NBS Source
I'm a manufacturer

"electric fires and room heaters"

5,487 results found

Sort by:

Showing 37-72 of 1668

Sponsored
Warwick University

Warwick University

Eaton Electric

Emergency escape lighting that can be monitored remotely to save time, ensure safety and avoid unnecessary interventions in hazardous or sensitive areas.
Sponsored
Type 100 Fully Electric - London School of Hygiene

Type 100 Fully Electric - London School of Hygiene

Movawall Systems Ltd

Our Type 100E Fully Electric movable wall was installed here a few years ago. This fully automatic system allows for ease of use and gives the client the ability to open or divide the lecture theatre in minutes with the touch of a button. With an acoustic rating of Rw 58dB, both sides of the theatre can have full AV lectures without disturbance. Each panel is hand crafted to millimetre precision to match every step and riser, then fabric wrapped in sound absorbing acoustic panels and installed by our own highly qualified technicians. There are walls, but there’s only one Movawall.
Sponsored
Jack Tyreman Therapy Room - F. Ball helps create therapy room for Jack

Jack Tyreman Therapy Room - F. Ball helps create therapy room for Jack

Ball, F and Co Ltd

Floor preparation products donated by F. Ball and Co. Ltd. have enabled an outbuilding to be turned into a therapy room for Jack Tyreman, from Burythorpe in Yorkshire, who was left with severe head injuries after a road accident four years ago when he was 18.The room provides a space with amenities, including an entertainment system and sofa, where Jack can relax and enjoy spending time, with the potential for it to house exercise equipment to assist with rehabilitation in the future.After a botched construction left the original building unusable while exhausting initial funds raised for the project, local tradespeople, including Richard Forbes, owner of Forbes Flooring, stepped up to offer their services for free to complete the project. F. Ball technical representative for the North East, John Rowlands arranged for the donation of flooring installation products. Floorcovering manufacturer Interface also donated LVT and carpet tile floorcoverings.A team of three fitters from Forbes Flooring began the flooring installation by grinding the surface of the new concrete screed to ensure it was suitably smooth. A moisture test indicated that subfloor relative humidity levels were low enough to proceed with the installation without the requirement of a moisture management solution.Contractors then primed the subfloor using P131 general-purpose primer before applying Stopgap Fast-Track 30 levelling compound – the fastest setting levelling compound on the market allows floorcoverings to be installed in as little as 45 minutes after application.Once the levelling compound had cured, a combination of Luxury Vinyl Tiles (LVTs) and carpet tiles was installed over the 40m2 area. Styccobond F46 pressure sensitive adhesive was used to adhere Interface ‘Studio Set’ wood grain LVTs on one half of the room. Styccobond F41 carpet tile tackifier was used to secure Interface graphite-coloured ‘Employ Lines’ carpet tiles. The adhesive dries to a permanently tacky film that will hold loose-lay carpet tiles securely in place when subject to normal foot traffic while allowing them to be lifted and replaced at a later date should they become damaged or worn.Commenting on the project, Richard Forbes said: “At first, we were asked if we would undertake the work for a fee, but we didn’t want any payment for it. Things can be very cutthroat nowadays, and it’s good to be able to look out for other people. I’d like to thank David Edmondson at Interface as well as John Rowlands at F. Ball for supporting the project. Using F. Ball’s Fast-Track 30 meant that we could achieve a quick turnaround, allowing other trades to do what they needed to.”On the benefits of the therapy room for Jack, his mum, Julie, added: “It’s got all the things in it a young lad needs and to help him get on with life, as well as a place to relax on his own and with other people. He loves it.”
Sponsored
Electrically Hinged Rooflight Provides Effective Light Source To Grade 2 Listed Barn

Electrically Hinged Rooflight Provides Effective Light Source To Grade 2 Listed Barn

Glazing Vision Ltd

Electrically Hinged Rooflight Provides Effective Light Source To Grade 2 Listed Barn Case Study
Sponsored
Skate Park Garden Room

