NBS Source
I'm a manufacturer

"assistance call systems"

1,930 results found

Sort by:

Showing 217-252 of 1634

Sponsored
Glan Clwyd Hospital

Glan Clwyd Hospital

Forbo Flooring Systems

Calming colours and patterns have helped to create a special environment for mothers and babies at Glan Clwyd Hospital. Forbo Flooring Systems’ Sphera Element vinyl collection was specified throughout the Mother and Baby Unit, due to its bright and fresh appearance, high-performance and durability. Easy to work with, the Sphera sheets were laid throughout the unit and hand cut to shape to create a beautiful butterfly designs.
Sponsored
Glasgow Caledonian University

Glasgow Caledonian University

Forbo Flooring Systems

The future looks bright for students at Glasgow Caledonian University (GCU) thanks to its newly refurbished airy and inviting library space. Using Forbo Flooring Systems' Marmoleum Modular in contrasting colours and designs, a unique yet functional flooring design has been created, which has also led the project to be recognised as the winner of the Highly Commended award in 2016/17 UK Fly Forbo competition.
Sponsored
My First Friends Nursery

My First Friends Nursery

Excelsior Panelling Systems Ltd

The Project A modernised, revamped nursery based in The Old Courthouse, Ednal Lane. The Nursery prides itself on its high-quality interior and services ensuring children and parents alike enjoy first class facilities and equipment as standard.Bromsgrove MP Sajid Javid officially opened My First Friends Nursery and Pre-School on November 13th, 2015, and commented “The facilities look great fun for the kids”.The Challenge Propose a system with children of nursery age in mind. Consider the height of the doors & partitions.Peardrop range is not supported by an overhead rail and the frontage is fixed at the floor and gable walls only.Flooring substate needs to be at lease 60mm thick and stable to ensure a secure fixing point at the base of the foot. The Solution Consult with the client and survey the area to ensure suitable fixing points.Harlequin Peardrop is the idea system for children of nursery age, the system is self-supporting on an aluminium leg; the legs ability to perform is reliant of the strength of the floor substrate which in this case proved suitable, enabling the client to proceed with this infant friendly system.The full system is professionally manufactured with children in mind providing easily accessible doors for children whilst ensuring efficient dimensions for adults to supervise.
Sponsored
Jaguar Landrover Taunton

Jaguar Landrover Taunton

Lusso Systems Ltd

A new state-of-the-art Jaguar Landrover showroom was built for the Helston Group in Taunton. The facilities reflect the latest corporate identity concept and comes complete with a new workshop, multi-storey rooftop parking, and an interactive showroom configuration with display systems.The showroom features wide open spaces and a large sales area to provide the customer with a first-class experience. It also affords staff members greater visibility throughout the showroom and forecourt areas. Lusso were appointed by main contractor, Acheson Construction, to provide internal glazing throughout the showroom and workshop area. Lusso 25 frameless single glazed partitioning system and complimentary Lusso glass doors were installed to form individual offices which allow privacy when needed, whilst still maintaining visibility of the showroom. Lusso 105 double glazed frameless partitions were installed to provide a barrier between the showroom and workshop area.The use of stylish internal glazing as part of the backdrop to the stunning Jaguar Landrover range certainly makes an impact. The end result blends functionality and aesthetics, providing a stylish and contemporary showroom worthy of the prestigious Jaguar Land Rover brand.
Sponsored
Newport School

Newport School

Excelsior Panelling Systems Ltd

The Project New two storey Sixth Form facility to house teaching, exhibition and social learning spaces.The facility is intended for use by the school and the local community & hoped to be a hive for activity in the local area.  The Challenge Propose and deliver a system suitable for a heavy use environment whilst also offering a commercial style space expected by the wider public.  Durability, ease of cleaning and maintenance are key drivers in the decision process as these areas will be used for extended periods and by a diverse sector.  The washrooms are likely be used by all visitors and it is paramount that the facilities compliment the building and impress the user. The SolutionExcelsior Flush 30 Cubicles with Stainless Steel Ironmongery create an opulent seamless wall within the washroom space Solid Surface bespoke vanity troughs with full height mirrors above open up the space and add a commercial fit out touch.Wall panelling has been included to completement the systems and enclose the WC working mechanisms whilst providing ease of access to the onsite maintenance teams.The project was managed by the contracts team at excelsior and delivered to an extremely high standard by our trusted team of fitters.
Sponsored
Waterproofing the Hotel Football in Manchester

