NBS Source
I'm a manufacturer

"air conditioning systems"

6,336 results found

Sort by:

Showing 217-252 of 1704

Sponsored
Ground Gas Barrier for Almshouses

Ground Gas Barrier for Almshouses

Triton Systems

Triton products, including liquid applied TT Vapour Membrane, were specified to form a ground gas barrier system in the redevelopment of listed almshouses situated in close proximity to a landfill site.
Sponsored
Damp Proofing, Brighton

Damp Proofing, Brighton

Newton Waterproofing Systems

Newton System 800 used to damp proof a school in Brighton which required multiple damp proofing treatments as part of its refurbishment. Installed by Newton Specialist Basement Contractor CavityTech.
Sponsored
Coleg Cambria

Coleg Cambria

Forbo Flooring Systems

When Ainsley Gommon Architects was tasked with designing the new sixth form college in Connah’s Quay, it called upon Forbo Flooring Systems to ensure the interior design would easily accommodate changes in the curriculum, while clearly defining departments.Deeside Sixth, a joint development between Coleg Cambria, local schools and Flintshire County Council, is a £14.6 million state-of-the-art centre, which provides a learning environment to offer enhanced curriculum options to A Level students.
Sponsored
Early Learning Centre

Early Learning Centre

Forbo Flooring Systems

Forbo Flooring Systems’ integrated portfolio of solutions played a vital role in helping to achieve a welcoming, stimulating and caring learning environment for the early learners of a new purpose-built nursery in Hamilton, South Lanarkshire.
Sponsored
Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System

Tour Alto, La Défense, Paris - Knauf DB Green Raised Floor System

Access Floors Distribution

The German company Knauf Integral was able to prevail against competitors with its GIFAfloor DB green raised floor system. A maximum flexible and individual floor due to the interchangeability of the individual panels, a non-combustible building material with A1 classification and the unproblematic recycling due to the lack of plastic edging, as is used in conventional raised floor elements, were decisive for the selection.Flexibility, health in the workplace and sustainability in construction - the 'Tour Alto' in Paris La DéfenseIn the Paris suburb of Courbevoie, in the office district of La Défense, the foundation stone was laid for the 'Tour Alto' - a 160 m high skyscraper which, after its planned completion in 2020, will have a usable area of 51,200 m2 next to countless offices, numerous restaurants, bars and fitness studios etc. will accommodate. For the floor structure, the property developer decided on the double floor 'GIFAfloor DB green' from Knauf Integral, paying particular attention to the aspects of flexibility, health, environmental protection and sustainability in buildings.The 'Tour Alto' office tower in the west of Paris extends over 38 floors and is part of the high-rise backdrop of the La Défense office district. Nevertheless, Bouygues, one of the largest property developers in the world, is setting new standards in construction: installed products not only have to be as flexible as possible in their design and use, they also have to meet high standards of sustainability and environmental compatibility as well as the highest health standards for people, who will do their jobs there every day.A maximum flexible and individual floor due to the interchangeability of the individual panels, a non-flammable building material with A1 classification and the unproblematic recycling due to the lack of plastic edging, as is used in conventional raised floor elements, were decisive for the selection.In addition, health and environmentally friendly aspects were the absolute focus of the project for the property developer: The selected product must contribute to excellent indoor air quality and all materials that come into contact with the indoor air should have A + according to French in terms of VOC and formaldehyde emissions Emission class to be rated. GIFAfloor DB green elements have exactly this A + certification - the decisive advantage compared to the commonly used raised floors with chipboard supports that contain formaldehyde. Independent (building) biological analysis laboratories also prove the excellent quality through their tests: Eurofins certifies the product as suitable for indoor use, and the Institute for Building Biology in Rosenheim gives the verdict " recommended ''. This ensures a healthy working environment for employees.With GIFAfloor DB green, Knauf Integral offers a sustainable and health-friendly double floor solution for flexible, high-quality commercial interior design. The elements consist of the homogeneous gypsum fiber material GIFAtec and are available in different thicknesses depending on the requirements.
Sponsored
Hurlford Avenue, Glasgow

