NBS Source
I'm a manufacturer

"electric wiring cables"

1,649 results found

Sort by:

Showing 217-252 of 374

Sponsored
HLAC Access Hatch - Queens Square, Crawley

HLAC Access Hatch - Queens Square, Crawley

Surespan

Project:Surespan manufactured a single leaf HLAC recessed access hatch to Queens Square in Crawley, part of a £3.2 million project. ProductSurespan manufactured an 80mm access hatch to fit a structural opening of 1000 x 3500 is operated by hydraulic cylinders and a hand pump. The operation will be by an electrically driven single power pack, including a push-button or key switch. Oil supply to the cylinders will be from a hydraulic mini-pack that can be remotely or locally sited. A retractable safety grid was also installed on three open sides, manually operated.
Sponsored
Floor Access Hatch - Heathrow Airport Terminal 5

Floor Access Hatch - Heathrow Airport Terminal 5

Surespan

Surespan has manufactured and supplied a large access hatch in the engine house of Heathrow Airport’s new terminal five. The three-leaf hatch – which measures 6 x 3 metres – can take up to 5kN/m² loading. It has an electric actuator opening which can be activated remotely and is fire rated for up to two hours. Bill Burke, Contracts Manager at Heathrow Airport said: “We were very impressed with Surespan’s proactive approach throughout the whole project. The hatch has been well received by the authorities at Heathrow”
Sponsored
Flood Defence Scheme

Flood Defence Scheme

Lochrin Bain Limited

In the summer of 2007 the country witnessed extensive flooding with areas in England experiencing “over two months rainfall in just 14 hours.” Loss of water and electricity supply was experienced with thousands of homes. Providing protection against a 1 in 1000 year flood event involved building over 1 kilometer of reinforced concrete and sheet piled walls. As well as protecting the site from future flooding, the team at RHI Industrials worked in partnership with Lochrin Bain to ensure the security fencing system was fully integrated with the substations new flood defences.
Sponsored
SuDS Permeable Paving, Truckcell, The Wave Surfing Lake, Washingpool Farm, UK

SuDS Permeable Paving, Truckcell, The Wave Surfing Lake, Washingpool Farm, UK

ABG

The Wave is a new inland-surfing lake, powered by 100% renewable electricity that provides the opportunity to surf all year round regardless of weather conditions or tides. The site’s entrance and car park suffered from boggy ground conditions following spells of wet weather and with approximately 2,750m2 of impermeable surfacing, there was limited potential for infiltration. The shuttle bus route between the main facilities and the car park is now surfaced with Truckcell 80 Permeable Paving blocks, filled with free draining angular gravel to allow rainwater to percolate down to the existing sub-soil.
Sponsored
Home elevator EcoVimec with masonry shaft

Home elevator EcoVimec with masonry shaft

Vimec SRL

The Home Lift installed in this private house is an EcoVimec Home lift, which has been chosen to increase comfort and add value to the property. The owner chose EcoVimec home lift because it’s electric and environmentally friendly (it has reduced energy consumption and doesn’t use hydraulic oil).The EcoVimec Home lift has been designed to fit within a masonry shaft, offering a compact and space-saving solution to access multiple floors of the house. The cabin has been designed to be as discreet as possible, with a low profile and modern appearance that complements the property perfectly.
Sponsored
Beatrice Offshore Wind Farm

Beatrice Offshore Wind Farm

Lionweld Kennedy Group

Lionweld Kennedy provided a package of work for 'Beatrice Offshore Wind Farm' which is just off the coast of John o'Groats in Scotland. We designed the project, ensuring steel and GRP was used efficiently to reduce costs for the client. In-house at our Middlesbrough factory, we fabricated steel and GRP grating to provide flooring and handrail solutions across the windfarm. The windfarm has the potential to generate 750MW of renewable energy,  is capable of providing enough wind powered electricity for up to 450,000 homes.The whole project was delivered in time and under budget.
Sponsored
Modular Changing Places for forest visitors

