NBS Source
I'm a manufacturer

"doors industrial"

4,910 results found

Sort by:

Showing 181-216 of 534

Sponsored
Chorlton High School Laminate Lockers Project

Chorlton High School Laminate Lockers Project

Helmsman

It’s prime time for the education sector to refurbish and service institutions. Helmsman manufactured and installed almost 200 new laminate lockers in a high school in Manchester. These laminate lockers were extra heavy duty. Having ‘extra’ heavy-duty lockers means that the laminate doors inset into the locker frame and creates extra durability. The advanced locking design provides a return lip within the internal door frame for the hooked cam to lock behind. In addition, there is a locking slot in the door frame upright that enables secure locking in two places. These stable and fire retardant four compartment lockers have created storage for 776 students.The Laminate used was Arpa Fucisa, which makes the corridors pop. The laminate lockers are all standard sizes of 1775mm high x 300mm wide x 450mm deep. This project included a standard 150 mm stand with the rear leg which has been cladded with matching laminate panels to have a fully secure, clean and aesthetically pleasing effect. Arpa Fucisa also used for the sidewall to locker infill. Chorlton school chose to have engraved numbers on each locker door. Using this solution for numbering protects the lockers from vandalism.Helmsman is the leading manufacturer of a complete range of lockers and cubicles in the UK and a specialist in providing solutions across different sectors from leisure, healthcare and education through to commercial, retail, construction and industrial. With a dedicated and experienced in-house design team supported by its on-site factory, the company produces high-quality lockers manufactured for each project.
Sponsored
North Sea Oil Platform ISO Enclosure Panels

North Sea Oil Platform ISO Enclosure Panels

CMS Danskin Acoustics

When undertaking a heating, ventilation and air conditioning (HVAC) maintenance and upgrade contract on a North Sea offshore platform, RBG Limited identified that critical noise levels were apparent in a range of working areas.Investigating the issue, RBG Ltd commissioned environmental sound testing, which revealed that ambient noise exceeded a specified minimum of 55dB (A) throughout the electrical workshop, store room, hydraulic workshop, subsea office and mechanical workshop, reaching its highest levels of 88-96dB (A) in the mud pit room. Additional noise generated by operating pumps, cranes and machinery would further increase the noise levels in these areas.As such, RBG Ltd needed to source a high performance industrial acoustic solution that would sufficiently reduce the noise contamination and make the working environment acceptable.Seeking expert industrial acoustics advice, RBG Ltd briefed CMS Acoustics on the project parameters, who responded with a bespoke ISO Acoustic Enclosure Panel system design.The SolutionThe ISO Enclosure Panel is a prefabricated sound reduction system, designed to create noise-protected structures in industrial environments. A self-supporting and robust construction, it offers the additional benefit of a short assembly time, facilitated by the panels being lightweight and easy to handle.The industrial acoustics technical team at CMS Acoustics calculated that a combination of 50mm and 100mm thick ISO Enclosure Panels would be required to achieve the specified noise reduction in the different areas. Depending on panel thickness, fire resistance ranging from 30 minutes to two hours can be achieved.For RBG Ltd, CMS Acoustics manufactured the panels in white and supplied them in ready to assemble kits clearly labelled according to area for installation. Some panels were manufactured to allow removal for maintenance while others were designed to be stud welded to external walls.To increase system robustness, CMS Acoustics integrated acoustic doors and vision panels into the ISO Enclosure design.
Sponsored
Cheshire and Wirral Partnership – En-suite Doors Risk Management

Cheshire and Wirral Partnership – En-suite Doors Risk Management

Intastop Ltd

Amongst the three solutions offered Intastop’s Door Top Alarm was considered to be the best option. The conclusion of the clinical group was that the Intastop Door Top Alarm would provide a robust assistance aid to ward staff and provide an early warning measure.
Sponsored
A Powerful Hinge that Combats Anti-Sagging even on Wide Doors

A Powerful Hinge that Combats Anti-Sagging even on Wide Doors

Sugatsune Kogyo UK Ltd

Heavy duty hinge Wash basin SolutionPROBLEMKey IssuesWhen using concealed hinges on wide doors, a several hinges must be used to support the door, otherwise it will sag.Product InformationOne-touch Heavy duty concealed hinge J95— Suitable for heavy doors up to 25 kg (2 hinges) and 40 kg (3 hinges).— Can also be fitted to glass doors by using the optional glass door faceplate.— Easy, one-touch attachment and removal of the door.SOLUTIONThe SolutionThe use of high load-bearing hinges meant that even wide doors could be supported with fewer hinges.Issue of wide door saggingConcealed hinges are essential for opening and closing furniture doors. However, with wide doors, the door will often slope downward, or “sag,” unless many hinges are used. This article will explain how this problem was addressed.What causes the doors to sag in the first place?The following are some of the reasons why a door may sag:— The door is too heavy— The door is too wide— The interval between the hinges is too short— Too few hinges are usedThe common issue with all of these problems is that the hinges cannot support the weight of the door.The Powerful J95 hinge to support even the heaviest doorsThe J95 concealed hinge is an ideal solution for hanging wide doors. This is specifically due to its high load-bearing capacity: 25 kg for 2 hinges and 40 kg for 3 hinges. It is possible to support heavy doors with fewer hinges than with conventional ones.Support 800 mm wide doors with just two hinges!A luxury hotel in Korea used the J95 concealed hinge for the bathroom sink plumbing maintenance door. Due to the 800 mm width of the door, it was necessary to use at least three conventional hinges, but with the J95, only two were needed. Since only two J95 hinges are required, it creates a cleaner and more visually appealing appearance. Additionally, since the same type of maintenance door was needed throughout the hotel, using only two hinges greatly decreased the overall installation time.
Sponsored
New Traditional Windows and Doors in South West London