Hurlford Avenue, Glasgow

K Systems Insulated Facades

The Hurlford Avenue new build project, situated on the former Garscadden Primary School site, truly harnesses innovation and design. This ‘Modern Methods of Construction’ project, completed in partnership with CCG, showcases technical prowess and constructional excellence.Garscadden Primary School closed back in 2017 but the 1930s school building remained standing. Spotting the potential for something impressive on the site, Glasgow Housing Association proposed a modern replacement – a portfolio of properties.The key requirement was to build modern, energy efficient homes which would provide much-needed affordable housing in the sought-after area of Dumbarton and make a significant difference to the local community.After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems devised a comprehensive delivery plan using our unrivalled experience and expertise.CCG fabricated the building off-site with timber kits and incorporated elements from our Aricco system, with the final finish being completed on-site. This approach was advantageous for a few reasons, including the speed of construction and a reduction in required labour.Hurlford Avenue is a prime example of our experience with off-site modular builds and our project-specific approach to EWI solutions. We brought Glasgow Housing Association’s vision to life and delivered 28 houses and 42 flats for mid-market rent.Our ServiceThe build of the Hurlford Avenue development wasn’t without its challenges. Precision planning was required to ensure minimal disruption to the residents in surrounding estates. All traffic ways remained free for passage and noise pollution was kept to a minimum.During the build, our team encountered some detailing challenges. However, working directly with the contractor and main contractor, these challenges were quickly resolved by key colleagues within our Technical Team, and the build remained on schedule and of the highest quality.From specification and design to planning, delivery and evaluating, our team transformed a derelict site to a contemporary multi-dwelling development that rejuvenated the Dumbarton area.“I would like to thank everyone on the K Systems technical support team for their contribution in accomplishing the Aricco System project at Hurlford Avenue. The regular visits from senior technicians always go a long way to keeping any project in check and it makes the job of our management much easier by having honest, professional judgement to go back to our guys, with well earned praise on this occasion. Everyone was onboard from the outset in working around any potential difficulties and you will agree it shows in the final results.”Garry Barton, Contractor.Technical Project DetailsAs the client of this project, Scotland based construction company CCG, approached K Systems to provide a suitable façade solution that would complement their design. A build with timber kits and a drained ventilated cavity system was specified, along with a silkolitt thin coat render finish.CCG are renowned for off-site manufacturing (OSM) and manufactured the kits from their production site in near-by Cambuslang. They sourced the correct material according to our exact specification. CCG’s ‘iQ’ System was chosen, which is designed with a fabric-first approach where greater tolerances are determined by fewer junctions and thermal bridges to deliver enhanced U-values and significantly improve airtightness. By incorporating OSM and the iQ system into this project, it is just a small insight into our unrivalled knowledge and expert approach that we take to fulfil the requirements of our clients.For the supporting façade, the K Systems Aricco system was specified - a drained ventilated cavity system perfectly suited for use in low rise buildings, particularly new build projects and timber framed construction. The Aricco system is also the most compatible with offsite/modular construction techniques and boasts an A2-s1, d0 fire rating and therefore complies with the latest building regulations, ensuring the safety of all residents.The finish was just as important as the façade system, with the cost-effective, industry-leading Silkolitt thin coat render specified. Silkolitt renders provide a contemporary finish to new-build applications, something this project very much required to modernise the area. Silkolitt is simple to apply, and its hydrophobic properties makes the render low maintenance. It also has excellent vapour permeability, allowing the Hurlford Avenue properties to breathe and avoid interstitial condensation. It is the most flexible system on the market, making cracking over its lifetime less likely and therefore delivering a pleasing aesthetic with outstanding longevity.The combinations specified by the K Systems team resulted in the build of impressive dwellings boasting a U-value of 0.13W/m ² K – meaning homes were easier and cheaper to heat, a particularly attractive benefit given the current cost of living crisis.
Sponsored
Co-operative, Avonmouth

Co-operative, Avonmouth

Berry Systems

Berry Systems supplied and installed Internal and external safety barriers to protect doorways, walkways, columns, racking, site and equipment at the Co-operative, Avonmouth project.The 435,780 square foot (40,485 sq m) state-of-the-art facility is conveniently located near to Junction 18 of the M5 and ideally placed to distribute goods to 482 Co-Operative stores in the Bristol, North Somerset and South Wales area. Our safety barriers have been installed extensively both inside and outside the distribution centre. The access roads are lined with Barrier Rails mounted on semi-flexible Flexi-Posts. In the vehicle waiting areas power cables have been integrated into the barrier with post extensions mounted to every other post, for the power outlets. The Flexi-Posts give greater protection if a reversing vehicle fails to stop in time, avoiding damage to the barrier, power cables and HGVs. We also installed a number of exterior bollards to protect doorways and other access points and additional barriers to protect fuel storage and other plant. Inside the distribution centre, structural columns benefit from our column protection units that flex upon impact to minimise damage. Other areas have our unique double rail system mounted on spring steel buffers to create an impenetrable but flexible  barrier from ground level to a height of 610mm.
Sponsored
East Marketgait, Dundee

East Marketgait, Dundee

Berry Systems

Berry System supplied and installed vehicle safety barriers for new multi-storey car park at Dundee Leisure Centre. Our innovative Brisafe Wire Rope safety barrier has been installed at the new, 500 space East Marketgait car park in Dundee.The multi-storey car park serves the new leisure centre which is part of Dundee City Council’s multi-million pound redevelopment of the city’s waterfront area. The car park, incorporating a retail unit, is linked to the leisure centre by a unit central foyer and the complete facility boasts a competition sized swimming pool, health suite, café and flumes.Our safety barriers were specified throughout the car park including their column  mounted Brisafe perimeter barrier which meets BS EN 1991-1-1 standards. With a zero footprint in the parking bay, Brisafe allows architects to maximise the parking space available, while providing a flexible system that ‘gives’ on impact to minimise damage to vehicles and the barrier itself. It creates a visually attractive barrier that combines an independently tested safety performance with architectural flexibility to enhance the appearance of the whole structure.Whilst most of the car park perimeter was protected by Brisafe barriers, areas that did not provide convenient structural columns were protected by Berry Beam barriers that are floor mounted on RB1 Spring Steel Buffers.
Sponsored
Perton First School

