NBS Source
I'm a manufacturer

"double bed"

1,504 results found

Sort by:

Showing 109-144 of 474

Sponsored
Southampton NHS Press Release

Southampton NHS Press Release

Tarkett

Tarkett chosen for NHS teenage cancer unit - The unit at Southampton General NHS Hospital was funded by the Teenage Cancer Trust and designed to create a space as comfortable as possible. Featuring six en-suite bedrooms, a four bed day unit, social space and support facilities. The bright and engaging décor of the centre was created using a variety of Tarkett flooring. The Tarkett flooring used included iQ Optima in Yellow, Medium Blue and Green, iQ Eminent in Turquoise and Acczent Excellence 80 in Bamboo.
Sponsored
ASF Bespoke Corten Planter / Seat

ASF Bespoke Corten Planter / Seat

Architectural Street Furnishings part of WB White Foundry

ASF Manufactured this large planter and seat from corten steel. The structure of the planter is 100% corten, manufactured as modular sections that were transported to site in sections and simply put together in situ. The seat area is a lowered platform alongside a running edge of the planter with hardwood seat slats attached to the top with invisible fixings. The seat area brings the lowered side up to full planter height so people can sit alongside the raised garden bed the planter creates.
Sponsored
Luxury apartments benefit from NIBE Exhaust Air heat pumps

Luxury apartments benefit from NIBE Exhaust Air heat pumps

NIBE Energy Systems Ltd

Salthaven Apartments, Tower Road, Poole, DorsetThe Salthaven apartments in Dorset aimed to deliver luxury living for occupants. Bayview Developments not only constructed beautiful homes for them, but also opted for highly energy efficient heating within the new development.Each of the 12 two or three bed apartments have been fitted with their own individual exhaust air heat pump (EAHP). This technology has been installed in buildings across continental Europe for many years but is now being used more commonly within the UK. Bayview Developments were looking to exceed their planning requirements by reducing carbon emissions and providing cost savings for occupants. NIBE’s innovative EAHPs were therefore the ideal solution.The solution to the projectA NIBE F730 EAHP system removed the need for gas boilers, something Bayview were keen to do given the UK’s net zero targets and commitment to phase out the technology. As heat pump technology is powered by electricity, no gas has been installed at the site.The NIBE F730 unit can be found in the utility room cupboard of each apartment and is comprised of a ventilation system, a hot water cylinder and a heat pump – a complete ‘all-in-one’ product. It works by drawing warm air from the kitchen and bathroom to feed the heat pump, which extracts the heat energy. The recovered energy from the ventilation system is used to drive the heat pump process, which heats the underfloor heating and provides water for the integrated 180litre hot water cylinder. The stale air from the ventilation system is then released outside, whilst fresh air from outdoors is introduced via wall inlets with cleanable filters. The efficient system minimises energy consumption by combing ventilation heat recovery with heat pump technology, that is perfect for well insulated new build properties such as these.The ResultsThe EAHP systems meet the average annual heat demand of 6019 kWh for each individual flat whilst also providing instant hot water. Occupants are able to schedule their heating to suit their timetable and energy tariffs, and therefore benefit from lower energy bills. The system performance factor (SPF) measures 3.33 – this means the system is very efficient as every kW of electricity used to run the unit produces approximately 3 kW of heat energy.NIBE utilised connected electricity meters in 3 apartments to remotely monitor the systems performance across a 12-month period. NIBE was thus able to see how the systems met energy demand consistently for residents, keeping them comfortable and warm throughout the year.Energy consumption data shown in Figure 1 visualises electricity consumption data from the monitored apartments throughout the year. This data also covers the provision of all heat pump controls and continuous mechanical ventilation.Figure 1: 2022 Energy Consumption data for monitored apartments.The all-in-one system has shown a noticeable reduction in energy bills for each apartment too, with all 3 monitored apartments experiencing both monthly and cumulative cost reductions in their energy bills as shown in Figures 2 and 3. This comes with the additional peace of mind that consumers will be kept cool in the summer months with ventilation with no increase in costs.Figure 2 and 3: Monthly and Cumulative Heating Bills for Apartment 11 with the NIBE F730 heat pump compared to a natural gas boiler.The occupants of Apartment 11 are saving on average £130 on their annual heating bills with the heat pump system in comparison to a natural gas boiler, even with the additional provision of mechanical ventilation. We expect that these savings will continue to increase as the Government seeks to rebalance green levies to decrease electricity prices.Sunstone Energy Ltd, the installer for this project, told us how easy the control system is to use for this heat pump, allowing for heating and hot water to be available at any time during the day. The building also benefits from insulation, underfloor heating, smart controls, double glazing, hot water cylinders and mechanical ventilation with heat recovery (MVHR).TestimonialVictoria and John are both residents of the Tower Road apartment complex and have been comfortably living with the exhaust air source heat pump system for a year. They added “We are delighted so far with the new heating system, and love that it has been providing us with heating and hot water throughout the year, keeping us warm in the cold winter months. The heat pump works just as well as our older systems and it is great to know that we’re also doing our bit for the environment in the process.”About the installerSunstone Energy Ltd takes responsibility for delivering complete renewable solutions appropriate to their client’s properties. Their expertise includes the installation of ground source and air source heat pumps, underfloor heating, solar panels, biomass boilers and MVHR.  
Sponsored
Southwyck House (the Barrier Block), Brixton, London