New Traditional Windows and Doors in South West London

The Sash Window Workshop

At The Sash Window Workshop we have been replacing and renovating timber windows and doors for various properties across London and the South for over 25 years.We were approached by an interior contracting company who were looking to replace the timber windows and doors for a property in South West London.The company requested new windows and doors which fitted the following specification:New traditional windows to match the existing style and be period appropriate;The highest possible thermal and acoustic performance;The maximum amount of light transmission possible through the glass;Bespoke window ironmongery;Painted internally to meet the customer’s specific paint colour requirements.Upon receiving the request for a quotation, one of our trained surveyors met with the architect for the project to discuss their requirements and advise how we could help. In total they required over 20 new sash windows and timber casement windows, and 4 new external wooden doors.As all of the new windows and doors that we manufacture are bespoke, we were able to ensure that their replacement windows and doors exactly matched the original designs, meaning that they fitted in with the surrounding properties and retained the aesthetic look and feel of the property.Due to the location of the property, all the new windows had to be carried up through the property by our experienced installers to be fitted.Both the customer and contractors were very happy with the work carried out, which helped transform the property into a beautiful home.
Sponsored
UCL PEARL

UCL PEARL

HAG Ltd. - The Door Specialists

“A great achievement by all involved”– Neil Turvey, UCL Estates Assistant Director Capital ProjectsOverviewUCL is one of the world’s leading universities, as well as being London’s number one university for Research Strength, where they have consistently led the way with not only their academic excellence but also their global impact.UCL PEARL (Person-Environment-Activity Research Lab) was completed in Autumn of 2021 and is a unique facility, designed to explore how people interact with their environment in a groundbreaking 4,000m² building. Sophisticated systems are used to gather a rich array of information which will help to understand these reactions and how they can be used to create a better urban environment for the future.PartnershipHAG Ltd. were tasked with protecting the building both through the supply & installation of essential fire protection systems, such as fire shutters & fire curtains and high security steel door sets throughout the building, located in Dagenham, in the London Borough of Barking & Dagenham.As a UK wide company with nearly 40 years’ experience in dealing with large scale contracts of this size, we were able to assist the main contractor by ensuring reliability, professionalism, safety and ensuring that the project was completed on time.All our fire protection products are fully compliant with the Regulatory Reform (Fire Safety) Order 2005 and certified to UKCA.All of HAG’s fire curtains have been independently tested and certified by the international fire testing experts at Warrington Fire, are tested to the latest standard BS EN 1634:2014 and marked to BS EN 13241-1:2003.HAG Ltd.’s steel doors offer an exceptional level of security, whilst not compromising on aesthetics. Our doors were made to the specification of UCL PEARL, to seamlessly sit in their surroundings and ensured not only security, but they are suitable for high levels of use and offer thermal insulation. The ProjectThe original UCL PEARL site consisted of various buildings, one of which was Grade II listed 1940’s. The new building is the first zero-carbon in-use building for UCL, and one it hopes will set the bar for future developments.Within the 10m high building, you will find life sized environments, such as a train station, village square, high street, even a pop-up theatre, all of which have fully controlled conditions and the ability to change materials, such as the flooring or wall cladding. UCL can adjust lighting, sounds and experiment with smells and the other senses to see the impact that these changes have on people. “A building that will be able to house the world”– Nick Tyler, Chadwick Professor of Engineering and Director of UCL Centre for Transport StudiesUp until now, assumptions have been made about how people react to environments, but this has been based on outdated data. UCL PEARL can now pave the way, with the use of sophisticated systems, such as eye trackers, brain scanners & accelerometers, to ensure a more informed suite of ground-breaking data going forward.UCL PEARL are already working in partnership with the London Underground and are researching the design of the built environment for people with dementia.Not only are there legal requirements and obligations for fire safety and protection within this building, but fire shutters & fire curtains should be regularly maintained to ensure they are suitable for intended use, they are safe to use, in good repair and subject to a program of monitoring & reviewing.This is another reason that HAG Ltd. were chosen to assist with this unique facility, as we can offer a full & comprehensive maintenance & repair service, to ensure that their fire shutters & curtains continue to work efficiently and with ease.
Sponsored
Quality wooden sash windows, French doors, entrance doors and casement windows for Coombe Hill Estate, Kingston upon Thames, Surrey

Quality wooden sash windows, French doors, entrance doors and casement windows for Coombe Hill Estate, Kingston upon Thames, Surrey