Waterproofing the Hotel Football in Manchester

Newton Waterproofing Systems

Newton combined waterproofing systems were applied to the Hotel in Manchester as part of a complex waterproofing design. NSBC Trace Basements were chosen as experts to waterproof The Hotel Football.
Sponsored
Watertight Concrete Basement For Luxury Wembley Development

Watertight Concrete Basement For Luxury Wembley Development

Triton Systems

Two 20 storey buildings, one a hotel and the other a luxury residential and commercial apartment block, have been constructed near Wembley Stadium. Triton Systems was appointed by the main contractor, Donban Construction, to supply a watertight concrete system for the large underground car park which will serve both buildings.
Sponsored
Calderwood Primary School

Calderwood Primary School

Forbo Flooring Systems

For the new Calderwood primary school, part of the Calderwood Master-plan development in West Lothian, JM architects was tasked with creating an open and collaborative space for teachers and students to enjoy for years to come. Thanks to Forbo Flooring Systems' large portfolio of solutions, JM architects specifies a variety of products throughout the school, with Marmoleum and vinyl at the forefront of this new development. The project went on to be the winner of the Forbo Escapes 2021/2022 competition.
Sponsored
Wiltshire Bus Depot

Wiltshire Bus Depot

CLD Physical Security Systems

Stagecoach West operates and maintains 65 buses serving over 5.5 million passengers annually within the Swindon area alone.So back in 2016; Stagecoach West relocated to a brand new £3.2million development, in order to expand their services and base depot. CLD Fencing Systems and Pembury Fencing worked together to design a fencing system that would match the requirements of Stagecoach West and their new bus depot.The BriefAs Stagecoach were relocating to a brand new development, the brief was driven by their need for bus depot fencing.Must offer a level of security for their property they previously didn’t have.Anti-climb properties.Aesthetically pleasing fence line that was modern and stylish.
Sponsored
Ceramic tile rail substructure system

Ceramic tile rail substructure system

Wallbarn Ltd

Laying ceramic tiles on flat roofs, terraces and podium decks has been made easier with the development of the Rail System, an integrated substructure system to increase stability of suspended tiles. The Rail System incorporates an adjustable height pedestal with a special clip head fitting, a specially profiled aluminium rail which clicks onto the headpiece without the need for mechanical fixings and a top headpiece which slides along the rail to hold and position the tile. By tying the pedestals together via the rail, there is far less risk of an individual pedestal moving or changing height, leading to far less risk of a tile rocking over time. This assures the integrity of the upper surface and gives a health and safety improvement to the area.The rail gives added structural stability as the weight is distributed laterally along the rails and not driven directly downwards onto the pedestal beneath. The top headpiece can be slid along the rail to fit to the corners of the tile above. This means the edge of the tile does not necessarily have to be directly above the pedestal, giving much greater flexibility for positioning.Consider the possibility of a drainage outlet or other awkward detail being directly beneath the edge of a surface tile. Instead of having to cut the tile back, simply move the pedestals away for the outlet and let the rail circumvent the hazard. Position the top head in the correct place to fit around the corner of the tile and the issue is addressed quickly, securely and easily. The rail system brings greater lateral stability to the tiled deck and is a faster, more efficient way to lay porcelain tiles and slabs. It is a major technical improvement to suspended tile and slab installations.
Sponsored
Hull City Council, Hull

Hull City Council, Hull

K Systems Insulated Facades

Providing the solution for EWI retrofit on non-traditional build housingHaving successfully completing the previous 2 phases, K Systems were approached to provide a specification for EWI installation onto two non-traditional build housing types: 5M and Caspon. Both archetypes are of timber frame construction with single skin brick infills at ground level and a mixture of hanging tiles or cladding on upper floors. Typical of non-traditional build housing, the technical team at K Systems had to pay particular attention to bespoke detailing to derive a suitable EWI solution to meet the client’s requirements.The hanging tiles and cladding were removed from the upper floor(s) and replaced with timber sheathing boards to allow for a uniform aesthetic and a striking contemporary finish.Delivering a robust, safe and aesthetic system solution to meet the project requirementsHull City Council wanted to improve the thermal efficiency of their housing stock whilst provide a durable and more contemporary aesthetic look for the project. A combination of K Systems M Silicone and K Systems M VBriQ was used to achieve a u-value of 0.28 using varying thicknesses of A1 non-combustible mineral wool (80mm to 150mm) to adapt to the variety of substrates typical of non-traditional build housing. The combination of acrylic brick slips and polymer enhanced silicone topcoats achieved an appearance that is durable and elevated the dated look of the estate to a more modern feel. Our team worked extensively with the appointed architect preparing bespoke detailed drawings for the various archetypes, particularly transitions between the brick and timber substrates, cills, verges, rooflines, gas boxes and below DPC. Weekly demand planning meetings ensured timely delivery of materials to the appointed contractor.We ensured the correct fixings were specifiedK Systems commissioned pull-out tests to determine the optimum fixings and washers to be used to anchor the EWI system to the different substrates. A combination of hammer fixings and screw fixings were specified.
Sponsored
School Receives New Single Layered Roofing System