Modular Changing Places for forest visitors

CareSpaces by Wealden Rehab

Accessible toileting facilities are crucial in public spaces to meet the diverse needs of individuals. Changing Places toilets, such as the modular Care Capsule™, provide a portable and adaptable solution for those with disabilities, ensuring they can enjoy their outings comfortably. A recent project with the Sussex Wildlife Trust exemplifies the effectiveness of Care Capsule™ in upgrading existing facilities. Despite space constraints in the visitors and education centres, a modular unit was swiftly installed adjacent to the main building, offering accessibility without the need for extensive construction within pre-existing structures.The project, initiated in January 2023, aimed for completion by the end of March 2023. The tight timeline was met through efficient processes, including a prompt site survey, proposal acceptance, and swift groundworks. Overcoming challenges like relocating a power cable, the team successfully hoisted the Care Capsule™ into place. The exterior was clad in local chestnut timber to harmonize with the surroundings, while interior features like Altro non-slip vinyl flooring, White Rock welded wall finishes, and height-adjustable units ensured both functionality and aesthetic coherence.
Sponsored
Trinity Primary Academy

Trinity Primary Academy

TRC Windows

TRC was appointed as principal contractor by Barker Associates in May 2019, to carry out specialist sash window restoration works.Trinity Primary Academy is a primary school located in Bounds Green Road, Wood Green, London. It was built in 1899 by Mitchell and Butler and consists of yellow brick and red brick dressings, tiled roofs, irregular fenestrations, and sash windows that give away its Queen Anne Revival style. It's currently categorised as a Grade II Listed building with Historic England, and is part of the Academies Enterprise Trust.Nature of the worksAs the building was Grade II listed, timber window repairs had to be sympathetic and complementary to the historic nature of the property. Many of the existing timber sash windows were inoperable due to the build-up of decorative coatings, timber degradation, and defective and broken sash window ironmongery, as well as opening mechanisms. The requirement was for the windows to be fully refurbished, repaired and operational as originally intended, but also modified to meet health and safety requirements.Phase one of the refurbishment of 200 sash and timber casement windows commenced on the area needing most attention: the west elevation of the building. Following the success of phase one, the client team extended TRC’s appointment to continue around the remainder of the building, systematically completing all other windows, door and roof light refurbishments.This overall refurbishment project included:Stripping back the existing paint from the historic sash windows and repairing any decayed timber.Repairing glazing as and where necessary.Improving the thermal and acoustic containment by installing draughtproofing.Repainting windows and installing ironmongery.Undertaking brick and stone repairs to the building’s exterior.This project also required our specialist attention on some specific areas of traditional glazing. This aspect of the project required the repair and refurbishment of all four oriel bay windows and the oriel bay glazed roofs. Completion included the supply and fixing of new safety glazing and hardwood timber roof rafters, along with the repair and refurbishment of the two existing openable roof lights. The supply and fixing of new code 4 lead flashing, with lead wedges, was also carried out and fully pointed with the correct cement mortar at the wall abutment.Additional detailed work throughout the project included the following:Removal of all existing fitted window blinds for refixing upon completion of works.Removal and repair of existing window ironmongery, including original mechanical winding gear, solid bar opening mechanisms, locking fasteners, slide bar restrictors, cable restrictors, handles and stays.Careful removal and repair of all internal fixed-glazed hopper units, casements and pivot openings.Removal and replacement of all cracked and broken glazing, and replacement of the existing Georgian wired-glazing, with 6mm safety glass or 4mm polished plate glass to areas up to 1.2m height from floor level. Where privacy was required, white opaque glass with thickness in accordance with above was used.Removal and replacement of all loose and defective glazing putties, and removal of all flaking, loose and built-up paint coatings.Exposure of all timber rot and decay ready for repair with Repair Care Systems products, followed by sanding and priming ready for decoration.Vertical sliding sashes repaired, refurbished and rehung on new sash cords and weights, and adjusted as needed. Sashes were routed to accept new brush pile weather stripping. New parting beads and staff beads were serviced with brush pile weather stripping where appropriate.Final internal and external decoration was carried out using Dulux or Leyland trade paints, allowing for one undercoat and one gloss finish.
Sponsored
Manchester Cathedral