Southwyck House (the Barrier Block), Brixton, London

Vestre

In 2016 award-winning landscape designers, The Edible Bus Stop, were commissioned by the Brixton BID to deliver a legacy installation for the Brixton Design Trail as part of the London Design Festival.Their brief was to create a parklet at the entrance to this famously foreboding building. The space had been habitually populated by street drinkers and labelled an anti-social environment by the residents and neighbouring businesses. The brief was to challenge the notion that the addition of seating and creating a space to dwell would increase anti-social behaviour and, on the contrary, that good design could improve perceptions of safety and empower a sense of wellbeing in a community.During the summer, planting beds were refurbished and many edibles and herbs, including fruit trees, were planted. Several Vestre Stripes elements were installed to punctuate the space with communal seating. The parklet was an instant success and quickly populated by residents of all ages, passers-by and visitors to local businesses. As a result, the ‘test-bed’ has now become a permanent legacy; an exemplar of how local stakeholder commissioning and intelligent socially minded design can be an agent of social change to create spaces of genuine community value.Client: Brixton BIDLandscape Design: The Edible Bus StopAddress: Southwyck HouseColdharbour LaneBrixtonLondonSW9 8TX
Sponsored
Futures Community College, Plymouth

Futures Community College, Plymouth

Rockfon

300 vertically hung Rockfon Industrial baffles are installed to provide acoustic absorption in the double height central hub of the college.
Sponsored
Camestone School, Bedford

Camestone School, Bedford

Broxap Ltd

Pupils at Camestone School in Bedford have a broad experience of sport and physical activities thanks to the installation of a new Sunshine Gym.After initially ordering five stations that can be used by up to nine pupils at any one time, the school ordered another four pieces of equipment to accommodate a further seven students.The outdoor gym area is used on a regular basis by upper Key Stage 2 and lower Key Stage 2 pupils and a rota is in place to ensure every child has access to the equipment.Initially the primary school used part of its PE and Sport Premium to fund a Children’s Double Slalom Skier; Double Strength Challenger; Horse Rider; Tai Chi Discs; and Double Health Walker.Twelve months on and the outdoor gym was such a success it was extended to include another Children’s Double Health Walker; Rower; Waist Twister and an Arm & Pedal Bike.Rubber mulch surfacing defines the Sunshine Gym area within the school grounds.As part of its commitment to supporting healthy lifestyles for children, parents and staff, the school also offers active travel infrastructure.It boosted its cycle parking provision in 2021 with the addition of a Wardale standard shelter and two-hoop Senior Sheffield Cycle Rack from our parent company Broxap Street Furniture.This complements the school’s two existing New Sheffield Shelters which together accommodate parking for up to 20 bikes.
Sponsored
Fully finished timber sash windows, casement and French doors for Conservation Area on the Isle of Wight

Fully finished timber sash windows, casement and French doors for Conservation Area on the Isle of Wight

Lomax + Wood Limited

A stunning property on the Isle of Wight which was built around 1844 in the Italian style and situated within the Conservation Area of Ventnor. Lomax + Wood provided high performance, double glazed timber French doors and sash windows. The house combines quality wooden double glazed and weather-stripped Lomax + Wood windows and doors. The property was designed to be energy efficient with Celotex fitted in the majority of the house. This is another example of how well designed timber windows and doors can add to and enhance even the most sensitive renovation within a Conservation Area.
Sponsored
Two-Tier Cycle Racks for Network Rail, London