Skate Park Garden Room

Lindab Ltd

Innovative garden refurbBuilder Ian Gray embarked on a major garden refurbishment to build a skate park and BBQ garden room at his own family home in Fareham, Hampshire.Having never worked with Lindab Rainline before Ian selected a plain galvanised system to complement the stylish design of the timber building. A key feature of the building is a truncated hipped shape roof with a raised gutter which provides shelter for the entrance to a covered seating area. Ian said, “we did this build as an on site example of what we can do and have taken orders for 5 so far”, “Rainline was very nice to work with”, adding “Thanks to Lindab for such a great product and service”.
Sponsored
Aldgate Tower, London Multisided Concertina Fire Curtains

Aldgate Tower, London Multisided Concertina Fire Curtains

Coopers Fire Ltd

The Coopers FireMaster®, closed rectangular Concertina fire curtain is a perfect solution when requiring fire compartmentation around a staircase as it offers a virtual firewall creating a lobby once the curtain has been deployed with more than 2 hours integrity. The innovative Concertina fire curtain installed at Aldgate Tower fully encapsulates the staircase from the 11th to the 12th floor in the event of a fire. The curtain is triggered by either the fire alarm system or a local heat or smoke sensor and is automatically deployed from the ceiling to the floor.
Sponsored
Type 100 Fully Electric - London School of Hygiene

Type 100 Fully Electric - London School of Hygiene

London Wall Design Ltd

Our Type 100E Fully Electric movable wall was installed here a few years ago. This fully automatic system allows for ease of use and gives the client the ability to open or divide the lecture theatre in minutes with the touch of a button. With an acoustic rating of Rw 58dB, both sides of the theatre can have full AV lectures without disturbance. Each panel is hand crafted to millimetre precision to match every step and riser, then fabric wrapped in sound absorbing acoustic panels and installed by our own highly qualified technicians. There are walls, but there’s only one London Wall.
Sponsored
Harris Calnan Construction Company (HCCC) - FireMaster Fire Curtains

Harris Calnan Construction Company (HCCC) - FireMaster Fire Curtains

Coopers Fire Ltd

Coopers installed and commissioned two FireMaster® Plus fire curtains, the first to protect the property from fire and smoke migrating from the kitchen whilst the second to protect the internal balcony from smoke and fire travelling between floors. Both fire curtains provide 2 hours fire and insulation zone protection and were installed into the ceiling to remain hidden from view until deployed by a fire alarm.
Sponsored
Acoustic Products launches semi-automatic electric movable wall

Acoustic Products launches semi-automatic electric movable wall

Acoustic Products Ltd

Acoustic Products has launched a new semi-automatic electric movable wall system. Each panel within the system has a microprocessor based circuit board controlling automatic operation of the panel seals making the system extremely easy to use and re-locate. Available in sound reduction ratings up to Rw 57 dB, a wide range of panel finishes and with simple or more complex remote stacking arrangements. Please contact the techical sales department at Acoustic Products for more information. Tel +44 (0)1227 281140 Fax +44 (0)1227 281141 www.acoustic-products.co.uk enquiries@acoustic-products.co.uk.
Sponsored
Bodmin Community Fire Station

Bodmin Community Fire Station

Gerflor Flooring UK Limited

When Bodmin Community Fire Station in Cornwall needed a hardwearing, hygienic, and safe flooring solution for their fitness room and gym, they turned to international flooring specialists Gerflor. Its’ Taraflex® sports flooring was supplied and would deliver to the highest standards required by the site users. In acknowledgement of the brave and hard work of Cornwall Fire Service crews, Gerflor donated 60m2 of this world-renowned sports flooring in the colour ‘Red’.
Sponsored
Concrete Reception Desk at Assembly Rooms

Concrete Reception Desk at Assembly Rooms

LIVING CONCRETE LTD

The Assembly Rooms is a new office block development on a site of a former 1870’s cinema situated on Werter Road, just off Putney High Street.Living Concrete team used an innovative concrete application technique to create ultra-sleek custom-built reception desk for Morgan Cox at Assembly Rooms. A special mix of spray concrete in Mist colour was applied onsite to MDF frame, seamlessly achieving a very complex and detailed design.In addition two large planter units with sitting benches were constructed and finished in the same style.
Sponsored
Electric Car Charging Forecourt Cranked Bollards