Perton First School

Excelsior Panelling Systems Ltd

The Project Perton First School has been open for over 40 years and the infant washroom facilities are in need of modernisation.The school prides itself its family ethos and has seen generations of families come the doors.The ChallengePropose a system with children of nursery age in mind. Consider the height of the doors & partitions.Peardrop range is not supported by an overhead rail and the frontage is fixed at the floor and gable walls only.Flooring substate needs to be at lease 60mm thick and stable to ensure a secure fixing point at the base of the foot.Deliver a non-standard laminate to enhance the systems aesthetics. The SolutionExcelsior, working alongside G Evans and Entrust, are excited to have installed our Harlequin Select Range at Perton First School. The school chose our Peardrop Range with low level accessible doors and magnetic locks, perfect for the classroom environment. The cubicles doors were finished in our vibrant Lolly Pop Digital Print & the area was surveyed to ensure suitable fixing points.Harlequin Peardrop is the ideal system for children of nursery age, the system is self-supporting on an aluminium leg; the legs ability to perform is reliant of the strength of the floor substrate which in this case proved suitable, enabling the client to proceed with this infant friendly system.The full system is professionally manufactured with children in mind providing easily accessible doors for children whilst ensuring efficient dimensions for adults to supervise.SpecificationProduct Range: Harlequin Select HPLDoors: 18mm High Pressure Laminate, Lolly Pop Digital PrintPilaster: Polyrey C018 ChardonPartition: 18mm High Pressure Laminate, Polyrey C018 ChardonIronmongery: SBAA 
Sponsored
The Old War Office

The Old War Office

Schlüter-Systems Ltd

Originally designed by British architect William Young, the transformation from former Old War Office into The OWO has been overseen by the award-winning EPR Architects. Schlüter-Systems supplied a comprehensive selection of waterproofing solutions.
Sponsored
Berwick Leisure Centre

Berwick Leisure Centre

Senior Architectural Systems Ltd

This new £22m state of the art leisure centre in Berwick, Northumberland, has been designed by GT3 Architects and features a striking glazed façade created using Senior’s slim profile SF52 curtain wall system.Senior worked closely with specialist contractor Crown Doors and Shutters Limited and main contractor Tolent Construction Ltd to deliver the landmark leisure scheme which is set to breathe new life into the area by replacing the town’s previous leisure centre. To ensure the town’s existing Swan Centre could remain operational throughout, the new leisure centre was constructed in two phases with the project team working closely to carefully coordinate each element of the build to limit the disruption to the local community.As well as creating an inviting and welcoming main entrance, the thermally-enhanced SF52 aluminium curtain wall system will also help improve the energy-efficiency of the scheme whilst maximising the use of natural daylight.Senior’s SF52 aluminium system features attractive slim sightlines and enhanced thermal performance to help boost energy-efficiency. Available as a mullion drained system which removes the need for visible drainage slots, Senior’s SF52 curtain wall can be specified as capped, silicone sealed or as a combination of the two for even greater design flexibility. Thanks to Senior’s in-house powder coating facility, the SF52 system is available in an almost unlimited range of colours and finishes.
Sponsored
Temple Carrig School

Temple Carrig School

Forbo Flooring Systems

Inspired by the mountainous views to the west and seaside views to the east, McCarthy O'Hora (MCOH) architects reflected the colours of the natural world that surrounds Temple Carrig School by specifying an array of vibrant shades from Forbo Flooring Systems' Marmoleum range.
Sponsored
The Richard Pate School

The Richard Pate School

Concept Cubicle Systems

Concept Cubicle Systems provided a complete washroom supply and installation for the school’s Nursery and Reception areas. They required a durable washroom solution that allowed for teacher supervision whilst maintaining student privacy.Read the full case study on our website.
Sponsored
Bishop Auckland, Durham