School Receives New Single Layered Roofing System

Iko Ireland

The roof on Bede Primary School and Community Centre in Gateshead was in great need of repair. Installing roofing contractors Hodgson and Allon liaised with IKO to refine the specification to meet the client’s requirements. This included a full strip and re-cover with a flame free system to carry a 20 year guarantee. IKO chose an IKO Mach One single layer bituminous system incorporating a site specific cut-to-fall system. This project was a complex roof replacement system with multi-trades required for specialist operations.
Sponsored
Glan Clwyd Hospital

Glan Clwyd Hospital

Roché Systems Ltd

Glan Clwyd hospital is one of Roché’s many public sector customers.The hospital required a total of fifteen shutters: a mix of M411 shutters and fire shutters.Roché’s fire shutters are linked to the building’s modern fire control and security management system, helping to prevent the spread of fire outbreaks, ensuring the safety of patients and staff.M411 shutters are used on reception counters to protect sensitive documents and controlled areas during closed hours.
Sponsored
Lincoln bowl

Lincoln bowl

Dart Valley Systems Ltd

Lincoln bowl has recently undergone a major washroom refurbishment to give their bowling alley a much-needed makeover. The renovation consisted of a whole washroom revamp from flooring to washbasins, taps, urinals and even the less-abled washroom facilities. The main aim of the project was to make their washrooms stand out as much as the bowling alley itself. Franke Water Systems provided over 20 washroom products for the revamp, including a range of Dart Valley branded taps, WCs, flush valves, hand dryers and a range of Miranit composite wash troughs for the male and female toilets.The full range of products provided were:2 x WC03-002 - WC flush valve kits 1 x WC03-002 - WC flush valve kit 2 x WC02-011 - Concealed plastic cistern kits 1 x WC02-011 - Concealed Plastic Cistern Kit 3 x UC07-010 - Urinal control systems 3 x UC00-001 - Backflow Preventers 3 x AT03-011 - Aquarius deck mounted A45 taps 1 x AT00-004 - Three station mains Kit 1 x ANMW411 - Single Quadro Miranit wash basin 1 x ANMW421 - Double Quadro Miranit wash basin 1 x DRYX500N - Hands in hand dryer 1 x F1390 - Airblast Hand Dryer
Sponsored
Scottish Policy on Unwanted Fire Alarm Signals