Manchester Cathedral

Howe Green

Howe Green’s 7500 Series Medium Duty Access Covers have been installed in Manchester Cathedral as part of extensive reordering works. The 7500 Series Access Covers were chosen to provide reliable yet virtually invisible access to new mechanical and electrical chambers across the entire body of the building. Over 70 covers were made, each to a bespoke size to fit precisely with the new Burlington Stone slabs being installed. Howe Green also designed a special cover grating to allow air supply to the blower working the bellows of the Cathedral’s remarkable organ.
Sponsored
National Waterfront Museum, Swansea

National Waterfront Museum, Swansea

Howe Green

The award winning National Waterfront Museum required an access solution to provide quick, easy and safe access to concealed under floor mechanical and electrical equipment. Howe Green’s 7500 Series floor access covers were purpose designed for installation throughout the museum. They run across the reception areas, displays and exhibits. Slim line aluminium show edges present clean and crisp geometry within the many different types of floor covering used throughout the building. The access covers provide a heavy duty and tamper resistant, aesthetically pleasing access solution for the highly trafficked pedestrian area.
Sponsored
Daylighting Solution for Nickel 28

Daylighting Solution for Nickel 28

Kingspan Light + Air

When proposing the architectural design, one challenge for Nickel 28 was how best to implement effective lighting into the large warehouse facility. Aiming to limit reliance on electric and artificial lighting in an effort to reduce energy consumption, daylighting solutions became a key consideration. Kingspan Light + Air, understanding the needs of the client, delivered a bespoke solution that satisfied the specific needs of the warehouse facility by helping to maximise on natural lighting. Implementing the Kingspan Day-Lite Kick wall light system horizontally across the loading bays in the warehouse enabled the facility to maximise on natural light without glare.
Sponsored
National Grid Isle of Grain Power Station Case Study

National Grid Isle of Grain Power Station Case Study

Marsh Industries Ltd

The National Grid Site on the Isle of Grain is a very sensitive environmental area, from the site liquefied pressurised gas and electricity is distributed to the Southern UK, France and Belgium. Site required a sewage plant able to treat raw sewage to 15:15:10 standard. Due to the high water table, plant had to be installed above ground. Discharge from the sewage plant was directly into the Thames/Medway estuary. The Marsh UP was installed replacing the existing sewage plant that failed consent standards. The plant has performed better than the 15:15:10 standard set by the EA.
Sponsored
Economical housing replaces factory: Merker-Park, Baden, Switzerland

Economical housing replaces factory: Merker-Park, Baden, Switzerland

Hawa Sliding Solutions AG

The Merker site in Baden now houses 45 low-cost apartments where the enameling plant once stood. The five-story structure sets new standards with regard to insulation and energy consumption. Architects Zulauf & Schmidlin have designed 45 apartments as the second stage of converting the site of the former Merker factory in Baden. The owners wanted an energy-efficient building and apartments with different layouts – suitable for singles and families. The folding sliding shutters made of lasered, perforated metal plate are equipped with the HAWA Frontfold 20 hardware.The shutters are powered by the building's electric system.
Sponsored
The Ricoh Arena, Coventry

The Ricoh Arena, Coventry

Howe Green

To operate at optimum capacity, the Ricoh Arena required a floor access solution to reach under floor services carrying water, drainage, electricity and data to internal and external leisure amenities. Staff at the arena also needed to carry out regular checks on under soil heating, sprinkler systems and floodlighting. Howe Green’s 7500 Series floor access covers were selected to provide safe and easy access to the concealed services. Fitted quickly and unobtrusively with the Terrazzo flooring used throughout the stadium complex, the covers are double-sealed to meet the highest standards of hygiene and security.
Sponsored
Nottingham Station

Nottingham Station

Howe Green

Over 40 of Howe Green’s 7500 Series Medium Duty Stainless Steel Access Covers were installed at The Nottingham Hub as part of the station's comprehensive enhancement project. Flooring specialists DMC Contracts Ltd required a network of access points within the station. They wanted to ensure that essential underfloor drainage, mechanical and electrical services could be reached quickly and easily. The 7500 Series specially designed recessed lids enabled the panels to be tiled with Quiligotti Terrazzo floor tiles. The result - an uninterrupted and continuous surface in the station's south concourse and Grade II listed porte-cochère.
Sponsored
New Horizons for record uk