Electric Car Charging Forecourt Cranked Bollards

Architectural Street Furnishings part of WB White Foundry

ASF manufacture stainless steel bollards for electric car charging forecourts, both as protection bollards and to house the chargers themselves. Manufactured to the highest standards in marine grade 316 stainless steel with polish finishes to meet any specification, these bollards can be either straight or cranked to provide the required protection and projection.
Sponsored
The Auditorium at the Fire Station - Sunderland

The Auditorium at the Fire Station - Sunderland

Vox Ignis Limited

The £11 million Auditorium at the Fire Station is a new live music and events venue in the heart of Sunderland city centre, developed by the Music, Arts and Culture (MAC) Trust, that required an Emergency Voice Communication System (EVCS). Officially opened by His Royal Highness Prince William and Catherine, Princess of Wales in 2018, the project forms a key component in the masterplan for the city’s Music and Cultural Quarter, built around the refurbished Dun Cow pub and the recently renovated adjacent Engine Room at the Fire Station.Products used - Lexicomm Network disabled refuge system, including integrated emergency assistance alarm.
Sponsored
Tough, heavy duty asphalt for fire station

Tough, heavy duty asphalt for fire station

Tarmac

The new, purpose-built Community Fire and Police Station on a two acre site in Prescot required a durable surface for the main yard area, car park and access road. This was a large site, incorporated three fire engine bays, a practice drill tower and community meeting rooms. Having replaced two local fire stations it was expected to be a busy station used by a range of vehicles. With each fire engine weighing up to 13 tonnes and using power-assisted steering the new surface would be subject to extreme turning forces. It would need to offer long-term durability and loss of aggregate due to surface abrasion. After considering the options, Tarmac’s ULTIPHALT HD was chosen, a tough, high performance 10mm asphalt with advanced modified binder. ULTIPHALT HD has been proven to deliver enhanced resistance in challenging environments like container ports and distribution centres. The modified binder enhances durability but also helps to maintain workability and aid compaction, even in low temperatures.
Sponsored
The Louvre Museum, Abu Dhabi - FireMaster Horizontal and FireMaster Fire Curtains

The Louvre Museum, Abu Dhabi - FireMaster Horizontal and FireMaster Fire Curtains

Coopers Fire Ltd

Coopers innovative FireMaster Plus2 fire curtains was also used to create tenable zones as the product offers both integrity and radiance performance. The use of all the fire curtains allowed the open plan design of the museum to be realised by offering fire compartmentation and boundary protection. A total of 20 Simplex and Duplex FireMaster Horizontal fire curtains and 110 FireMaster and FireMaster Plus fire curtains have been installed in the museum by Coopers Fire UAE partners, Dosteen Doors.
Sponsored
The SSE Hydro, Glasgow. Fire Curtains and Smoke Curtains

The SSE Hydro, Glasgow. Fire Curtains and Smoke Curtains

Coopers Fire Ltd

As the leading manufacturer of fire and smoke curtains, Coopers were appointed to develop a smoke curtain system to provide an unintrusive method capable of controlling smoke migrating from the lower floors. It was also necessary to protect the un-insulated glazing installed above the atrium’s reception area with an approved fire curtain barrier system approved to provide a one hour insulating zone. Coopers manufactured, installed and commissioned two SmokeStop smoke curtains developed to control smoke generated in the event of fire and effectively channel it away from occupants during evacuation.
Sponsored
the-benefits-of-modular-acoustic-ceiling-in-the-operating-room

the-benefits-of-modular-acoustic-ceiling-in-the-operating-room

Saint-Gobain Ecophon

the-benefits-of-modular-acoustic-ceiling-in-the-operating-room
Sponsored
Colditz castle: Teckentrups fire-protection in a historical building with all glass fire doors and fire doorsets creates a brilliantly sympathetic fire protection solution

Colditz castle: Teckentrups fire-protection in a historical building with all glass fire doors and fire doorsets creates a brilliantly sympathetic fire protection solution