Two-Tier Cycle Racks for Network Rail, London

Bellsure Group

The ProblemCyclists and staff at London stations were frustrated by poor quality infrastructure for bikes, leading to congestion, theft and damage to cycles.The SolutionThree busy London rail hubs, Waterloo, Marylebone and London Bridge, chose Streetsure ‘Double Decker’ parking to solve the problem. At London Waterloo Station, Streetsure provided 322 new cycle spaces increasing the number of spaces from 212 to 534. We delivered the complete Streetsure package to Network Rail quickly and efficiently, providing the rail giants with an in-depth site proposal and installation of the Double Decker System. The BenefitsThe quality of the Double Decker System has provided commuters and their bikes with an easy to use, secure and protective system that has helped encourage cycling in the capital. No more messy cycle parking areas with channels to support the bike in an upright position No more damaged bikes with our well-spaced parking positions and anti-scratch guards No more fears about security with our high-security brace frame
Sponsored
The Grid

The Grid

Michelmersh Brick Holdings PLC

The Grid is a four-storey project in Leeds, it consists of 11 apartments housing 38 beds with a cycle store, gym and laundry facilities. Its modern approach to design fits the aesthetic choices of university students while landscaped grounds offer an area of calm with limited parking for each flat.The Grid makes perfect use of Carlton’s Wolds Minster Blend and its internal contemporary leanings. The dark orange, red, purple and brown bricks create a harmonious visual synergy with the ageing brickwork in the surrounding area.
Sponsored
AKRI provides attractive planting solution in new public space

AKRI provides attractive planting solution in new public space

Furnitubes International Ltd

Furnitubes provisioned a number of AKRI raised planter beds for the scheme, the flexibility of the product permitted the creation of a unique stepped solution that was required at specific intervals in the planter to allow for the various changes in levels. A total of 26 meters of AKRI retaining walls were provided in heights of 670mm to accommodate the stepped solution, each planter comprising two internal soil retaining supports to provide increased strength to retain the contents. A return fold with additional anti-skates outlined the rim of the planters to maximise strength and not form a potential harmful edge.
Sponsored
Accord Hospice, Scotland

Accord Hospice, Scotland

Innova Care Concepts

After working with Accord Hospice for many years, they came to us straight away when they got funding for a new 8-bed inpatient unit refurbishment. We brought some of their team to our private showroom to go through the product range and take a closer look at certain items they were interested in. Innova ended up supplying the hospice with bespoke fitted furniture, loose furniture, Integralift hidden hoist systems, and all kinds of specialist equipment in keeping with their modern, homely décor. Take a closer look…
Sponsored
Stannah passenger lift refurb saves legs in Scottish Highlands hotel

Stannah passenger lift refurb saves legs in Scottish Highlands hotel

Stannah Lifts

Visitors of all mobilities to the Alexandra Hotel in Fort William in the Scottish Highlands are thankful for Stannah Lifts’ recent passenger lift refurbishment. Why? Because, with five floors to navigate in this 93-bed hotel, the lift takes the strain off compromised legs—of all ages and capabilities—in an area known for its outdoor challenges and sites of historic interest. The lift refurb is one of three for this eight-strong hotel group, with similar revamps in sister hotels, The Royal Hotel in Oban, and the Cumbria Grand Hotel in Grange-over-Sands, Cumbria.
Sponsored
Santander UK HQ

Santander UK HQ

Planet

As one of Santander’s approved suppliers, Planet Partitioning was approached directly by the client to specify internal glass partitions and glass doors for the refurbishment of VIP meeting rooms at its UK headquarters. By installing p100 double-glazed partitioning and single and double Sonotec doors in all the VIP meeting rooms, Planet Partitioning achieved the look and the high sound attenuation levels required. Planet also installed electronic room booking systems and three-quarter-high switchable glass division panels for added privacy. FireTec doors on the ground floor help meet the building’s strict fire strategy requirements.
Sponsored
Renovation project featuring Cedral Lap fibre cement cladding