New Horizons for record uk

Record U.K. Limited

record uk installed a 3 wing all-glass revolving door with a stainless steel frame to provide an attractive and impressive entrance to Horizons House in Aberdeen, a development of prestigious serviced office suites built by Waterloo Quay properties. The revolving door complemented the modern and attractive interior and prevented through draft which otherwise may have posed a problem with the entrance opening directly into the reception area. This revolving door was fitted with a fully automatic in-ground electric mechanism and microprocessor control unit. Safety features are also built in and activated by infrared detectors and overload detection.
Sponsored
Bolton Gate Thermafold Doors protect the Fire Station at Hong Kong Disneyland

Bolton Gate Thermafold Doors protect the Fire Station at Hong Kong Disneyland

Bolton Gate Company

When the Hong Kong Disneyland Resort was planned, the project included a 7-bay fire / ambulance station which featured a garden style theme to enable the buildings to harmonise with the green surrounding and the nearby Theme Park. Bolton Gate were specified to provide fourteen electric folding doors which included a special green powder coating, Lexan vision panels and faux louvres to each door. In addition, the doors had to be designed to resist typhoon loadings of up to 3Kpa, were manufactured in Bolton and shipped to Hong Kong where they were installed by the local agent Deacon.
Sponsored
Biomass Access Cover - National Justice Centre

Biomass Access Cover - National Justice Centre

Surespan

Project: Surespan custom-designed a hatch to provide access to a Biomass storage plant at the new Criminal Justice Centre, Northampton.Product: The double leaf hatch – measuring 2750mm x 2900mm – is electrically operated by a key switch and has synchronised leaf operation with a safety grid. Rated to FACTA Class A pedestrian loading, it was designed with a chequer plate lid to match the surround and incorporates a rain skirt apron and Sureguard handrail system on both sides. A secondary 1000mm x 1000mm gas spring-operated floor hatch was installed with a retractable hand hold and ladder for safe and easy access.
Sponsored
A FIRST FOR AUTOMATIC PARTITIONING

A FIRST FOR AUTOMATIC PARTITIONING

Style - Moveable Partition Specialists

Recently refurbished, Vodafone’s Manchester office is the first building in the UK to combine two electric moveable walls, delivering an entirely automated system for dividing room space. Working with architects, CMI Workplace and main contractor, Overbury, Style was specified to install a fully automatic Dorma Moveo Glazed ComfortDrive moveable wall adjacent to a Skyfold, the fully automatic, vertically rising operable wall, housed in the ceiling cavity. At the push of a button, the walls open and close with ease, offering a phenomenal lab tested 50dB Rw acoustic integrity for the glass system, and 51dB Rw for the Skyfold.
Sponsored
Circular Rooflights - Newcastle University

Circular Rooflights - Newcastle University

Surespan

Surespan supplied a number of circular dome rooflights with triple layers to The Key, situated in the new Science Central development at Newcastle University. These large 1500 (49”) and 2000 (79”) diameter polycarbonate domes feature triple layers providing a U-value of 1.8 W/m²K. The rooflights were supplied with electric opening actuators to allow ventilation to control the temperature of the fabric structure. Surespan Dome skylights were specified due to their high sustainability and small impact on the environment. The triple layers ensure compliance with energy-saving requirements and offer excellent air tightness.
Sponsored
MG Tower, Padua Italy:  Eastman Performance Films commissioned the University of Padua to conduct an independent study of the effects of using LLumar® solar control window films on the MG Tower

MG Tower, Padua Italy: Eastman Performance Films commissioned the University of Padua to conduct an independent study of the effects of using LLumar® solar control window films on the MG Tower