Lomax + Wood Limited

High performance, made-to-order, timber, traditional flush leaded light casement windows and doors from the Lomax + Wood Kensington & Chelsea range have been specified for a stunning new build property located on the private Coombe Hill Estate, Kingston upon Thames. The 12,000 sq ft property designed and constructed by an award-winning London developer offers unparalleled views towards Richmond Park, Wimbledon Common as well as the legendary and adjacent Coombe Hill Golf Course. Made-to-order wooden windows from knot free engineered timber were supplied as fully finished windows and doors with leaded lights.
Sponsored
Integrated communal entrance door and post box

Integrated communal entrance door and post box

Premier Security & Fire Consultants Ltd

Premier Security & Fire Consultants Ltd are the UK’s leading provider of Secured by Design security door sets and we were proud to be engaged by experienced contractors Durkan to supply and install our products at this excellent assisted residential care centre and day centre for the elderly.The Premier team supplied and installed the 28 internal doors as well as the LPS1175 SR2 security entrance door with associated Secured by Design post boX installation. The internal doors were all fitted with power-assisted closers.
Sponsored
Automotive - Nissan Car Plant - Speedor Cleanroom

Automotive - Nissan Car Plant - Speedor Cleanroom

Hart Door Systems Ltd

Nissan Sunderland is one of the largest, most efficient car plants in Europe. On average, the plant has built a Nissan car every two minutes since production started.Project/doors:10 Speedor Cleanrooms (Over 200 doors supplied to the plant)The challengeFollowing the manufacture of a new paint plant where Hart have a number of doors including several ATEX, Nissan identified a requirement for new repair lines to enable them to carry out both light and heavy repairs and not have to completely repaint the vehicles. This is fast moving environment with the need for a reliable and dust reducing solution.The solutionUsing a tried and tested solution, Hart installed these “hybrid” Speedor Cleanrooms with ATEX operators within the repair zone. We worked closely with site engineers to give them the solution they require, rather than a door to fit an opening. The Speedor Cleanroom maintains strict air leakage requirements over specified pressure differentials and a non-touch safety light curtain which ensures maximum protection to personnel. The successHart is a trusted supplier to Nissan and its subcontractors. Having worked on the site since it’s inception, Nissan approached Hart to supply the doors. Following this Hart were approached by an OEM who provided a full spray booth, after Nissan insisted Hart Doors were specified due to the success of the earlier installations.The review“Speedor is a tried and tested product that is why we keep using them.” Nissan Motor Manufacturing UK Ltd
Sponsored
Premium Plus roller shades in Smart 22@

Premium Plus roller shades in Smart 22@

Bandalux Industrial SA

Smart 22 @ project is a building that arises from the industrial legacy of Poblenou in Barcelona, Spain. It was designed by GCA Architects inspired by the values of modernity, sustainability, and technology and that becomes the First Smart Building in Spain, with Leed Platinum V4 and Well Gold certification. It also has AAA and Wiredscore certifications.The project stands out for its sustainable characteristics and high energy efficiency. Any construction material and elements take part in this purpose. In this context, our Premium Plus roller shades with Polyscreen® 501 contribute to optimal solar management as well as to reduce energy consumption and energy savings in heating and air conditioning. First Smart Building in Spain - 2023
Sponsored
Using Polytrol to revive a dull and faded garage door

Using Polytrol to revive a dull and faded garage door

Owatrol UK Ltd

We’re always so pleased when we hear from customers who have opted to use our products for their projects.When we received an email and some impressive before and after photos, from one such customer who had used Polytrol colour restorer to revive his garage door, we’re not exaggerating when we say that there was an audible buzz of appreciation in the Owatrol office as we took in the transformation.It was then that we knew that we had to share how Brian (our happy customer) had achieved this result, so that our other customers could benefit, too.First, clean your garage doorIf you want to replicate Brian’s success, it’s important to ensure that your garage door is prepped before application. Your door must be clean and free of any dirt, grease, mildew or grime.A bit of elbow grease and a bowl of soapy water is usually all you’ll need to do the job. However, if there’s any mildew on your garage door, scrub on a 50:50 bleach and water solution, leave it for 10 minutes, then rinse it off.If you have any polishes or waxes on your garage door, you will need to remove these too.Before moving on to the next step, ensure that your garage door is completely dry.Now it’s time to apply PolytrolA deep penetrating oil, Polytrol works by penetrating the surface of your door and re-wetting the pigments. This restores the colour that has been lost over the years, through exposure to pollution, rain and sunlight.Using a brush or a cloth and only working in sections that you can complete in 10-20 minutes, apply a liberal layer of Polytrol.As you work, if you notice any particularly matt and shiny patches, it means that the surface is absorbing Polytrol unevenly. If this happens, just move any surplus oil over to the matt areas.Allow the product to work for 10-20 minutes, then wipe off any excess with a clean, lint-free cloth. If you want a shinier finish, you can also buff the surface with a lint-free cloth.It really is as simple as that…Now, you just need to leave Polytrol to dry.One of the great things about Polytrol, is that it has been designed to dry to a tough and long-lasting flexible finish but with no film, so you won’t need to worry about it peeling or flaking.Plus, Polytrol is now also available in a spray can, to make application super simple.“Couldn’t have wished for a better result”Brian informed us that he:“just chanced upon your advert while browsing the net looking for a product that would improve the look of my door, and I am so very glad that I did…”In his email, Brian also said he “couldn’t have wished for a better result”. We have to agree – his garage door has been totally transformed.
Sponsored
Vivienne Westwood, Nottingham