Renovation project featuring Cedral Lap fibre cement cladding

Cedral

Cedral fibre cement cladding has been at the forefront of a substantial renovation project in South Worcestershire, which has almost doubled the size of the original property.
Sponsored
Cambridge University Botanical Gardens | Commercial Non-Slip Decking Case study

Cambridge University Botanical Gardens | Commercial Non-Slip Decking Case study

Gripsure (UK) Ltd

Gripsure non-slip decking made from Accoya® wood was specified for the Rising Path Project at Cambridge University’s Botanic Garden. The Rising Path is one of the gardens’ biggest horticulture projects. It revitalises the three-acre Systematic Beds, which were first laid out in 1845. The striking structure offers visitors new ways to explore plant taxonomy. The 65-metre-long spiral structure was designed by Chadwick Dryer Clarke as a gently sloping path stemming off from the gardens’ existing path network. The path leads visitors to a viewing platform with a three-metre vantage point from which the full layout of the Systematic Beds can be enjoyed. The structural frame is formed from galvanized steel with the majority of the structure built from Accoya® wood, which was selected for its durability, stability and clean aesthetic. To ensure safe access all year round the walkway and stairs needed to be slip-resistant. We supplied over 1,300 hundred linear metres of Gripsure non-slip decking made from Accoya® wood, backed with our ten-year non-slip performance guarantee. Along the pathway are sections of landing points that highlight some of the plants’ significant evolutionary innovations, which allowed them to leave the water for life on land. At these points, Gripsure Graphics non-slip deck boards were supplied to create custom typographics. The boards needed to provide a visual contrast to the main decking as well as displaying information for visitors. Project architects Chadwick Dryer Clarke and Designmap (whose design was inspired by the work of the artist Gordon Young) developed the graphic design of the boards. A representative from Chadwick Dryer Clarke said “Gripsure’s approach was positive and collaborative, with a real interest in supporting the design team and project. A number of prototypes were developed that refined the depth, size and edge clarity of lettering, and the successful result has a crispness and quality that exceeds the design aspirations.” The Rising Path is a well-crafted and elegant structure which enhances the experience of the Systematic Beds which are of global heritage significance. It has had very positive feedback from visitors since its opening.
Sponsored
Harrison Thompson offer Yeoman Shield Services to Local Hospice

Harrison Thompson offer Yeoman Shield Services to Local Hospice

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Celebrating 50 years trading this year, as part of their celebrations and charitable activities, Harrison Thompson were pleased to offer their services to their local hospice.The Sue Ryder Wheatfields at Headingley Leeds is a charity run 18-bed hospice, offering the very highest care and services to patients with life-limiting conditions and their families, free of charge.“For our 50th anniversary, we wanted to focus our charity efforts on local organisations.” Explained Harrison Thompson Director, Graeme Brumwell.“Serious illness has touched a number of lives within the company and Wheatfields Hospice has been a facility close to our hearts helping families on these difficult occasions.“It seemed only fitting that we should offer something back for the care that Wheatfield has provided over the years.” Concluded Graeme.Yeoman Shield – the wall and door protection division of Harrison Thompson – got in contact with the Hospice to offer free material and installation for wall and door protection products to be fitted in an area of their choice which was gratefully accepted.2.0mm thick wall protection panels in Cream were fitted to the bedroom walls at the head of beds protecting from marking and damage which can occur from the movement of both the bed and medical equipment.In the corridors, Yeoman Shield’s Fire Rated Door Edge Protectors were fitted to the meeting edge of doors helping to protect from damage and helping to prolong the life of expensive to replace fire doors.The installation of Yeoman Shield will help Wheatfields to keep looking smart and inviting for all those who use the facilities whilst importantly helping to reduce their repair and redecoration cost over the years to come.Sue Waddington, Service Improvement Matron commented “I cannot commend high enough the service that we have received from Yeoman Shield’s contract department.“Due to the nature of our provision of specialist care and services, we had to call on Yeoman Shield at short notice to carry out the work when rooms were available. The installation was undertaken with great empathy and regard for the surroundings.“Now completed the Wall & Door protection looks great and dovetails into our existing décor lovely and gets the hospice well on the way to our forthcoming refurbishment plans for the inpatient unit” Concluded Sue.
Sponsored
Outstanding new care home features Neaco balustrade and balconies