Bishop Auckland, Durham

K Systems Insulated Facades

The Bishop Auckland refurbishment project, is a stellar example of K Systems ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Durham Homes commissioned K Systems to refurbish its residential development of 120 terraced houses. The primary aim of this project was to improve the thermal performance rating of each home. The challenge for K Systems was to provide a suitable EWI solution whilst retaining the character of the homes by replicating the existing brick and stone walls.Due to this unique mix of required finishes, we were presented with an extremely complex project that required careful attention of several aesthetic and design considerations.Having a good reputation for matching systems with finishes to deliver clients’ visions, we worked in collaboration with our approved installer Westdale Group, to scope out the project and specification in fine detail, with particular focus on insulating properties and aesthetic.These poorly insulated brick and stone terraced houses were given a thermal upgrade to enhance occupier comfort. An attractive brick render finish was used over insulation to provide an aesthetic finish that is in keeping with the current street scene.This satisfied the client’s requirements whilst providing a total revamp for the properties, which has resulted in energy efficient and aesthetically pleasing homes for the client and residents.Our ServiceWe worked in collaboration with Durham Homes and approved installer Westdale Group to upgrade these poorly insulated brick and stone terraced houses and deliver a total revamp of the properties, resulting in thermally efficient homes.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Our Application Specialists visited the site regularly throughout the project working in collaboration with the approved contractor to ensure correct installation and detailing.As a result, we delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Durham Homes, and the residents of the newly improved homes.Joe Rogers at Westdale Group, said:“To deliver such a large project (120 houses), it requires multiple teams to work seamlessly together and have absolute trust in the other’s skill, vision, and judgement. That’s exactly what we had with K Systems on this Bishop Auckland project. The team’s innate understanding of pairing systems with finishes for optimal performance is second to none and together we delivered a best-in-class refurbishment which was an absolute pleasure.”Technical Project DetailsEffective demand planning and technical detailing ensured that the Durham Homes project was completed on time in March 2022.Having comprehensively assessed the project requirements, taking into consideration thermal u-value target, aesthetics and cost, our K Systems E BrickRend EWI system was specified. This high-performing system is lightweight utilising expanded polystyrene (EPS) panels that are enhanced with graphite to further enhance thermal performance.The E BrickRend system has a fire performance rating of B2-s1,d0. It’s low moisture absorption and resistance to mould growth ensures a high level of durability.The system was specifically tailored to meet the thermal performance criteria of the project. Utilising 90mm EPS panels, the target U-value of 0.30W/m2K was achieved, delivering the benefits of improved thermal comfort and lower heating costs for residents, whilst helping the local authority achieve it’s environmental carbon reduction targets.Several finish options were considered to meet the client’s requirement of replicating the existing brick/stone appearance of the properties whilst remaining within the project budget.K Systems specified BrickRend, a bespoke, specially formulated polymer render which was colour-matched to the existing masonry. It was then down to the skill of our approved installer to apply pigments to tint and shade the render surface and simulate the appearance of real stonework. The surface is then sealed to provide a long-term durability. A dash render finish was applied to the rear of the Bishop Auckland properties.This particular finish didn’t just ‘fit the bill’ at the time of delivery, but is an economic, durable, lightweight solution, easily applied, with an increased bond strength compared to sand and cement, which will protect the insulation and structural fabric of the homes from environmental deterioration in years to come.This customised finish and attention to detail is a perfect example of how K Systems works with all clients to fulfil any specific design criteria and go above and beyond the standard requirements to deliver superior quality.
Sponsored
GameChanger LED Flooring system

GameChanger LED Flooring system

Reflex Sports Ltd

The Reflex GameChanger flooring system was installed at this leisure centre.
Sponsored
St Hila's Cresent

St Hila's Cresent

Wetherby Building Systems Ltd

St Hila's Cresent - Wetherby's Modular Facade System
Sponsored
UWE Business School

UWE Business School

Lusso Systems Ltd

The £50m Business School for the University of the West of England, located in the proposed ‘Heart Zone’ of the Frenchay Campus masterplan, provides a new home for the Faculty of Business and Law. The vision behind the design was around transparency, visibility, and collaboration. The 17,000 square metre iconic building, which spans seven floors, includes large areas of collaborative space for students, visitors and staff to meet.Impressive AtriumCirculation around the Bristol Business School is obvious and highly visible from the main atrium where the Lusso 105 frameless double glazed system was installed. The system needed to be designed for imposed line load and potential wind load within the space. The glazed atrium, which is the heart of the building, incorporates a variety of social learning and flexible meeting spaces.Sleek DesignThe two wings of accommodation contrast to reflect the accommodation uses within and the orientation of the building on the site for environmental purposes. For these, the Lusso 105M double glazed framed system which complimented the other atria screens and enabled the slim ghost post mullion to incorporate the integral blind control mechanism.The multi award winning project was delivered to Building Information Modelling (BIM) Level 2 maturity. The FIS, a representative body for the finishes and interiors sector, presented Lusso with the Silver Award in Partitioning for the Business School at their annual awards ceremony. These awards are held annually and are designed to ‘promote and encourage highs levels of craftsmanship’.  
Sponsored
Type G200 - Duff & Phelps

Type G200 - Duff & Phelps

Movawall Systems Ltd

Kroll (previously Duff & Phelps) operate within the risk and financial advisory sector, with UK offices based in Manchester’s Northern Quarter for which we had the pleasure of providing a Type G200 folding partition system during a recent refurbishment. The operable wall allows the space to be transformed from a large open plan area into two separate rooms as and when required.The Type G200 system offers impressive acoustic, achieving up to Rw 47dB when fully closed – minimising noise transfer between the two spaces, without compromising on light transfer. In this instance, a fully glazed, full height pass door allows for easy access between the two smaller rooms when the system is in use.
Sponsored
Manchester Construction Site

Manchester Construction Site

CLD Physical Security Systems

Eric Wright Construction are an organisation based in the North West of England, providing high quality construction services to customers for over 40 years.Back in 2017, work started on one of their new residential redevelopment projects in Manchester. Due to services and potential contaminates running directly underneath the construction site, they were in need of a zero ground strike fencing system that still held high security properties.The BriefThe brief was outlined by Eric Wright Construction through their specific requirements on the compound that CLD Fencing Systems and Wallbank Fencing needed to follow. Due to their inability to break ground, a permanent fencing system was not going to work.Zero ground strike fencing due to potential contaminates and servicesCompetitively pricedOperation and installation flexibility
Sponsored
Gaywood House, Bristol