Vivienne Westwood, Nottingham

ASH Door Furniture & Entrance Specialists Ltd

When the Vivienne Westwood group wanted to project their brand image on to their outlet entrances, they contacted ASH directly to design a door handle.Using the well-known iconic orb logo as a starting point we created a unique polished brass profile with engraved features which reflects their brand and also feels comfortable to touch and operate.We are proud to have provided such a bespoke handle to the location in Nottingham, the same city where the handle was manufactured, and even prouder to see the handle still on the doors 15 years later, providing a testament to the quality and durability of our products and craftsmenship. 
Sponsored
Millets Farm Centre - Ultra Polylok Sewage Treatment 125PE & 250PE

Millets Farm Centre - Ultra Polylok Sewage Treatment 125PE & 250PE

Marsh Industries Ltd

Millets Farm is a family run farm centre including farm shop, garden centre, leisure attractions and activity areas.  This award winning location has now turned to Marsh Industries twice in 5 years for expert advice on how to best support the expanding facilities onsite.In the first instance, a sewage treatment plant was required for its Children’s Activity Centre in 2017.  A Marsh Ultra:Polylok 125PE was selected for this popular destination.In 2021 this thriving regional attraction identified that the existing sewage treatment arrangements for the main Farm Shop, Restaurant and Function rooms needed to be upgraded.  Millets Farm again turned to Marsh Industries.  This time a Marsh Ultra:Polylok 250PE was required to cover the variety of facilities and their associated footfall alongside the increased staff numbers. With installation successfully completed in the Autumn between school holidays.
Sponsored
Delivering unusual security rated doors for the Tate Modern

Delivering unusual security rated doors for the Tate Modern

Teckentrup UK Ltd

As part of the extension to the Tate Modern there was a requirement for doorsets with unusual characteristics. The RC4 security rated doors were quite large at 3m x 3m which, combined with the need to clad the doors in the same material as the building, created potential certification issues.Teckentrup was part of the team for the project and worked with the test houses through the design process to achieve a solution for the building.
Sponsored
All Glass K32 Revolving Doors at Rutherford House

All Glass K32 Revolving Doors at Rutherford House

Record U.K. Limited

Rutherford House is an imposing 58,000 sq ft office building located within the heart of Birchwood Park, Warrington, providing superior office space to rent for small, medium and large businesses employing up to 100 people. Consisting of two wings of three and five floors, the building has excellent natural lighting and is conveniently located for travel across the region. Recently refurbished to a high standard, the office complex now boasts a full-height glass atrium and spacious reception area. To achieve this record was chosen to remove the existing bi-parting sliding doors and replace them with a K32 Full Glass Revolving Door, pass door with a DFA 127 Swing Operator, full screen and linear framework.The K32 Full Glass Revolving Door, with the drive motor under the floor, provides a striking and welcoming entrance that complements the surrounding glass facade and allows natural light to flood into the building. With large, spacious compartments, the K31 can accommodate the constant flow of building occupants, ensuring they can safely and comfortably enter and exit the building at all times, whilst maintaining an airlock into the reception to create an ambient temperature and help reduce heating costs.To complement the record K32, a pass door with a record DFA 127 Swing Operator, which is silent in operation, has been installed to enable a wider opening, for wheelchair users and deliveries of large bulky items as and when required.
Sponsored
Installation Guide - VEGA 1500 Series Riser Door

Installation Guide - VEGA 1500 Series Riser Door

Profab Access Ltd

Installation Guide - VEGA 1500 Series Riser Door 
Sponsored
New Clement metal windows and doors for ‘Arts and Crafts’ home

New Clement metal windows and doors for ‘Arts and Crafts’ home

Clement Windows Group

Clement was thrilled to be asked to manufacture the new steel windows and doors for this spectacular Arts and Crafts style house in the Hampstead Garden Suburb. The new leaded Brooking windows and W20 steel doors, look just like the originals – perhaps even better! Hampstead handles were chosen for the windows and Kensington handles for the doors. They were all polyester powder painted in RAL 9005 Jet Black to match the frames. Our client is really pleased with the end result and said:“We placed a large order with Clement of double glazed leaded doors and windows. From start to finish we received a first-class service and the product quality and finish is superb.” 
Sponsored
Percy Lane featuring Reynaers Aluminium CS 77 windows, CF 77 Bifold doors and CP 155 sliding doors

Percy Lane featuring Reynaers Aluminium CS 77 windows, CF 77 Bifold doors and CP 155 sliding doors

Reynaers Aluminium

Located in an historic part of Dublin, surrounded by Georgian and Victorian architecture lies One Percy Lane: 3 high-end townhouses. Underneath the curved, zinc roof, the 3 homes have been designed to maximize light and space. Designed to bring serenity in the bustle of the city, each floor connects to the outside with large windows and terraces. Percy Lane features Reynaers CF 77 and CP 155(-LS) sliding and folding door systems, and CS 77 aluminium window systems.
Sponsored
New steel windows and doors for sensitive replacement project

