NBS Source
I'm a manufacturer

"construction plant equipment"

8,175 results found

Sort by:

Showing 1369-1372 of 1372

Sponsored
A Window On Successful Collaboration.

A Window On Successful Collaboration.

Eurocell plc

Eurocell’s market leading PVC-U window profiles, technical expertise, and commitment to a sustainable future, is helping to underpin the success of a major ongoing property maintenance and refurbishment project in Birmingham. As a result of the work undertaken in tandem with project lead, construction company, Wates, and fabrication partner, Shelforce, many of Birmingham’s social housing tenants are now benefiting from improved property insulation, lower energy bills, and aesthetically pleasing building exteriors, thanks to the specification and installation of new attractive windows with a minimum design life expectancy of 35 years.  
Sponsored
City Quays II

City Quays II

Kingspan Data & Flooring

Belfast Harbour’s estate spans over 8,000,000 sq. m. The award-winning 'City Quays II' development was completed in 18 months with a construction value of €31 million.Kingspan RMG Simploc was installed on the ground floor Management Suite, with RMG and RMG Simploc fitted on floors three through to seven. RMG performs to PSA medium grade, featuring galvanised steel-encapsulated panels that come with a 25-year total system warranty. The system has also been designed so that the flooring can be easily removed or replaced.
Sponsored
Vienna State Opera

Vienna State Opera

Harlequin Floors (British Harlequin plc)

Before the installation of the Liberty Switch system could begin, a sub-floor was constructed using timber battens to provide a completely level surface onto which the pre-manufactured Liberty Switch base panels, complete with the drives and control mechanism were installed. The Harlequin Liberty top panels were then laid and locked into place, finally being topped with a Harlequin Studio vinyl floor. The whole system is operated via a master control unit using a simple touch screen placed on the wall of the room which enables rapid transformation.  
Sponsored
Hurlford Avenue, Glasgow

Hurlford Avenue, Glasgow

K Systems Insulated Facades

The Hurlford Avenue new build project, situated on the former Garscadden Primary School site, truly harnesses innovation and design. This ‘Modern Methods of Construction’ project, completed in partnership with CCG, showcases technical prowess and constructional excellence.Garscadden Primary School closed back in 2017 but the 1930s school building remained standing. Spotting the potential for something impressive on the site, Glasgow Housing Association proposed a modern replacement – a portfolio of properties.The key requirement was to build modern, energy efficient homes which would provide much-needed affordable housing in the sought-after area of Dumbarton and make a significant difference to the local community.After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems devised a comprehensive delivery plan using our unrivalled experience and expertise.CCG fabricated the building off-site with timber kits and incorporated elements from our Aricco system, with the final finish being completed on-site. This approach was advantageous for a few reasons, including the speed of construction and a reduction in required labour.Hurlford Avenue is a prime example of our experience with off-site modular builds and our project-specific approach to EWI solutions. We brought Glasgow Housing Association’s vision to life and delivered 28 houses and 42 flats for mid-market rent.Our ServiceThe build of the Hurlford Avenue development wasn’t without its challenges. Precision planning was required to ensure minimal disruption to the residents in surrounding estates. All traffic ways remained free for passage and noise pollution was kept to a minimum.During the build, our team encountered some detailing challenges. However, working directly with the contractor and main contractor, these challenges were quickly resolved by key colleagues within our Technical Team, and the build remained on schedule and of the highest quality.From specification and design to planning, delivery and evaluating, our team transformed a derelict site to a contemporary multi-dwelling development that rejuvenated the Dumbarton area.“I would like to thank everyone on the K Systems technical support team for their contribution in accomplishing the Aricco System project at Hurlford Avenue. The regular visits from senior technicians always go a long way to keeping any project in check and it makes the job of our management much easier by having honest, professional judgement to go back to our guys, with well earned praise on this occasion. Everyone was onboard from the outset in working around any potential difficulties and you will agree it shows in the final results.”Garry Barton, Contractor.Technical Project DetailsAs the client of this project, Scotland based construction company CCG, approached K Systems to provide a suitable façade solution that would complement their design. A build with timber kits and a drained ventilated cavity system was specified, along with a silkolitt thin coat render finish.CCG are renowned for off-site manufacturing (OSM) and manufactured the kits from their production site in near-by Cambuslang. They sourced the correct material according to our exact specification. CCG’s ‘iQ’ System was chosen, which is designed with a fabric-first approach where greater tolerances are determined by fewer junctions and thermal bridges to deliver enhanced U-values and significantly improve airtightness. By incorporating OSM and the iQ system into this project, it is just a small insight into our unrivalled knowledge and expert approach that we take to fulfil the requirements of our clients.For the supporting façade, the K Systems Aricco system was specified - a drained ventilated cavity system perfectly suited for use in low rise buildings, particularly new build projects and timber framed construction. The Aricco system is also the most compatible with offsite/modular construction techniques and boasts an A2-s1, d0 fire rating and therefore complies with the latest building regulations, ensuring the safety of all residents.The finish was just as important as the façade system, with the cost-effective, industry-leading Silkolitt thin coat render specified. Silkolitt renders provide a contemporary finish to new-build applications, something this project very much required to modernise the area. Silkolitt is simple to apply, and its hydrophobic properties makes the render low maintenance. It also has excellent vapour permeability, allowing the Hurlford Avenue properties to breathe and avoid interstitial condensation. It is the most flexible system on the market, making cracking over its lifetime less likely and therefore delivering a pleasing aesthetic with outstanding longevity.The combinations specified by the K Systems team resulted in the build of impressive dwellings boasting a U-value of 0.13W/m ² K – meaning homes were easier and cheaper to heat, a particularly attractive benefit given the current cost of living crisis.

Showing 1369-1372 of 1372

Feedback