Gaywood House, Bristol

K Systems Insulated Facades

Improving the thermal fabric performance and replicating the existing lookThe primary aim of the project was to improve the thermal fabric performance of the block and also to replicate the existing look. To achieve this, the client’s key requirements were two-fold. Firstly, to match the original external style as closely as possible in both colour and texture to satisfy the local authority’s requirements. The second key criteria was to ensure that all the systems used on the project were fully approved regarding fire performance, to meet the current regulations for buildings over the height of 18 meters in England. Delivering a robust, safe and aesthetic system solution to meet the project requirementsWe specified a combination of K Systems M VBriQ and K Systems M VBriQ+ to ensure we met the aesthetic planning requirements and comply with building regulations for resistance to fire in high-rise buildings. Our system incorporate mineral wool insulation which has an outstanding A1 non-combustible fire rating, which improves the thermal comfort and reduces heating costs for residents, whilst supporting Bristol City Council to meet their carbon emission targets.Our VBriQ acrylic brick slip finish was specified due to its lightweight characteristics and wide range of colours. Our Acrylic slips have a high UV resistance which will ensure the building maintains its appearance over time. Our VBriQ+ clay brick slip finish was specified for the ground floor and surrounding garage areas because of its robust and durable characteristics.Meeting the project deadlines and minimising disruptionsWe worked in collaboration with our approved installer Rateavon Ltd to ensure there was minimum disruption to the residents of Gaywood House. Our Technical team carried out regular site inspections to ensure the systems were installed to the highest standard with timely responses to technical detailing requests.
Sponsored
Premier Inn Scarborough Isogrid

Premier Inn Scarborough Isogrid

CMS Danskin Acoustics

Isolating Hotel Rooms from RestaurantsPreventing noise transmission between the noisy areas of a building to the quiet areas is an ongoing challenge. When the quiet areas are people sleeping and the noisy area is a busy hotel dining room, the problem is particularly acute, but can be resolved by using the appropriate products which are cost effective and easy to install correctly.The ProjectPremier Inn Scarborough North is a new build 105 room, 5-storey hotel with a 68-cover restaurant, which was completed in March 2021. The new hotel was granted planning permission in 2018 and construction was slightly delayed over the Covid lockdown period.Owner of the Premier Inn brand, Whitbread, continues to see strong growth with their UK business continuing to outperform in the midscale and economy market and now has over 800 hotels in the UK. Key to the brand’s message is that wherever you stay in a Premier Inn, you will always get great levels of comfort.The ChallengeSources of noise which affect hotel guests include:External sources of noise and vibrationTransmission between rooms and between rooms and corridorsTransmission from engineering systems (ventilation and air conditioning, heating systems, lifts and so on)Transmission from public areas – reception, conference facilities and in particular restaurants.Noise transmission from restaurants, bars and reception areas becomes a significant challenge where the design of the hotel incorporates these areas on the ground floor of a block, with hotel rooms directly above.Reducing the transmission of noise from a large common area to individual hotel rooms rests principally on isolating the plasterboard or suspended ceiling. To overcome this challenge, a frequent recommendation is to design a ceiling incorporating neoprene isolation hangers.Neoprene Isolation Hangers for HotelsNeoprene isolation hangers are primarily used to isolate suspended sources of audible frequency vibration, such as piping and ductwork systems. They also provide very effective vibration isolation for hanging acoustic ceilings by preventing transmission of noise to the building structure.The isolation hangers supplied for use in the ceiling at Premier Inn Scarborough North were Isogrid Quick-Connect Ceiling Hangers, supplied by CMS Danskin Acoustics.The IsoGrid Quick Connect Ceiling Hanger has a specially designed dual deflection neoprene isolator which allows internal bulging. This enables the neoprene element to achieve greater deflections whilst maintaining lateral stability. Greater deflection translates to greater performance for noise control ceilings.IsoGrid Quick-Connect Ceiling Hangers have several other benefits:They are more cost effective than similar products;The simple design makes them quick and easy to install, providing significant labour savings over conventional sound control ceiling hangers;The known deflection rates ensure acoustical performance under design loads;Tested for airborne, impact and frequency performance to BS EN ISO 10140 requirements;Various attachment methods allow for installation on a variety of ceiling structures, including concrete, metal deck or structural framing;A bronze core serves to prevent poor acoustic performance due to over compression or due to accidental short circuiting of the transmission pathway.InstallationThe ceiling was installed by specialist contractor B W Shrimpton Limited. This was the first time that Shrimpton’s had used IsoGrid hangers, but they were well received.Supervisor Kirk Talbot, who has worked closely with the CMS Danskin Acoustics Team on several projects, explained his preference for the hangers is very much about the ease of installation:“We used Hilti pan head HUS fixings into the soffit for fixing them up, and the lads on site had no issues with them at all.“The IsoGrid hangers are definitely robust enough and easy to fix angle or wires to. On that basis and the cheapness compared to other hangers out there, I’d definitely use them again and will recommend that others do too.”Kirk Talbot, BW Shrimpton LtdTechnical Advice on Acoustics in HotelsCMS Danskin Acoustics are specialists in soundproofing materials and acoustic insulation. Our expert technical team can advise on the specification of a wide range of specialist acoustic and vibration control systems – balancing performance, aesthetics and budget. We provide solutions to treat floors, walls and ceilings, as required, delivering a holistic design approach to sound control for the complete gym or sports hall environment.We don’t just design, manufacture and deliver market leading products. We work with the entire supply chain and project teams to ensure a smooth path from conception to completion.
Sponsored
BISF Housing, Motherwell