Outstanding new care home features Neaco balustrade and balconies

NEACO Ltd

Neaco’s structural glass balustrade and Juliet balconies are adding a touch of contemporary style in keeping with the outstanding modern design of a new £6m care home in Brighouse. Providing 61-bed luxury accommodation, Bridge House was designed by SS+A Architects and constructed by Marshall (Building Contractors) Ltd of Elland on behalf of the Fisher Care Group. The collaboration has delivered an exceptional scheme which maximises the elevated views from the spectacular ridge-top site. Neaco’s structural glass balustrade was specified for external terraces and the roof garden, enabling residents to take in the panoramic outlook.
Sponsored
Wall Protection - BMI Healthcare Facility

Wall Protection - BMI Healthcare Facility

Gradus

BMI The Somerfield Hospital is part of BMI Healthcare, a leading provider of independent healthcare with a nationwide network of hospitals. Gradus SureProtect Pure hygienic wall protection in White was specified for use in the anaesthetic and sluice rooms, specifically designed for areas of a hospital where cleanliness is a priority, the hygienic wall cladding creates an impermeable barrier to moisture and bacteria and has a smooth, easy to clean surface. It offers a tough and durable finish helping to protect against impact and abrasion from passing equipment, trolleys and beds, thus reducing any ongoing repair and maintenance costs.
Sponsored
Modular seating for University of Leicester, Brookfield Campus

Modular seating for University of Leicester, Brookfield Campus

Furnitubes International Ltd

Brookfield is a recent acquisition that the University of Leicester is developing to offer supplementary and upgraded teaching facilities and office accommodation for support staff. When selecting seating for the scheme, landscape architects Barry Chinn Associates truly embraced the modular concept of RailRoad, so much so that the setting out of the perimeter planting beds was dictated by the seating sizes. Three separate seats were supplied, each comprising different radii modules that introduce a refreshing informality to the courtyard. The seating is further enhanced by the addition and informal placement of backrests, armrests and tablet surfaces.
Sponsored
Junction 17 Mental Health Facility

Junction 17 Mental Health Facility

danfloor UK Ltd

Junction 17 is a 20 bed unit at Prestwich Hospital and offers a specialist adolescent mental health service for young people who require assessment and treatment for a range of complex mental health difficulties. Junction 17 provides a wide range of services both in the community and within a state of the art inpatient unit. Whilst trying to create a safe environment the Trust worked hard to design a stylish and colourful interior. Striking colours including Jazzberry and Aurora were selected from the Equinox Stripe and Tones ranges to create this co-ordinating, inspiring and welcoming setting.
Sponsored
Bespoke RailRoad benches provide flexible seating system

Bespoke RailRoad benches provide flexible seating system

Furnitubes International Ltd

The Excelsior Building is a new addition to the impressive Haberdashers’ Aske’s School campus in Borehamwood. The courtyard comprises planted beds, with social spaces and pathways in a mix of resin-bound gravels and synthetic grass surfaces. To allow pupils to enjoy this new outdoor space a seating system was required that was sufficiently flexible, and RailRoad was the ideal choice. Over 60 linear metres of the Delta version from the RailRoad range was supplied, creating 4 long curvi-linear seating runs and also some shorter independent straight units, together with purpose-made steel planters.
Sponsored
Papworth Hospital

Papworth Hospital

Shield Membranes Ltd

The new hospital was designed to combine a highly efficient clinical layout with a stunning external appearance. Set in beautifully landscaped grounds, it captures the essence of the original tuberculosis hospital that is today’s pioneering heart and lung treatment and transplant centre of excellence.The 40,000sqm hospital has 310 beds, six operating theatres and six catheterisation labs.Shield Membranes supplied materials for all external areas, including two of our BBA accredited ShieldTEC Hotmelt and ShieldSEAL Liquid Applied waterproofing systems as well as our ShieldBROWN living roof system.
Sponsored
Tottenham Hotspur Football Club

Tottenham Hotspur Football Club

Steintec

An extensive hard landscape setting for the new Tottenham Hotspur Football Club stadium. The large 11,000 m2 paved area has been constructed in a combination of granite and concrete block paving units. Although the area is mainly pedestrian the brief required that the units be completely and permanently bonded into position. This was achieved using Steintec tuffbond in combination with tuffbed 2-pack Type 35 bedding mortar to achieve a minimum 2MPa adhesion between the paving units and the supporting layers. Steintec tufftop Type 40 jointing mortar was used to complete the installation.
Sponsored
24-25 GROSVENOR STREET