Teckentrup UK Ltd

The recently renovated 'schloss Colditz' in Saxony, Germany is a great example of how to reconcile the often conflicting demands of historic preservation and fire-protection. The renovation has not just fulfilled fire-protection requirements but the planners have used extremely discreet solutions that fit with historic preservation requirements. Many of the passageways have been fitted with Teckentrup T30 all-glass doors, which combine functionality with aesthetics and maximum transparency.
Sponsored
Roath Fire Station, Cardiff

Roath Fire Station, Cardiff

Anderson, GEC Ltd

Stainless steel worktops, by GEC Anderson, were deployed in the refurbishment of the mess room at Roath Fire Station in Cardiff. The kitchen units were supplied by Steelplan Kitchens.The continuous, high quality, stainless steel worktops provide a highly professional look and feel to the busy area within this important emergency facility. The requirements of hygiene, durability and safety are met by the worksuraces that feature integrated sink bowls as well as upstands to walls.
Sponsored
Wimbledon Tennis Installs Changing Places Rooms

Wimbledon Tennis Installs Changing Places Rooms

Astor Bannerman

Changing Places takes Centre Court at All England Tennis Club, one of the oldest and widely referred to as the worlds most prestigious tennis tournament hosted by the All England Lawn Tennis Club (AELTC) in Wimbledon, London.  Working with Aveso (the expert in Changing Places) the AELTC have installed 2 Changing Places rooms at Wimbledon, both branded for the club.
Sponsored
One Creechurch Place, London - FireMaster Concertina Fire Curtains

One Creechurch Place, London - FireMaster Concertina Fire Curtains

Coopers Fire Ltd

The Coopers FireMaster, closed and open Concertina fire curtain is a perfect solution when requiring fire compartmentation around a staircase as it offers a virtual firewall creating a lobby, once the curtain has been deployed, with more than 3 hours integrity. A total of five FireMaster Concertinas were installed between floors 11 and 15 in this large office space. These curtains allow for the open plan flow of the building to remain as intended and prevent the spread of fire through the building whilst providing compartmentation.
Sponsored
Electric cassette blinds with screen fabric provide high street restaurant chain with a neat and seamless shading solution

Electric cassette blinds with screen fabric provide high street restaurant chain with a neat and seamless shading solution

Yewdale Corporation Ltd

When a blind company was tasked with replacing the electric blinds in a popular highstreet noodle restaurant chain in St Albans, they knew they could depend on Yewdale. They chose YewdaleDefiant® C27 electric cassettes with five blinds in Light Grey 1% Roe fabric. They also specified a fascia that could cover the entire length with three blinds on one barrel, saving the installation of three individual cassettes in one, large window. Read more about this project.
Sponsored
Fire Information

Fire Information

Rapid Access Ltd

Product constituents: To meet UK fire standards the Access Panels manufactured have been tested by Warrington Fire and hold a 120-minute fire rating certificate.
Sponsored
Luxury Steam Room Gets The Schlüter Treatment

Luxury Steam Room Gets The Schlüter Treatment

Schlüter-Systems Ltd

A residential property in Lancashire saw a variety of Schlüter-KERDI waterproofing products aid in the correction of a previous installation, resulting in a stunning high-end steam room ensuite.
Sponsored
Nova, Victoria, UK - FireMaster Concertina Fire Curtains

Nova, Victoria, UK - FireMaster Concertina Fire Curtains

Coopers Fire Ltd

Coopers Fire installed a large, multi-faceted FireMaster Concertina Closed fire curtain on floor 12. The client utilising floors 12 and 13 wanted to keep an open plan feel between floors to allow a more free flowing environment for the staff. To achieve this, a bespoke staircase was designed connecting the floors. The spiral staircase was a major feature on floor 12 and meant that staff were able to move freely between floors 12 and 13 without using the lifts.
Sponsored
Barry Fire Station

Barry Fire Station

Altro

Barry Fire Station / Altro case study
Sponsored
EXTENSIVE ROOM FLEXIBILITY AT LEADING UNIVERSITY