BISF Housing, Motherwell

K Systems Insulated Facades

BackgroundThe BISF (British Iron and Steel Federation) constructed the Newarthill properties in the 1940’s, utilising steel-framed walls that were initially coated in cement render and vertical steel panels.In previous renovations overseen by the Local Authority, the upper level of the building was clad in PVC weatherboard, while the lowest floor had its exterior re-rendered. The building is characterised by its non-traditional construction style.The houses had extremely poor thermal performance and the flats were difficult and expensive to heat, especially with the rising fuel prices and current cost of living crisis, meaning some residents were in a state of fuel poverty.North Lanarkshire Council required an EWI solution that would achieve the following three key objectives:- Improve the thermal performance of the property portfolio- Specify a system that would achieve a U-value of 0.17 W/m²K and would involve as little technical detailing around the property as possible- Ensure the properties had a modern and aesthetically pleasing look as the current exterior was tired and datedUnderstanding and appreciating K System’s expertise in this sector and innate ability to deliver best-in-class refurbishments, North Lanarkshire Council appointed the partnership of K Systems and Ailsa Building Contractors to tackle the low rise refurbishment project.Our ServiceAs the Newarthill development was already occupied, a key element of this project was to deliver the refurbishment with minimal disruption to current residents and / or neighbouring houses.This is one of K Systems strengths, ensuring jobs are delivered in a timely fashion, without delay, without disruption, and with full disclosure of each phase given to residents throughout the project to build rapport, trust, and confidence.On this particular low rise refurbishment, which had limited access points for all traffic in and out surrounding its immediate vicinity, K Systems had to work closely with the contractor, main contractor, and local authority to ensure they were working in harmony to negate any unnecessary commotion.K Systems’ technical team also carried out regular site visits to make sure the system was installed to the highest standard, in line with specification, and to ensure all involved parties were delivering to time and budget.The refurbishment of the properties is a great example of K Systems’ unparalleled ability to deliver constructional excellence that not only meets but exceeds the expectations of its customers.Technical Project DetailsOn initial scope, the K Systems team identified that a major challenge for this project was going to be the technical detailing between the timber frame sheeted ply at the top storey and precast concrete slab at the bottom. Several U-value calculations were completed by the experienced K Systems team to support the Council’s request of minimal detailing around the property and the target U-value.To meet these requirements, the K Systems P EWI system was specified, which utilises phenolic foam insulation boards. This insulation is lightweight and has a high thermal performance, allowing for thinner sections of insulation to achieve optimal thermal efficiency - perfect for this project, achieving the target U-value of 0.17 W/m²K , up from 0.32 W/m²K.It is a suitable solution for buildings that are restricted in expanding their footprint due to pavements or nearby properties, and can be easily installed on masonry structures, as well as non-traditional structures - an ideal solution for the Newarthill properties.Addressing the request for a modernised aesthetic, a dash render finish was specified. This render is extremely robust, hard-wearing, and low maintenance, ensuring the properties’ refreshed exterior would remain for years to come. The dash render was also complementary to the existing local property portfolio which was something the Council wanted to achieve.This refurb completely transformed cold, weathered, distressed housing in a Scotland suburb into warm, comfortable, aesthetically pleasing homes that met the exact requirements of North Lanarkshire Council and reduced the energy bills for residents due to improved thermal performance.
Sponsored
AluOne - Herbert Road

AluOne - Herbert Road

Balco Balcony Systems Ltd

AluOne is a self-supporting, lightweight and recyclable open balcony system. Designed for structural simplicity and ease of installation, whilst stylishly complimenting the building facade. Manufactured at our state-of-the-art production facility, and constructed using a four column self-supporting lightweight system, AluOne ensures ease of implementation on site. Suitable for new builds, renovations and retro-fitting to existing buildings. We have a suitable solution for every building. Guaranteed durability, practicality and a high quality finish, AluOne is a truly bespoke modular system.Available in a wide-range of RAL colours, AluOne can be customised specifically for each project with a choice of balustrade and floor tile options. AluOne comes with a tiled floor of concrete paving slabs. The plates have been carefully sandblasted to allow the natural stone ballast in the plate to appear. Thanks to our manufacturing method, this plate has an unique colour resistance. The paving slabs are 400 x 400 in size and available in three colour shades. Always designed with drainage management in mind, AluOne has a hidden system in the balcony for optional rainwater drainage. The water flows discreetly under the paving slabs, allowing it to move into the drainage pipe via a gutter in the balcony frame. This is connected to the building's drainage system or to a drainage pipe that ensures the balcony rainwater discharge is properly managed. AluOne is available ins 12 different sizes. You can choose between four different widths and three depths, each in convenient increments of 400mm.
Sponsored
Nile Street - Grad Decking System