LLumar by EASTMAN

Study shows the significant benefits of LLumar® films for saving energy, reducing CO2 emissions, improving thermal comfort, and controlling glare: Energy: - 3.9 year simple payback - 42 % annual savings on electrical energy - conditioning cooling - Savings of €125 800 on energy costs over operational lifetime of the film - Reduction of 46 tonnes annual CO2 emissions Thermal Comfort: - Reduction in indoor temperatures of up to 5 °C when HVAC cooling switched off - Productivity savings estimated at €40 per employee per cooling month Lighting and Glare: - Significant reduction in glare
Sponsored
Residence near Lake Constance

Residence near Lake Constance

Gira Giersiepen GmbH & Co KG

A home owner near Lake Constance has fulfilled his dream of having an office with a view: From the top floor, one can enjoy a fabulous vista of the water and the Alps rising into the sky behind the lake. In terms of building technology, virtually everything that you could wish for in an intelligent home has been installed. All components in the house have been networked via a KNX system, so that they can be controlled centrally and even automatically, when cross-linked with each other.Architect:  Matzke ArchitekturbüroElectrical installation: Contrel - Building Control Systems Photos: Ulrich Beuttenmüller for Gira
Sponsored
Great Blakenham Energy Park

Great Blakenham Energy Park

Marshalls plc

he Great Blakenham incinerator plant is a joint initiative between Suffolk County Council and waste management company SITA UK. This energy-from-waste facility uses the household and business waste left after recycling, burning materials which would otherwise go to landfill, and generates enough electricity to power 30,000 homes. Although operations carried out at the plant are largely industrial, the appearance of the building itself including the suspended, glass fronted office section required hard landscaping to increase overall aesthetics, as well as providing a SuDS solution to ensure safe and practical surface water removal in the car parking areas...
Sponsored
AusNet Services: Increased Safety for Working at Heights on Utility Towers

AusNet Services: Increased Safety for Working at Heights on Utility Towers

MSA Safety (Latchways) – Fall Protection

AusNet Services, formally SP AusNet, is the largest diversified energy network business in Victoria, Australia. The company owns and operates approximately AUD$11 billion of electricity and gas transmission and distribution assets. In March 2004, the Occupational Health & Safety (Prevention of Falls) Regulations 2003 became effective, requiring AusNet Services to cease sole reliance upon dual lanyards, and to consider other attachment methods for climbers during maintenance and other transmission tower operations. MSA provided AusNet Services with not just products, but a complete service package that provided comprehensive support for AusNet Services’ ground installation team.
Sponsored
Multi-Fold Gates at Elephant Park

Multi-Fold Gates at Elephant Park

Bolton Gate Company

Elephant Park is part of a £2.3 billion regeneration project in Elephant & Castle. It comprises a mixed-use development of 3000 new homes and up to 50 shops /retail units all centred around a new 2-acre park. Bolton Gate assisted the Architect with the design of a large electric Multi-Fold Gate to the Service Bay which consists of twelve equal leaves each constructed from an SHS frame with 50 x 10mm vertical steel fins and internal mesh to prevent the ingress of birds. Matching cladding and balustrades completed the elevation all of which were powder coated black.
Sponsored
Crown Paints celebrates decade of success with earthbalance

Crown Paints celebrates decade of success with earthbalance

Crown Trade, product of Crown Paints Ltd

Crown’s earthbalance scheme sets out the company’s commitment to being more sustainable and less wasteful as well as helping customers and staff make responsible decisions. The earthbalance scheme covers all aspects of Crown’s business and applies to all staff and operations at Crown’s two UK manufacturing plants and network of Crown Decorating Centres. Crown has reduced its overall electricity consumption by 15 per cent, reduced packaging waste by approximately 15 per cent, recycled more than 800 tonnes of paint cans and donated 112 benches made using recycled paint cans through social enterprise NIMTECH.
Sponsored
Boxed Glazed Roof Access - Circle Hospital Bath

Boxed Glazed Roof Access - Circle Hospital Bath

Surespan

Project:Architects Foster + Partners approached Surespan to design and manufacture two roof hatches for Circle Hospital Bath – the new centre of clinical excellence due to open in late 2009. Product:The huge single-leaf glazed roof hatches are electrically operated by push button switches, one hatch incorporating a side door. The high spec glazed lid is supported by heavy-duty aluminium hinges and features an integral ‘wrap over’ edge, incorporating double unbroken EPDM seals. The hatches offer a high level of thermal insulation against heat loss and condensation, together with excellent sound absorption properties.
Sponsored
Automated Cycle Wheel Travelators Installed in the Heart of the City