24-25 GROSVENOR STREET

INTRAsystems

24-25 Grosvenor Street in Mayfair offers high-quality office space. Having been completely reconstructed behind its imposing double fronted period façade in the 1980’s, the building underwent a major back-to-frame refurbishment in 2018 to modernise the space. With two entrances to work with, the contractor needed a high-quality entrance matting system that would befit its location, whilst also providing superior performance from a relatively small area of matting. Two bespoke entrance designs were created to complement the aesthetics using INTRAdisc bronze capsules and INTRAform Double Module cut directly into the ceramic flooring.
Sponsored
British Museum WCEC

British Museum WCEC

Planet

For the basement laboratories, Planet used p100 demountable double-glazed full-height partitions with two layers of 15mm toughened glass to reach heights in excess of three metres. The partitioning framework was set within the steel grid structure, ensuring an industrial look and incorporating slimline single-glazed and SonoTec double glazed doors with integrated venetian blinds. Planet provided a full blackout option for lab work on sensitive ancient human remains. Planet AG was responsible for the full-height atrium glazing, using 19.5mm toughened laminated glass. It required carefully spaced holes for securing attenuators that control airflow within the building.
Sponsored
IWA 14/PAS 68 HVM Terra Bifold Gate

IWA 14/PAS 68 HVM Terra Bifold Gate

Frontier Pitts Ltd

IWA 14 – 7.2t @ 30mph Introducing the latest Terra Bi-folding Speed Gate which has been successfully impact tested to the International IWA14 Specification, stopping a 7.2 ton vehicle travelling at 30mph (48kph). **** Unique to the market this double leaf HVM Bi-folding Gate impact test resulted in minimal penetration *** This HVM Bi-fold Gate is the perfect solution for any building or perimeter fence line bringing together protection from the threat of VBIED’s (vehicle borne improvised explosive devices) and LPS1175 Security Rated Automatic Gates. Double bi-folding gate leaves Hinged Gates leaves can be automated with Actuators.
Sponsored
Glazed Sliding Roof Hatch - London

Glazed Sliding Roof Hatch - London

Surespan

Surespan manufactured a double-glazed sliding access hatch for use in a private residential apartment in London. Product2640 (103?) x 2020mm (79?) hatch was electrically operated via a key switch for easy operation and allowed access to the roof providing views across the London skyline. The sliding cover was finished in grey external polyester powder coating with a white internal finish. The 35.5mm sealed double glazed unit comprised of Pilkington 6mm toughened K polished all-round outer pane, 20mm Warm Edge silver spacer Bar argon filled, Pilkington 9.5mm toughened & laminated inner pane, divided into two panes.
Sponsored
Monkwearmouth Hospital - Sunderland

Monkwearmouth Hospital - Sunderland

Johnstone's Trade Paints - a brand of PPG Industries

Products from Johnstone’s Trade’s portfolio have created a lasting impression on patients at a state-of-the-art, 24-bed dementia unit in Sunderland. Helping a Gateshead-based decorating contractor win a prestigious Johnstone’s Painter of the Year Award. Thousands of litres of Johnstone’s Covaplus Vinyl Matt, Premium Contract Matt and Acrylic Eggshell were used throughout the unit by the decorators during a tight four-month timescale. The paint was used on corridors, offices, washrooms, stairwells, lounges, dining areas and doors throughout the unit, all of which now boast bold, fresh looks.
Sponsored
Stone cottage structurally secured without disruption

Stone cottage structurally secured without disruption

Helifix

A 150yr old stone built cottage had developed structural faults. The archway entrance was failing due to inadequate support causing distortion of the arch pier, the front door to jam and masonry cracking in the archway walls. HD BowTies were installed through the front elevation stonework and the first two floor joists to provide lateral restraint. HeliBars were bonded into the mortar beds to create masonry beams which assisted in distributing the loads above the arch. Crack stitching was undertaken to repair and stabilise the archway wall which was also secured to the internal cross wall with grouted CemTies.
Sponsored
Russell Gardens Playpark, London