Nile Street - Grad Decking System

Alfresco Floors Ltd

Alfresco Floors were commissioned to refurbish the external terrace of a top floor apartment located on Nile Street, London. The brand new GRAD invisible fixings clip system was supplied and installed by Alfresco Floors, their first ever GRAD installation in the UK. The unique clip and groove design at the heart of the GRAD system means that decks can be installed about 30% faster than competing products. The GRAD system can be retrofitted onto existing timber joists, installed from scratch on top of a new timber sub-frame, or mounted onto the bespoke rail system.
Sponsored
CO-OP Live

CO-OP Live

CGL Systems Ltd

A new stunning Musical / arena named Co-Op Live in Manchester. Situated next door to the Etihad Stadium. We adopted a contemporary LED integrated design using our well renowned Hook-on Rainscreen system, with PPC finish using 3mm Aluminium to RAL 9005.
Sponsored
Park Plaza - Riverbank Hotel

Park Plaza - Riverbank Hotel

Licata Building Systems Ltd

With an enviable location on the South Bank of the River Thames, Park Plaza London Riverbank is ideal travellers from near and far to central London. Those travelling for leisure return again and again thanks to the prime central location, heated indoor swimming pool, enticing dining options and elegantly spacious rooms.Licata Building Systems was involved with the development of this project, providing several Licata systems, such as waterproofing and flooring systems. Licata waterproofing systems were used throughout the modern bathrooms and swimming pool facility. Licata resin flooring created a sleek and modern finish throughout public area of the hotel.
Sponsored
Cobalt Business Park

Cobalt Business Park

CLD Physical Security Systems

At 1.5 million sq ft, the Cobalt Business Park is the UK’s largest office park. The development is home to a number of public and private organisations such as the Department for Work and Pensions, North Tyneside Council, Utility Wise, Procter & Gamble, and Accenture.Along with the offices, the park also houses three data centres, designed to store data for companies. These Data Centres cover 10,000 sq M of Data Hall space, making it one of the largest carrier-neutral wholesale co-location campuses in the North.The BriefPhysical security was key for the creation of a Fencing and Gate package to protect over 10,000m2 of data hall space.358 LPS 1175 SR1 Fencing SystemAnti-Climb MeshSawtooth Security ToppingUpgradable System in event of change in security requirementsVarious Physical Access Control Systems
Sponsored
Indigo Heavy Grade PSA Wood Core - Data Centre Central London

Indigo Heavy Grade PSA Wood Core - Data Centre Central London

Access Floors Distribution

AFD supplied our Indigo Raised Access Floor system to a Data Centre in Central London This system is tested to PSA MOB PF/2, classed as "heavy grade" The Indigo HGEB features: 700kg/m3 highly recycled 100% FSC wood core centreTop & Bottom steel sheetsFinished in static dissipative Polyflor Steel GreyThis install features: Pedestals & snap on stringer at 600mm voidIndigo Heavy Duty - Opposed Blade Air Grille Resulting in a high performance, fully accessible raised access floor with a static dissipative finish or air grille suitable to protect equipment from static discharge & aid air cooling
Sponsored
Impressive Basement Extension, Berkshire

Impressive Basement Extension, Berkshire

Newton Waterproofing Systems

An impressive basement extension, housing a swimming pool and sauna, required a robust waterproofing solution at this large country home.Newton Specialist Contractor Stonehouse were brought onto this large residential project to waterproof an underground extension including a swimming pool and sauna. Set in a small village in Berkshire, the impressive countryside home was designed by architects Spratley and Partners.For the new below-ground structure, Stonehouse were required to install a failsafe and maintainable waterproofing system that would completely protect the luxurious basement from unwanted water ingress.Ensuring that the project was fully compliant with BS 8102:2009, Stonehouse recommended a combined waterproofing solution using a Type B reinforced and water-resistant concrete structure designed to BS EN 1992, combined with a full Type C internal cavity drain membrane system.As the most reliable and completely maintainable Type C waterproofing solution, the Newton CDM System was the ideal choice for this structure. Firstly, Newton 508 membrane was securely fixed to the internal walls of the basement using Newton's specialist MultiPlug fixings.Any water that is captured by the membrane is then drained away with Newton Basedrain channels, and pumped out of the property using a Titan-Pro sump chamber fitted with two NP400 pumps and supported by a failsafe battery back-up system.As an extremely experienced waterproofing contractor, Stonehouse were able to confidently recommend, design and install a comprehensive and truly failsafe waterproofing system that will protect the property from unwanted water ingress for many years to come. Stonehouse also provided complete peace of mind by offering a 10-year guarantee on the installation.
Sponsored
JD Gyms

JD Gyms

Wedi Systems (UK) Ltd

JD Gyms are a reputable company within the leisure industry. When they started to experience serious leakage problems across their estate (especially on mezzanine floors), they quickly realised that their existing shower construction does not live up to the standard of their service – and would need a reliable, guaranteed system solution.In order to allow for a straightforward and safe replacement of existing showers without the need to change the existing pipework, a grid platform constructed of 80mm XPS building boards was proposed . The showers then were fitted with XPS linear shower trays featuring dry-fit drain technology, 12.5mm XPS building boards on the walls and surrounding floor areas were sealed by proprietary sealing and decoupling membrane, all ready to tile after 24 hours. Up till now, 18 different sites have been completed and the shower system solution comes with one manufacturer’s guarantee on the whole installation. 
Sponsored
Ormskirk Hospital