Scottish Policy on Unwanted Fire Alarm Signals

Safety Technology International Ltd

The Scottish Fire and Rescue Service (SFRS) have announced their new policy on Unwanted Fire Alarm Signals (UFAS) that came into effect at the start of this month.The policy affects all calls to the fire control operators who will confirm a fire before the incident requires the fire service to be dispatched.Scotland have a continuously high rate of false alarms attended by the Scottish Fire and Rescue Service, with over 57,000 unnecessary journeys a year. This is why the new policy adopts a ‘call challenge’ policy to reduce the number of false fire alarms attended by the service.False fire alarms cause disruption in various ways, from impacting the time and resources of fire and rescue services, implicating people’s safety and harmfully impacting the environment. False alarms are also costly procedures, not only for the Fire Service but also businesses where the false alarm takes place.These UFAS have many detrimental effects:They impact on resources available to attend real fires.They impact on time available for other valuable work, such as training and community safety activities. Where fire crews comprise on-call (retained) fire fighters, the crews may be unnecessarily taken away from their place of work.They impact on road safety, as a result of fire appliances travelling under emergency conditions.They impact on the environment from the number of appliance journeys. The new guidance on safe investigation of unwanted fire alarm signals aims to challenge calls to confirm fire or signs of fire in order to ensure resources and time are being used effectively. However, the SFRS will continue to attend calls received from automatic fire alarm systems and if the signal has been initiated by a manual call point (MCP), heat or smoke detector or sprinkler system, in premises in which people sleep. There will also be fire service attendance in non-sleeping risks if there is physical signs or technological indication of a real fire, such as the fire alarm signal triggered by a manual call point.Although the policy will significantly reduce the number of false alarms attended by fire crews, there is still more to be done to decrease the vast number of unnecessary call outs.Protective covers from STI help to reduce both malicious and accidental activations of manual call points, available in various sizes, mounting options and custom text available to suit all applications. The tough polycarbonate covers have been specifically designed to help deter false alarms and prevent vandalism of various devices. The range of Call Point Protectors are highly effective without restricting legitimate operation of the devices, meaning they are easily accessed in emergency situations.For more information on the new policy, visit the FIA website here: https://www.fia.uk.com/news/guidance-on-safe-investigation-of-fire-alarm-signals-in-scotland.html?utm_source=Fire%20Industry%20Association&utm_medium=email&utm_campaign=14001136_June%202023%20MMU
Sponsored
Clifftown Shore, Essex

Clifftown Shore, Essex

Senior Architectural Systems Ltd

Set on the former site of a pub and a fish and chip shop, the stunning new Clifftown Shore residential development has breathed new life into the Western Esplanade in Southend-on-Sea in Essex. The development boasts a stunning location close to both the seafront and the nearby Conservation Area, which encompasses some of the coastal city’s most celebrated local architecture including the 1912 built Cliff Lift funicular railway. In addition to the 51 luxury one, two and three bedroomed apartments, the development also features a ground floor restaurant and cocktail bar and a host of aluminium fenestration systems.Taking inspiration from the Art Deco style of the neighbouring buildings and the beauty of the natural landscape, the undulating ‘waves’ of the white concrete framed building have been further accentuated by the curved installation and slim sightlines of Senior’s thermally-efficient SF52 aluminium curtain wall system.The stunning views from the individual apartments have been framed using Senior’s patented PURe® tilt and turn aluminium windows, with PURe® SLIDE aluminium doors providing access to the outdoor terraces. The thermal efficiency achieved by Senior’s PURe® aluminium system has been further enhanced with the use of energy-efficient triple glazing.The main entrance to the development features Senior’s aluminium PURe® Commercial Doors to provide safe and secure access. As well as contributing to a more energy-efficient building envelope, with all of Senior’s aluminium windows and doors comfortably meeting the new lower U-value targets of Part L of the Building Regulations, the use of the PURe® system also offers improved acoustic performance.Owing to the coastal location of the development, Senior’s aluminium fenestration systems were powder-coated in marine grade Matt Black to offer additional protection from the elements and provide an attractive contrast with the white building design. The installation of aluminium brise soleil, also powder-coated to match the aluminium windows, is both an attractive and practical feature, and will provide solar shading and protection against solar gain.Designed by LAP Architects and built by Cura Construction, all of Senior’s aluminium fenestration solutions were fabricated and installed by supply chain partner Glass & General.
Sponsored
Triton watertight concrete waterproofs lift shafts

Triton watertight concrete waterproofs lift shafts

Triton Systems

Triton Systems approved contractor, British Damp Proofing, installed products supplied by Triton Systems to waterproof two lift shafts in a development of 25 dwellings. Triton Bentonite Membrane was used to waterproof the lift slab base and kicker, which were poured using concrete made waterproof with Triton TT Admix. Triton's Adcor waterbar was then installed on to the kicker.
Sponsored
Nuway Tuftiguard Classic

Nuway Tuftiguard Classic

Forbo Flooring Systems

Nuway Tuftiguard Classic has recently been installed within a modern office building in Dublin, by the expert installers from Andrew Scollan Matting Systems.Cut into a unique shaped matwell, the classic grey and aluminium aesthetic of Nuway Tuftiguard Classic was chosen to complete the first impression for visitors entering the building, whilst also providing outstanding dirt and moisture retention. As a result, this will reduce the number of accidental slips or falls and protect interior floor finishes.
Sponsored
Powell Hall Student Accommodation

Powell Hall Student Accommodation

Forbo Flooring Systems

An array of Forbo Flooring Systems products has been installed within the University of St Andrews’ newest student accommodation building, to help deliver a contemporary and high-end aesthetic that would enhance the students’ experience.
Sponsored
Corrugated Wall Panelling System