New steel windows and doors for sensitive replacement project

Clement Windows Group

Typical of most of the houses in the Hampstead Garden Suburb, the style of this beautiful home is influenced by the Arts & Crafts movement.The original steel windows and doors were draughty and no longer fit for purpose and so they needed replacing. The Clement range of Brooking windows, which feature a specialist ‘putty fronted’ system, was chosen together with doors from the Clement W20 range, to match the originals perfectly. The new, bespoke steel doors and windows were painted ‘Jet Black’ on the outside to replicate the previous fenestration and ‘Traffic White’ on the inside to complement the interior. The homeowner said:“I am absolutely delighted with Clement and would recommend them very highly. Their workmen were very professional and swift and they left the house tidy each day. They were a pleasure to have in the house whilst they were doing the work.”
Sponsored
Full-door alarm - The Junipers PICU

Full-door alarm - The Junipers PICU

Safehinge Primera

The Junipers is the first of its kind in the south west of England; offering inpatient support that's closer to home for people with complex mental health needs. The design of the purpose-built unit included input from experts by lived experience and is truly a facility designed with people in mind. When we first discussed the plans for The Junipers PICU with Devon Partnership, we knew it was an opportunity to work together to create a new state-of-the-art ward. After reviewing their options, Devon Partnership chose to install our full doorset range. We worked closely with them before, during and after installation to ensure all of the doors and locksets were operating to help both patients and staff.
Sponsored
DRIVE THRU POD

DRIVE THRU POD

Next Doors Ltd

Our client faced the challenge of transforming a conventional restaurant into a drive-thru establishment without available internal space. In response to their unique requirements, we proposed a comprehensive solution centered around the provision of two separate drive-thru booths. The first booth was designated for payment collection, while the second served as the food presenter window. To expedite the installation process and minimise disruption to ongoing refurbishment works, both pods were meticulously fabricated off-site in our workshop and swiftly assembled on-site.Each drive-thru booth was equipped with a range of featured to optimise functionality and user experience. A notable highlight was the incorporation of a one-piece, large-sized aluminium roof system, providing instant weatherproofing upon installation and ensuring operational continuity regardless of outdoor conditions. Additionally, the pods featured commercial-grade access aluminium doors and large-sized, heavy duty drive-thru windows, meticulously designed to withstand rigorous use while offering ease of operation for end users. By seamlessly integrating functionality, durability, and efficiency, we delivered a turnkey solution that not only met but exceeded our client’s expectations for their drive-thru restaurant conversion project.
Sponsored
CASE: Motorised and concealed roller blinds and awnings across sliding doors

CASE: Motorised and concealed roller blinds and awnings across sliding doors

Blindspace

CASE: Motorised and concealed roller blinds and awnings across sliding doors
Sponsored
B-Box roller blinds in Loft Columella

B-Box roller blinds in Loft Columella

Bandalux Industrial SA

The project is a loft located in Columella street in the northeast of Milan as part of 25 lofts forming the residential complex by modifying a former industrial structure.To cover its double high windows, our B-Box roller blinds are positioned on the exterior for maximum comfort and sunlight protection. They manage to provide human scale to the spaces by combining technology and functionality.The same system is used with two types of guidance. The lateral cable guide is configured with Polyscreen ® 473 in bright orange color in contrast with the planted spaces for excellent thermal protection and light textile appearance. To get better intimacy, B-Box is also configured with aluminium guides U302 and Trend Light Blackout. Those two different uses complete the inhabitant’s needs of Loft Columella.
Sponsored
Installation Video - INTEGRA 4000 Series Riser Doors

Installation Video - INTEGRA 4000 Series Riser Doors

Profab Access Ltd

Installation of Profab Access INTEGRA 4000 Series Riser Doors at 8 Bishopgate
Sponsored
Fire Doors Protected by Yeoman Shield

Fire Doors Protected by Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

After carrying out a fire door survey, Warwick Hospital undertook measures to protect and refurbish the fire doors throughout their sterilisation unit with Yeoman Shield door protection products.Catering for the sterilisation requirements for all wards and departments within South Warwickshire NHS Foundation Trust as well as GP surgeries and clinics, the department is a hub of activity. The movement of heavily laden trolleys and equipment around the unit had caused impact damage to the department’s doors around door edges, glazing beads and the door fronts. Damage to these particular parts of a fire door can render it unfit for purpose.In this instance Yeoman Shield fired rated door protection products were used to refurbish and then protect from further impact damage. Door edge protectors were fitted to the leading and meeting edges of the doors with door protection panels installed to a height that would shield the most vulnerable areas.For additional protection, particularly to ward off blows to the glazing bead section of the doors, Yeoman Shield’s rub rail was fitted to the face of the door just below the vision panels. Colours of Blue and Red were chosen to distinguish between the contaminated and sterile areas within the unit.Yeoman Shield door protection products come with current and relevant fire certificates and do not affect the integrity of a fire door when installed but will continue to protect from detrimental impact damage for many years to come.Malcolm Bloxham Reactive Supervisor commented “We have used Yeoman Shield for many years and find their door protection products perfect for maintaining our fire doors in good working condition, helping to reduce our door maintenance costs by minimising repair and replacement requirements.”
Sponsored
Speedwell Baths - social housing for local people