Automated Cycle Wheel Travelators Installed in the Heart of the City

Falco UK Ltd

Falco is pleased to announce another installation of the UK’s only automated cycle wheeling ramp, for 20 Ropemaker Street, located within the heart of the city. The new automatic cycle wheel ramps have been installed by Falco as part of a £240m state-of-the-art development bringing a new commercial building of more than 450,000ft² of Grade A, BREEAM ‘Outstanding’ office space and premium retail provision to a prominent corner site just north of Moorgate Station.The automated bike wheeling ramp known as the ‘VeloComfort®’ is a huge innovation and Falco is once again delighted to bring what is standard Dutch cycling technology to the UK market. These wheeling ramps provide cyclists with the next generation of accessibility and are designed to assist users with manoeuvring their bikes up and down stairs with virtually no effort.This is particularly important where a bike is either heavy or perhaps has a basket or panniers and makes carrying a bike up stairs or even using a traditional wheeling ramp difficult. The VeloComfort® range comes in two patented innovative designs, one for manoeuvring bicycles up the stairs - VeloComfortUp®, and one for down - VeloComfortDown®!Falco supplied and installed 22m of both VeloComfortUp® and VeloComfortDown® designed to meet the client’s exact stair dimensions.The VeloComfortUp® is essentially a mini ‘travellator’ or conveyor belt which starts once the integrated sensors detect a bike and automatically stops if the conveyor is completely free of bicycles. The high quality conveyor (kevlar-based) belt runs in a durable, low-maintenance aluminium double-sided channel and is powered by an electric motor. The entrance and exit of the conveyor are aesthetically, functionally and safely integrated into the system, with the electric motor positioned on the side of the conveyor belt.The VeloComfortDown® is a simple and effective non-electric cycle / bike wheeling ramp designed with a gutter brush to reduce the speed of the bike. The gutter brush is made from a high quality, durable and low-maintenance aluminium double-sided channel, which is equipped with brush strip on both sides. The friction of the gutter brush ensures that the bike slows down, allowing the user to determine his/her own pace during the descent.Falco provide complete supply and installation of the VeloComfort® cycle wheeling ramps as well as free rendering graphics to help the client to visualise the scheme, free UK-wide site surveys and free CAD design and schematics.A video demonstrating the VeloComfort® Bike Wheeling Ramp can be viewed by clicking here.For more information about the innovative VeloComfort® Bike Wheeling Ramp, please contact our helpful sales team on 01538 380080.
Sponsored
Flitwick Football Centre, Bedfordhire - Codale Junior

Flitwick Football Centre, Bedfordhire - Codale Junior

Able Canopies Ltd

The BriefFlitwick Football Centre is a charity in Bedfordshire that aims to provide excellent opportunities to grow and develop sport in the local community of Flitwick. They had a 15m x 9m patio terrace on their grounds and required a canopy that would provide protection from the rain and the sun, so they could use it as a permanent marquee for events.They had browsed our website and liked the look of the Codale Junior Free-Standing Tensile Canopy and requested an estimate for a 15m x 9m structure. Shortly after, they also requested prices for 10m x 6m and 10m x 5m structures.Requesting prices for different sizes and products is a great way to discover your perfect shade and shelter solution that fits within your budget. We’re always happy to discuss your options and find the perfect product for both your needs and available funds.The Solution The volunteers at the football club were pleased with the prices and the specification of the Codale Junior, opting the 10m x 5m option and requested a full site survey so we could provide a firm quotation.To enable the football club to gain the maximum usage from their canopy, they were looking into the possibility of having lighting added to the canopy as well as side panels. These are both possible with the Codale Junior. Cables for lights can be run through the canopy posts as long as they are outdoor IP rated cables and are set within trunking.We also supply tensile fabric side panels for the Codale Junior that can be rolled up when not required. We can supply and install the side panels at a later date so there was no need for the club to make any commitment when ordering the canopy.Upon receipt of the canopy order, we organised a pre-site meeting to finalise the power connections, dimensions, access points, health and safety measures and contacts at the location. This is a standard procedure that applies to all canopy orders before the installation.At the pre-site stage, it was established that planning permission was required however, Able Canopies offer a free service and can submit planning documents, removing any unnecessary stress from our customers. A few years previous in 2019, we installed a canopy nearby at Flitwick Children’s Centre which also required planning permission, so having dealt with the local council before, we liaised with our existing contact to ensure we covered any issues that could arise, ensuring a speedy and smooth planning process.The Installation Once planning was approved, the canopy was installed as scheduled over two days in June 2021 and went ahead smoothly. The volunteers at Flitwick Football Club were pleased with their new shade and shelter structure and were looking forward to gaining a lot of use from it, especially as summer was in full swing.
Sponsored
East Marketgait, Dundee