Corrugated Wall Panelling System

Gooding Aluminium Ltd

This Aluminium 'Simplicity' Corrugated Wall Pannelling System has been installed into an Office Reception Area.Finished in both Natural Anodised and white Powder Coating, these interlocking profiles have created a modern, sleek feature.
Sponsored
Chitterman House - The Challenge of Chitterman

Chitterman House - The Challenge of Chitterman

Schlüter-Systems Ltd

Marrying the old with the new is an age old problem for the self-builder, but at a project in Leicestershire contractor Pearson Properties was able to seamlessly combine history and cutting edge environmental benefits using products from Schlüter-Systems.
Sponsored
INNOVATIVE FENCE WALKWAY SYSTEM FOR INSTALLERS SAFETY

INNOVATIVE FENCE WALKWAY SYSTEM FOR INSTALLERS SAFETY

Zaun Limited

In preparation for the 2012 Olympics, where over 10,000 athletes from more than 200 countries competed in London, Zaun developed a walkway system that would enable technicians to work safely at height to install fencing as well as attach CCTV and security enhancements to the highest parts of the fencing.Project ChallengesThe project required a range of unique and innovative solutions because of the varied challenges that were in play. The system needed to adhere to strict health and safety regulations, especially as working at heights has many potential dangers, and worker safety is a huge priority. We needed to create a cost-effective solution that installers could use in various venues and areas.We also needed to ensure that this walkway system did not damage the 358 mesh. The walkway also needed to facilitate the repair and installation of Perimeter Intrusion Detection (PID) and pulse-monitored electric fencing systems and razor wire. As such, it was essential that installers could easily and safely access materials, equipment and tools.Biggest Sporting Event In The WorldAs the Olympics is one of the biggest events in the world, global attention was on London and the various venues needed to be as secure as possible. From camera operators and athletes to volunteers and security personnel, the huge number of people involved in the Olympics meant that the security team needed to be able to see as much as possible at all times. To do this, it was best to put the security monitoring equipment along the fence line to survey the whole area and reduce the requirement for additional civils for CCTV cameras. Security measures during big events like the Olympics need to be incredibly stringent. The installation of these surveillance and security measures is of utmost importance to the security of the entire event.Innovative Walkway SystemZaun designed and manufactured a unique walkway system that allowed installers to work at heights safely without damaging the mesh fencing. Our innovative system was designed specifically to support the installation and maintenance of 358 security mesh fencing, CCTV cameras and electric fencing at the top of the fence line. We created an innovative walkway solution that easily attached to 358 mesh so technicians could check and access the security measures whilst safely working at height.
Sponsored
Chapters House

Chapters House

Bushboard Washroom Systems Ltd

Ogura Ward is one of 6 wards that makes up Chapters House, the mental health facility in Goodmayes Hospital, Ilford. Bushboard supplied high risk healthcare units – healthcare boxed out units with a rigid aluminium frame and panel system – specifically designed for safe ensuites and communal wet rooms in a high security environment. Anti-ligature sanitaryware, crafted from high impact resistant, anti-shatter moulded resin, was pre-plumbed to the units ensuring the safest possible environment.
Sponsored
Rail Station, Coventry

Rail Station, Coventry

Senior Architectural Systems Ltd

The £82 million redevelopment of Coventry’s rail station has seen the creation of a new entrance building and multi-storey car park, with Senior Architectural Systems playing a key role in its creation.Designed by AHR Architects, the West Midlands station is one of the busiest outside of London. The project is the latest to have been delivered by Senior and its long-term supply chain partners Elite Aluminium Systems and Buckingham Group Contracting Ltd.Senior’s slimline SF52 aluminium curtain wall system was specified for the main station building, helping to flood the concourse with natural light. Senior’s robust SD automatic commercial sliding doors were also installed to provide secure, safe and accessible access to the thousands of passengers who use the station every day. Additionally, the new-look station also features a footbridge to allow easier access to the platforms and bus interchange.Senior’s slim profile SF52 aluminium curtain wall system provided the ideal balance of aesthetics and performance by allowing copious amounts of light to enter the building and offering enhanced thermal efficiency. The aluminium frames were powder coated to boost durability and also complement the station’s feature grey and red cladding. Senior’s SPW501 aluminium commercial swing doors were also specified throughout to provide a safe and secure solution to such a high traffic environment.The extensive use of glazing on the building also pays homage to the original station building which is located nearby but owing to its Grade II status, could not be extended or developed to meet the increased demand on Coventry’s rail network. Ahead of the wider refurbishment of the original building, the large glazed panels have been used to frame various artwork from local artists and create another focal point for visitors to the city.
Sponsored
Aurora, Finzels Reach