Speedwell Baths - social housing for local people

HAG Ltd. - The Door Specialists

Speedwell Baths were originally opened in 1937, and quickly became a beloved recreational spot for hundreds of Bristol City dwellers for more than 7 decades. Unfortunately, in 2005, Bristol City Council made the decision for the Baths to close. Subsequently, the site remained abandoned for several years until their demolition in 2019.This paved the way for a new five-storey complex comprising 31 affordable homes, featuring a mixture of 1 & 2 bedroom apartments.This signifies the successful conclusion of a vital revitalization initiative for the local community, bringing much-needed affordable housing to Bristol. PARTNERSHIPThe architectural design for this development was entrusted to Angus Meek Architects, a Bristol based firm, who worked alongside Bristol City Council & property developer, Crossman Homes, to bring the project to fruition.HAG Ltd was successfully awarded the contract & crucial responsibility of delivering security and fire protection door solutions throughout the five-story building, leveraging our expertise and track record. THE PROJECTWork on site began in 2019, starting with the dramatic demolition of the historic swimming pool and the building was eventually completed & handed over to Abri Housing Association in January 2022.The front of the building is designed as an "art moderne" style but incorporating elements of art deco detailing from the original Baths, demonstrating that the development has been thoughtfully designed to enhance the area, reflecting the style & shape of the existing building in a contemporary way.HAG Ltd. were delighted to have been chosen to work on such ground-breaking local development and were keen to assist in the design & installation of high-end security & fire protection products that could aesthetically compliment the design & style of the building.Steel doorsets are versatile, can provide high levels of security, as well as fire protection tested to BS EN 1634, and offer excellent value for money. Bespoke options that were utilised on his project, were louvered doors, communal doors & insurance certified doors, which conform to LPS1175.Louvered doors allow for bi-directional airflow, a medium level of security and can be fully customisable to meet your specification. This was key in this project, to allow ventilation to various secure plant rooms across the site and offer a bespoke colour option, so doors can blend seamlessly into their surroundings.In a busy City complex of 31 apartments, secure yet robust communal entrance doors are a necessity to allow for a high level of pedestrian traffic throughout the day. Double glazing panels allow for through vision and locking systems can be adapted to include access control.Our Fireguard Fire Resisting steel doors gave Speedwell Baths fire protection & high levels of security. Fire protection can be guarantee from 60 to 240 minutes and these doors are certified to BS EN 16034. HAG Ltd. hold the CERTIFIRE certification as well as being FIRAS installation certified – one of only a few installers in the UK to hold such a highly sought after accolade. Sean Gill, management company manager at Abri, one of the largest housing providers in the south, said: “Our new development on the Speedwell Swimming Baths sites will provide further much-needed affordable housing in the city."
Sponsored
Eclisse supply the Lukas Koch foundation with Eclisse Hoist Pocket Door Systems.

Eclisse supply the Lukas Koch foundation with Eclisse Hoist Pocket Door Systems.

Eclisse UK

Sliding pocket doors are hugely beneficial when designing new or refurbished accommodation for people with disabilities where inclusive design is deemed important. More than 30 sliding pocket door systems and 11 Eclisse Hoist pocket door systems have been installed inside the new building. The Eclisse Hoist pocket door system has meant that a hoist lift can be between rooms to transport the young people from one area to another. Three ECLISSE Hoist pocket door systems have been installed in the physiotherapy area and a motorised lifting system in the pool area.
Sponsored
GEZE automatic doors promote a feel-good atmosphere for young patients

GEZE automatic doors promote a feel-good atmosphere for young patients

GEZE UK Limited

GEZE is also a leading provider of door, window and safety technology in the UK. GEZE UK Ltd implemented state-of-the-art door solutions in the John Radcliffe Children's Hospital in Oxford, skilfully combining clinical functionality with a comfortable atmosphere for the young patients.Invisible efficiency: Slimdrive SL sliding door systemsAutomatic glass sliding door system with Slimdrive SL-drives in discreet 70 mm design.The John-Radcliffe Children's Hospital designed by Parry Bowen architects, and built in accordance with the latest hospital architectural standards.. The real eye-catcher of the main entrance is the double-leaf automatic sliding door, with a powerful GEZE Slimdrive SL drive system that works almost invisibly thanks to its construction height of only 70 mm. The Slimdrive SL drive automatic drive fits unobtrusively and elegantly into the contemporary clinic façade, and quietly and efficiently manages thousands of movement cycles every day at the busy children’s hospital."We are delighted by the design of our entrance area. It’s exactly the kind of atmosphere that is expected of a modern children's hospital. The high-quality workmanship makes a key contribution to a comfortable and inviting atmosphere for patients and clinical staff," says Vickie Holcroft, Project Manager at the John Radcliffe Hospital.Automatic swing doors: convenience in the entire clinical areaThe swing door systems from the GEZE TSA drive series are used everywhere in the clinic complex where functionality and ease of access are of particular importance. The automatic TSA 160 door drive ensures light and reliable opening and closing of the automatic doors, even in heavily frequented areas. The TS 4000 overhead door closer provides flexible ease of access at swing doors with manual opening. The closing force of the door closers can be individually set and can be perfectly adjusted to meet the needs of each clinical area. They enable door leaves to be opened with minimal effort, e.g. for children and weak adults. The TSA drives make transportation of beds and/or patients easier for clinical staff.Access control for supervised clinical areasTo safeguard access control to sensitive clinical areas, the swing doors to the operating rooms and intensive card wards were also equipped with a TSA drive with an electromagnetic locking system. This guarantees that only authorised persons can enter these areas.
Sponsored
Installation Video - Integra 4000 Precision Riser doors