EXTENSIVE ROOM FLEXIBILITY AT LEADING UNIVERSITY

Style - Moveable Partition Specialists

Designed throughout for adaptability, space at the new Emily Wilding Davison building, Royal Holloway University, benefits from the installation of numerous moveable wall systems. Partitioning experts Style, worked closely with contractor, Geoffrey Osbourne, and Associated Architects to assist and advise on the design, bringing practical, aesthetic and cost-saving benefits to the project. Demonstrating Style’s extensive portfolio, the final arrangement involved a 50 dB Rw DORMA glass wall in a seminar room, a DORMA Variflex system on which art can be displayed, two 56dB Rw acoustic DORMA moveable walls and a 46dB Rw folding wall dividing meeting/ training rooms.
Sponsored
Selectaglaze and Pilkington support CRASH with secondary glazing for new computer room

Selectaglaze and Pilkington support CRASH with secondary glazing for new computer room

Selectaglaze Ltd

Selectaglaze helps create and enhance a computer suite at London homelessness charity, Caritas Anchor House as part of their on-going relationship with the CRASH charity. CRASH Chief Executive, Francesca Roberts contacted Selectaglaze asking if they would be willing to donate secondary glazing for the computer suite at Caritas Anchor House. Selectaglaze was happy to contribute and involved Pilkington with them donating the fire-resistant glass to support the installation. Three Series 40 units with 10mm Pyrodur fire-rated glass were installed, which has a beaded fixed frame system offering 30 minute fire integrity protection.
Sponsored
Forbury Place, Reading. Fire Curtains over Lift Doors

Forbury Place, Reading. Fire Curtains over Lift Doors

Coopers Fire Ltd

Coopers installed FireMaster fire curtains with smoke control over the lift door openings on each of the ground and upper seven floors and two on the basement so a total of forty eight curtains. An important part of the design of the building on the ground and first floor was to subtly integrate the fire curtain headbox and side guides into the lift opening.
Sponsored
MG200 Glazed Newport Meeting Room

MG200 Glazed Newport Meeting Room

ModernGlide Ltd

Manufactured panels have a different level of acoustic reduction, but all of them provide the kind of flexibility needed to work perfectly within any office or commercial environment following a professional installation from ModernGlide.Because there is no need for a structural head support, this makes the MG200 series perfect for smaller openings. The versatility of our sliding folding wall partitions continue through the format of slimline stacking. This means that when the wall is not in use, it will take up minimal space in your environment.Additionally, the MG200 sliding partition series comes standard with a pass door panel which allows movement from side-to-side with seamless ease. We are able to offer a complete solution for all of your acoustic sliding partition needs.A continuous acoustic wall partitions system, it is perfect for a quick and easy set-up process and is our most popular budget solution for acoustic partitions that move.MG200 Wall Partitions Key FactsAcoustic reduction from 37dB to 49dBFloor-supportingPanel widths 450mm to 900mmHeight up to 4,000mmPass door as standardCentre-folding or end-folding stacking optionsPanel finishes include melamine, laminate, veneer and white boardIntegral glazing options30 minute fire rating option
Sponsored
New hygiene room for primary academy

New hygiene room for primary academy

CareSpaces by Wealden Rehab

The SEN Code of Practice mandates that schools must take reasonable steps to identify and support children with special educational needs, facilitating their progress toward personal potential. Recently, Care Spaces collaborated with Kent County Council for a Primary Academy in Gravesend, tasked with creating a hygiene room for a new pupil with additional needs. Despite challenges such as a small initial space, asbestos removal, and a tight timeline, the team reconfigured walls, installed essential features, and completed the project, providing the school with a compliant, safe, and inclusive space.
Sponsored
Blavatnik School of Government, University of Oxford. Bespoke Fire Curtains and Smoke Curtains

Blavatnik School of Government, University of Oxford. Bespoke Fire Curtains and Smoke Curtains

Coopers Fire Ltd

There are a total of 30 active SmokeStop smoke curtain barriers, 5 vertical FireMaster fire curtains and 2 FireMaster Concertina multi-faceted fire curtains installed within the university building offering protection from fire and smoke. With a large central atrium in the centre of the building, smoke control was a huge necessity on this project and therefore various bespoke engineered solutions were required to help solve the smoke and fire requirements.
Sponsored
A wet-room adaptation bestowing independence