Aurora, Finzels Reach

Lusso Systems Ltd

Aurora is a first-class, highly sustainable office building in the heart of the city of Bristol and one of the greenest offices outside London and among only six in the UK to achieve a special BREEAM 2014 Outstanding Environmental Award for its sustainability credentials. Aurora, which provides 95,000 square foot of Grade A office space on the Floating Harbour, also achieved LEED ‘Gold Standard’ and is currently the only building in Bristol to exceed BCO design guide criteria.The aim of the design was to provide a space that is efficient, offers maximum natural daylight and promotes health, wellbeing and productivity amongst users. To achieve this inspiring working environment Lusso provided and installed the glazed partitions to create a stunning glass atrium within the 7-storey building. This was a challenging design which involved close collaboration between Lusso, Bush Consultancy, and Willmott Dixon to create a system where the framework floated off the slab edge. The structural complexity of this atria required a bespoke solution, which involved close collaboration with the architects from conception.The Lusso 25M single glazed framed system was used within the interior of the building which allows the maximum amount of daylight possible uniformly spread throughout the interior making Aurora, arguably, one of the best office space Bristol currently has to offer.
Sponsored
Damp Proofing Windsor Castle

Damp Proofing Windsor Castle

Newton Waterproofing Systems

Newtons help defeat damp in this remarkable building using Newton System 800. Due to the age of the castle, there were significant rising and penetrating damp problems, for which Newton damp proof membranes were the ideal solution.
Sponsored
Dudley Leisure Centre

Dudley Leisure Centre

Excelsior Panelling Systems Ltd

The Project A new Leisure Centre at Dudley is part of a multi-million-pound Leisure Centre program and regeneration of the area. The new facility will include a 25metre swimming pool, teaching pool, four-court sports hall, gym, exercise studios, soft play area, and caféDudley Council has committed £17.4 million to the project in the heart of the town centre. Working in partnership with Alliance Leisure, through the UK Leisure Framework, the council will create a vibrant modern hub for residents and workers to enjoy a range of physical activities.The ChallengePropose a system suitable for a wet, high humidity environment including Cubicles, Ducts, Vanities, Lockers & Benches. Ensure the material used and the system proposed is suitable for a high traffic environment. Changing cubicle divisions to have increased height at the rear of the cubicle to prevent users standing on the bench and peering over. Fully framed cubicles to be free standing & self-supporting, positioned in centre of the changing area. Create a locker area suitable for use by wheelchair users. The SolutionSolid Grade Laminate was used throughout the scheme. 12mm core boards, self-supporting, highly durable and impervious to water penetration.Hydroline system installed as a fully framed island constructed cubicle with profiled division panels at 2400mm.
Sponsored
Healthcare | The Royal London

Healthcare | The Royal London

Venesta Washroom Systems Ltd

“Venesta's product is both quick and easy to install. This, combined with an experienced CAD and manufacturing team, made them the ideal choice when procuring a washroom package of this size and complexity.” - Marcus Lynes, Shire Integrated Systems. The quality of our specialist healthcare washroom products and customer service was crucial to the success of the project at The Royal London Hospital. The client had total peace of mind, knowing that deadlines could always be met, even when faced with unforeseen problems on site. We appointed a full-time project manager to oversee the surveying, scheduling, and production drawing of every unit supplied.By specifying Vepps, our industry-leading pre-plumbed (IPS) system, installation time was reduced by 50%.Read the full case study for more details.
Sponsored
BUPA