Russell Gardens Playpark, London

Furnitubes International Ltd

Furnitubes designed and manufactured bespoke Akri raised planter beds and integrated seating, framed in corten steel – which we chose for its long term durability in outdoor environments. It’s also a great choice where damage to the steelwork might occur. Planter units were sealed using a protective sealant in order to avoid staining on users’ clothing and the surrounding paving and surfaces. Picnic table units were incorporated to provide adequate resting space for public use. Providing a whole range of new playing experiences, Russell Gardens has been transformed for the betterment and wellness of the local community.
Sponsored
TERRABOUND RESIN BOUND POROUS PAVING FOR RHS ROSEMOOR COOL GARDEN

TERRABOUND RESIN BOUND POROUS PAVING FOR RHS ROSEMOOR COOL GARDEN

Addagrip Terraco Ltd

Over 320m2 of Terrabound resin bound surfacing was specified for the pathways of the Cool Garden designed by multi-award-winning designer Jo Thompson. The design has a strong focus on water, embracing the challenge of the high levels of rainfall experienced in the region. With water flow in mind, BBA certified Terrabound resin bound porous surfacing was chosen for the curving pathways that follow the rills and form organic shaped planting beds, helping to reduce surface water runoff. A 6mm Hazelnut natural aggregate blend was selected, providing seamless, low maintenance, decorative pathways for this stunning new garden.
Sponsored
The Chocolate Quarter, Bristol

The Chocolate Quarter, Bristol

AluK (GB) Ltd

One of the most recognisable buildings in Keynsham, UK has been given a new lease of life which includes a number of new restaurants, a cinema, spa and swimming pool alongside over 55's living accommodation. The former Fry's chocolate factory was built in the 1920s, and it later became home to Cadbury. After a £60million investment, St Monica Trust has converted the iconic former Cadbury's chocolate factory into 151 assisted living apartments and a 90-bed nursing care home was project managed by the Andrew Wilson Partnership, with architects KWL of South Wales, and AWW of Bristol.
Sponsored
Dan Court Wembley, London

Dan Court Wembley, London

EFFISUS

The purpose of this development is making the re-cladding of an existing building removing Aluminium Composite Material insulation and cement particle board and replacement with new 3mm aluminium cladding and associated works. The new building will include a mixed tenure unit of 138 one, two and three bed apartments. It’s design was developed by the PRP Architects. Its design was developed by the PRP Architects. In order to protect the façade building from moisture, driving rain and wind the solution Effisus A2 Fire Rated Breather FR System was applied, using an A1 Fire Rated Breather FR Membrane.
Sponsored
Home of Compassion Care Home

Home of Compassion Care Home

TRC Windows

This Grade II listed building in Thames Ditton dates from 1792. The former manor house, priory and chapel was repurposed as a care home in 1905 by the Nuns of Compassion, yet in recent years the historic buildings have posed challenges to delivering modern standards of care. Oliver & Robb Architects have rationalised the design in a renovation project to created 78 luxury bed spaces. We were appointed to design, supply and install a total of 263 timber tilt and slide sash windows, tilt and turn windows, single doors and French doors to sympathetically upgrade the property.
Sponsored
Kimpton Fitzroy London UK (York)

Kimpton Fitzroy London UK (York)

Victoria + Albert Baths

Kimpton Fitzroy London is a Grade II listed landmark building in London’s literary neighbourhood of Bloomsbury. The hotel re-opened in Spring 2018, with interiors by renowned design firm, Tara Bernerd and Partners, that restore the historic hotel to its original grandeur.In the most distinctive and desirable rooms in the hotel, four-poster beds overlook ceramic and marble bathrooms, that offer a mix of walk-in shower stalls and roll-top baths. The traditional York has been specified in these suites, chosen for its luxurious look and feel and sheer comfort.Design: Anna SpiroDesign: Anna Spiro
Sponsored
1-way SOS locksets - Ancora House (Mental Health, CAMHS)

1-way SOS locksets - Ancora House (Mental Health, CAMHS)

Safehinge Primera

Designed by Gilling Dod Architects, Ancora House is an award-winning 30-bed CAMHS unit. When it was being built, the trust specified a need for practical and safe en-suite locksets that were also consistent with the window and door handles. Our Primera 1-way SOS (Staff Override System) locksets were fitted on all of the en-suite rooms, offering superior safety by allowing staff to unlock the door even if the service user was to hold the turn/pull. P Plus our standard anti-ligature push/pull handles was fitted across the ward, providing consistency .

Showing 109-144 of 474

Feedback