Installation Video - Integra 4000 Precision Riser doors

Profab Access Ltd

Installation of Profab Access' INTEGRA 4000 Series riser doors with PRECISION adjustable frame at 8 Bishopsgate
Sponsored
Coedcae Industrial Estate, Technical Fire Damage Specification

Coedcae Industrial Estate, Technical Fire Damage Specification

Garland UK

A busy recycling centre in Coedcae Industrial Estate, Pontyclun South Wales, suffered from a crippling fire that destroyed one-third of the building leaving the rest in severe disrepair from fire damage.Garland Technical Manager, Dale Thomas, was instructed by long-term partner Cushman Wakefield to assess the extent of the damage and secure the optimum waterproofing system to get the warehouse unit returned to its former glory as a hive of activity for the local area.Dale conducted a thorough condition survey and supplied a detailed written report to the client, highlighting the severity of the building damage and the poor condition of the existing roof sections and walls. Approximately 2,000 sqm were either damaged beyond repair or had fallen into a state of disrepair, meaning that a full refurbishment of all roof and wall sections was required before the optimum waterproofing system could be implemented.
Sponsored
Contemporary industrial design for London’s latest development | Supplied by Towelrads

Contemporary industrial design for London’s latest development | Supplied by Towelrads

Towelrads

Goodluck Hope sits in an enviable position on the banks of the river Thames, directly opposite the 02 Arena. This flagship project from the Irish developer, Ballymore, is a prime example of stunning contemporary design with an industrial edge. Using a mix of blue and green façades, interiors feature bright, colour palettes interspersed with splashes of polished brass in both the kitchens and bathrooms.Towelrads have worked with the M&E subcontractor, Borough Engineering, on every phase of the waterside development and supplied Multicolumn radiators, along with chrome and white towel rails, to the private and shared units. This unique island development features an eclectic mix of contemporary buildings including suites, 1,2-, and 3-bedroom apartments, lofts and townhouses. With so many different plot types, most sizes throughout the project have been made to order with vertical and low-level radiators supplied, some up to 1.6m long.
Sponsored
Long cottage - Oxfordshire

Long cottage - Oxfordshire

Rationel Windows

It was the pretty garden and view of the house from the driveway that first drew retired couple Melanie and Phil to what is now their much-loved home of ten years.The property has four bedrooms and two bathrooms and, though it sits within a conservation area, it is not listed. The house was originally three dwellings, each with an entrance door at the front and staircases behind the fireplaces. In the 1970s the houses were converted to a single dwelling and an extension was added at the back to house a single staircase, hall, landing and main bathroom. When the couple bought the house, it had old single glazed windows and doors, some of which were rotten. Since moving in Melanie did their best to persevere with the old glazing because it suited the cottage, but in the end decided to update it earlier this year. The couple wanted a solution that fitted with the character and age of Long Cottage, but also wanted it to feel cosier, warmer and more energy efficient. They decided on triple glazed Rationel windows and doors. They chose Rationel FORMAPLUS alu-clad triple glazed windows and doors in two finishes – cream for the outside and white inside. ‘We liked the fact they were maintenance free, but had the look of wooden units to tie in with the character of the cottage and the surrounding village properties,’ says Phil.While energy efficiency was a key reason for choosing triple glazing, they also wanted to reduce noise as much as possible – Brize Norton airbase is nearby. The couple are especially pleased with the windows in the bedrooms – which now meet industry safety standards for evacuation in case of a fire – and in the sitting room.‘The sitting room is in an end gable next to the road,’ says Melanie, ‘and the new triple-glazed unit has made it so much quieter and cosier than it was before.’
Sponsored
Efficient and safe goods lifts optimize performance for a large online shopping retailer’s warehouse

Efficient and safe goods lifts optimize performance for a large online shopping retailer’s warehouse

