints providing a smooth clean finish throughout the room. Our innovative acoustic ceiling combines hygienic, wipeable, sound absorbing materials and cleanroom grade panels which not only reduce environmental noise levels but also provide cleanable airtight surfaces. Within the open plan secondary area, partial height glazed partitioning was employed. The facility was built with future adaptability in mind and the possibility of increasing the cleanrooms to Grade C, therefore the Norwood Flush Coving was utilised in the spinal corridor and primary cells. Supplying over 7000m2 of ceilings and 6000m2 of partitioning, this was one of Norwood’s largest projects, delivered to an extremely challenging programme. 
Sponsored
Quality Assurance Laboratory for a Pharmaceutical Blue Chip Client

Quality Assurance Laboratory for a Pharmaceutical Blue Chip Client

Norwood Group Limited

PROJECT OVERVIEWWorking with BES, we have successfully completed a refurbishment of an existing space into new quality assurance (QA) laboratory for a pharmaceutical blue-chip client. The fundamental requirement was to deliver a purpose- designed laboratory, located at the heart of the client’s busy manufacturing site, to run robust microbiological analytical activities for the next 25 years.SCOPE OF WORKTo meet the project requirements, we utilised several products, including 100mm Mediline partitions, metal pan ceilings, walk-on ceilings and various types of doors. Our in-house team became involved at an early stage of the design process. Working closely with the main contractor and end-users, we were able to recommend different products which would benefit the client’s processes and flow of the building. One of the key solutions we offered was Norwood’s automatic hermetically sealing sliding door system with large vision panels. This specifically designed doors not only saved space but also provided users with an open feel of the facility. It is due to this project that Norwood became a member of the Automatic Door Suppliers Association – (ADSA). Not many companies hold an ADSA membership and being associated with ADSA promotes the highest standards in automatic doors and gives Norwood operatives the qualification for certifying their own automatic doors to BS 7036: 1988. We delivered a modern and energy efficient facility, compliant with Good Laboratory Practice (GLP) requirements, within a controlled budget. The laboratory was finished to the highest standards, with a great attention to detail throughout.This project demonstrates that by involving Norwood at the early design stages, we can add real value, advising on the most suitable solutions, tailored to the specific needs of our clients.
Sponsored
Dorma Variflex Manual Acoustic moveable wall - Coventry Building Society offices

Dorma Variflex Manual Acoustic moveable wall - Coventry Building Society offices

Style - Moveable Partition Specialists

Coventry Building Society recently opened its new, ultra-modern head office at Binley Business Park. With strong green credentials, the 40,000 sq ft development prioritises staff wellbeing through healthy workplace design.In a key meeting area, Style worked with contractors, Barnwood, to divide a large, open-plan space into two separate rooms.Combining effortless manoeuvrability with exceptional acoustic performance, a Dorma Hüppe Variflex moveable wall was installed, allowing separate meetings to run concurrently, undisturbed. Supporting the sustainability aims of the development, the Variflex system has an environmental product declaration (EPD) in accordance with ISO 14025 and EN 150804. In addition, Style is the only UK partitioning specialists that is accredited under the ISO 14001:2004 Environmental Management System, ensuring operational processes maximise sustainability goals whilst limiting wasted resources.Recently named one of the best places to work in the country, Coventry Building Society has designed the new head office to include relaxation and quiet areas, a multi-faith room, eat-and-meet hubs for socialising as well as kitchen areas with complimentary drinks and fruit. Throughout the building there is a range of collaborative spaces for in-office employees as well as zoom pods for hybrid working.The building itself is powered by renewable energy and 632 high-efficiency solar panels produce 30 per cent of the electricity required. Outside, the car park has electric vehicle charging points, and inside, an entire wall is covered in moss, helping improve air quality and absorb noise.“Specifying a moveable wall system with an EPD, shows you are serious about your carbon footprint, said Steve Williams, sales director for Style Midlands.“An EPD delivers science-based, verified and comparable information about the environmental performance of a system, including areas such as global warming potential, for example.“This is a top end moveable wall from Dorma Hüppe, delivering a 55db acoustic rating and sustainability qualifications that are second-to-none.”
Sponsored
Sustainable Transport Charity, Moray Carshare, Extends New e-Bike Service Utilising FalcoCrea Cycle Lockers

Sustainable Transport Charity, Moray Carshare, Extends New e-Bike Service Utilising FalcoCrea Cycle Lockers

Falco UK Ltd

Sustainable transport charity, Moray Carshare, continues with the rollout of its new e-Bike rental service, with the latest addition at Tulloch Park car park in Forres, North of Scotland.Featuring a new installation of the FalcoCrea cycle locker, complete with vibrant, eye-catching branding graphics provided by the charity, the cycle locker is now equipped with two e-Bikes for members of the public to rent, with a further two more coming in the spring.The latest e-Bike service shown here at Tulloch Park now joins existing e-Bike rental stations at Fiddich Park car park and Speyside Way Visitor Centre, creating a network of e-Bike cycle rental hubs operated by the charity.The image attached shows a festive elf cutting the ribbon to the latest FalcoCrea cycle locker and announcing it open with members of the public now able to rent eBikes for as little as 99p per hour!The FalcoCrea has proven to be a highly popular cycle locker since its launch last year providing local authorities, with a cycle parking solution which answers three common problems; security, spacing footprint and branding. The FalcoCrea is designed to provide maximum security, within a compact space saving design and fully capable to incorporate branding to promote cycling as a principal mode of transport.  The ingenious cycle locker has already been commissioned for a number of schemes across the UK including recent installations at; Queens Cross Housing Association for Glasgow City Council, The Social Bite Village in Edinburgh, Rouken Glen Park in Glasgow, Barra Airport and Oban Airport.With the use of an electric cycle charging point (FalcoCrea+), the cycle locker can be transformed into a convenient charging hub for electric bikes whilst retaining all of the benefits from the standard model.Image: Daniel ForsythFor more information about the innovative FalcoCrea cycle locker, please contact our helpful sales team on 01538 380080.

Showing 469-504 of 504

Feedback