Ormskirk Hospital

Forbo Flooring Systems

After nearly 30 years without refurbishment, the Paediatrics department at Ormskirk District General Hospital required a new lease of life to be injected into the building. With hospitals in operation around the clock by patients, visitors and staff, it was vital that the new flooring solution offered a combination of optimal performance benefits, whilst being quick and easy to install to minimise both disruption and downtime. Looking for a time and cost saving solution, Southport and Ormskirk NHS Hospital Trust chose Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for the refurbishment. Easy and quick to install during out of hours, the ‘fast fit’ floor covering delivers outstanding dimensional stability and indentation resistance.
Sponsored
Roman House

Roman House

Forbo Flooring Systems

Forbo Flooring Systems’ impressive digital printing capabilities gave Gilltown the scope to have some real fun with the interior design of new student accommodation in Newcastle, resulting in a scheme like no other – all while providing the performance properties required for a heavily used building.“The flooring played a key role within this project and we were determined to opt for floor coverings that have rarely been seen in this kind of environment before. After working with Forbo on earlier projects, we knew it’s wide range of high-end and quality products, along with its impressive bespoke design capabilities would help us to achieve this.” - James Gillespie, Project manager.
Sponsored
Jubilee Wood School

Jubilee Wood School

Excelsior Panelling Systems Ltd

The Project  A new Primary School built as part of the school’s framework agreement with Milton Keynes.  Two storey portal frame build.Jestico & Whiles Architects The Challenge Produce a system suitable for use in an open space.Open plan arrangement of Cubicles and Solid Surface Vanities located directly off the corridor.Ensure safety of the user and create an anti-bulling, completely visible space. The Solution Excelsior Skyline Cubicle Range, a full height system with overhead panel. This extremely popular range is an ideal choice for school environments meeting the demands of modern education and providing complete privacy and comfort to the user.Full height cubicle systems have increased in popularity over the past few years. Skyline Range enables Schools, Colleges and the like to ensure both safety and anti-bulling objectives are met and Excelsior’s rise and fall hinge paired with the bespoke door design enables lift off access in the event of an emergency.Skyline range is an extremely durable system and comes as standard with a ‘P’ section headrail, ‘U’ channel base rail and over-panel providing maximum stability. Optional bolt through fixings are available and recommended.The successful open plan arrangement of cubicles and solid surface vanities in Orange and Pomme Verte is in keeping with the modern vibrant atmosphere of the school.
Sponsored
Broadway Apartments, Morecambe

Broadway Apartments, Morecambe

K Systems Insulated Facades

BackgroundLocated in a prominent location on the Morecambe seafront, the Broadway Apartments project was large new build steel frame apartment block.A challenging project to be involved with, as M H Stainton Homes wanted to create an iconic building on a corner location. The steel frame was key, combined with curved glazing on the corner elevation of the building. Then a lightweight cladding solution was required for the rest of the façades.K Systems approved installer M & M Façades were contracted to complete the exterior wall insulation and rendering of the 8-storey residential building.Our ServiceWe worked in close partnership with M & M Façades throughout the duration of the project. The K Systems Technical team offered on-site technical and installation support throughout the build process and supported the M & M Façades team at all stages of the project.As the building is over 18 metres, a bespoke specification was produced to ensure compliance with the current building safety regulations.A direct fix system suitable for steel frame structures and all building heights was specified, ensuring the safety of both the building and future residents.Technical Project DetailsAfter numerous design meetings the K Systems Direct Fix M (Mineral Wool) EWI system with a Silicone Render (TC 15) finish was chosen, meeting the requirements of M H Stainton Homes.This system provides high levels of fire resistance and non-combustibility bringing the apartments in line with mandatory Government requirements for buildings over 18 metres tall.We specified the use of multiple thicknesses of insulation boards (50mm, 100mm and 170mm) to allow for the line and level of the steel frame. A U-value of 0.28 W/m²K was achieved, meaning the residents will enjoy thermally efficient homes.For the finish Silicone TC 15, our high-performance thin coat render, was used. With the coastal location, this durable, weather resistant finish offers an eye catching, clean design, creating a modern and crisp aesthetic. Its hydrophobic properties provide a low-maintenance finish.We delivered a safe, thermally efficient, eye-catching design with a long-lasting finish that residents will appreciate for years to come.
Sponsored
Basement Extension

Basement Extension

Delta Membrane Systems Ltd

The project was split into 2 phases. Phase 1, waterproofing the exiting basement and Phase 2, retrofit extension to the existing basement to create a luxurious multiuse living area. Due to the partially retaining nature of the structure, the project required a combination of Type B and C waterproofing systems to ensure a Grade 3 habitable environment.
Sponsored
Park Plaza - Victoria Hotel

Park Plaza - Victoria Hotel

Licata Building Systems Ltd

Park Plaza Victoria Hotel is located in the heart of central London providing premium stays in close proximity to famous attractions such as Buckingham Palace, Big Ben, and the Houses of Parliament. Guests of the Park Plaza Victoria Hotel can enjoy the exclusive facilities available such as the sauna, swimming pools and on-site restaurant. Licata Building Systems are proud to have been a part of this project by providing full Licata waterproofing systems, flooring systems, and interior paints.

Showing 217-252 of 1704

Feedback