A wet-room adaptation bestowing independence

CareSpaces by Wealden Rehab

A man with a prosthetic limb faced difficulties in his small, impractical bathroom after a leg injury. Collaborating with an Occupational Therapist, Care Spaces redesigned the space, ensuring approval from both the therapist and the user. They revamped the bathroom into a functional wet room, addressing accessibility issues. Key features included a level-access shower, shower seat, non-slip flooring, safety grab rails, an accessible toilet, and basin. The transformed space now meets the user's needs, enabling independent living. Notably, the adaptation benefits the user's son, who has a disability, ensuring a lasting solution for the family.
Sponsored
Double Timber Fire Doors with High dB acoustic ratings

Double Timber Fire Doors with High dB acoustic ratings

Forza Doors Limited

A stunning design by architects Townscape, Peter O’Sullevan House is located at the front entrance of the British Racing School in Newmarket. It provides the horse racing community in East Anglia with a local specialist facility for treatment and training. The facility incorporates a hydrotherapy pool, gymnasium, treatment rooms, changing rooms, conference room, offices and meeting rooms. Forza Doors supplied high dB acoustic American White Oak veneer fire doors and solid American White Oak frames as well as Class 0 spread of flame fire-rated wall cladding panels. All the veneers were laid horizontally to match perfectly down the length of the corridors and open spaces. The feature grooves embedded into the doors provide a smart contemporary look and align with the adjacent panels.  As this innovative building needed a high level of internal finishes and fittings throughout, the contractor RG Carter chose Forza Doors. Just one of several jockey rehab centres we have had the privilege to supply in recent times. Consisting of open plan areas, treatment rooms and hydrotherapy zones, the finished project looks stunning.  
Sponsored
5 Things To Consider When Installing Hygiene Rooms In Schools