East Marketgait, Dundee

Berry Systems

Berry System supplied and installed vehicle safety barriers for new multi-storey car park at Dundee Leisure Centre. Our innovative Brisafe Wire Rope safety barrier has been installed at the new, 500 space East Marketgait car park in Dundee.The multi-storey car park serves the new leisure centre which is part of Dundee City Council’s multi-million pound redevelopment of the city’s waterfront area. The car park, incorporating a retail unit, is linked to the leisure centre by a unit central foyer and the complete facility boasts a competition sized swimming pool, health suite, café and flumes.Our safety barriers were specified throughout the car park including their column  mounted Brisafe perimeter barrier which meets BS EN 1991-1-1 standards. With a zero footprint in the parking bay, Brisafe allows architects to maximise the parking space available, while providing a flexible system that ‘gives’ on impact to minimise damage to vehicles and the barrier itself. It creates a visually attractive barrier that combines an independently tested safety performance with architectural flexibility to enhance the appearance of the whole structure.Whilst most of the car park perimeter was protected by Brisafe barriers, areas that did not provide convenient structural columns were protected by Berry Beam barriers that are floor mounted on RB1 Spring Steel Buffers.
Sponsored
WIMBLEDON REMOVABLE FENCING SYSTEM

WIMBLEDON REMOVABLE FENCING SYSTEM

Zaun Limited

Wimbledon, the British Tennis Championships are led and conducted by the All England Lawn Tennis & Croquet Club. The championships occur every year at Wimbledon, London, in July and are well attended by tennis enthusiasts, celebrities and other spectators worldwide.The AELT&C required the venue to regularly and temporarily install tennis ball stop netting around the smaller courts around the arena to act as a ball stop fence and stop stray balls, therefore required removable fencing.The SolutionRemovable posts were designed and manufactured by Zaun’s in-house design team. The bespoke designed temporary posts were created to slot into support sockets in the ground, ensuring that the posts could be installed and removed easily for when the Wimbledon Tennis Championships are played.These removable posts were manufactured with offset holes for eyebolt type tensioners and supplied with a 30x5mm strip to thread the net through to provide a neat and tidy termination or corner. These are designed specifically to support the line wires and the netting on the additional smaller courts outside of the main court, providing a temporary ball stop netting area to stop stray balls from venturing on other courts around the venue.The removable fencing and temporary netting are installed during Wimbledon Championships and removed for the day to day running at the venue. In addition, specialist ball stop netting designed specifically for tennis courts is installed with apertures that are small enough that tennis balls cannot pass through.
Sponsored
Dagenham Flats