Lödige Industries

Efficient and safe goods lifts optimize performance for a large online shopping retailer’s warehouseThe top online fashion retailer improves its productivity, efficiency and safety to meeting higher market demandsOnline orders for the fashion industry have significantly peaked over the last few years, making fashion retailers recognise the need to expand their warehouses. The international and rapidly growing fashion brand has opened a new warehouse in Litchfield to supply their multinational customers efficiently and on time. In 2021, Lödige Industries was contracted to design, manufacture, deliver and install one SHERPA and one ESCORTA goods lift for the new facility. Installation work of the goods lifts was accomplished in November 2021, while the rack system will be finished afterwards.Optimizing space and serving each mezzanine floor efficientlyDue to the increasing number of online orders, the international fashion retailer needed an efficient and space-saving lift solution. The client envisioned a multi-level storage solution, to fully utilise the available warehousing space.Lödige Industries in the UK decided to implement large goods lifts as a solution to access each floor. The free-standing SHERPA and ESCORTA goods lifts fully automate the transfer of goods across five and six floors and were easily integrated into the rack system. The two lifts have been configured specially to help the flow of goods in the building. They have been fitted to align with their vast increase in orders, facilitating their constant success globally. Overall, the cabin sizes of the goods lifts allow the customer to fit all their equipment in the shaft without any disturbances between different stops.Safety and security are key priorities for the customerSafety for employees in installation and operation of goods lifts is one of the key priorities for the fashion brand. Therefore, engineers from Lödige Industries installed the goods lifts in line with Machinery Directive 2006/42/EC. It contains guidelines to minimise any injury to the user or people close to the machine. It specifies the maximum gap in a guard and directives regarding the lift such as lift speeds for different applications, alongside many other guidelines.For the ESCORTA, Lödige Industries fitted a bumper rail to protect the emergency stop button from being damaged. Additionally, rumble strips were installed to prevent the trolley from moving and maintaining the smooth running of the lift. As a result, this reduces downtime of the goods lifts, the amount of call outs and allows them to be more cost efficient.Consistent site coordination to apply the best lift solution for the customerThe biggest challenge for the customer was the limited space available for the goods lifts. Consequently, the customer required a lift solution to fit between the steel building columns and respecting all other work and storage areas. This made the sizing of the lifts become complex.In close collaboration with the customer, the efficiency of the building was maximised by optimising both, general goods flow and use of space within the goods lifts areas. The constant coordination and communication between the customer and Lödige Industries allowed a precise location for the lifts within the space available.SolutionIn order to save space and meeting the available space restrictions, free standing goods lifts were attached to the rack system.The applied safety measurements reduce downtimes of the goods lifts, the amount of call outs and allows the customer to operate more cost efficient.Close collaboration between the go-to fashion brand and Lödige Industries enabled the customer to optimise goods flow while respecting all site specifications.
Sponsored
Bespoke Rundum Meir door chosen for period property renovation

Bespoke Rundum Meir door chosen for period property renovation

Rundum Meir (UK) Ltd

A bespoke side sliding sectional garage door by Rundum Meir provides a blend of aesthetics and modern functionality in a Victorian house renovation project. The 19 ft x 12 ft garage has been transformed into a quality working space equipped and finished exquisitely, allowing for use as a utility area or office as well as a vehicular. A clear 2900mm span is provided by a sliding sectional garage door. Hand crafted using knot-free Spruce, this bespoke timber door in RAL 6021 Pale Green is fully automated with insulation between the five solid double skinned timber panels.With one third obscure glazing, the door allows for plenty of natural light to enter the garage. The design of the garage door panels and the cross styles in the window were the customer’s wish to satisfy the local conservation area requirements. It is the perfect example of the role a Rundum Meir garage door can play in transforming a garage to give it new purpose and flexibility.
Sponsored
Cotswold Renovation Project: Traditional Timber Windows and Doors

Cotswold Renovation Project: Traditional Timber Windows and Doors

The Sash Window Workshop

The Sash Window Workshop were contacted to replace the windows and doors in a property in the Cotswolds, as part of a large renovation project of the property.The majority of the existing windows were 2 over 2 sash windows, but these didn’t suit the style of the property home so they wanted to get an idea what other styles of sash windows would look like to restore the property to be more period appropriate.After discussing with the customer, a quote was sent across for replacement 6 over 6 sash windows, new casement windows and new doors.When proceeding with the work, they decided to split the work required across several separate orders between October 2020 and July 2021.As the property was in a conservation area and the windows were not being replaced like-for-like, they obtained planning permission for the new windows. After the order was placed with us, we sent across detailed drawings to accompany their planning permission request.The door and windows were then made to their exact requirements in our workshops in Berkshire. They were manufactured in Accoya, which comes with a 50 year anti-rot guarantee, and were finished in a bespoke semi-gloss paint.After the windows and door were manufactured, they were installed by our skilled fitters. In total, across all the orders, 1 complete new window and 2 complete new French doors were manufactured and installed, along with 24 sets of windows having new sashes manufactured and installed into the existing window frames.Since completing the work, the customer has commented that the product and service was excellent and noted that they would recommend us to others. They have also since placed another order for additional work.To obtain a quote for your project, call us on 01344 868 668.
Sponsored
Supply chain scrutiny key to minimising fire door risks

Supply chain scrutiny key to minimising fire door risks

Promat UK

The Hackitt Review has brought to the broader public attention the myriad of standards and testing or assessment methods that specifiers and the fire protection sector has had to carefully navigate for many years. And whilst the debate continues about the best way forward in respect of specific applications, one positive step that fire door manufacturers can take right now is to go back to basics and check whether their supply chain for fire resisting components is opening the door to risk.Fire resistant products like fire rated glass, intumescents and core materials are composed to precise specifications.

Showing 181-216 of 534

Feedback