BUPA

Forbo Flooring Systems

For the new office of one of the UK’s leading healthcare specialists, workplace interior design specialists, ID:SR – Sheppard Robson, specified the natural beauty of Forbo Flooring Systems’ Allura Flex Wood Luxury Vinyl Tiles (LVT) to help ‘bring the outside in’.  Occupying the first and second floor of a new seven-storey Grade A office building in Leeds, the healthcare specialist has brought over 250 staff together into one co-located environment. Expertly designed by ID:SR, the 25,000 sq ft space comprises a variety of agile work and social settings to support a range of activities, a dedicated client reception, meeting suite and lounge.   “To support employee wellbeing, the office also engages with the principles of biophilic design, so we incorporated natural looking materials where possible to emphasise the connection between people and nature. The beautiful and realistic wood effect of Forbo’s Allura Flex Wood LVT supported this idea of bringing the outside in. Offering convincing, authentic visuals and excellent functional performance, we used the finish in prominent positions of the office as we felt the flooring supported the overall concept of the scheme.”  Allura Flex Wood in the Weathered Oak colourway was fitted in a herringbone pattern with bursts of Seaweed Solid Oak, Charcoal Solid Oak and Smoke Solid Oak in the main reception and staff breakout areas. Thanks to its tackified installation, the high quality, dimensionally stable Allura Flex tiles provides answers to key issues such as limiting valuable downtime, the re-use of floors and minimising environmental impact, perfect for busy office spaces.  What’s more, Surestep Material in Cool Concrete was specified in the kitchenette of the staff breakout area, where there is an increased risk of slip. The safety flooring combines outstanding slip resistant properties with differentiated design and through the use of Step Crystals, the natural colourway offers a clean, fresh look and improved cleaning and maintenance properties. The PUR Pearl finish ensures that it is stain and chemical resistant.  
Sponsored
AluOne - Herbert Road (video)

AluOne - Herbert Road (video)

Balco Balcony Systems Ltd

AluOne is a self-supporting, lightweight and recyclable open balcony system. Designed for structural simplicity and ease of installation, whilst stylishly complimenting the building facade.Manufactured at our state-of-the-art production facility, and constructed using a four column self-supporting lightweight system, AluOne ensures ease of implementation on site.Suitable for new builds, renovations and retro-fitting to existing buildings. We have a suitable solution for every building. Guaranteed durability, practicality and a high quality finish, AluOne is a truly bespoke modular system.Available in a wide-range of RAL colours, AluOne can be customised specifically for each project with a choice of balustrade and floor tile options.AluOne comes with a tiled floor of concrete paving slabs. The plates have been carefully sandblasted to allow the natural stone ballast in the plate to appear. Thanks to our manufacturing method, this plate has an unique colour resistance. The paving slabs are 400 x 400 in size and available in three colour shades.Always designed with drainage management in mind, AluOne has a hidden system in the balcony for optional rainwater drainage. The water flows discreetly under the paving slabs, allowing it to move into the drainage pipe via a gutter in the balcony frame. This is connected to the building's drainage system or to a drainage pipe that ensures the balcony rainwater discharge is properly managed.AluOne is available ins 12 different sizes. You can choose between four different widths and three depths, each in convenient increments of 400mm.
Sponsored
Bexley College

Bexley College

Bushboard Washroom Systems Ltd

Bexley College is just over 100 years old. It moved to its last site in Belvedere in the mid-1960s and has recently moved again to a new £20m campus in Erith. ‘The overall look of the new college was extremely important from the offset, Martin Peat, Vice Principal of Finance and Resources explains.' Martin chose Bushboard’s Profiles toilet cubicle range, a robust and hardwearing system which features individual head rails for style and durability.Read the whole case study on our website.
Sponsored
Atrium Gardens, Glasgow

Atrium Gardens, Glasgow

Stone Cladding Systems

Architect: EMAStone: Bela SandstoneThis impressive new residential development consisting of 34 apartments is clad in Aztec Rainscreen façade finished in Bela Sandstone. This buff/blonde sandstone is a perfect match for the historical City of Glasgow and the surrounding Victorian tenements It follows on from the earlier use of this durable stone in North Street. Completed in 2018 and designed by KFK Design, Atrium Gardens is a new-build property with the rainscreen installed by Roof & Façade Systems and boasting its own refined, sleek and contemporary finish.
Sponsored
UK Hydrographic Office