Dagenham Flats

Sertus

United Living approached Sertus to supply automatic smoke ventilation products for all seven blocks, to keep fire escape routes via stairwells and communal corridors free from smoke in the event of a fire.Project Name: Dagenham FlatsLocation: East LondonSector: ResidentialClient: London Borough of Barking & DagenhamInitial BriefUnited Living is one of the UK’s leading providers of refurbished and new build dwellings. The company was tasked with the refurbishment of seven apartment blocks in the London borough of Dagenham and Barking. As multi-storey blocks occupied by demographically-diverse residents, including families and the elderly, the requirement for safe escape routes in the event of a fire was clear; and the existing ventilation within this 1970's building had been identified as less than optimal.Sertus' Façade Louvre Blade (Glass) vents were used in this project. View the product here.OutcomeThe addition of windows has improved overall quality of life in the building by introducing more natural light, increasing ventilation and comfort, and reducing the energy costs associated with both.Fitting into the existing window frames and supplied with full wiring schematics, the window vents proved simple and speedy to install, which kept costs down and reduced disruption for residents during the scheme of works. All products are certified to residential building regulations, including EN12101-2, delivering total peace of mind for client, contractor and residents alike.
Sponsored
Kidbrooke, Greenwich

Kidbrooke, Greenwich

Redlynch Leisure Installations Ltd

We designed, supplied, installed, and surfaced this new playground in East London, with the project completing in December 2023. The customer was looking for strong, durable, and attractive looking equipment, and our stainless steel range from Spiel Bau was perfect for the requirement. Spiel Bau equipment comes with lifetime guarantees on stainless steel elements, and has been designed to provide excitement and challenge for children of all ages.The centrepiece unit, the Beeskow multiplay, features two decks linked by an inclined rope bridge, monkey bars, a fireman’s pole, traditional slide, rail slide, and an overhanging climbing wall. The stainless steel uprights combined with hardwood robinia decking and panelling gives a beautiful, architectural finish. The large size and wide variety of play features ensures a high number of children can use the structure at any one time, making it a great piece for parks in high use areas such as this.The multiplay was complimented by two stainless steel climbing frames, the first a crow’s nest look out tower and the second an linear, obstacle course style structure. A stainless steel rope end swing, Stainless Steel seesaw, Zip Wire, and two springers rounded off the equipment, all of which was surfaced by our inhouse surfacing teams with black and green fleck wet pour rubber. We loved working on this project, introducing high quality equipment and surfacing to a park in much need of redevelopment.
Sponsored
Unilever Hamburg

Unilever Hamburg

Gira Giersiepen GmbH & Co KG

Even its location is one-of-a-kind: HafenCity Hamburg, on the Strandkai directly along the Elbe River, within sight of the Elbe Philharmonic Concert Hall on one side and the cruise ship terminal on the other. The Marco Polo Terraces are right around the corner. Unilever Germany has built its new corporate headquarters on this striking location of the currently largest inner-city construction project in Europe. The building was designed by Behnisch Architekten from Stuttgart, and it covers 30,000 square metres and sets new standards in a variety of ways.Building technology: HKP Ingenieure GmbHElectrical installation: Bauer Elektroanlagen GmbH HallePhotos: Adam Mørk
Sponsored
Glazed Sliding Roof Hatch - London

Glazed Sliding Roof Hatch - London

Surespan

Surespan manufactured a double-glazed sliding access hatch for use in a private residential apartment in London. Product2640 (103?) x 2020mm (79?) hatch was electrically operated via a key switch for easy operation and allowed access to the roof providing views across the London skyline. The sliding cover was finished in grey external polyester powder coating with a white internal finish. The 35.5mm sealed double glazed unit comprised of Pilkington 6mm toughened K polished all-round outer pane, 20mm Warm Edge silver spacer Bar argon filled, Pilkington 9.5mm toughened & laminated inner pane, divided into two panes.
Sponsored
Glazed Roof Hatch - San Francisco

Glazed Roof Hatch - San Francisco

Surespan

ProjectSurespan manufactured and supplied a double-glazed access hatch for use on a private residential apartment in downtown San Francisco. ProductThe 915 (36”) x 4115 (162”) hatch was electrically operated for easy operation and allowed easy access to the roof deck for Al Fresco dining in the Californian sun. “The glass hatch is one of the best features of the house.” Glazed hatches feature a frameless design eliminating water ponding. The 28.4mm sealed glazed unit comprised of Pilkington Insulight™ Therm, 6mm Optifloat™ Clear ‘T’ (toughened), 16mm Argon filled cavity, 6.4mm Pilkington Optilam™ ‘K’ Glass Laminated glass.

Showing 217-252 of 374

Feedback