5 Things To Consider When Installing Hygiene Rooms In Schools

Astor Bannerman

In recent guidance from the Department for Education (DfE), specifically BB103 and BB104, it has been strongly recommended that both mainstream and Special Educational Needs (SEND) schools incorporate hygiene rooms as an essential component of their facilities to comply with regulations. This highlights the commitment to creating inclusive learning spaces that cater to the diverse needs of students.This guide shares five crucial insights for anyone embarking on the journey of creating hygiene rooms within educational institutions.One. Adhere To DfE Guidelines:Underscored is the importance of aligning with the Department for Education (DfE) guidelines, specifically BB104 and BB103. These guidelines set forth the standards necessary for designing hygiene rooms that cater comprehensively to the diverse needs of students with disabilities. We’ve briefly outlined the guidance below:BB103: “Area Guidelines for Mainstream Schools”:BB103 provides guidance on the space requirements and design considerations for various areas within mainstream schools. This includes classrooms, dining areas, toilet facilities, and more. The goal is to ensure that the physical environment supports effective teaching and learning, as well as the overall well-being of students.BB104: “Access to and Use of Buildings”:BB104 focuses on access to and use of buildings, specifically addressing issues related to accessibility for individuals with disabilities in SEND schools. This guideline outlines the standards for creating an inclusive and accessible built environment within educational facilities. It covers features to ensure that buildings are welcoming and usable by everyone.Most importantly BB103 & BB104 state that a hygiene room should be included in all school settings.Two. Ensure You Have Considered Full Room Hoist CoverageIt’s important to consider the mobility of students when planning for a hygiene room installation. We recommend the Astor OT200 Overhead Ceiling Track Hoist, this advanced hoist system offers full room coverage, ensuring secure and seamless transfers for students with mobility challenges. Improving the utilisation of space and the versatile enhancement of accessibility within hygiene rooms. Discover more about the Astor OT200 Overhead Ceiling Track Hoist here, including its X-Y track system to give access to all amenities and facilities, room-to-room transfer capabilities, considerations for door height/track system impact, and room height/depth of track.Three. Choose The Correct Changing TableIn schools, changing tables are essential for students with disabilities, offering a supportive and dignified space for changing routines. Tailored to various needs, these tables contribute to creating an inclusive environment, ensuring all students feel welcome and supported. When selecting a changing table for a school hygiene room, you’ll need to consider crucial factors. The key considerations when making your decision include:Wall Mounted / Mobile: Considerations include the available space, access and the number of carers needed.Height Adjustability: Protect your carers by insuring easy adjustment to the correct working height,Maximum Working Load: Ensure durability for daily use with a robust design.Size: Optimise functionality by considering the changing table’s size in relation to available space.Shower Tray Required?: Enhance hygiene with the option for a practical shower tray.Space / Need to Stow?: Maximise efficiency with a fold-away design for space-saving and easy stowing.Tilting Headrests: Improve user comfort with tilting headrests for a friendly changing experience.Explore the Astor CTX2-CP, with a water collection tray and drain hose which is ideal for showering and changing. The CP model comes with an emergency stop button which is perfect for multi-user environments such as Changing Places Toilets, schools and care environments.Four. Include A Height Adjustable Wash BasinInstalling a Height-adjustable wash basin will offer accessibility for students with a range of disabilities. Specially designed to cater to diverse needs, these basins ensure comfort and prolonged independence, fostering an inclusive and supportive educational environment. This inclusive design not only enhances the overall functionality of these spaces but also emphasises a commitment to inclusivity, ensuring that every child can navigate and utilise hygiene facilities with ease and dignity.We recommend the Astor ABW-CP Height Adjustable Wall Mounted Wash Basin featuring a spacious basin surround, it aids wheelchair users in transitioning from sitting to standing. Controlled effortlessly by a handheld device, the ABW-CP includes a large integrated mirror and an adjustable soap dispenser for added convenience.Five. Consider The Colour Scheme For Sensory Well-BeingWhen designing hygiene rooms in schools, you will need to consider a strategic colour contrast for enhanced sensory well-being. Instead of solely opting for calming colours, integrate high-contrast elements like light-coloured walls with dark or bright furnishings. This not only aids sensory wayfinding, particularly for children with autism, but also creates visually distinct zones within the space. Consider incorporating varied textures alongside the chosen colour palette to further enrich the sensory experience. By taking a thoughtful approach to colour contrast, hygiene rooms can become incredibly positive and inclusive spaces that support the well-being of all students.To ConcludeIn summary, this guide advocates for a comprehensive approach to inclusivity when installing hygiene rooms in schools. Prioritising adherence to guidelines, making innovative equipment choices, and adopting thoughtful design are central to creating educational spaces that address the diverse needs of students. With these insights, professionals can work towards seamlessly integrating inclusivity into the very fabric of educational environments. Our skilled team has many years of experience planning and installing equipment in public spaces like schools and universities.Please do get in touch if you need help or advice with your project or further support on the government requirements for equipment to support SEND students.
Sponsored
Floor impact sound reduction in snooker room, Cheshire

Floor impact sound reduction in snooker room, Cheshire

Hush Acoustics

Hush Acoustics were tasked with providing a solution to reduce an impact noise issue on the upper floor of a luxury five-bedroom detached home in Knutsford, Cheshire.Home to a professional football player, the issue stemmed from the noise on the flooring of his snooker room. Impact noise from footsteps when using the room was generating nuisance noise within the living area directly below, which was making it difficult for others in the family to enjoy this space.Working with Short Construction, building contractors based in Wilmslow, Hush supplied 167x sheets of our Hush Panel 33 to solve the issue. This is a versatile, high performing acoustic flooring which is widely used in timber construction, making it ideal for the timber separating floors in this property.With a combination of our eco-friendly acoustic felt and our rubber barrier mat, the Hush Panel 33 performs to all UK Building Regulation requirements as well as the Robust Detail performance targets for timber frame developments. Its unique composition makes it easy to install and quick to use.The product works by creating a high mass barrier and isolating the floor finish from the structure. As the nuisance noise issue in this situation was due to impact noise, it was key to introduce a high performing acoustic floor product to break the connection of the floor finish from the structure. This, in turn, improved the impact performance of noise transmission through the floor structure, giving the client the desired effect and enabling him to use the snooker room as intended.

Showing 37-72 of 1668

Feedback