UK Hydrographic Office

Lusso Systems Ltd

The United Kingdom Hydrographic Office (UKHO) is the UK’s agency for providing hydrographic and marine geospatial data to mariners and maritime organisations across the world. Their visually stunning new headquarters in Taunton has been designed based on the concept of contours and currents by multi-award winning architects, AHR. An impressive central atrium with feature stair connects the two wings with access to the upper floors reached by a feature stairway which leads onto open platforms and connecting walkways. The fluid lines and vast spaces gives the interior a sense of openness in such a large structure and is an incredibly inspiring environment in which to work. Lusso worked closely with BAM and AHR on the internal glazing requirements to create administration offices, a meeting suite, training rooms, as well as recreation and dining areas to the ground floor. The use of Lusso 25 single glazed partition system and Lusso 105 double glazed partition system allowed for the different acoustic and structural design specifications throughout the building. The clever use of glass partitions has ensured that the requirement for a “one team approach” design brief has been met. The UKHO can now boast highly impressive headquarters, befitting of a world leading geospatial information company. Opened by HRH The Princess Royal, it has now been nominated and won several design awards and is on course to achieve BREEAM Excellent.  
Sponsored
Sherwood Oaks

Sherwood Oaks

Dart Valley Systems Ltd

The Nottinghamshire Healthcare Foundation Trust is looking to improve its Adult Mental Health Inpatient services and Dart Valley Systems provided products for its new Sherwood Oaks unit. The new unit aims to give patients, staff, and visitors the best form of services and level of care by providing single accommodation and en-suite facilities that will improve privacy and dignity for patients. The products provided for the project are as follows: • 72 x VR01-030 High security V2 basin with integrated backplate (not including sensors) • 72 x SH07-040 High security shower head 30 degree • 36 x VR01-072 High security WC pan less abled with grey top • 36 x VR01071 V2 high security WC pan with grey top • 72 x VR07-004 Washroom control system kit – for DVS High Security backplate & WC Our high-security and ligature resistant products are virtually unbreakable and create a safe solution within all mental health facilities. The Sanitaryware, basins and accessories are manufactured from GRP (glass reinforced polyester) which is cost-effective, vandal-resistant, and completely shatterproof. Complete with a high-grade polyester gel coat finish, GRP provides a more domestic and familiar feel to the room creating a more therapeutic environment for those requiring an inpatient stay. 
Sponsored
Port of Tyne

Port of Tyne

Hart Door Systems Ltd

The Port of Tyne is one of UK’s most efficient deep-sea ports, handling a diverse range of cargoes from cars to containers and bulk goods to renewable energy across five continents. They offer a unique end-to-end solution ensuring goods move safely, securely and efficientlyThe project4 Speedor Storms designed, manufactured and installed to mobile hoppersThe challenge:A key part of the port’s ship unloading procedure required fast and reliable doors to compliment their logistics process. Materials such as wood pellets are unloaded into hoppers which simultaneously load directly into lorries that drive into the hoppers. The process generates dust which must be controlled as a residential area is close by. These hoppers are in highly exposed areas and require a product that withstands strong winds.The Solution:The mobile hopper systems originally came with rigid doors that blew out as they were rated Class 3 and were not fit for purpose. We resolved the issue by installing robust Speedor Storms, the Speedor variant with exceptional wind resistance up to Class 5 (over 90 mph). Their automatic action and robust design ensured that the doors worked during all weather conditions ensuring the efficiency of the port is maintained.The success:The original project was to install 2 doors to the hopper systems. Due to the reliability of the first 2 doors, a further 2 Speedor Storms were installed a few years later. 
Sponsored
Type 100SE - Radiation Protection

Type 100SE - Radiation Protection

Movawall Systems Ltd

As business evolves and requirements change in our fast-paced world, Movawall Systems Ltd continue to bring ground breaking, intuitive products to the industry and pride ourselves in being able to create unique and bespoke systems for all our clients, whatever the application. One of our latest projects which has been installed and tested has made us particularly proud and set a new standard in acoustic movable walls.The requirements on this project were clear and simple with very specific needs for one of the leading pharmaceutical companies and we were going to tackle it head on. A movable acoustic wall with radiation protection for a research and testing environment needing to maximise flexibility while still offering the safety and protection required in a radiology environment.Our Type 100SE semi-electrically operated movable wall was developed and tailor-made for this requirement; with X-Ray protection and specialised seals to ensure the ground-breaking radiation protection and acoustic levels would be achieved. Each wall weighed in the region of circa 6 tons and the top hung system was fitted with our Type “K“ track which allows for remote and varied stacking locations. The walls varied in width and height but were all finished in Rigato Formica laminate with aluminium protective edge trims. The vision panels in the pass doors were fitted with Med-X type single glazed glass between two layers of 4mm thick toughened glass.

Showing 217-252 of 1634

Feedback